CN208518308U - Soft operation platform for daylighting roof construction - Google Patents

Soft operation platform for daylighting roof construction Download PDF

Info

Publication number
CN208518308U
CN208518308U CN201820668387.1U CN201820668387U CN208518308U CN 208518308 U CN208518308 U CN 208518308U CN 201820668387 U CN201820668387 U CN 201820668387U CN 208518308 U CN208518308 U CN 208518308U
Authority
CN
China
Prior art keywords
operation platform
roof construction
lace curtaining
soft operation
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820668387.1U
Other languages
Chinese (zh)
Inventor
侯健
胡帅
孙大奎
张楠
张�浩
张万宏
王冬
夏寅欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201820668387.1U priority Critical patent/CN208518308U/en
Application granted granted Critical
Publication of CN208518308U publication Critical patent/CN208518308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a high altitude operation platform technical field discloses a soft operation platform for daylighting top construction. The tunnel portal comprises a counter beam arranged above the edge of a peripheral structure of a portal, a grid soft support pulled below the portal and a sandwich platform laid above the grid soft support; the embedded hooks are arranged in the inverted beam and are distributed at intervals along the length direction of the inverted beam, and each embedded hook comprises an embedded rod horizontally arranged in the inverted beam, an agnail obliquely arranged on the outer side wall of the embedded rod and a hook ring exposed on the outer side of the inverted beam; the grid soft support comprises a lower layer of net curtain and an upper layer of net curtain positioned above the lower layer of net curtain, and the lower layer of net curtain and the upper layer of net curtain are vertically overlapped to form a net structure; the end of the steel wire rope is connected with a shackle of the embedded hook in a hanging mode; the sandwich platform comprises a bottom layer wood template, battens and a top layer wood template from bottom to top in sequence. The utility model discloses simple structure, the take and tear open of being convenient for fixes in the high sky, and occupation space is little, does not influence the cross construction of each specialty of job site.

Description

Soft operation platform for lighting roof construction
Technical field
The utility model relates to high-altitude operation platform technical fields, more particularly to a kind of soft behaviour for lighting roof construction Make platform.
Background technique
With popularizing for modern architecture, more and more markets, station etc. can all use large span lighting roof steel construction Roofing needs in work progress spanning multilayer to build or set up superelevation frame body to provide construction operation platform.
General operating platform is to use to set up plank sheathing on steel pipe scaffold, or do type steel support and set up wooden model board group Close the rigid operating platform formed.
The first putting up platform form, with the increase of operating platform scaffolding height, the requirement to scaffold basis is more next It is higher, not only increase construction cost, and taking for basic scaffold is torn open and its cumbersome, time-consuming and laborious, construction efficiency is low, heavier It wants, the space below operating platform is occupied by scaffold, and the environment for not only taking separation of copulating moth construction site has higher requirement, And the space occupied drastically influences the crossed construction of each professional process, drastically influences the duration of construction.
Fashioned iron is arranged in the structure around high-rise region to be onstructed, then in fashioned iron bone in second of putting up platform form Plank sheathing is laid on frame, it is higher to the intensity requirement for the surrounding structure set up since fashioned iron self weight is larger, using by biggish Limitation, and the intensity of fashioned iron with the increase for setting up span it is in exponential increase, higher cost;The company of fashioned iron and surrounding structure It connects, generally requires setting built-in fitting, working procedure is cumbersome, and safety coefficient is low.
Utility model content
It is simple that the utility model provides a kind of structure, tears open convenient for taking, and is fixed on high aerial, occupies little space, does not influence to apply The soft operation platform for lighting roof construction of the crossed construction of each profession in work scene.
Technical problems to be solved are: existing scaffold operating platform is at high cost, takes and tears cumbersome, time-consuming and laborious, construction open Low efficiency, the space below operating platform are occupied by scaffold, larger using limiting, and the space occupied is applied to the intersection of each profession Work brings great inconvenience;Type steel skeleton operating platform is higher to the intensity requirement for the surrounding structure set up, using by larger Limitation, at high cost, working procedure is cumbersome, and safety coefficient is low.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The utility model is used for the soft operation platform of lighting roof construction, including being arranged in above the peripheral structure edge of hole Reversed beam draws the soft support of grid being located at below hole, and is laid on the sandwich platform above the soft support of grid;
It is provided with pre-buried hook in the reversed beam, is intervally arranged along reversed beam length direction, the pre-buried hook includes horizontally disposed Pre-buried bar in reversed beam, the hangnail being inclined on pre-buried bar lateral wall and the exposed shackle on the outside of reversed beam, it is described Reversed beam is arranged in towards on the side wall of soft operation platform side in shackle;
The soft support of grid includes lower layer's lace curtaining and the upper layer lace curtaining above lower layer's lace curtaining, by the steel of one group of laid out in parallel Cord composition, upper layer lace curtaining along the setting of the longest length direction in hole, lower layer's lace curtaining is vertical with upper layer lace curtaining overlap formed it is netted Structure, pre-buried hook and wirerope correspond on reversed beam;The shackle of steel wire rope end head and pre-buried hook mounts;
Sandwich platform is followed successively by bottom plank sheathing, flitch and top layer plank sheathing from bottom to top.
The utility model is used for the soft operation platform of lighting roof construction, and further, the reversed beam is concrete structure, water Flat thickness is not less than 200mm, is highly not less than 150mm.
The utility model is used for the soft operation platform of lighting roof construction, and further, the quantity of the hangnail is no less than 4 It is a, it along the circumferentially-spaced distribution of pre-buried bar, and misplaces and arranges along the axial length direction of pre-buried bar, outside hangnail one end and pre-buried bar Sidewall weld is fixed, and the other end is obliquely installed towards soft operation platform direction.
The utility model is used for the soft operation platform of lighting roof construction, further, between the hangnail and pre-buried bar Angle is not less than 30 °.
The utility model is used for the soft operation platform of lighting roof construction, and further, the axial length of the hangnail is not small In 3 times of hangnail diameter, the axial length of hangnail is the 1/(10-13 of pre-buried rod axis length).
The utility model is used for the soft operation platform of lighting roof construction, further, the adjacent wires of the upper layer lace curtaining Spacing between rope is not more than 600mm, and the spacing between the adjacent steel cord of lower layer's lace curtaining is not more than 1200mm.
The utility model is used for the soft operation platform of lighting roof construction, and further, the fixing end of the wirerope is arranged There is connection ring, connection ring and shackle mount;The stretching end of wirerope passes through unroll and to form ring segment after shackle after, then with wirerope Congruent form is fastened at overlapping section by least three U-shaped padlock, between U-shaped button and adjacent U-shaped button far from shackle one end A segmental arc is installed in wirerope overlapping section.
The utility model is used for the soft operation platform of lighting roof construction, and further, the bottom plank sheathing is located at upper layer Above lace curtaining, minimum side length is not less than 900mm, and setting is overlapped between adjacent bottom plank sheathing, and overlapping area is not less than 20%.
The utility model is used for the soft operation platform of lighting roof construction, further, length of the flitch along upper layer lace curtaining Direction, uniform intervals arrangement are spent, the distance between adjacent flitch is not more than 200mm.
The utility model is used for the soft operation platform of lighting roof construction, and further, the both ends and middle part of the flitch are logical It crosses and is fixed by steel nail and bottom plank sheathing;Top layer plank sheathing is fixed on above flitch by steel nail.
Soft operation platform of the utility model for lighting roof construction has the following beneficial effects: compared with prior art
The utility model is erected at high aerial, surrounding and hole periphery to be onstructed for the soft operation platform of lighting roof construction Structure is fixed, and lower section construction space is not take up, and is limited in application process by construction environment smaller, will not influence lower space Other constructions.
The utility model supports the brace foundation as entire soft operation platform using steel wire, not only significantly reduces branch support group The self weight of plinth reduces the load of operating platform, allows to be suitable for the biggish putting up platform of span, the scope of application is wider It is general, and construction cost is greatly reduced, working procedure is simplified, construction efficiency is improved, is suitable for hole of various shapes Construction.
The steel wire support of the utility model uses Dual-layer lace curtaining and vertically overlaps setting, and bearing capacity is strong, stress equalization, Sandwich platform is laid with above operating platform simultaneously, sandwiched flitch between two layers of plank sheathing eliminates flitch and is laid immediately on bilayer The construction procedure for needing root root to bind on lace curtaining, not only reduces construction workload, improves construction efficiency, and greatly improve The stability and fastness of soft operation platform.
The steel wire rope end head of the utility model is mounted with the built-in fitting being arranged in reversed beam, easy to operate, is greatly reduced Working procedure improves construction efficiency;Built-in fitting is the pre-buried hook by special designing, and structure is simple, convenient for production, cost It is low, it is provided with hangnail, increases and grabs resultant force with concrete reversed beam, improve the bearing capacity of pre-buried hook, it is ensured that soft operation is flat The safety of platform.
The soft operation platform for lighting roof construction of the utility model is described further with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the utility model for the soft operation platform of lighting roof construction;
Fig. 2 is the structural schematic diagram of wirerope fixing end and reversed beam junction;
Fig. 3 is the structural schematic diagram of wirerope stretching end and reversed beam junction;
Fig. 4 is the schematic cross-section of soft operation platform.
Appended drawing reference:
1- reversed beam;2- top layer plank sheathing;The soft support of 3- grid;31- lower layer lace curtaining;The upper layer 32- lace curtaining;4- flitch;5- bottom Plank sheathing;The pre-buried hook of 6-;The pre-buried bar of 61-;62- hangnail;63- shackle;7- connection ring;81- ring segment;82- overlaps section;83- arc Shape section;9-U shape button.
Specific embodiment
As shown in Figure 1, the utility model includes being arranged in hole peripheral structure for the soft operation platform of lighting roof construction Reversed beam 1 above edge draws the soft support 3 of the grid being located at below hole, is laid on the sandwich platform of soft 3 top of support of grid.
Reversed beam 1 is concrete structure, and horizontal breadth is not less than 200mm, is highly not less than 150mm, according to practice of construction item Purpose span is adjusted, and should be able to bear the maximum pull of soft operation platform, as shown in Fig. 2, pre-buried hook 6 is provided in reversed beam 1, Pre-buried hook 6 is intervally arranged along 1 length direction of reversed beam, and pre-buried hook 6 includes the pre-buried bar 61 being horizontally set in reversed beam 1, and inclination is set Set hangnail 62 and the exposed shackle 63 in 1 outside of reversed beam on pre-buried 61 lateral wall of bar;Pre-buried bar 61 be nominal diameter not Spiral less than 16mm, the angle between hangnail 62 and pre-buried bar 61 are not less than 30 °, and the quantity of hangnail 62 is no less than 4, Along the circumferentially-spaced distribution of pre-buried bar 61, and along the axial length direction of pre-buried bar 61 misplace arrange, 62 one end of hangnail with it is pre-buried 61 lateral wall of bar is welded and fixed, and the other end is obliquely installed towards soft operation platform direction, and hangnail 62 is diameter not less than 12mm's Round steel, the axial length of hangnail 62 are not less than 3 times of 62 diameter of hangnail, and the axial length of hangnail 62 is pre-buried 61 axial length of bar 1/(10-13);Reversed beam 1 is arranged in towards on the side wall of soft operation platform side in shackle 63, is made into integration with pre-buried bar 61.
As shown in Figure 1, the soft support 3 of grid includes lower layer's lace curtaining 31 and the upper layer lace curtaining 32 above lower layer's lace curtaining 31, Be made of the wirerope of one group of laid out in parallel, upper layer lace curtaining 32 along hole extreme length direction be arranged, lower layer's lace curtaining 31 with it is upper Layer lace curtaining 32 is vertically overlapping to form reticular structure, and the spacing between the adjacent steel cord of upper layer lace curtaining 32 is not more than 600mm, lower layer Spacing between the adjacent steel cord of lace curtaining 31 is not more than 1200mm, and specific spacing is according to practice of construction span and load situation It is adjusted and selects, pre-buried hook 6 is corresponded with wirerope on reversed beam 1;The diameter of wirerope is not less than 18mm, with specific reference to The span and stress condition of the soft support 3 of grid are adjusted;As shown in Fig. 2, the both ends of wirerope, the one end first mounted with shackle 63 For fixing end, fixing end is provided with connection ring 7, directly mounts with shackle 63, fixed with shackle 63 again after other end tensioning in place, For stretching end, as shown in figure 3, stretching end passes through after unrolling after shackle 63 and forming ring segment 81, then stacked with wirerope congruent form Section 82 is closed, is locked by least three U-shaped button 9, the steel wire between U-shaped button 9 and adjacent U-shaped button 9 far from 63 one end of shackle A segmental arc 83 is installed in rope overlapping section 82.
As shown in figure 4, sandwich platform is followed successively by bottom plank sheathing 5, flitch 4 and top layer plank sheathing 2, bottom wood from bottom to top Template 5 is located at the top of upper layer lace curtaining 32, and the minimum side length of bottom plank sheathing 5 is not less than 900mm, between adjacent bottom plank sheathing 5 Overlap joint setting, overlapping area are not less than 20%;Flitch 4 is arranged along length direction, the uniform intervals of upper layer lace curtaining 32, adjacent flitch 4 The distance between be not more than 200mm, the both ends and middle part of flitch 4 pass through fixed by steel nail and bottom plank sheathing 5;Top layer wooden model Plate 2 is fixed on 4 top of flitch by 1 cun of steel nail.
The erection method of the utility model high-altitude soft operation platform, comprising the following steps:
Step 1: pour reversed beam 1 above the edge of the peripheral structure at hole to be onstructed, and it is arranged in reversed beam 1 pre-buried Hook 6;
Step 2: wearing the wirerope of lower layer's lace curtaining 31, first fixing end connection ring 7 is articulated on corresponding pre-buried hook 6, Then using the tensioning equipments such as jack or chain block by the exceptionally straight tension of wirerope, then by stretching end around opposite pre-buried It is fixed after hook 6;
Step 3: wearing the wirerope of upper layer lace curtaining 32, the concrete operations of fastening are identical as step 2;
Step 4: being laid with bottom plank sheathing 5 above upper layer lace curtaining 32, adjacent 5 overlapping area of bottom plank sheathing is not less than 20%;
Step 5: being laid with flitch 4 from edge to centre, and flitch 4 is fixed by steel nail and bottom plank sheathing 5;
Step 6: being laid with top layer plank sheathing 2 from edge to centre, top layer plank sheathing 2 is fixed by screws in flitch 4 On.
Embodiment described above is only that preferred embodiments of the present invention are described, not practical to this Novel range is defined, and under the premise of not departing from the spirit of the design of the utility model, those of ordinary skill in the art are to this The various changes and improvements that the technical solution of utility model is made should all fall into the protection that the utility model claims book determines In range.

Claims (10)

1. the soft operation platform for lighting roof construction, it is characterised in that: including being arranged in above the peripheral structure edge of hole Reversed beam (1) draws the soft support (3) of grid being located at below hole, and is laid on the sandwich platform above the soft support (3) of grid;
Pre-buried hook (6) are provided in the reversed beam (1), length direction is intervally arranged along reversed beam (1), and the pre-buried hook (6) includes The pre-buried bar (61) being horizontally set in reversed beam (1), the hangnail (62) being inclined on pre-buried bar (61) lateral wall and naked The shackle (63) being exposed on the outside of reversed beam (1), the shackle (63) setting is in reversed beam (1) towards the side wall of soft operation platform side On;
The soft support (3) of grid includes lower layer's lace curtaining (31) and the upper layer lace curtaining (32) above lower layer's lace curtaining (31), by one group The wirerope of laid out in parallel forms, and upper layer lace curtaining (32) is along the longest length direction setting in hole, lower layer's lace curtaining (31) and upper layer Lace curtaining (32) is vertically overlapping to form reticular structure, and pre-buried hook (6) and wirerope correspond on reversed beam (1);Steel wire rope end head with The shackle (63) of pre-buried hook (6) mounts;
Sandwich platform is followed successively by bottom plank sheathing (5), flitch (4) and top layer plank sheathing (2) from bottom to top.
2. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the reversed beam (1) is Concrete structure, horizontal breadth are not less than 200mm, are highly not less than 150mm.
3. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the hangnail (62) Quantity is no less than 4, along the circumferentially-spaced distribution of pre-buried bar (61), and misplaces and arranges along the axial length direction of pre-buried bar (61) Cloth, hangnail (62) one end are welded and fixed with pre-buried bar (61) lateral wall, and the other end is obliquely installed towards soft operation platform direction.
4. it is according to claim 3 for lighting roof construction soft operation platform, it is characterised in that: the hangnail (62) with Angle between pre-buried bar (61) is not less than 30 °.
5. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the hangnail (62) Axial length is not less than 3 times of hangnail (62) diameter, and the axial length of hangnail (62) is the 1/ of pre-buried bar (61) axial length (10-13).
6. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the upper layer lace curtaining (32) the spacing between adjacent steel cord is not more than 600mm, and the spacing between the adjacent steel cord of lower layer's lace curtaining (31) is little In 1200mm.
7. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the wirerope is consolidated Fixed end is provided with connection ring (7), and connection ring (7) and shackle (63) mount;The stretching end of wirerope unrolls after passing through shackle (63) Formed ring segment (81) after, then with wirerope congruent form at overlapping section (82), be locked by least three U-shaped button (9), far The U-shaped of off-hook ring (63) one end buckles (9) and adjacent U-shaped is buckled and is installed with a segmental arc (83) in the overlapping section (82) between (9).
8. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the bottom plank sheathing (5) it is located above upper layer lace curtaining (32), minimum side length is not less than 900mm, overlaps setting between adjacent bottom plank sheathing (5), takes Junction product is not less than 20%.
9. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: flitch (4) edge The length direction of upper layer lace curtaining (32), uniform intervals arrangement, the distance between adjacent flitch (4) are not more than 200mm.
10. the soft operation platform according to claim 1 for lighting roof construction, it is characterised in that: the flitch (4) Both ends and middle part pass through fixed by steel nail and bottom plank sheathing (5);Top layer plank sheathing (2) is fixed on flitch (4) by steel nail Top.
CN201820668387.1U 2018-05-07 2018-05-07 Soft operation platform for daylighting roof construction Active CN208518308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820668387.1U CN208518308U (en) 2018-05-07 2018-05-07 Soft operation platform for daylighting roof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820668387.1U CN208518308U (en) 2018-05-07 2018-05-07 Soft operation platform for daylighting roof construction

Publications (1)

Publication Number Publication Date
CN208518308U true CN208518308U (en) 2019-02-19

Family

ID=65342222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820668387.1U Active CN208518308U (en) 2018-05-07 2018-05-07 Soft operation platform for daylighting roof construction

Country Status (1)

Country Link
CN (1) CN208518308U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528849A (en) * 2019-09-05 2019-12-03 北京天润建设有限公司 A kind of aerial operation Platforms Construct Method of Super
CN115075531A (en) * 2021-03-10 2022-09-20 中建装饰海南有限公司 Cloud floating type flexible operation platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528849A (en) * 2019-09-05 2019-12-03 北京天润建设有限公司 A kind of aerial operation Platforms Construct Method of Super
CN115075531A (en) * 2021-03-10 2022-09-20 中建装饰海南有限公司 Cloud floating type flexible operation platform

Similar Documents

Publication Publication Date Title
CN109629810A (en) Closed builder's jack system and construction method
US8789317B2 (en) Method for forming a double-curved structure and double-curved structure formed using the same
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN202324571U (en) Overhanging type double-row scaffold
CN103669845A (en) High-altitude long-span overhung cornice formwork supporting system and constructing method thereof
CN208518308U (en) Soft operation platform for daylighting roof construction
CN102635226B (en) Flexible hanging self-expansion operating platform and construction method
CN205875666U (en) A platform suspends in midair that is used for building eaves oral area position to be under construction
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN211974274U (en) No counter weight hanging flower basket structure for construction
CN202530736U (en) Steel wire rope operating platform for building
CN209780190U (en) Hanging platform for large-span beam string beam daylighting roof construction
CN216640303U (en) Foldable T roof beam hogging moment construction operation is with hanging basket
CN208220165U (en) High-altitude soft operating platform
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN201850711U (en) Rainproof sun shelter
CN209384613U (en) Soft platform for mounting daylighting roof steel structure
CN206753017U (en) A kind of pull-back cable Superimposed fastener
CN208830690U (en) Daylighting top operation platform
CN102359262A (en) Rope net scaffold
CN201649607U (en) Overhung-type outer wall scaffold
CN109278174A (en) A kind of prefabricated beam steam health shed and its construction method
CN107035037A (en) High building top layer curtain wall frame and its installation method
KR101191918B1 (en) Rotating-up building roof structure using keel truss and rotating-up building method using keel truss
CN205857661U (en) Superelevation is tubaeform steel structure exterior finish operation platform and build and use equalizer bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant