CN209261202U - A kind of hanging basket system for the installation of steel construction metal Roof bottom plate - Google Patents

A kind of hanging basket system for the installation of steel construction metal Roof bottom plate Download PDF

Info

Publication number
CN209261202U
CN209261202U CN201821908406.XU CN201821908406U CN209261202U CN 209261202 U CN209261202 U CN 209261202U CN 201821908406 U CN201821908406 U CN 201821908406U CN 209261202 U CN209261202 U CN 209261202U
Authority
CN
China
Prior art keywords
hanging basket
main
bottom plate
connection component
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821908406.XU
Other languages
Chinese (zh)
Inventor
吕中亮
刘群杰
刘庆
郭健鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201821908406.XU priority Critical patent/CN209261202U/en
Application granted granted Critical
Publication of CN209261202U publication Critical patent/CN209261202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of hanging basket systems for the installation of steel construction metal Roof bottom plate, including cage lifting unit, hanging basket suspension and sliding element;The hanging basket is arranged in roofing bottom plate installation region, cage lifting unit is made of hoist engine, lifting wire rope, bottom fixed pulley and top fixed pulley, and basket suspension and sliding element are made of 2 main ropes, first end node connection component, the second end node connection component and multiple fixed points connection component.The utility model provides stable operating platform for roofing construction of bottom plates, can further realize Roof system cross-operation synchronous with alien invasion on this basis, to improve engineering integral construction efficiency, it is convenient that it transports arrangement, mobility is strong, easy to operate, securely and reliably.

Description

A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
Technical field
The utility model relates to steel structure construction technology field, more particularly to a kind of steel construction metal Roof bottom plate that is used for pacify The hanging basket system of dress.
Background technique
In recent years, horizontal in order to greatly meet the increasing material and culture of the people with China's rapid economic development, entirely A large amount of gymnasium is built within the scope of state, conference and exhibition center, the communal facilitys such as library are to enlargement, architectural appearance multiplicity Change, alien invasion moulding unique aspect development, metal Roof system as a part of building not only to meet Functional Requirement, It also to meet the design concept and the aesthetic feature of building is showed.Compared with previous relatively simple roof structure, it is bound to Difficulty of construction is increased in building installation process.Hanging basket system essential device when being installed as metal Roof system, It is also required to adapt to this variation, improves the convenience and safety that it is used.
Summary of the invention
The utility model provides a kind of hanging basket system for the installation of steel construction metal Roof bottom plate, applies for roofing bottom plate Work provides stable operating platform, can further realize Roof system cross-operation synchronous with alien invasion on this basis, To improve engineering integral construction efficiency, transport arrangement is convenient, and mobility is strong, easy to operate, securely and reliably.
In order to achieve the above object, the utility model is implemented with the following technical solutions:
It is a kind of for steel construction metal Roof bottom plate installation hanging basket system, including cage lifting unit, hanging basket suspension and Sliding element;The hanging basket is arranged in roofing bottom plate installation region, and the length direction of hanging basket is perpendicular to main purlin length direction, i.e., It is parallel to the length direction of roofing bottom plate;Cage lifting unit is slided surely by hoist engine, lifting wire rope, bottom fixed pulley and top Wheel composition, hoist engine, bottom fixed pulley and top fixed pulley are respectively 2 groups and are symmetricly set on the two sides of cage lifting position, wherein rolling up It raises machine and bottom fixed pulley fixes on the ground, top fixed pulley is suspended on the lower section of main purlin;One end of lifting wire rope with Hoist engine is connected, and the other end is fixedly connected after successively bypassing bottom fixed pulley, top fixed pulley with one end of hanging basket;Hanging basket suspension And sliding element is by 2 main ropes, first end node connection component, the second end node connection component and multiple fixed points Connection component composition, 2 main ropes are arranged in parallel in above hanging basket along roofing floor length direction, after hanging basket rises on hanging basket Hanging ring be slidably connected by shackle and main rope, 2 coir ropes for sliding traction are additionally provided on hanging basket;Every king wire One end of rope is fixedly connected by first end node connection component with the main purlin that roofing bottom plate installs initial position, the other end It is fixedly connected by the second end node connection component with the main purlin at gutter;It is equipped at intervals on every main rope multiple solid Fixed point is connected by the main purlin of fixed point connection component and corresponding position.
The first end node connection component is made of connecting steel wire ropes one, shackle, steel wire rope clamp;The connection steel wire Rope one, which splices to circularize, to be disposed around on corresponding main purlin, is connect by shackle with main rope, main rope is correspondingly connected with End, which splices, to be circularized, around clamping fixed by wirerope after shackle.
The second end node connection component is buckled by connecting steel wire ropes two, chain block, shackle bolt lock and steel wire rope clamp Composition;The connecting steel wire ropes two are disposed around on corresponding main purlin, main rope be correspondingly connected with end splice circularize after lead to It crosses shackle bolt lock button and chain block to be fixedly connected with connecting steel wire ropes two, between the end and main rope of connecting steel wire ropes two It is clamping fixed by multiple wirerope.
The fixed point connection component is made of hanging ring wirerope and steel wire rope clamp, and hanging ring wirerope is disposed around corresponding master On purlin, clamping fixed by multiple wirerope at enclosing, main rope is passed through from hanging ring wirerope.
A kind of hanging basket system for the installation of steel construction metal Roof bottom plate, further includes the anti-fall unit of hanging basket, the hanging basket Anti-fall unit is made of safety steel cable, safe hoisting ring wirerope and shackle, and the both ends of hanging basket set 2 safe suspension centres respectively, peace Full hanging ring forming wire-rope into interlocking-wire is connected on the main purlin that annular is disposed around above hanging basket, and safety steel cable leads to after passing through 2 safe suspension centres Shackle is crossed to be fixedly connected with safe hoisting ring wirerope.
Compared with prior art, the utility model has the beneficial effects that
Compared with the scheme for setting up all round victory scaffold in traditional construction on a large scale, it can be significantly reduced using hanging basket system Working measure takes, more applicable in the construction site that can not set up scaffold because of place limitation;It is avoidable to be accounted for because setting up scaffold The case where with operation side, realizes Roof system cross-operation synchronous with alien invasion, mentions engineering integral construction efficiency significantly Height, and transport arrangement conveniently, mobility is strong, and it is easy to operate, securely and reliably
Detailed description of the invention
Fig. 1 is the structural schematic diagram of cage lifting unit described in the utility model.
Fig. 2 is the attachment structure schematic diagram of hanging basket and main rope described in the utility model.
Fig. 3 is the structural schematic diagram of the anti-fall unit of hanging basket described in the utility model.
Fig. 4 is the node diagram that main rope is fixedly connected with the main purlin of roofing bottom plate installation initial position.
Fig. 5 is the node diagram that main rope is fixedly connected with the main purlin at gutter.
Fig. 6 is the node diagram that fixed point is fixedly connected with main purlin on main rope.
In figure: 1. hanging basket, 2. 4. hoist engine of main 3. main rope of purlin, 5. bottom fixed pulley, 6. top fixed pulley 7. 11. safe hoisting ring wirerope of hanging ring 9. shackle, 10. safety steel cable, 12. connecting steel wire ropes of 8. hanging basket of lifting wire rope One 13. steel wire rope clamp, 14. connecting steel wire ropes, 2 15. chain block, 16. shackle bolt lock buckles 17. hanging ring wirerope
Specific embodiment
Specific embodiment of the present utility model is described further with reference to the accompanying drawing:
See Fig. 1, a kind of hanging basket system for the installation of steel construction metal Roof bottom plate described in the utility model, including hanging basket Lifting unit, hanging basket suspension and sliding element;The setting of hanging basket 1 is hung down in roofing bottom plate installation region, the length direction of hanging basket 1 Directly in main 2 length direction of purlin, that is, it is parallel to the length direction of roofing bottom plate;Cage lifting unit is by hoist engine 4, lifting steel wire Rope 7, bottom fixed pulley 5 and top fixed pulley 6 form, and hoist engine 4, bottom fixed pulley 5 and top fixed pulley 6 are respectively symmetrical for 2 groups The two sides of cage lifting position are set, and wherein hoist engine 4 and bottom fixed pulley 5 fix on the ground, and top fixed pulley 6 is suspended on The lower section of main purlin 2;One end of lifting wire rope 7 is connected with hoist engine 4, and it is fixed that the other end successively bypasses bottom fixed pulley 5, top It is fixedly connected after pulley 6 with one end of hanging basket 1;Hanging basket suspension and sliding element are connected by 2 main ropes 3, first end node Connected components, the second end node connection component and multiple fixed points connection component composition, 2 main ropes 3 are long along roofing bottom plate Degree direction is arranged in parallel in 1 top of hanging basket, and the hanging ring 8 after hanging basket 1 rises on hanging basket is connected by shackle 9 and the sliding of main rope 3 It connects, 2 coir ropes for sliding traction is additionally provided on hanging basket 1;One end of every main rope 3 is connected by first end node The main purlin 2 of component and roofing bottom plate installation initial position is fixedly connected, the other end by the second end node connection component with Main purlin 2 at gutter is fixedly connected;Multiple fixed points are equipped at intervals on every main rope 3, pass through fixed point connection component It is connect with the main purlin 2 of corresponding position.
The first end node connection component is made of connecting steel wire ropes 1, shackle 9, steel wire rope clamp 13;The company It connects wirerope 1 and splices to circularize and be disposed around on corresponding main purlin 2, connect by shackle 9 with main rope 3, main rope 3 end that is correspondingly connected with splices and circularizes, around fixed by steel wire rope clamp 13 after shackle 9.
The second end node connection component buckles 16 and steel by connecting steel wire ropes 2 14, chain block 15, shackle bolt lock 13 composition of cord folder;The connecting steel wire ropes 2 14 are disposed around on corresponding main purlin 2, and the end that is correspondingly connected with of main rope 3 is compiled It is fixedly connected by shackle bolt lock button 16 and chain block 15 with connecting steel wire ropes 2 14 after being connected into annular, connecting steel wire ropes 2 14 End and main rope 3 between it is fixed by multiple steel wire rope clamps 13.
The fixed point connection component is made of hanging ring wirerope 17 and steel wire rope clamp 13, and hanging ring wirerope 17 is disposed around pair On the main purlin 2 answered, clamping fixed by multiple wirerope 13 at enclosing, main rope 3 is passed through from hanging ring wirerope 17.
A kind of hanging basket system for the installation of steel construction metal Roof bottom plate, further includes the anti-fall unit of hanging basket, the hanging basket Anti-fall unit is made of safety steel cable 10, safe hoisting ring wirerope 11 and shackle 9, and the both ends of hanging basket 1 set 2 safety jaws respectively Point, safe hoisting ring wirerope 11 are spliced to circularize and be disposed around on the main purlin 2 of 1 top of hanging basket, and safety steel cable 10 passes through 2 peaces It is fixedly connected by shackle 9 with safe hoisting ring wirerope 11 after full suspension centre.
Following embodiment is implemented under premised on technical solutions of the utility model, gives detailed embodiment With specific operating process, but the protection scope of the utility model is not limited to the following embodiments.Side used in following embodiments Method is conventional method unless otherwise instructed.
[embodiment]
The present embodiment is by taking the metal Roof engineering construction of one venue of certain exhibition center as an example, because the engineering roofing bottom plate is pacified The height of holding position is relatively high, and the short time limit installed, and construction speed can be seriously affected by such as being set up using steel pipe foot prop, because This uses the construction method of hanging basket installation, wherein moving in the horizontal direction hanging basket, how guaranteeing the safety of nacelle construction Property be concern emphasis.
The engineering roofing bottom plate is arranged vertically with main purlin 2, and the roofing bottom plate between two axial lines is essentially identical by length Roofing bottom plate composition.Hanging basket 1 is once arranged in single span roofing construction of bottom plates according to this layout feature, the length side of hanging basket 1 Vertical with main 2 direction of purlin to parallel with the length direction of roofing bottom plate, the length of hanging basket 1 is 5 meters, can satisfy room bottom plate Installation requirement.
Roofing construction of bottom plates section arranges that suspension of 2 12 main ropes 3 of φ for hanging basket 1 is fixed.When roofing bottom plate is installed It is installed in hanging basket 1 by construction personnel station, after certain section of roofing bottom plate is installed, construction personnel leaves hanging basket 1, and hanging basket 1 passes through Horizontal shift is realized in sliding on main rope 3.
To prevent hanging basket 1 after mounting since gravity load is excessive, 3 downwarp of main rope after tensing is made to seriously affect room The construction of face bottom plate, using self-control lightened hanging basket.The main body of hanging basket 1 is using 50 × 2.5 steel square tubes and the steel pipe welding of φ 25 × 2.5 It connects.The hanging ring 8 of hanging basket is welded in 50 × 2.5 square tubes after using 16 round steel simmering and bending of φ;It is used in the bottom of hanging basket 1 The pedestal screw connection of 0.6mm thickness profiled sheet and hanging basket 1.
To prevent the tool of installer or installation from occurring the danger from falling from high altitude in the installation process of high-altitude, hanging The surrounding of basket 1 and bottom are gone along with sb. to guard him using safety net.
Hanging basket 1 carries out Mechanics Calculation through the 3D3S design software of Tongji University, in load setting, dead load 20Kg/ ㎡, construction loads are 150Kg/ ㎡, are computed the intensity of hanging basket, overall stability is all met the requirements.The slenderness ratio of rod piece is full The smallest slenderness ratio 1/150 in sufficient Code for design of steel structures requirement.
Every hanging basket 1 is fixed using 2 12 main rope 3 of φ suspensions, and one end of main rope 3 is directly tied up installs in starting On the main purlin 2 of position, the other end is connect after extending with the main purlin 2 at gutter, is set with 2T chain block 15 with enclosing when connection Connecting steel wire ropes 2 14 on main purlin 2 tense.Connecting steel wire ropes 1, connecting steel wire ropes 2 14 and main rope 3 are even It connects end and splices and circularize, connected by 20 shackle of φ, the splice length of each wirerope is not less than 300mm.
After preventing hanging basket 1 from installing, since 1 self gravity of hanging basket spends 3 downwarp of main rope greatly, lead to roofing bottom plate Distance is excessive between hanging basket 1, influences the smooth installation of roofing bottom plate, sets on every main rope 3 at interval of 10 meters or so One fixed point, each fixed point are connect using the hanging ring wirerope 17 of φ 12 with main purlin 2.
It after hanging basket 1 is promoted by hoist engine 4 to installation site, must be connect with main rope 3, it is contemplated that hanging basket 1 needs It slides in the horizontal direction, hanging basket 1 is connect with the connection of main rope 3 using 20 shackle of φ.It first is to make 1 side of dismounting of hanging basket Just;It second is friction when reducing hanging basket 1 and 3 horizontal sliding of main rope.The hanging basket 1 behind a roofing construction of bottom plates complete region When needing horizontal shift, first hanging basket 1 is fallen, all installation personnels are walked out out of hanging basket 1, then rise empty hanging basket, are passed through and are Two coir ropes drawing on hanging basket 1, realizes the moving horizontally along main rope 3 of hanging basket 1.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (5)

1. a kind of hanging basket system for the installation of steel construction metal Roof bottom plate, which is characterized in that including cage lifting unit, hang Basket suspension and sliding element;The hanging basket is arranged in roofing bottom plate installation region, and the length direction of hanging basket is long perpendicular to main purlin Direction is spent, that is, is parallel to the length direction of roofing bottom plate;Cage lifting unit is by hoist engine, lifting wire rope, bottom fixed pulley And top fixed pulley composition, hoist engine, bottom fixed pulley and top fixed pulley are respectively 2 groups and are symmetricly set on the two of cage lifting position Side, wherein hoist engine and bottom fixed pulley fix on the ground, and top fixed pulley is suspended on the lower section of main purlin;Lifting wire rope One end be connected with hoist engine, the other end is fixedly connected after successively bypassing bottom fixed pulley, top fixed pulley with one end of hanging basket; Hanging basket suspension and sliding element are by 2 main ropes, first end node connection component, the second end node connection component and more A fixed point connection component composition, 2 main ropes are arranged in parallel in above hanging basket along roofing floor length direction, and hanging basket rises The hanging ring on hanging basket is slidably connected by shackle and main rope afterwards, and 2 coir ropes for sliding traction are additionally provided on hanging basket;Often One end of root main rope passes through the fixed company of main purlin that first end node connection component and roofing bottom plate install initial position It connects, the other end is fixedly connected by the second end node connection component with the main purlin at gutter;It is spaced on every main rope Equipped with multiple fixed points, connected by the main purlin of fixed point connection component and corresponding position.
2. a kind of hanging basket system for the installation of steel construction metal Roof bottom plate according to claim 1, which is characterized in that The first end node connection component is made of connecting steel wire ropes one, shackle, steel wire rope clamp;The connecting steel wire ropes one splice It circularizes and is disposed around on corresponding main purlin, connect by shackle with main rope, the end that is correspondingly connected with of main rope is spliced into Annular, around clamping fixed by wirerope after shackle.
3. a kind of hanging basket system for the installation of steel construction metal Roof bottom plate according to claim 1, which is characterized in that The second end node connection component is buckled by connecting steel wire ropes two, chain block, shackle bolt lock and steel wire rope clamp forms;It is described Connecting steel wire ropes two are disposed around on corresponding main purlin, main rope be correspondingly connected with end splice circularize after pass through shackle bolt lock Button and chain block are fixedly connected with connecting steel wire ropes two, pass through multiple steel between the end and main rope of connecting steel wire ropes two Cord is clamping fixed.
4. a kind of hanging basket system for the installation of steel construction metal Roof bottom plate according to claim 1, which is characterized in that The fixed point connection component is made of hanging ring wirerope and steel wire rope clamp, and hanging ring wirerope is disposed around on corresponding main purlin, Clamping fixed by multiple wirerope at enclosing, main rope is passed through from hanging ring wirerope.
5. a kind of hanging basket system for the installation of steel construction metal Roof bottom plate according to claim 1, which is characterized in that It further include the anti-fall unit of hanging basket, the anti-fall unit of hanging basket is made of safety steel cable, safe hoisting ring wirerope and shackle, hanging basket Both ends set 2 safe suspension centres respectively, safe hoisting ring forming wire-rope into interlocking-wire is connected on the main purlin that annular is disposed around above hanging basket, safety It is fixedly connected by shackle with safe hoisting ring wirerope after 2 safe suspension centres of steel wire penetrating.
CN201821908406.XU 2018-11-20 2018-11-20 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate Active CN209261202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821908406.XU CN209261202U (en) 2018-11-20 2018-11-20 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821908406.XU CN209261202U (en) 2018-11-20 2018-11-20 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Publications (1)

Publication Number Publication Date
CN209261202U true CN209261202U (en) 2019-08-16

Family

ID=67555517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821908406.XU Active CN209261202U (en) 2018-11-20 2018-11-20 A kind of hanging basket system for the installation of steel construction metal Roof bottom plate

Country Status (1)

Country Link
CN (1) CN209261202U (en)

Similar Documents

Publication Publication Date Title
CN109372243A (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN201661083U (en) Sliding type safety net
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN202767494U (en) Hanging basket for high-altitude roof inner plate construction
CN101200975A (en) High-altitude bridge type cantilever scaffold
CN104074349A (en) Novel protective attached lifting scaffold
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN204899185U (en) Adhere to formula lift high altitude construction device
CN108505623A (en) A kind of overhead cable construction method suitable for flexible double rope net system
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN102691421B (en) Safe protecting device for high-altitude work of steel structure
CN209261202U (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN201531111U (en) Movable hanging basket for installing and decorating curtain walls
CN202441045U (en) Rail-type electric attached lifting scaffold
CN204418629U (en) A kind of integrated form climbing frame
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN206720680U (en) A kind of roofing color corrugated sheet steel lifting device
CN202731270U (en) Movable platform for high-altitude installation operation of space steel structure
CN206487129U (en) Safety hanging cradle for industrial premises Construction of Steel Structure
CN216007754U (en) All-steel attached lifting scaffold
CN205259573U (en) A hanging flower basket hangs mechanism for high -rise roofing transformation
CN205575534U (en) Lattice formula groined type support body lifting means
CN107524285A (en) A kind of external wall construction suspension bracket and its installation method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant