CN109779281A - A method of with prestressing force hose clamp reinforced steel concrete structure - Google Patents
A method of with prestressing force hose clamp reinforced steel concrete structure Download PDFInfo
- Publication number
- CN109779281A CN109779281A CN201910097859.1A CN201910097859A CN109779281A CN 109779281 A CN109779281 A CN 109779281A CN 201910097859 A CN201910097859 A CN 201910097859A CN 109779281 A CN109779281 A CN 109779281A
- Authority
- CN
- China
- Prior art keywords
- hose clamp
- prestressing force
- concrete structure
- force hose
- reinforced concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
The present invention relates to a kind of methods with prestressing force hose clamp reinforced steel concrete structure, comprising the following specific steps 1) being equally spaced prestressing force hose clamp outside reinforced concrete structure, are risen with universal hose clamp batch or a word by hose clamp screw rod pre-screwing;2) prestressing force hose clamp is fastened using torque wrench, tightening torque value is set as predetermined value;3) deformation for considering reinforced concrete structure needs to carry out secondary fastening to prestressing force hose clamp there are torque decaying when prestressing force hose clamp is installed;4) black marking pen marking is used after the completion of fastening;5) check whether prestressing force hose clamp has stripped thread to loosen phenomenon, discovery, which has stripped thread to loosen phenomenon, to be replaced.The present invention is used cooperatively the adjustable controllable prestressing force hose clamp reinforcement means of torque wrench, both prestressing force can accurately be applied, the loss of prestress caused by the relaxation of later period steel can be prevented again, effectively improve the overall deformation ability, bearing capacity and the development in confined concrete crack of reinforced concrete structure.
Description
Technical field
The invention belongs to technical field of structural reinforcement more particularly to a kind of prestressing force hose clamp reinforced steel concrete structures
Method.
Background technique
Construction department's statistics shows, existing 7,000,000,000 m in China2In reinforced concrete structure building, there is half at present
Aging period, about 10~1,200,000,000 m have been stepped into above2Reinforced concrete structure building need to carry out strengthening reconstruction and can guarantee to pacify
It entirely uses.In addition, the Urbanization Construction in China is in new zone development and reconstruction of the old city town parallel, and the reinforcing of oriented old house changes
The trend of transition stage is made, so reinforcing great to the research significance of Structures Reinforced Technique.
Traditional reinforcement means is that reinforcement material is pasted onto surface of concrete structure using binder, since binder is deposited
The burn into aging the defects of, consolidation effect can have a greatly reduced quality.There is also one for the prestressed consolidation technology that have developed rapidly in recent years
A little problems, such as initial stage could will accurately apply prestressing force by complicated monitoring process, and the relaxation of later period steel can make pre-
Stress reduces, and the constraint for causing crack to be subject to and member section bearing capacity reduce.There are no convenient and efficient and long-term steady at this stage
Fixed reinforced concrete structure reinforcement means.
Summary of the invention
The purpose of the present invention is obtaining a kind of technology of adjustable controllable hose clamp reinforced steel concrete structure of prestressing force, with
Solve disadvantage existing in the prior art.
It is a kind of to use prestressing force hose clamp reinforced steel concrete knot the purpose of the present invention is what is be achieved through the following technical solutions
The method of structure, comprising the following specific steps
1) it is equally spaced prestressing force hose clamp outside reinforced concrete structure, is risen with universal hose clamp batch or a word by hose clamp
Screw rod pre-screwing;
2) prestressing force hose clamp is fastened using torque wrench, tightening torque value is set as predetermined value;
3) deformation for considering reinforced concrete structure is needed there are torque decaying when prestressing force hose clamp is installed to answering in advance
Power hose clamp carries out secondary fastening;
4) black marking pen marking is used after the completion of fastening;
5) check whether prestressing force hose clamp has stripped thread to loosen phenomenon, discovery, which has stripped thread to loosen phenomenon, to be replaced.
Further, the shape of the prestressing force hose clamp is selected as rectangular or circle according to the shape of reinforced concrete structure
Shape.
The beneficial effects of the present invention are:
(1) prestressing force hose clamp not will increase dead load from heavy and light;
(2) easy to operate, time saving and energy saving, torque is adjustable using the fixed hose clamp of the torque wrench that can set torque value;
(3) hose clamp structure is simple, cheap, obvious compared with steel fibre and prestress steel band economic benefit;
(4) small to original structure disturbance, construction reinforcement can be carried out on not damaging original structure basis;
(5) structural initial pre stress when reinforcing, can delay crack developing and give full play to steel to avoid excessive Stress resort
Band examining tensile behavior.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation
Content disclosed by book is understood other advantages and efficacy of the present invention easily.
A method of with prestressing force hose clamp reinforced steel concrete structure, comprising the following specific steps
1) it is equally spaced prestressing force hose clamp outside reinforced concrete structure, is risen with universal hose clamp batch or a word by hose clamp
Screw rod pre-screwing;
2) prestressing force hose clamp is fastened using torque wrench, tightening torque value is set as predetermined value;
3) deformation for considering reinforced concrete structure is needed there are torque decaying when prestressing force hose clamp is installed to answering in advance
Power hose clamp carries out secondary fastening;
4) black marking pen marking is used after the completion of fastening;
5) check whether prestressing force hose clamp has stripped thread to loosen phenomenon, discovery, which has stripped thread to loosen phenomenon, to be replaced.
Further, the shape of the prestressing force hose clamp is selected as rectangular or circle according to the shape of reinforced concrete structure
Shape.
The present invention by adopting the above technical scheme, with the use of the adjustable controllable prestressing force hose clamp reinforcement means of torque wrench,
Not only it can accurately apply prestressing force, but also the loss of prestress caused by the relaxation of later period steel can be prevented, be answered in advance by outside
Power hose clamp forms radial constraint to armored concrete part, effectively improves overall deformation ability, the carrying of reinforced concrete structure
The development in ability and confined concrete crack.
Above-described embodiment is merely exemplary to illustrate the principle of the present invention and its effect, and is not intended to limit the present invention.It is any ripe
The personage for knowing this technology all without departing from the spirit and scope of the present invention, carries out modifications and changes to above-described embodiment.Cause
This, institute is complete without departing from the spirit and technical ideas disclosed in the present invention by those of ordinary skill in the art such as
At all equivalent modifications or change, should be covered by the claims of the present invention.
Claims (2)
1. a kind of method with prestressing force hose clamp reinforced steel concrete structure, which is characterized in that comprising the following specific steps
1) it is equally spaced prestressing force hose clamp outside reinforced concrete structure, is risen with universal hose clamp batch or a word by hose clamp screw rod
Pre-screwing;
2) prestressing force hose clamp is fastened using torque wrench, tightening torque value is set as predetermined value;
3) consider that the deformation of reinforced concrete structure is needed there are torque decaying when prestressing force hose clamp is installed to prestressing force larynx
Hoop carries out secondary fastening;
4) black marking pen marking is used after the completion of fastening;
5) check whether prestressing force hose clamp has stripped thread to loosen phenomenon, discovery, which has stripped thread to loosen phenomenon, to be replaced.
2. a kind of method with prestressing force hose clamp reinforced steel concrete structure according to claim 1, which is characterized in that
The shape of the prestressing force hose clamp is rectangular or round.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910097859.1A CN109779281A (en) | 2019-01-31 | 2019-01-31 | A method of with prestressing force hose clamp reinforced steel concrete structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910097859.1A CN109779281A (en) | 2019-01-31 | 2019-01-31 | A method of with prestressing force hose clamp reinforced steel concrete structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109779281A true CN109779281A (en) | 2019-05-21 |
Family
ID=66502970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910097859.1A Pending CN109779281A (en) | 2019-01-31 | 2019-01-31 | A method of with prestressing force hose clamp reinforced steel concrete structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109779281A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111157307A (en) * | 2019-12-30 | 2020-05-15 | 扬州大学 | Method for manufacturing self-repairing cement-based material test piece cracks |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201546456U (en) * | 2009-10-27 | 2010-08-11 | 华侨大学 | Novel prestress steel plate sleeve hoop device |
CN105926961A (en) * | 2016-04-27 | 2016-09-07 | 郭猛 | Method for reinforcing rectangular-section concrete columns through prestressed steel plate hoops |
CN208328664U (en) * | 2018-03-28 | 2019-01-04 | 中交一公局第三工程有限公司 | A kind of Prestressed Slab Beams support anchor ear and Prestressed Slab Beams building system |
-
2019
- 2019-01-31 CN CN201910097859.1A patent/CN109779281A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201546456U (en) * | 2009-10-27 | 2010-08-11 | 华侨大学 | Novel prestress steel plate sleeve hoop device |
CN105926961A (en) * | 2016-04-27 | 2016-09-07 | 郭猛 | Method for reinforcing rectangular-section concrete columns through prestressed steel plate hoops |
CN208328664U (en) * | 2018-03-28 | 2019-01-04 | 中交一公局第三工程有限公司 | A kind of Prestressed Slab Beams support anchor ear and Prestressed Slab Beams building system |
Non-Patent Citations (2)
Title |
---|
郭子雄等: ""横向预应力钢套箍加固RC柱研究综述"", 《工程力学》 * |
郭子雄等: ""预应力钢板箍加固RC短柱抗剪承载力试验研究"", 《工程力学》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111157307A (en) * | 2019-12-30 | 2020-05-15 | 扬州大学 | Method for manufacturing self-repairing cement-based material test piece cracks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203320978U (en) | Tensioning and anchoring device for prestressed carbon fiber sheet reinforced long-span concrete structure | |
CN109779281A (en) | A method of with prestressing force hose clamp reinforced steel concrete structure | |
CN110004816B (en) | Corrugated steel web prestress UHPC combined box girder and construction method thereof | |
CN103276674A (en) | Method for reinforcing bridge by external transverse prestressing tendons | |
CN104775629A (en) | Prestress tension method and equipment for self-control fiber cloth | |
CN204676920U (en) | The fiber cloth reinforced structure of a kind of power | |
CN201695706U (en) | Tensioning device of prestress fiber cloth for reinforcing reinforced concrete column | |
CN207920141U (en) | A kind of high ductility concrete-wrapping wire pin ruggedized construction | |
CN203890902U (en) | External prestressed cable vibration reduction device | |
CN205531379U (en) | A can dismantle ground tackle for stretch -draw of prestressing force carbon plate | |
CN110397797A (en) | Prestressing force ultra-high performance concrete pressure pipe | |
CN203308104U (en) | Prestress tension device of fiber cloth | |
CN211172712U (en) | Steel pipe-spliced wood-recycled concrete composite column | |
CN203096731U (en) | Pre-stressed hollow square pile assembly without end plate at one end | |
CN204112601U (en) | The threaded bond type anchorage of new-type FRP rebar | |
CN204059754U (en) | The concrete beam that a kind of FRP grid is reinforced | |
CN204691276U (en) | Autocontrol cloth prestress tensioning equipment | |
CN203347107U (en) | Reinforced concrete pipe lattice column | |
CN103739252A (en) | Concrete and concrete pole using same | |
CN208105668U (en) | A kind of support construction | |
CN209742223U (en) | Local reinforcing apparatus of circular reinforced concrete column | |
CN204475872U (en) | Pre-stressed carbon fiber plate tensioning equipment | |
CN203716519U (en) | Carbon fiber cloth tensioning device for strengthening and treatment of concrete column | |
CN219118842U (en) | Reinforced concrete column reinforcing structure | |
CN205557350U (en) | Solid steel sheet of prestressed anchorage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |