Prior art keywords
crushing bin
plate
water
bin
crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822225904.0U
Other languages
Chinese (zh)
Inventor
罗亚南
王曼
温丛格
薛晓燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Science and Technology
Original Assignee
Zhengzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Science and Technology filed Critical Zhengzhou University of Science and Technology
Priority to CN201822225904.0U priority Critical patent/CN209287425U/en
Application granted granted Critical
Publication of CN209287425U publication Critical patent/CN209287425U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model discloses a kind of civil engineering work waste treatment devices of construction waste process field, including support baseboard, support side plate is provided at the top of the support baseboard, material bin is fixedly connected at the top of the support side plate, the bottom of the material bin is provided with crushing bin, the middle part upper and lower side of the crushing bin is provided with communication port, the upper wall of the crushing bin and the two sides inner cavity of lower wall are provided with electric telescopic rod, the inner end of electric telescopic rod described in two groups of two groups of upside and downside is provided with partition, the side wall of inner cavity four of the crushing bin is evenly arranged with crushing bur respectively, level is provided through drive shaft in the middle part of the inner cavity of the crushing bin, the setting of the hydraulic push rod and hydraulic block of lower end, construction waste after the completion of pulverization process can be compressed, both the overall volume of waste material can have been reduced, it is conducive to Waste material can also be compacted closely, prevent waste material dust from splashing, be conducive to the popularization of the utility model by transport.

Description

A kind of civil engineering work waste treatment device
Technical field
The utility model relates to construction waste process field, specially a kind of civil engineering work waste treatment device.
Background technique
Building waste refers to that construction, unit in charge of construction or individual build all kinds of buildings, structures, pipe network etc., spread If or remove, generated dregs, spoir, rejected material, remaining mud and other wastes in reparative processes, with industrialization, urbanization The acceleration of process, construction industry is also fast-developing simultaneously, and the building waste generated together is increasing, if not in time processing and It utilizes, adverse effect will be brought to society, environment and resource
On civil construction building site, it may appear that many waste materials discarded can be to sky if these waste materials are handled not in time Gas pollutes, and pollutes environment, in addition, block objects can exist a large amount of when placing containing block objects such as bricks in waste material Gap, it is unstable when leading to transport, be easy to turn over and fall, the device for handling waste material on building site at present directly smashes big lump waste materials, It is subsequently used for the use such as road pavement, but existing waste treatment device can not cause waste powder chopping fine, smashed waste material body Product is larger, occupies very much place, and be unfavorable for transporting.
Based on this, the utility model devises a kind of civil engineering work waste treatment device, to solve the above problems.
Utility model content
The purpose of this utility model is to provide a kind of civil engineering work waste treatment devices, to solve above-mentioned background skill The existing waste treatment device proposed in art can not cause waste powder chopping fine, and smashed waste material volume is larger, occupy very much Place, and it is unfavorable for the problem of transporting.
To achieve the above object, the utility model provides the following technical solutions: a kind of civil engineering work waste disposal dress It sets, including support baseboard, support side plate is provided at the top of the support baseboard, is fixedly connected at the top of the support side plate Material bin, the bottom of the material bin are provided with crushing bin, and the middle part upper and lower side of the crushing bin is provided with communication port, described The upper wall of crushing bin and the two sides inner cavity of lower wall are provided with electric telescopic rod, electric expansion described in two groups of two groups of upside and downside The inner end of bar is provided with partition, and the side wall of inner cavity four of the crushing bin is evenly arranged with crushing bur, the powder respectively Level is provided through drive shaft in the middle part of the inner cavity in broken storehouse, is provided with drive in the middle part of the lateral wall of the left and right sides support side plate Dynamic motor, the output shaft of the driving motor are fixedly connected by shaft coupling with drive shaft, the surface setting of the drive shaft There is crushing bar, the bottom of the crushing bin is provided with pressure-resisting plate, and cambered way, the resistance to compression are provided in the middle part of the pressure-resisting plate The bottom right of plate is provided with hydraulic push rod, and the left end of the hydraulic push rod is provided with hydraulic block, the left side support side plate Lateral wall lower end is provided with communicating door, is respectively arranged with water storage box in the middle part of the lateral wall of the left and right sides support side plate, described The lateral wall upper end of water storage box is provided with water inlet, and water pump is provided at the top of the water storage box, and the both ends of the water pump connect It is connected with water pipe, the outside water pipe is disposed through water storage roof box, and the inner end of the water pipe is disposed through support side plate, and The inner end of water pipe is connected with crushing bin upper wall.
Preferably, the partition includes the first demarcation plate, the second demarcation plate and docking groove, and the docking groove is set to The inside of two component partitions, and the first demarcation plate is mutually spliced with the second demarcation plate by docking groove, it can be closely by communication port Closure, flies out when waste material being avoided to crush.
Preferably, the outer end side wall for crushing bar is evenly arranged with sword slot, and the sword rooved face material is diamond, can To cope with the construction waste of different hardness, equipment damage is prevented.
Preferably, the upper side wall inner cavity of the crushing bin is provided with water pipeline, the water outlet direction of the water pipeline Bar is crushed, the dust generated when can reduce internal comminution reduces pollution.
Preferably, the end of water pipe described in outer end is provided with suction nozzle, and the suction nozzle is close to water storage box intracavity bottom, Ke Yichong Divide the water inside absorption water tank.
Compared with prior art, the utility model has the beneficial effects that the utility model uses closed type disintegrating mechanism, it will Construction waste is placed in closed crushing bin and is crushed, and construction waste, which splashes, when can both prevent from crushing generates danger, can also To improve the revolving speed of driving motor, the crushing effect of device is improved;Secondly, being provided with water storage box, water pump and a series of sprays of water pipe Water dispenser structure can carry out water spray dust to crushing bin inside, reduce the generation of dust, be conducive to the maintenance of environment;Furthermore lower end Hydraulic push rod and hydraulic block setting, the construction waste after the completion of pulverization process can be compressed, can both be reduced The overall volume of waste material is conducive to transport, waste material can also be compacted closely, prevent waste material dust from splashing, it is practical new to be conducive to this The popularization of type.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment Attached drawing is briefly described, it should be apparent that, the drawings in the following description are merely some embodiments of the present invention, For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings Other attached drawings.
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the portion the utility model A enlarged drawing;
Fig. 3 is the utility model vibrating mechanism structural schematic diagram.
In attached drawing, parts list represented by the reference numerals are as follows:
1- support baseboard, 2- support side plate, 3- material bin, 4- crushing bin, 41-, water pipeline, 5- electric telescopic rod, 6- Partition, the first demarcation plate of 61-, the second demarcation plate of 62-, 63- docking groove, 7- crush bur, 8- drive shaft, 9- driving electricity Machine, 10- crushing bar, 101- sword slot, 11- pressure-resisting plate, 12- cambered way, 13- hydraulic push rod, 14- hydraulic block, 15- communicating door, 16- water storage box, 17- water inlet, 18- water pump, 19- water pipe, 191- suction nozzle.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without creative efforts All other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of civil engineering work waste treatment device, Including support baseboard 1, the top of support baseboard 1 is provided with support side plate 2, and the top of support side plate 2 is fixedly connected with material bin 3, the bottom of material bin 3 is provided with crushing bin 4, and the middle part upper and lower side of crushing bin 4 is provided with communication port, the upper wall of crushing bin 4 Electric telescopic rod 5 is provided with the two sides inner cavity of lower wall, and two groups of upside and the inner end of the two groups of electric telescopic rods 5 in downside are provided with Partition 6, the side wall of inner cavity four of crushing bin 4 is evenly arranged with respectively crushes bur 7, horizontal in the middle part of the inner cavity of crushing bin 4 It is provided through drive shaft 8, is provided with driving motor 9 in the middle part of the lateral wall of left and right sides support side plate 2, driving motor 9 Output shaft is fixedly connected by shaft coupling with drive shaft 8, and the surface of drive shaft 8, which is provided with, crushes bar 10, the bottom of crushing bin 4 It is provided with pressure-resisting plate 11, the middle part of pressure-resisting plate 11 is provided with cambered way 12, and the bottom right of pressure-resisting plate 11 is provided with hydraulic thrust Bar 13, the left end of hydraulic push rod 13 are provided with hydraulic block 14, and the lateral wall lower end of Left-side support side plate 2 is provided with communicating door 15, It is respectively arranged with water storage box 16 in the middle part of the lateral wall of left and right sides support side plate 2, the lateral wall upper end of water storage box 16 is provided with Water inlet 17, the top of water storage box 16 are provided with water pump 18, and the both ends of water pump 18 are communicated with water pipe 19, and outside water pipe 19, which runs through, to be set It is placed in 16 top plate of water storage box, the inner end of water pipe 19 is disposed through support side plate 2, and the inner end of water pipe 19 and 4 upper wall of crushing bin It is connected.
Wherein, partition 6 includes that the first demarcation plate 61, the second demarcation plate 62 and docking groove 63, docking groove 63 are set to The inside of two component partitions, and the first demarcation plate 61 is spliced with the second demarcation plate 62 by 63 phase of docking groove.Crush the outer of bar 10 End side wall is evenly arranged with sword slot 101, and 101 Facing material of sword slot is diamond.The upper side wall inner cavity of crushing bin 4 is provided with water spray The water outlet direction of pipeline 41, water pipeline 41 crushes bar 10.The end of outer end water pipe 19 is provided with suction nozzle 191, and suction nozzle 191 pastes 16 intracavity bottom of nearly water storage box.
One concrete application of the present embodiment are as follows: external power supply is connected by control switch and makes the two groups of electric expansions in upside Bar 5 extends, and two groups of downside electric telescopic rod 5 shortens, so that the first demarcation plate 61 of upside and the second demarcation plate 62 are opened, First demarcation plate 61 of downside and the second demarcation plate 62 are closed, and construction waste are poured into 3 inner cavity of material bin, construction waste falls to powder Broken 4 inner cavity of storehouse, the two groups of electric telescopic rods 5 in elongation upside, the first demarcation plate of upside 61 and the second demarcation plate 62 are closed at this time, this When external power supply is connected by control switch make two groups of driving motors 9 while running, the rotation drive drive shaft 8 of driving motor 9 Rotation crushes construction waste to drive and crush bar 10, meanwhile, two groups of water pumps 18 operate, by 16 inner cavity of water storage box Water absorption is sprayed to 4 inner cavity of crushing bin, carries out depositing dust, completes when crushing, and the first demarcation plate 61 and second for opening downside separates Plate 62, waste material fall to the left side of hydraulic block 14 from cambered way 12, and hydraulic push rod 13 extends at this time, and hydraulic block 14 is turned left promotion Construction waste is squeezed, to be compressed.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one of the utility model In embodiment or example.In the present specification, schematic expression of the above terms be not necessarily referring to identical embodiment or Example.Moreover, particular features, structures, materials, or characteristics described can be in any one or more embodiment or examples In can be combined in any suitable manner.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. a kind of civil engineering work waste treatment device, including support baseboard (1), it is characterised in that: the support baseboard (1) Top be provided with support side plate (2), be fixedly connected with material bin (3), the material bin at the top of the support side plate (2) (3) bottom is provided with crushing bin (4), and the middle part upper and lower side of the crushing bin (4) is provided with communication port, the crushing bin (4) the two sides inner cavity of upper wall and lower wall is provided with electric telescopic rod (5), electric expansion described in two groups of two groups of upside and downside The inner end of bar (5) is provided with partition (6), and it is prominent that the side wall of inner cavity four of the crushing bin (4) is evenly arranged with crushing respectively It pierces (7), level is provided through drive shaft (8) in the middle part of the inner cavity of the crushing bin (4), the left and right sides support side plate (2) Lateral wall in the middle part of be provided with driving motor (9), the output shaft of the driving motor (9) and drive shaft (8) pass through shaft coupling Device is fixedly connected, and the surface of the drive shaft (8), which is provided with, crushes bar (10), and the bottom of the crushing bin (4) is provided with resistance to compression Plate (11) is provided with cambered way (12) in the middle part of the pressure-resisting plate (11), and the bottom right of the pressure-resisting plate (11) is provided with The left end of hydraulic push rod (13), the hydraulic push rod (13) is provided with hydraulic block (14), the outside of the left side support side plate (2) Wall lower end is provided with communicating door (15), is respectively arranged with water storage box in the middle part of the lateral wall of the left and right sides support side plate (2) (16), the lateral wall upper end of the water storage box (16) is provided with water inlet (17), is provided at the top of the water storage box (16) The both ends of water pump (18), the water pump (18) are communicated with water pipe (19), and the outside water pipe (19) is disposed through water storage box (16) inner end of top plate, the water pipe (19) is disposed through support side plate (2), and the inner end of water pipe (19) and crushing bin (4) Upper wall is connected.
2. a kind of civil engineering work waste treatment device according to claim 1, it is characterised in that: the partition It (6) include that the first demarcation plate (61), the second demarcation plate (62) and docking groove (63), the docking groove (63) are set to two set isolations The inside of plate, and the first demarcation plate (61) is mutually spliced with the second demarcation plate (62) by docking groove (63).
3. a kind of civil engineering work waste treatment device according to claim 1, it is characterised in that: the crushing bar (10) outer end side wall is evenly arranged with sword slot (101), and sword slot (101) Facing material is diamond.
4. a kind of civil engineering work waste treatment device according to claim 1, it is characterised in that: the crushing bin (4) upper side wall inner cavity is provided with water pipeline (41), and the water outlet direction of the water pipeline (41) crushes bar (10).
5. a kind of civil engineering work waste treatment device according to claim 1, it is characterised in that: water pipe described in outer end (19) end is provided with suction nozzle (191), and the suction nozzle (191) is close to water storage box (16) intracavity bottom.
CN201822225904.0U 2018-12-28 2018-12-28 A kind of civil engineering work waste treatment device Expired - Fee Related CN209287425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822225904.0U CN209287425U (en) 2018-12-28 2018-12-28 A kind of civil engineering work waste treatment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822225904.0U CN209287425U (en) 2018-12-28 2018-12-28 A kind of civil engineering work waste treatment device

Publications (1)

Publication Number Publication Date
CN209287425U true CN209287425U (en) 2019-08-23

Family

ID=67649048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822225904.0U Expired - Fee Related CN209287425U (en) 2018-12-28 2018-12-28 A kind of civil engineering work waste treatment device

Country Status (1)

Country Link
CN (1) CN209287425U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111330706A (en) * 2020-05-06 2020-06-26 绍兴上虞丙方环保设备有限公司 Garbage crushing and compressing device
CN112642513A (en) * 2020-12-08 2021-04-13 陈晓艳 Construction site garbage truck based on stirring mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111330706A (en) * 2020-05-06 2020-06-26 绍兴上虞丙方环保设备有限公司 Garbage crushing and compressing device
CN112642513A (en) * 2020-12-08 2021-04-13 陈晓艳 Construction site garbage truck based on stirring mechanism

Similar Documents

Publication Publication Date Title
CN209287425U (en) A kind of civil engineering work waste treatment device
CN207154372U (en) A kind of garbage dewatering crushes environment-friendly processing unit
CN211660719U (en) Domestic waste compression dewatering device
CN107130473B (en) A kind of regenerated paper pulp article manufacturing equipment
CN207325561U (en) Breaker and solid waste regenerating unit
CN207385569U (en) A kind of construction site breaker
CN108526199A (en) A kind of recycle device of organic garbage of city
CN210787504U (en) Building engineering construction waste material automatic processing apparatus
CN107983484A (en) A kind of Environment-friendlyhousehold household garbage crusher
CN108745585A (en) A kind of waste and old brick and tile high-efficient treatment device
CN108970697A (en) Produced garbage reclamation processing unit in a kind of construction site work progress
CN206716062U (en) A kind of civil engineering waste recovery processing unit
CN209397137U (en) A kind of building discarded concrete high quality recycled aggregates recyclable device
CN208661250U (en) A kind of building waste crushing reuse means
CN207102839U (en) A kind of special waste treatment equipment of civil construction
CN107985876B (en) Special compression equipment before domestic waste is carried
CN206937616U (en) A kind of mixing device for construction site
CN109331926A (en) A kind of concrete crushing robot facilitating discharging
CN206633270U (en) A kind of plastic processing reducing mechanism
CN202174079U (en) Washing and purifying device for waste partition plate
CN209061308U (en) A kind of building engineering construction waste material environment-friendly processing unit
CN214439479U (en) Building construction rubbish reducing mechanism
CN206444667U (en) A kind of efficient construction waste crusher
CN109046680A (en) A kind of gardens cleaning crushing packing apparatus
CN207042641U (en) A kind of civil engineering work waste treatment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20201228

CF01 Termination of patent right due to non-payment of annual fee