CN109184740A - Assembled tube coupling and preparation method thereof - Google Patents
Assembled tube coupling and preparation method thereof Download PDFInfo
- Publication number
- CN109184740A CN109184740A CN201811223842.8A CN201811223842A CN109184740A CN 109184740 A CN109184740 A CN 109184740A CN 201811223842 A CN201811223842 A CN 201811223842A CN 109184740 A CN109184740 A CN 109184740A
- Authority
- CN
- China
- Prior art keywords
- jurisdiction
- section
- steel plate
- tube coupling
- junction steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000008878 coupling Effects 0.000 title claims abstract description 74
- 238000010168 coupling process Methods 0.000 title claims abstract description 74
- 238000002360 preparation method Methods 0.000 title abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 179
- 239000010959 steel Substances 0.000 claims abstract description 179
- 230000002787 reinforcement Effects 0.000 claims abstract description 81
- 238000005859 coupling reaction Methods 0.000 claims abstract description 70
- 238000004519 manufacturing process Methods 0.000 claims abstract description 23
- 238000007789 sealing Methods 0.000 claims description 11
- 239000002689 soil Substances 0.000 claims description 10
- 238000005266 casting Methods 0.000 claims description 9
- 230000007704 transition Effects 0.000 claims description 6
- 238000012423 maintenance Methods 0.000 claims description 4
- 230000015271 coagulation Effects 0.000 claims description 3
- 238000005345 coagulation Methods 0.000 claims description 3
- 239000006260 foam Substances 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 3
- 238000006424 Flood reaction Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 28
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 238000011031 large-scale manufacturing process Methods 0.000 abstract 1
- 230000032258 transport Effects 0.000 description 11
- 238000000034 method Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009417 prefabrication Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012634 fragment Substances 0.000 description 1
- 230000001771 impaired effect Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
- E21D11/083—Methods or devices for joining adjacent concrete segments
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/385—Sealing means positioned between adjacent lining members
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/14—Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
Abstract
The invention discloses a kind of assembled tube coupling and preparation method thereof, the technical issues of tube coupling for solving jacking construction in the prior art is not convenient for transportation, inconvenient production.The assembled tube coupling includes upper section of jurisdiction and lower section of jurisdiction, upper section of jurisdiction and lower section of jurisdiction are poured by concrete and steel reinforcement cage, connection section in upper section of jurisdiction is embedded with upper junction steel plate, connection section in lower section of jurisdiction is embedded with lower junction steel plate, upper junction steel plate, lower junction steel plate are connected and fixed with the steel reinforcement cage in corresponding section of jurisdiction, and correspondence offers multiple bolts hole on upper junction steel plate and lower junction steel plate.By making the tube coupling piecemeal of jacking construction, it is readily transported, and prefabricated using armored concrete, convenient for large-scale production production, reduces cost;Upper section of jurisdiction is connected with upper junction steel plate by lower junction steel plate with lower section of jurisdiction and is combined into tube coupling, and tube coupling overall structure is firm, and in jacking construction, tube coupling can bear sufficiently large thrust without the fissure of displacement completely.
Description
Technical field
The present invention relates to jacking construction tube coupling technical fields, and in particular to a kind of assembled tube coupling and preparation method thereof.
Background technique
Jacking construction is a kind of non-excavating construction method, and jacking construction is mainly used for subway entrance pedestrian passage and street
The construction of underground pedestrian passageway, and with the development of pipe jacking tunnel construction technology, jacking construction is also more and more used for tunnel
Engineering construction, construction by pipeline jacking method process are as follows: the top power generated in working pit by means of jacking device overcomes pipeline and surrounding soil
Tube coupling is headed into soil by the gradient of design, and the earthwork is transported by the frictional force of earth, and a tube coupling completion heads into after soil layer,
Lower second tube coupling continues jacking again, so successively heads into multiple tube couplings in soil.
There are mainly two types of production methods for tube coupling used in jacking construction, another one is produced on-site on construction ground
Kind is strange land production, then transports tube coupling finished product to construction site.For the mode of produced on-site, construction site is needed to have foot
The space of tube coupling is enough stored, and many tunnels build place and do not have enough spaces for making, storing tube coupling, therefore general use
The mode of strange land production makes tube coupling.
Produced if it is strange land, tube coupling is transported by grown place it is more difficult to construction site, in particular with push pipe tunnel
The cross dimensions of road tube coupling is increasing, and thickness is increasing, and weight is increasing, lifting appliance etc. is required it is higher and higher,
Simultaneously because tube coupling enormous size, produced on-site transport is relatively easy, if strange land produces, huge tube coupling transport needs
Road occupying, transport difficult.
In engineering, the tube coupling of common shield tunnel is formed by prefabricated pipe sheet assembling, after endless tube section score block processing
Assembling, is readily transported in this way, but since the section of jurisdiction stress condition of rectangular configuration is more complicated than round, how piecemeal and to divide
How to be connected after block, how waterproof is an extremely important problem to connector, and the tube coupling in jacking construction be subjected to it is huge
Thrust, during bearing huge thrust, how to keep the stabilization of tube coupling is also problem in need of consideration.
The Chinese patent of Publication No. CN108396777A describes a kind of big cross section for meeting segmentation prefabricating on-site consolidation
Tube coupling, including steel pipe joint, weld seam, the first piecemeal, the second piecemeal and bolt;Steel pipe joint is welded by the first piecemeal, the second piecemeal assembly
It connecing, both the first piecemeal, second piecemeal size and shape are identical and welding groove is reserved inside and outside Mosaic face,
First piecemeal, the second piecemeal Mosaic face end plate on reserve several bolts hole respectively, be located by connecting after splicing using bolt, first
Piecemeal, the second piecemeal assembly circlewise steel pipe joint.Tube coupling in the patent document is made of steel, then by different piecemeals
Part is welded, and the operations such as Mold Making, molten steel casting, workload also higher to later period welding requirements are related in manufacturing process
Greatly, at high cost, casting manufacturing speed slowly, low efficiency.
For these reasons, it is necessary to one kind be provided and be readily transported, convenient for structurally stable assembled pipe after production, assembly
Section.
Summary of the invention
The purpose of the present invention is to provide a kind of assembled tube coupling, the tube coupling for solving jacking construction in the prior art is not square
Just it transports, be inconvenient to the technical issues of making.
Second object of the present invention is to provide the production method of above-mentioned assembled tube coupling.
In order to solve the above technical problems, the technical scheme adopted by the invention is that:
Design a kind of assembled tube coupling, including upper section of jurisdiction and lower section of jurisdiction, which is characterized in that the upper section of jurisdiction and lower section of jurisdiction are by mixed
Solidifying soil and steel reinforcement cage pour, and the connection section in the upper section of jurisdiction is embedded with upper junction steel plate, the company in the lower section of jurisdiction
It connects section and is embedded with lower junction steel plate, the upper junction steel plate is connected and fixed with the steel reinforcement cage in the upper section of jurisdiction, institute
It states lower junction steel plate to be connected and fixed with the steel reinforcement cage in the lower section of jurisdiction, on the upper junction steel plate and lower junction steel plate
Correspondence offers multiple bolts hole, so that the upper section of jurisdiction and lower section of jurisdiction are bolted and are assembled into tube coupling.
Assembled tube coupling of the present invention can be split up into upper section of jurisdiction and lower section of jurisdiction after production site production, by by tube coupling fragment
Transport, reduce production site to construction site transport difficulty, and production site can the bigger tube coupling of prefabrication size.Upper
The section part that section of jurisdiction is connected with lower section of jurisdiction is wholely set upper junction steel plate and lower junction steel plate respectively, by upper section of jurisdiction and lower section of jurisdiction
It transports to after construction site, upper section of jurisdiction and lower section of jurisdiction are aligned in section part, upper junction steel plate and lower junction steel plate are passed through multiple
It is bolted, in jacking construction, tube coupling can bear sufficiently large thrust without the fissure of displacement completely.
Preferably, the upper junction steel plate and lower junction steel plate are connected in corresponding section of jurisdiction by multiple vertical steel rib
Steel reinforcement cage on.By being integrally fixed with steel reinforcement cage, junction steel plate, lower junction steel plate are enhanced in conjunction with corresponding section of jurisdiction
The tube coupling formed after intensity, upper section of jurisdiction and the combination of lower section of jurisdiction can become a firm entirety.
Preferably, the upper section of jurisdiction and lower section of jurisdiction are U-shaped, and the corner part inner wall of the upper section of jurisdiction is plane transition.
Since the corner part of section of jurisdiction is stress most weak spot, by the corner part inner wall of upper section of jurisdiction be set as plane transition be conducive to increase turn
The bearing capacity in corner.
Preferably, the corner part of the lower section of jurisdiction is equipped with interior right angle protrusion.Corner part setting right angle protrusion in lower section of jurisdiction
Be conducive to increase the bearing capacity of corner part, and conveniently make ditch in tube coupling.
Preferably, it is equipped with sealing bar groove in the end face of the lower section of jurisdiction and upper section of jurisdiction, and in the lower section of jurisdiction and upper tube
The outside wall surface end of piece also is provided with sealing bar groove.
Preferably, the upper section of jurisdiction and lower section of jurisdiction are equipped with multiple holes for hoist through tube wall, the hole for hoist include with
Tube wall pours steel pipe and spiral reinforcement together, and the spiral reinforcement is set in outside the steel pipe.The hole for hoist of setting is convenient
The transport of the lifting of section of jurisdiction, either later period is still spliced, and hole for hoist can work, and spiral reinforcement is integrally set with steel reinforcement cage
It sets, steel pipe and spiral reinforcement are conducive to section of jurisdiction entirety stress in lifting, prevent section of jurisdiction local pressure huge and impaired.
Assembled tube coupling of the present invention is composed of the section of jurisdiction of piecemeal, in the prefabricated rear convenient transportation of production site to construction field
Upper section of jurisdiction is connected with upper junction steel plate with lower section of jurisdiction by lower junction steel plate and is combined into tube coupling by ground, and tube coupling overall structure is firm,
In jacking construction, tube coupling can bear sufficiently large thrust without the fissure of displacement completely.
Technical solution used by the production method of above-mentioned assembled tube coupling is:
A kind of production method of assembled tube coupling, comprising the following steps:
(1) section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage in binding, described upper section of jurisdiction steel reinforcement cage or so lower edge are respectively fixed with
Lower junction steel plate is fixed in junction steel plate, the left and right upper edge of the lower section of jurisdiction steel reinforcement cage respectively;
(2) the upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage enter mould, casting concrete, demoulding maintenance.
The production method of assembled tube coupling of the present invention, during banding steel cage, by upper junction steel plate, lower junction steel plate
Together with steel reinforcement cage binding and fixing, be conducive to increase upper junction steel plate, lower junction steel plate strong in conjunction with the section of jurisdiction after pouring
Degree.
Preferably, the step (2) specifically includes:
(2.1) the upper junction steel plate and lower junction steel plate are bolted, make the upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction
Steel reinforcement cage docking is integral;
(2.2) the upper section of jurisdiction steel reinforcement cage to link together and lower section of jurisdiction steel reinforcement cage are integrally entered into mould;
(2.3) bolt location is connected with lower junction steel plate in the upper junction steel plate and places foam protection connection bolt not by coagulation
Soil floods;
(2.4) casting concrete.
Before casting concrete, by upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage docking it is integral enter mould after pour again it is mixed
Solidifying soil avoids the error during independent prefabricated pipe section and the bolt hole on junction steel plate and lower junction steel plate is caused to be difficult to
All alignments, improve the Forming Quality of section of jurisdiction.
Preferably, after curing period terminates, the bolt on the upper junction steel plate and lower junction steel plate is taken out, by the domain
Tube coupling is divided into section of jurisdiction and lower section of jurisdiction.During maintenance, concrete has cubic deformation, should not dismantle at this time, and after conserving,
Upper section of jurisdiction and down tube piece shape substantially, are easy assembling after separating.
Preferably, in the step (1), the upper junction steel plate and lower junction steel plate pass through multiple vertical reinforcements respectively
Part is weldingly fixed on the upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage.
The production method of assembled tube coupling of the present invention is to make the steel reinforcement cage piecemeal of tube coupling, then by the reinforcing bar of piecemeal
Cage connection is integral, and what is obtained after casting concrete is the tube coupling entirety that can be divided into section of jurisdiction and lower section of jurisdiction, so that pre- be made
The section of jurisdiction shape arrived is regular, high-quality, reduces deformation of the section of jurisdiction in prefabrication process, when the later period assembles, facilitate upper section of jurisdiction and
Lower section of jurisdiction alignment is assembled into tube coupling.
Detailed description of the invention
Fig. 1 is the end view of one embodiment of assembled tube coupling of the present invention;
Fig. 2 is the portion the A enlarged drawing in Fig. 1;
Fig. 3 is the connection schematic diagram of junction steel plate and lower junction steel plate in one embodiment of assembled tube coupling of the present invention;
Fig. 4 is the A-A direction view in Fig. 3;
Fig. 5 is the B-B view profile in Fig. 1;
Fig. 6 is the structural schematic diagram of steel reinforcement cage inside one embodiment of assembled tube coupling of the present invention;
Fig. 7 is the C-C view profile in Fig. 6;
Fig. 8 is the portion the B enlarged drawing in Fig. 6.
Each label signal in attached drawing are as follows: upper tube piece 11, upper junction steel plate 111, bolt hole 1111, vertical steel rib tie point
1112, vertical steel rib 1113, angle member 1114, transition plane 112, lower section of jurisdiction 12, lower junction steel plate 121, interior right angle protrusion
122, sealing bar groove 123, lateral main reinforcement 124, longitudinal stirrup 125, bolt 13, hole for hoist 14, steel pipe 141, spiral reinforcement 142.
Specific embodiment
Illustrate a specific embodiment of the invention with reference to the accompanying drawings and examples, but following embodiment is used only in detail
It describes the bright present invention in detail, does not limit the scope of the invention in any way.
Embodiment 1:
Fig. 1 is please referred to Fig. 8.
As shown in Figure 1, assembled tube coupling provided in an embodiment of the present invention includes upper section of jurisdiction 11 and lower section of jurisdiction 12, upper section of jurisdiction 11
It is poured with lower section of jurisdiction 12 by concrete and steel reinforcement cage, upper section of jurisdiction 11 and lower section of jurisdiction 12 are U-shaped, upper section of jurisdiction 11 and down tube
The section of jurisdiction that piece 12 is assembled into generally rectangle, the rectangular tube save the underground tunnel project that Mr. Yu uses jacking construction, end face
Wide D is 7600mm, and high H is 5625mm, and thickness of pipe wall L is 500mm, and tube coupling overall length L1 is 1500mm, enormous size, and construction site
There is no sufficient space for produced on-site, need remotely to produce in distance construction place, transport difficult, by the way that tube coupling is separated system
Make, then convenient transportation is many.
Further, as shown in Figure 1, two corner part inner walls of upper section of jurisdiction 11 are transition plane 112, and lower section of jurisdiction 12
Two corner parts be equipped with interior right angle protrusion 122, for rectangle tube coupling, corner is weak load-bearing point, pass through setting transition
Plane 112 and interior right angle protrusion 122, increase the bearing capacity of corner.In addition, can make between two interior right angle protrusions 122
For ditch draining.
As shown in Fig. 2, the connection section in upper section of jurisdiction 11 is embedded with upper junction steel plate 111, the connection in lower section of jurisdiction 12 is disconnected
Face is embedded with lower junction steel plate 121, and upper junction steel plate 111 and lower junction steel plate 121 correspondence offer multiple bolts hole, upper section of jurisdiction
11 and lower section of jurisdiction 12 section part alignment after, made by screwing on bolt 13 between upper junction steel plate 111 and lower junction steel plate 121
Section of jurisdiction 11 must be gone up and lower section of jurisdiction 12 fits together composition tube coupling.
As shown in figure 3, the two sides of upper junction steel plate 111 respectively offer 8 bolts hole 1111, the same side adjacent bolt hole
1111 spacing 200mm.Uniformly distributed multiple vertical steel rib tie points 1112 on upper junction steel plate 111, upper junction steel plate 111 are logical
Multiple vertical reinforcement parts are crossed to be connected on the steel reinforcement cage of section of jurisdiction 11.Lower 121 upper bolt hole of junction steel plate and vertical steel rib connect
The layout of contact is identical as upper junction steel plate 111, is screwed into 16 M22's between upper junction steel plate 111 and lower junction steel plate 121 altogether
Bolt 13.
As shown in figure 4, the upper surface of upper junction steel plate 111 is welded with vertical steel rib 1113, vertical steel rib 1113 is in C
Shape is made of the reinforcing steel bar hoop bending of diameter 20mm, and 1113 bottom of vertical steel rib is welded on junction steel plate 111.In upper company
It connects and is respectively provided with angle member 1114 at left and right sides of 111 upper surface of steel plate, for protecting bolt 13, angle member 1114 is welded on one side
On junction steel plate 111, lower junction steel plate is similarly equipped with vertical steel rib and angle member.
As shown in figure 5, the end face in lower section of jurisdiction 12 is equipped with sealing bar groove 123, also set in the outside wall surface end of lower section of jurisdiction 12
There is sealing bar groove 123, and is equipped with corresponding sealing bar groove, the corresponding sealing rod in lower section of jurisdiction 12 and upper section of jurisdiction 11 on upper section of jurisdiction 11
Slot constitutes annular, and sealing rod is arranged in the sealing bar groove of annular, prevents water in soil from penetrating into tunnel.
As shown in fig. 6, steel reinforcement cage is equipped with inside upper section of jurisdiction 11 and lower section of jurisdiction 12, and for following section of jurisdiction 12, lower section of jurisdiction 12
Interior steel reinforcement cage includes lateral main reinforcement 124 and longitudinal stirrup 125, and lateral main reinforcement 124 extends to separately from a section of lower section of jurisdiction 12
One section, longitudinal stirrup 125 transversely main reinforcement 124 extension route interval setting.And when section of jurisdiction transports, is assembled for convenience
Lifting is respectively provided with four holes for hoist 14 for running through tube wall in upper section of jurisdiction 11 and lower section of jurisdiction 12.
As shown in fig. 7,14 lateral main reinforcements 124 of lateral main reinforcement 124,14 are laid in lower section of jurisdiction 12 altogether in rectangular ring
Arrangement, adjacent transverse main reinforcement 124 are spaced 274.8mm, and longitudinal stirrup 125 is set in outside lateral main reinforcement 124.Reinforcing bar in upper section of jurisdiction 11
Cage set-up mode is identical as lower section of jurisdiction 12.
As shown in figure 8, hole for hoist 14 includes the steel pipe 141 and spiral reinforcement 142 poured with tube wall together, spiral reinforcement
142 are set in outside steel pipe 141.Upper junction steel plate 111 binds or welds together, lower connection steel with the steel reinforcement cage in upper section of jurisdiction 11
Plate 121 binds or welds together with the steel reinforcement cage in lower section of jurisdiction 12, and upper junction steel plate 111 and lower junction steel plate 121 are logical
Multiple vertical reinforcement parts 1113 are crossed to connect with the steel reinforcement cage in corresponding section of jurisdiction.
The production method of assembled tube coupling in embodiment 1, comprising the following steps:
The first step, section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage in binding, upper section of jurisdiction steel reinforcement cage or so lower edge is respectively fixed with
Junction steel plate, fixed lower junction steel plate, upper junction steel plate and lower junction steel plate divide respectively for the left and right upper edge of lower section of jurisdiction steel reinforcement cage
It is not weldingly fixed on upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage by multiple vertical steel rib.
Second step, upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage enter mould, specifically, in the step, first by upper connection steel
Plate and lower junction steel plate are bolted, and dock section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage integral, will be connected to one
The upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage risen integrally enters mould, then connects bolt position with lower junction steel plate in upper junction steel plate
Placement location foam protection connection bolt is not flooded by concrete;Last casting concrete again.
Maintenance is demoulded after concrete initial set, after curing period terminates, further takes out junction steel plate and lower junction steel plate
On bolt, domain tube coupling is divided into upper section of jurisdiction and lower section of jurisdiction, prefabricated upper section of jurisdiction and lower section of jurisdiction are stacked, arrived to subsequent transportation
Construction site.
The present invention is described in detail above in conjunction with drawings and examples, still, those of skill in the art
Member is it is understood that without departing from the purpose of the present invention, can also carry out each design parameter in above-described embodiment
Change, forms multiple specific embodiments, is common variation range of the invention, is no longer described in detail one by one herein.
Claims (10)
1. a kind of assembled tube coupling, including upper section of jurisdiction and lower section of jurisdiction, which is characterized in that the upper section of jurisdiction and lower section of jurisdiction are by coagulation
Soil and steel reinforcement cage pour, and the connection section in the upper section of jurisdiction is embedded with upper junction steel plate, the connection in the lower section of jurisdiction
Section is embedded with lower junction steel plate, and the upper junction steel plate is connected and fixed with the steel reinforcement cage in the upper section of jurisdiction, described
Lower junction steel plate is connected and fixed with the steel reinforcement cage in the lower section of jurisdiction, right on the upper junction steel plate and lower junction steel plate
Multiple bolts hole should be offered, so that the upper section of jurisdiction and lower section of jurisdiction are bolted and are assembled into tube coupling.
2. assembled tube coupling according to claim 1, which is characterized in that the upper junction steel plate and lower junction steel plate are logical
Multiple vertical reinforcement parts are crossed to be connected on the steel reinforcement cage in corresponding section of jurisdiction.
3. assembled tube coupling according to claim 1, which is characterized in that the upper section of jurisdiction and lower section of jurisdiction are U-shaped, described
The corner part inner wall of upper section of jurisdiction is plane transition.
4. assembled tube coupling according to claim 3, which is characterized in that it is convex that the corner part of the lower section of jurisdiction is equipped with interior right angle
It rises.
5. assembled tube coupling according to claim 4, which is characterized in that be all provided in the end face of the lower section of jurisdiction and upper section of jurisdiction
There is sealing bar groove, and also is provided with sealing bar groove in the outside wall surface end of the lower section of jurisdiction and upper section of jurisdiction.
6. assembled tube coupling according to claim 1, which is characterized in that the upper section of jurisdiction and lower section of jurisdiction are equipped with multiple pass through
The hole for hoist of poling wall, the hole for hoist include the steel pipe and spiral reinforcement poured with tube wall together, the spiral reinforcement set
It is located at outside the steel pipe.
7. a kind of production method of assembled tube coupling described in claim 1, which comprises the following steps:
(1) section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage in binding, described upper section of jurisdiction steel reinforcement cage or so lower edge are respectively fixed with
Lower junction steel plate is fixed in junction steel plate, the left and right upper edge of the lower section of jurisdiction steel reinforcement cage respectively;
(2) the upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction steel reinforcement cage enter mould, casting concrete, demoulding maintenance.
8. the production method of assembled tube coupling according to claim 7, which is characterized in that the step (2) specifically includes:
(2.1) the upper junction steel plate and lower junction steel plate are bolted, make the upper section of jurisdiction steel reinforcement cage and lower section of jurisdiction
Steel reinforcement cage docking is integral;
(2.2) the upper section of jurisdiction steel reinforcement cage to link together and lower section of jurisdiction steel reinforcement cage are integrally entered into mould;
(2.3) bolt location is connected with lower junction steel plate in the upper junction steel plate and places foam protection connection bolt not by coagulation
Soil floods;
(2.4) casting concrete.
9. the production method of assembled tube coupling according to claim 8, which is characterized in that after curing period terminates, take
Domain tube coupling is divided into upper section of jurisdiction and lower section of jurisdiction by the bolt on the upper junction steel plate and lower junction steel plate out.
10. the production method of assembled tube coupling according to claim 7, which is characterized in that in the step (1), institute
It states junction steel plate and lower junction steel plate and is weldingly fixed on the upper section of jurisdiction steel reinforcement cage under by multiple vertical steel rib respectively
On the steel reinforcement cage of section of jurisdiction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811223842.8A CN109184740A (en) | 2018-10-19 | 2018-10-19 | Assembled tube coupling and preparation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811223842.8A CN109184740A (en) | 2018-10-19 | 2018-10-19 | Assembled tube coupling and preparation method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109184740A true CN109184740A (en) | 2019-01-11 |
Family
ID=64946328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811223842.8A Pending CN109184740A (en) | 2018-10-19 | 2018-10-19 | Assembled tube coupling and preparation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109184740A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109882195A (en) * | 2019-03-27 | 2019-06-14 | 浙江大学城市学院 | A kind of assembled big cross section rectangle pipe jacking tube coupling and construction method |
CN111206618A (en) * | 2019-12-28 | 2020-05-29 | 广州市市政集团有限公司 | Prefabricated rectangular jacking pipe and construction method thereof |
CN111502684A (en) * | 2020-05-21 | 2020-08-07 | 上海市城市建设设计研究总院(集团)有限公司 | Prefabricated pipe joint structure for pipe jacking method tunnel opening and using method thereof |
CN113073982A (en) * | 2021-04-30 | 2021-07-06 | 中电建十一局工程有限公司 | Mechanical underground excavation pushing system for large-section rectangular segment duct piece of subway station and construction method |
CN113334568A (en) * | 2021-06-07 | 2021-09-03 | 中铁工程装备集团有限公司 | Segment whole-ring structure and segment whole-ring prefabricating method |
CN113374504A (en) * | 2021-07-29 | 2021-09-10 | 中铁隧道集团一处有限公司 | Assembling construction method for prefabricated pipe pieces at tunnel arch part |
CN115434361A (en) * | 2022-09-15 | 2022-12-06 | 深圳市市政设计研究院有限公司 | Prefabricated component connecting joint and assembled station |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008202218A (en) * | 2007-02-16 | 2008-09-04 | Nippon Steel Corp | Cast-in-place steel pipe concrete pile and its construction method |
JP2012172483A (en) * | 2011-02-24 | 2012-09-10 | Taisei Corp | Underground structure and construction method of underground structure |
CN204457798U (en) * | 2014-12-26 | 2015-07-08 | 广东华隧建设股份有限公司 | A kind of weight concrete section of jurisdiction for the shallow earthing section of shield structure |
CN205369299U (en) * | 2016-01-15 | 2016-07-06 | 山东轻强建材有限公司 | Pin -connected panel precast reinforced concrete piping lane |
CN106703831A (en) * | 2016-11-30 | 2017-05-24 | 上海市政工程设计研究总院(集团)有限公司 | Method for assembling segments of shield tunnels with internal water pressures |
CN108396777A (en) * | 2018-05-03 | 2018-08-14 | 上海市城市建设设计研究总院(集团)有限公司 | Meet the big cross section tube coupling of segmentation prefabricating on-site consolidation |
CN208845183U (en) * | 2018-10-19 | 2019-05-10 | 中铁隧道局集团有限公司 | Assembled tube coupling |
-
2018
- 2018-10-19 CN CN201811223842.8A patent/CN109184740A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008202218A (en) * | 2007-02-16 | 2008-09-04 | Nippon Steel Corp | Cast-in-place steel pipe concrete pile and its construction method |
JP2012172483A (en) * | 2011-02-24 | 2012-09-10 | Taisei Corp | Underground structure and construction method of underground structure |
CN204457798U (en) * | 2014-12-26 | 2015-07-08 | 广东华隧建设股份有限公司 | A kind of weight concrete section of jurisdiction for the shallow earthing section of shield structure |
CN205369299U (en) * | 2016-01-15 | 2016-07-06 | 山东轻强建材有限公司 | Pin -connected panel precast reinforced concrete piping lane |
CN106703831A (en) * | 2016-11-30 | 2017-05-24 | 上海市政工程设计研究总院(集团)有限公司 | Method for assembling segments of shield tunnels with internal water pressures |
CN108396777A (en) * | 2018-05-03 | 2018-08-14 | 上海市城市建设设计研究总院(集团)有限公司 | Meet the big cross section tube coupling of segmentation prefabricating on-site consolidation |
CN208845183U (en) * | 2018-10-19 | 2019-05-10 | 中铁隧道局集团有限公司 | Assembled tube coupling |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109882195A (en) * | 2019-03-27 | 2019-06-14 | 浙江大学城市学院 | A kind of assembled big cross section rectangle pipe jacking tube coupling and construction method |
CN111206618A (en) * | 2019-12-28 | 2020-05-29 | 广州市市政集团有限公司 | Prefabricated rectangular jacking pipe and construction method thereof |
CN111502684A (en) * | 2020-05-21 | 2020-08-07 | 上海市城市建设设计研究总院(集团)有限公司 | Prefabricated pipe joint structure for pipe jacking method tunnel opening and using method thereof |
CN113073982A (en) * | 2021-04-30 | 2021-07-06 | 中电建十一局工程有限公司 | Mechanical underground excavation pushing system for large-section rectangular segment duct piece of subway station and construction method |
CN113334568A (en) * | 2021-06-07 | 2021-09-03 | 中铁工程装备集团有限公司 | Segment whole-ring structure and segment whole-ring prefabricating method |
CN113374504A (en) * | 2021-07-29 | 2021-09-10 | 中铁隧道集团一处有限公司 | Assembling construction method for prefabricated pipe pieces at tunnel arch part |
CN113374504B (en) * | 2021-07-29 | 2023-11-17 | 中铁隧道集团一处有限公司 | Tunnel arch prefabricated segment assembling construction method |
CN115434361A (en) * | 2022-09-15 | 2022-12-06 | 深圳市市政设计研究院有限公司 | Prefabricated component connecting joint and assembled station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109184740A (en) | Assembled tube coupling and preparation method thereof | |
CN108678775B (en) | Transverse oval deformation resistant shield tunnel reinforcing structure of embedded steel plate and construction method | |
CN106090450B (en) | The box pipeline connected with circumferential obtuse angle | |
CN207348091U (en) | A kind of assembled pipe gallery | |
CN208845183U (en) | Assembled tube coupling | |
CN211257077U (en) | Prefabricated assembly and cast-in-place utility tunnel who mixes construction | |
CN108149706A (en) | Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and laminated slabs and construction method thereof | |
CN108729564A (en) | Assembled architecture system | |
CN108086354A (en) | Prefabricated assembled comprehensive pipe gallery spliced by cast-in-place hidden beams and construction method thereof | |
CN107246016A (en) | A kind of suspension type inner support system and foundation ditch construction method suitable for base pit engineering | |
CN207092108U (en) | A kind of suspension type inner support system suitable for base pit engineering | |
CN212452316U (en) | Bridge with small box girders prefabricated in longitudinal sections | |
CN108396777A (en) | Meet the big cross section tube coupling of segmentation prefabricating on-site consolidation | |
CN113279414A (en) | Octagonal working pit supporting member and installation and construction method thereof | |
CN113585456A (en) | Precast concrete beam column connection node structure and construction method | |
CN205369299U (en) | Pin -connected panel precast reinforced concrete piping lane | |
CN207525779U (en) | A kind of assembly type pipe gallery pattern foundation pit supporting structure of recycling and structure external mold composite structure | |
CN108286267B (en) | Assembled corrugated steel Combined concrete pipe gallery | |
CN216108621U (en) | Immersed tube structure suitable for high water pressure condition | |
CN105298147A (en) | Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof | |
CN212427202U (en) | Large-span overlapping assembly integral comprehensive pipe gallery | |
CN212316712U (en) | Box culvert construction is with assembled platform truck | |
CN206667085U (en) | A kind of spliced draining steel box culvert | |
CN106351234A (en) | Assembled type three-combined-round-steel-pipe concrete inner support structure and manufacturing method | |
CN207862947U (en) | A kind of enclosure structure of foundation pit of subway station support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |