CN209308448U - One kind is novel to choose rack - Google Patents
One kind is novel to choose rack Download PDFInfo
- Publication number
- CN209308448U CN209308448U CN201821164926.4U CN201821164926U CN209308448U CN 209308448 U CN209308448 U CN 209308448U CN 201821164926 U CN201821164926 U CN 201821164926U CN 209308448 U CN209308448 U CN 209308448U
- Authority
- CN
- China
- Prior art keywords
- rack
- wirerope
- buried point
- floor
- choose
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to machinery field, more particularly to a kind of novel choose rack.Comprising more floor structures, the multilayer in more floor structures includes that at least one layer is the floor that rack is chosen in preparation installation, includes at least two layers above the floor for pre-buried point structure layer, the avris of pre-buried point structure layer respectively contains pre-buried point;The pre-buried point of two layers of pre-buried point structure layer is respectively extended with wirerope, and wirerope can be hung on the steel wire rope drawknot point for choosing rack.The utility model has the advantages that compared to needing scaffold constantly to erect the structure come originally, this patent is pulled using wirerope, wirerope initially passes through on a steel wire rope drawknot point, one end of wirerope is located on a pre-buried point, wirerope is then pulled, the mode of pulling is either to directly adopt mechanical pulling using hoist engine;Hoist engine or mechanical energy are placed on higher floor position when pulling, and starting hoist engine can be realized as pulling rapidly, rapidly safety.
Description
Technical field
The utility model relates to machinery field, more particularly to a kind of novel choose rack.
Background technique
It in the construction for choosing the rack prior art, often needs to carry out installation with scaffold, very cumbersome, construction speed
Degree is slow.
" reinforced concrete structure executive information systems derrick crane " is delivered by Liu Peiheng in 1988-11-26
In " Building technology ".
Utility model content
The purpose of utility model: a kind of effect is preferably novel to choose rack in order to provide, and specific purposes are shown in specific implementation portion
The multiple substantial technological effects divided.
In order to reach purpose as above, the utility model adopts the following technical scheme:
One kind is novel to choose rack, which is characterized in that includes more floor structures, the multilayer in more floor structures includes at least
One layer is that the floor for choosing rack is installed in preparation, and floor top is pre-buried point structure layer, pre-buried point structure layer comprising at least two layers
Avris respectively contain pre-buried point;The pre-buried point of two layers of pre-buried point structure layer is respectively extended with wirerope, and wirerope can be hung over
It chooses on the steel wire rope drawknot point of rack.
The further technical solution of the utility model is that the pre-buried point is reinforcing bar.
The further technical solution of the utility model is that the rack of choosing includes to choose net extension, chooses net and stretches out
Part can be welded on the built-in fitting of corresponding floor.
The further technical solution of the utility model is that the pre-buried point and corresponding steel wire rope drawknot point include more
Group.
It using the utility model of technical solution as above, has the advantages that compared with the existing technology: compared to original
Scaffold is needed constantly to erect the structure come, this patent is pulled using wirerope, and wirerope initially passes through a steel wire
In drawknot node of restricting, one end of wirerope is located on a pre-buried point, then pulls wirerope, and the mode of pulling is using hoist engine
Either directly adopt mechanical pulling;Hoist engine or mechanical energy are placed on higher floor position, starting volume when pulling
The machine of raising can be realized as pulling rapidly, rapidly safety.
Detailed description of the invention
In order to further illustrate the present invention, it is further illustrated with reference to the accompanying drawing:
Fig. 1 is utility model structural schematic diagram;
Fig. 2 is that utility model chooses rack overlooking structure diagram;
Wherein: 1. choose rack;2. pre-buried point structure layer;3. pre-buried point;4. steel wire tow line;5. choosing net extension;6. steel
Cord drawknot node.
Specific embodiment
With reference to the accompanying drawings and detailed description, the utility model is furtherd elucidate, it should be understood that following specific embodiment parties
Formula is merely to illustrate the utility model rather than limitation the scope of the utility model.It needs in the description of the present invention,
Illustrate, term " center ", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outside", "top", "bottom" etc. refer to
The orientation or positional relationship shown be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the utility model and
Simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation construction
And operation, therefore should not be understood as limiting the present invention.Furthermore unless specifically defined or limited otherwise, term " peace
Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally
Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary,
It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
The concrete meaning of language in the present invention.
This patent provides a variety of concomitant regimens, in place of different expression, belong to modified scheme based on basic scheme or
It is parallel type scheme.Every kind of scheme has the unique features of oneself.
One kind is novel to choose rack, which is characterized in that includes more floor structures, the multilayer in more floor structures includes at least
One layer is that the floor for choosing rack is installed in preparation, and floor top is pre-buried point structure layer 2, pre-buried point structure layer comprising at least two layers
Avris respectively contain pre-buried point 3;The pre-buried point of two layers of pre-buried point structure layer 2 is respectively extended with wirerope, and wirerope can be hung
On the steel wire rope drawknot point for choosing rack.The technical effect and its realization process for the essence that the technical solution at this place is played are such as
Under: compared to needing scaffold constantly to erect the structure come originally, this patent is pulled using wirerope, and wirerope is first
On a steel wire rope drawknot point, as represented in figure 1, one end of wirerope is located on a pre-buried point, then pulls steel wire
Rope, the mode of pulling are either to directly adopt mechanical pulling using hoist engine;Hoist engine or mechanical energy are put when pulling
It sets in higher floor position, starting hoist engine can be realized as pulling rapidly.Concrete implementation can be as follows: hard protection is chosen
Rack prosthese is set up using 48 steel tube fastener of Φ;Steel pipe uses 6m steel pipe;Rack position is set according to actual field situation, one
As be set to first floor periphery ceiling location;Hard draw node (steel pipe) is preset at structure stress edge simultaneously, buried depth is not less than
300mm, leakage height are not less than 200mm, and brush red antirust paint for warning;The inside slope 5% of rack, gradient is not less than
2 °, not preferably greater than 3 °.It chooses rack and tensioning is carried out not less than 14# wirerope using model;Frame body bottom completely spreads closely-knitted safety net,
Top is laid with bamboo frame plate;6 meters long steel pipe one end is fixed on floor and (shores using wall-connecting piece or steel pipe and adds on top plate
Gu), the other end puts down choose (outer end upwarps) outward, and every 3 meters of settings, which are put down, chooses steel pipe, flat will choose steel pipe and choose position with elongated horizon bar
Connection.Net end setting wirerope is chosen in safety and carries out off-load, is connected to building top at interval of 3 meters of settings, one of wirerope,
Wirerope must be tensioned stress.
The pre-buried point 3 is reinforcing bar.After pulling in place, wirerope is fixed on reinforcing bar, can be welded and fixed.It is similar
Fixed form and structure in the protection scope of this patent.
The rack of choosing includes to choose net extension 5, and the pre-buried of corresponding floor can be welded on by choosing net extension 5
On part.
The pre-buried point and corresponding steel wire rope drawknot point includes multiple groups.The essence that the technical solution at this place is played
Technical effect and its realize process be as follows: the wirerope of multiple groups can pull simultaneously.After pulling in place, rack stretching will be chosen
Part is welded on corresponding pre-buried point.
The steel wire rope drawknot point can be a ring structure, can also be exactly to choose rack itself.Choose rack stretching
Part can be steel pipe.
In a creative way, above each effect is individually present, moreover it is possible to the combination of the above results is completed with a nested structure.
It is clear that the technical effect that the above structure is realized is realized, if the additional technical solution is not taken into account, this patent title is also
It can be a kind of new builing structure.Part details is not shown in the figure.
It should be noted that multiple schemes that this patent provides include the basic scheme of itself, independently of each other, not mutually
It restricts, but it can also be combined with each other in the absence of conflict, reach multiple effects and realize jointly.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of this field
Personnel should be recognized that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this hairs
Bright principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these variations
It is both fallen in claimed range with improving.
Claims (4)
1. one kind is novel to choose rack, which is characterized in that include more floor structures, the multilayer in more floor structures includes at least one
Layer chooses the floor of rack for preparation installation, and floor top is pre-buried point structure layer (2), pre-buried point structure layer comprising at least two layers
Avris respectively contain pre-buried point (3);The pre-buried point of two layers of pre-buried point structure layer (2) is respectively extended with wirerope, wirerope
It can hang on the steel wire rope drawknot point for choosing rack.
2. one kind as described in claim 1 is novel to choose rack, which is characterized in that the pre-buried point (3) is reinforcing bar.
3. one kind as described in claim 1 is novel to choose rack, which is characterized in that the rack of choosing includes to choose net extension
Divide (5), choosing net extension (5) can be welded on the built-in fitting of corresponding floor.
4. one kind as described in claim 1 is novel to choose rack, which is characterized in that the pre-buried point and corresponding wirerope
Drawknot node includes multiple groups.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821164926.4U CN209308448U (en) | 2018-07-23 | 2018-07-23 | One kind is novel to choose rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821164926.4U CN209308448U (en) | 2018-07-23 | 2018-07-23 | One kind is novel to choose rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209308448U true CN209308448U (en) | 2019-08-27 |
Family
ID=67668500
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821164926.4U Active CN209308448U (en) | 2018-07-23 | 2018-07-23 | One kind is novel to choose rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209308448U (en) |
-
2018
- 2018-07-23 CN CN201821164926.4U patent/CN209308448U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013812B (en) | A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method | |
CN201962932U (en) | Building construction segmented overhung outer scaffold | |
CN204199686U (en) | Without outrigger concrete parapet formwork system | |
CN106741070B (en) | A kind of cable channel cover plate transport laying vehicle | |
CN204001779U (en) | A kind of built with ribbed bricks wall construction reinforced bar guiding device | |
CN209308448U (en) | One kind is novel to choose rack | |
CN101693329A (en) | Pairing welding device for oil storage tanks and method thereof | |
CN204126284U (en) | LNG storage tank outer tank vertical prestressing steel strand tension suspension bracket | |
CN204022082U (en) | A kind of cold-rolling ribbed wire roll payingoff mechanism | |
CN201531111U (en) | Movable hanging basket for installing and decorating curtain walls | |
CN102011491B (en) | Tumbling barrel device with vibrating spear | |
CN204357139U (en) | Suspender | |
CN209585580U (en) | Huge column modular is tilted from lifting operation platform | |
CN207129394U (en) | A kind of novel road bridge engineering pipe storage frame | |
CN211312514U (en) | Movable ground anchor device for mounting conical section of steel structure cooling tower | |
CN203669721U (en) | Hanging type inclined ladder | |
CN203229308U (en) | Ultra-long tubular hanger | |
CN205472340U (en) | People's passageway on instrument formula tower crane | |
CN203039301U (en) | A high-fall pipeline device | |
CN204826867U (en) | Building construction protection fence of steel cable structure | |
CN204456891U (en) | Mortar hopper is adopted mortar concrete to be transported to the device of floor | |
CN208518308U (en) | Soft operation platform for lighting roof construction | |
CN207234231U (en) | A kind of buried electricity box of overhead type | |
CN203755153U (en) | Simply supported plate bridge bottom plate maintenance construction moving operation platform | |
CN205013853U (en) | High strength cleans connection structure that lays of heat -preservation type feed pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210326 Address after: No.32 Jinye Road, high tech Zone, Xi'an, Shaanxi 710000 Patentee after: SHAANXI AOIANG TIANYUE INDUSTRIAL Co.,Ltd. Address before: 710023 Room 2238, Building 11, Taiao Square Commercial District, 275 Fenghe Road, Lianhu District, Xi'an City, Shaanxi Province Patentee before: Xiao Zhijia |