CN209277165U - A kind of detachable lightweight assembled pattern foundation pit supporting structure - Google Patents

A kind of detachable lightweight assembled pattern foundation pit supporting structure Download PDF

Info

Publication number
CN209277165U
CN209277165U CN201821147617.6U CN201821147617U CN209277165U CN 209277165 U CN209277165 U CN 209277165U CN 201821147617 U CN201821147617 U CN 201821147617U CN 209277165 U CN209277165 U CN 209277165U
Authority
CN
China
Prior art keywords
standard component
bolt
block
standard
curved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821147617.6U
Other languages
Chinese (zh)
Inventor
张稳军
张云旆
焦亚磊
李瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201821147617.6U priority Critical patent/CN209277165U/en
Application granted granted Critical
Publication of CN209277165U publication Critical patent/CN209277165U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of detachable lightweight assembled pattern foundation pit supporting structures, complement one another the Prefabricated concrete-filled steel tube standard component used including six kinds, geometric dimension modularization, each standard component constitutes hollow calibrated bolck by the curved screwed joint assembling of the curved screwed joint in front and side, and adjacent calibrated bolck passes through short straight screwed joint and the long straight integral foundation pit supporting construction of screwed joint group again;Every kind of Prefabricated concrete-filled steel tube standard component is made of outsourcing rectangular steel pipe and inner concrete, each prefabricated standard component is connected by screwed joint, marine glue is uniformly smeared between connector, straight bolt is directly anchored at outside steel pipe surface, curved bolt is anchored at hand hole surface, bolt hand hole uses pre-buried cast iron hand hole, pours together with concrete.The pattern foundation pit supporting structure of the utility model, has the advantages that strong light-weight.

Description

A kind of detachable lightweight assembled pattern foundation pit supporting structure
Technical field
The utility model designs Base hole supporting technology field, relates in particular to a kind of detachable lightweight assembled foundation pit branch Shield.
Background technique
Base pit engineering mainly includes excavation, precipitation and supporting, is a comprehensive system engineering.According to JGJ120- 99 " building foundation pit supporting technical regulations ", are divided into one, two, three to base hole sides safety grade, respectively correspond as to supporting knot Structure destroys, sediment failure or excessive deformation are very serious on foundation pit surrounding environment and underground structure influence, general, not serious.As it can be seen that Pattern foundation pit supporting structure is the core and emphasis of base pit engineering, and the quality of supporting construction will directly determine the quality of base pit engineering.
The purpose of pattern foundation pit supporting structure be protect Underground Construction go on smoothly and the safety of foundation pit surrounding environment, can It is divided into temporary supporting and permanent supporting, what common engineering used is mostly temporary supporting, i.e., in the excavation of foundation pit stage to base Take supporting means, after base pit engineering, remove supporting construction in hole.Traditional foundation pit supporting method include slope, campshed, The modes such as soil nail wall, diaphram wall, cement soil wall, anchor pole, with the big rule of urban architecture speeded up the construction with the underground space Mould exploitation, has also appeared some composite supporting constructions using some support technique.
Slope is to release enough side slopes according to certain gradient when excavation is more than certain depth, is suitable for shallow foundation and cheats Engineering.This method has the advantages that safe and reliable, economical rationality, easy for construction, but for site requirements height, it is desirable that place is empty Spacious and ground soil property is relatively good;Campshed supporting is using certain pile-type, the foundation pit supporting construction of queue-type arrangement composition, with regard to material For, including the forms such as artificial digging pile, cast-in-situ bored pile, precast rc slab stake, but in contrast, higher cost, Utilization rate is low and installing and dismounting is cumbersome;Diaphram wall is the deep trouth long and narrow in underground excavation section by section, and steel reinforcement cage is put into slot, Casting concrete again forms reinforced concrete wall section, these wall sections are finally linked to be continuous underground wall together.Connect in underground In the design process of continuous wall, on the one hand, designer keeps the ratio of reinforcement of diaphram wall higher, cause for secure context considers Serious economic waste;On the other hand, owner requires the design economical rationality of deep foundation pit supporting structure, often in design process In cause ignoring for some unfavorable factors, lead to the generation of foundation pit accident.It, in the construction process will be to underground in order to avoid accident The reinforcement stresses of diaphragm wall, strain carry out tracking and monitoring, but this method will expend a large amount of fund.
Utility model content
The technical problem to be solved by the utility model is to, overcome in existing Base hole supporting technology there are it is at high cost, peace The problem of filling difficult, long in time limit, dismounting hardly possible, cannot being recycled, while overcoming prefabricated member overall stiffness and non-deformability The problem of difference, providing one kind can detachable quick assembled type foundation pit supporting construction at the construction field (site).In order to achieve the above objectives, originally Utility model the technical solution adopted is that:
A kind of detachable lightweight assembled pattern foundation pit supporting structure, complement one another the Prefabricated concrete-filled steel tube standard used including six kinds Part, geometric dimension modularization, the lateral standard component A of respectively four identical sizes, lateral standard component B, lateral standard component C, cross To standard component D and longitudinal standard component A of two identical sizes, longitudinal standard component B, each standard component passes through the curved screwed joint in front Hollow calibrated bolck is constituted with the curved screwed joint assembling in side, lateral standard component A is in an intermediate position, connects horizontal and vertical side To other standards part, connect the lateral standard component of other standards block in the horizontal direction by short straight bolt, pass through the straight bolt of length In the lateral standard component of vertical direction connection other standards block, the longitudinal of this standard block is connected in vertical direction by curved bolt and is marked Quasi- part;Lateral standard component C is located at boundary in the vertical direction;Lateral standard component B is located at boundary in the horizontal direction;Laterally Standard component D is located at boundary in the vertical direction, also is located at boundary, lateral standard component B and lateral standard in the horizontal direction Part D is respectively provided with the curved bolt hand hole in side and screw hole, and the entirety of lateral standard component and longitudinal standard component is improved using the curved bolt in side Property;
Position in the entirety foundation pit supporting construction according at calibrated bolck, calibrated bolck are divided into boundary standard block, intermediate mark Quasi- block and angle calibrated bolck, adjacent calibrated bolck pass through short straight screwed joint and the long straight integral pattern foundation pit supporting structure knot of screwed joint group again Structure;Foundation pit supporting construction intermediate standard block is made of lateral standard component A and longitudinal direction standard component A, passes through eight inside this standard block Front is curved to be bolted, and is connect in the horizontal direction by eight short straight bolt with other standards block, passes through eight in vertical direction Long straight bolt is connect with other standards block;Foundation pit supporting construction boundary standard block A is by lateral standard component B, longitudinal direction standard component A and indulges It forms to standard component B, by the curved bolt in eight fronts and two sides are curved is bolted inside this standard block, leads in the horizontal direction It crosses four short straight bolt to connect with other standards block, be connect by eight long straight bolt with other standards block in vertical direction;Base Pit supporting construction boundary standard block B is made of lateral standard component A, transverse direction standard component D and longitudinal direction standard component A, inside this standard block It is bolted, is connect in the horizontal direction by four short straight bolt with other standards block, in vertical direction by the way that eight fronts are curved Logical four long straight bolt is connect with other standards block;
Every kind of Prefabricated concrete-filled steel tube standard component is made of outsourcing rectangular steel pipe and inner concrete, each prefabricated standard component It is connected by screwed joint, uniformly smears marine glue between connector, straight bolt is directly anchored at outside steel pipe surface, curved bolt anchor Gu bolt hand hole uses pre-buried cast iron hand hole on hand hole surface, poured together with concrete.
Compared with the prior art, the beneficial effects of the utility model are embodied in:
1. the utility model site operation operability is good;
2. component quality of connection is reliable;
3. component lightweight is easy to install, disassembly is simple;
4. the effectively save engineering material of Prefabricated concrete-filled steel tube component energy, is greatly reduced prefabricated components weight, while not shadow Stiffness of structural member is rung, compared to the globality and construction quality that traditional foundation pit supporting construction mores easily guarantee structure, guarantees non-deformability, Pattern foundation pit supporting structure cost is reduced, engineering construction works well.
Detailed description of the invention
Fig. 1 is the utility model Fabricated Structure for Support of Excavation transverse direction standard component A three-view diagram;
Fig. 2 is the utility model Fabricated Structure for Support of Excavation transverse direction standard component A schematic diagram;
Fig. 3 is the utility model Fabricated Structure for Support of Excavation transverse direction standard component B schematic diagram;
Fig. 4 is the utility model Fabricated Structure for Support of Excavation transverse direction standard component C schematic diagram;
Fig. 5 is the utility model Fabricated Structure for Support of Excavation longitudinal direction standard component D schematic diagram;
Fig. 6 is the utility model Fabricated Structure for Support of Excavation longitudinal direction standard component A three-view diagram;
Fig. 7 is the utility model Fabricated Structure for Support of Excavation longitudinal direction standard component A schematic diagram;
Fig. 8 is the utility model Fabricated Structure for Support of Excavation longitudinal direction standard component B schematic diagram;
Fig. 9 is the detachable quick assembled type foundation pit supporting construction bolt schematic diagram of the utility model;
Figure 10 is the utility model Fabricated Structure for Support of Excavation intermediate standard block schematic diagram;
Figure 11 is the utility model Fabricated Structure for Support of Excavation boundary standard block A schematic diagram;
Figure 12 is the utility model Fabricated Structure for Support of Excavation boundary standard block B schematic diagram;
Figure 13 is the utility model Fabricated Structure for Support of Excavation angle calibrated bolck schematic diagram;
Figure 14 is that the utility model Fabricated Structure for Support of Excavation installs three-view diagram;
Figure 15 is the utility model Fabricated Structure for Support of Excavation scheme of installation;
In figure:
1- transverse direction standard component A, 2 transverse direction standard component B, 3- transverse direction standard component C, 4- transverse direction standard component D, 5- longitudinal direction standard component A, The short straight bolt hand hole of the longitudinal direction 6- standard component B, 7- rectangular steel pipe, 8- concrete block, 9-, the short straight bolt hole of 10-, the curved spiral shell in the front 11- Bolt hand hole, the curved bolt hole in the front 12-, the straight bolt hole of 13- long, the curved bolt hand hole in the side 14-, the curved bolt hole in the side 15-, 16- are short Straight bolt, the straight bolt of 17- long, the curved bolt of 18-, 19- hexagonal (hexagon)nut A, 20- hexagonal (hexagon)nut B, 21- hex nut A, 22- hexagonal spiral shell Female B, 23- intermediate standard block, the angle 24- boundary standard block A, 25- boundary standard block B, 26- calibrated bolck.
Specific embodiment
The utility model is described in detail in the following with reference to the drawings and specific embodiments.The present embodiment is with the utility model Implemented premised on technical solution, the detailed implementation method and specific operation process are given, but the guarantor of the utility model Shield range is not limited to the following embodiments.
Now in conjunction with above-mentioned each attached drawing example, the utility model is further described.
As shown in FIG. 1 to FIG. 8, for the simplification for realizing transport and installation process, it need to guarantee prefabricated single standard component size It is smaller, while to guarantee pattern foundation pit supporting structure quality, the number of standard component is reduced, need to guarantee that the area coverage of calibrated bolck is larger.Base In this, six kinds of standard component designs are proposed, wherein lateral four kinds of standard component, two kinds of longitudinal standard component, lateral standard component size are equal For 1000mm × 200mm × 150mm, longitudinal standard component size is 700mm × 200mm × 200mm, then calibrated bolck can actually cover Capping product is that 1000mm × 1000mm greatly reduces dead load while guaranteeing supporting quality.The mark that present case proposes Quasi- piece design, but it is not limited solely to above-mentioned size, it can be according to Practical Project and construction site actual conditions, in conjunction with lifting machine Etc. the standard chip size for determining to be suitble to projects.
As shown in Figs. 1-2, lateral standard component A (1) is made of outsourcing rectangular steel pipe 7 and internal fill concrete 8, and steel pipe is horizontal Section is the rectangle of 200mm × 150mm, to improve the phenomenon that edge stress is concentrated, setting half at the angle of rectangular section four Diameter is the round lead angle of 10mm, and rectangular steel pipe is with a thickness of 8mm.Concrete section is the rectangle of 184mm × 134mm, is equally being cut The lead angle that radius is 10mm is set at the angle of four, face.Lateral standard component A is in an intermediate position in whole foundation pit supporting construction, needs Connect the other standards part in horizontal and vertical direction.In design, other marks are connected by short straight bolt 16 in the horizontal direction The lateral standard component of quasi- block is connected the lateral standard component of other standards block in vertical direction by the straight bolt 17 of length, passes through curved spiral shell Bolt 18 connects longitudinal standard component of this standard block in vertical direction.Therefore, it is necessary to need pre- before prefabricated construction concreting Cast iron hand hole and bolt hole pipeline are buried, it is straight to form short straight bolt hand hole 9, screw hole 10, curved bolt hand hole 11, screw hole 12, and length Bolt screw hole 13.
As shown in figure 3, transverse direction standard component B (2) is consistent with lateral standard component A on composition and size, but in whole base Position and the latter's different from pit supporting construction, lateral standard component B is located at boundary in the horizontal direction, therefore does not need Short straight bolt 16 is all set on both sides and connects horizontal direction standard component.In view of boundary is directly contacted with foundation pit side-wall, stress Situation is more complicated, therefore the curved bolt hand hole 14 in side and screw hole 15 is arranged, using the curved bolt in side improve lateral standard component with The globality of longitudinal standard component connection;As shown in figure 4, transverse direction standard component C (3) composition and size on lateral standard component A Unanimously, but the position in whole foundation pit supporting construction and the latter's different from, lateral standard component C are located at side in the vertical direction At boundary, therefore do not need that the long straight connection of bolt 17 vertical direction standard component is arranged at the top of standard component;As shown in figure 5, laterally marking Quasi- part D (4) is consistent with lateral standard component A on composition and size, but position and the latter in whole foundation pit supporting construction Different from, lateral standard component D are located at boundary in the vertical direction, also are located at boundary in the horizontal direction, therefore be not required to Long straight bolt 17 is set at the top of standard component and connects vertical direction standard component, does not also need that short straight bolt 16 is all arranged on both sides Horizontal direction standard component is connected, worry is directly contacted with foundation pit side-wall to boundary, and force-bearing situation is more complicated, therefore side is arranged Curved bolt hand hole and screw hole improve the globality of lateral standard component and longitudinal standard component using the curved bolt in side.
As shown in fig. 6-7, longitudinal standard component A (5) is in an intermediate position in whole foundation pit supporting construction, needs to connect water It is longitudinal to connect other standards block by the straight bolt 17 of length in design in the horizontal direction for the other standards part of gentle vertical direction Standard component connects the lateral standard component of this standard block by curved bolt 18 in vertical direction.Therefore, it is necessary in prefabricated construction coagulation Before soil pours, pre-buried cast iron hand hole and bolt hole pipeline are needed, forms curved bolt hand hole 11, screw hole 12, and long straight bolt spiral shell Hole 13.As shown in figure 8, longitudinal direction standard component B (6) is in boundary position in whole foundation pit supporting construction, it is only necessary to which connection is up and down The other standards part in direction connects other standards block longitudinal direction standard component by the straight bolt 17 of length in design in the horizontal direction, leads to Cross the lateral standard component that curved bolt 18 connects this standard block in vertical direction.Therefore, it is necessary to before prefabricated construction concreting, Pre-buried cast iron hand hole and bolt hole pipeline are needed, curved bolt hand hole 11, screw hole 12, and long straight bolt screw hole 13 are formed.
As shown in figure 9, utility model device provides 3 kinds of bolt designs, respectively short straight bolt 16, long straight bolt 17, curved bolt 18.Hexagonal is arranged for connecting lateral standard component, dimensions length 170mm in the horizontal direction in short straight bolt 16 Nut A (19) and hex nut A (21), is highly 20mm, diameter of bolt 20mm;Long straight bolt 17 for connecting in the horizontal direction Longitudinal standard component is connect, connects lateral standard component in vertical direction, dimensions length 500mm is arranged hexagonal (hexagon)nut B (20) and six Angle nut B (22) is highly 30mm, diameter of bolt 20mm;Curved bolt 18 is used to connect lateral standard component and longitudinal standard component, Its Axis arc length is 203.63mm, and central angle is 80 °.
As shown in Figure 10, foundation pit supporting construction intermediate standard block 23 is made of lateral standard component A and longitudinal direction standard component A, this It is bolted inside calibrated bolck by the way that eight fronts are curved, is connect in the horizontal direction by eight short straight bolt with other standards block, It is connect by eight long straight bolt with other standards block in vertical direction;As shown in figure 11, foundation pit supporting construction boundary standard block A (24) it is made of lateral standard component B, longitudinal direction standard component A and longitudinal direction standard component B, passes through eight curved bolts in front inside this standard block With two sides are curved is bolted, connect by four short straight bolt with other standards block, led in vertical direction in the horizontal direction Eight long straight bolt is crossed to connect with other standards block;As shown in figure 12, foundation pit supporting construction boundary standard block B (25) is by laterally marking Quasi- part A, transverse direction standard component D and longitudinal direction standard component A composition, this standard block inside is bolted by the way that eight fronts are curved, in level Direction is connect by four short straight bolt with other standards block, leads to four long straight bolt in vertical direction and other standards block connects It connects;As shown in figure 13, foundation pit supporting construction angle calibrated bolck (26) by lateral standard component A, lateral standard component C, longitudinal direction standard component A and Longitudinal standard component B composition, by the curved bolt in eight fronts and two sides are curved is bolted inside this standard block, in the horizontal direction It is connect by four short straight bolt with other standards block, leads to four long straight bolt in vertical direction and connect with other standards block.
As shown in figs. 14-15, this foundation pit supporting construction is made of four kinds of calibrated bolcks, six kinds of standard components, intermediate standard block 23 Positioned at the middle part of entire supporting construction, the other standards block of four direction is connected;Boundary standard block A (24) is located at entire supporting knot The horizontal direction boundary of structure, connects the other standards block in three directions, directly contacts with foundation pit side-wall;Boundary standard block B (25) it is located at the top of entire supporting construction, connects the calibrated bolck in three directions;Angle calibrated bolck 26 is located at entire supporting construction four At angle, four pieces are shared, connects the calibrated bolck of both direction.
In installation process, first carry out built-in groove excavation, according to foundation depth calculate excavate groove depth, then first into The installation of the row integer support structure bottom, according to, to both sides, the sequence for having bottom to top layer is installed, installed by centre Overall structure is then subjected to backfilling of earthwork by crane lifting to built-in groove after.
When the detachable foundation pit assembled supporting construction of the present embodiment is removed, it then follows first remove one layer of standard film knot Structure backfills one layer of soil afterwards, is from bottom to top removed and backfilled, and can guarantee structure and soil stabilization in this way, and then guarantee construction The safety of process.The utility model creation is not limited to above embodiment, and those skilled in the art are not disobeying Equivalent deformation or replacement can be also made under the premise of back the spirit of the present invention, these equivalent deformations or replacement are all contained in this Apply in claim limited range.

Claims (1)

1. a kind of detachable lightweight assembled pattern foundation pit supporting structure, complement one another the Prefabricated concrete-filled steel tube standard used including six kinds Part, geometric dimension modularization, the lateral standard component A of respectively four identical sizes, lateral standard component B, lateral standard component C, cross To standard component D and longitudinal standard component A of two identical sizes, longitudinal standard component B, each standard component passes through the curved screwed joint in front Hollow calibrated bolck is constituted with the curved screwed joint assembling in side, lateral standard component A is in an intermediate position, connects horizontal and vertical side To other standards part, connect the lateral standard component of other standards block in the horizontal direction by short straight bolt, pass through the straight bolt of length In the lateral standard component of vertical direction connection other standards block, the longitudinal of this standard block is connected in vertical direction by curved bolt and is marked Quasi- part;Lateral standard component C is located at boundary in the vertical direction;Lateral standard component B is located at boundary in the horizontal direction;Laterally Standard component D is located at boundary in the vertical direction, also is located at boundary, lateral standard component B and lateral standard in the horizontal direction Part D is respectively provided with the curved bolt hand hole in side and screw hole, and the entirety of lateral standard component and longitudinal standard component is improved using the curved bolt in side Property;
Position in the entirety foundation pit supporting construction according at calibrated bolck, calibrated bolck are divided into boundary standard block, intermediate standard block With angle calibrated bolck, adjacent calibrated bolck passes through short straight screwed joint and the long straight integral foundation pit supporting construction of screwed joint group again; Foundation pit supporting construction intermediate standard block is made of lateral standard component A and longitudinal direction standard component A, passes through eight fronts inside this standard block It is curved to be bolted, it is connect, is passed through in vertical direction eight long straight with other standards block by eight short straight bolt in the horizontal direction Bolt is connect with other standards block;Foundation pit supporting construction boundary standard block A is by lateral standard component B, longitudinal direction standard component A and longitudinal mark Quasi- part B composition passes through four by the curved bolt in eight fronts and two sides are curved is bolted inside this standard block in the horizontal direction A short straight bolt is connect with other standards block, is connect by eight long straight bolt with other standards block in vertical direction;Foundation pit branch Protection structure boundary standard block B is made of lateral standard component A, transverse direction standard component D and longitudinal direction standard component A, is passed through inside this standard block Eight fronts are curved to be bolted, and is connect in the horizontal direction by four short straight bolt with other standards block, is led to four in vertical direction A long straight bolt is connect with other standards block;
Every kind of Prefabricated concrete-filled steel tube standard component is made of outsourcing rectangular steel pipe and inner concrete, and each prefabricated standard component is logical Screwed joint connection is crossed, uniformly smears marine glue between connector, straight bolt is directly anchored at outside steel pipe surface, and curved bolt is anchored at Hand hole surface, bolt hand hole use pre-buried cast iron hand hole, pour together with concrete.
CN201821147617.6U 2018-07-19 2018-07-19 A kind of detachable lightweight assembled pattern foundation pit supporting structure Active CN209277165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821147617.6U CN209277165U (en) 2018-07-19 2018-07-19 A kind of detachable lightweight assembled pattern foundation pit supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821147617.6U CN209277165U (en) 2018-07-19 2018-07-19 A kind of detachable lightweight assembled pattern foundation pit supporting structure

Publications (1)

Publication Number Publication Date
CN209277165U true CN209277165U (en) 2019-08-20

Family

ID=67597957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821147617.6U Active CN209277165U (en) 2018-07-19 2018-07-19 A kind of detachable lightweight assembled pattern foundation pit supporting structure

Country Status (1)

Country Link
CN (1) CN209277165U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842786A (en) * 2018-07-19 2018-11-20 天津大学 A kind of detachable lightweight assembled pattern foundation pit supporting structure
WO2021196657A1 (en) * 2020-04-03 2021-10-07 山东大学 Novel fabricated anchorage structure serving as both dewatering well and support, and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108842786A (en) * 2018-07-19 2018-11-20 天津大学 A kind of detachable lightweight assembled pattern foundation pit supporting structure
WO2021196657A1 (en) * 2020-04-03 2021-10-07 山东大学 Novel fabricated anchorage structure serving as both dewatering well and support, and construction method

Similar Documents

Publication Publication Date Title
CN204919588U (en) A board -like assembly of cavity round platform basis for frozen soil area transmission line iron tower
US11920313B2 (en) Aqueduct leakage repairing method
CN105714831A (en) Abnormal-shape double-row pile for supporting foundation pit side wall and construction method of abnormal-shape double-row pile
CN209277165U (en) A kind of detachable lightweight assembled pattern foundation pit supporting structure
CN111779025A (en) In-situ protection structure crossing foundation pit municipal pipe network box culvert and construction method
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN109184740A (en) Assembled tube coupling and preparation method thereof
CN209652936U (en) A kind of artificial push pipe inspection shaft steel plate box pattern foundation pit supporting structure
CN106978814A (en) A kind of Fabricated Structure for Support of Excavation
CN110117959B (en) Construction method for foundation pit support near river
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN208009473U (en) The integrated concrete pipe gallery in braced wall corridor
CN110939139A (en) Pile slab wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof
CN104088288B (en) The preparation method of container caisson and application thereof
CN203701145U (en) Underground pipe network inspection well concrete assembly
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN108842786A (en) A kind of detachable lightweight assembled pattern foundation pit supporting structure
CN2921109Y (en) Mast type machinery equipment combined foundation
CN216108621U (en) Immersed tube structure suitable for high water pressure condition
CN109972657A (en) Overall assembled steel reinforced concrete pipe gallery is contained in stake
CN205421276U (en) Strut heterotypic double row pile of foundation ditch lateral wall
CN108005119A (en) The integrated concrete pipe gallery in braced wall corridor and its installation method
CN211547738U (en) Be used for subway station light weight assembled excavation supporting system that excels in
CN110106930B (en) Iron tower foundation reinforcement protection method
CN112177016A (en) Composite steel pipe pile foundation pit supporting structure and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant