CN2092578U - Self-hoist, self-protect scaffold for high building - Google Patents

Self-hoist, self-protect scaffold for high building Download PDF

Info

Publication number
CN2092578U
CN2092578U CN 91207215 CN91207215U CN2092578U CN 2092578 U CN2092578 U CN 2092578U CN 91207215 CN91207215 CN 91207215 CN 91207215 U CN91207215 U CN 91207215U CN 2092578 U CN2092578 U CN 2092578U
Authority
CN
China
Prior art keywords
construction
frame
rise building
operation frame
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 91207215
Other languages
Chinese (zh)
Inventor
余家模
冯裕瑞
杨策
陈清和
胡泽榘
李毅生
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUNNAN NO 5 CONSTRUCTION ENGINEERING Co
Original Assignee
YUNNAN NO 5 CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN NO 5 CONSTRUCTION ENGINEERING Co filed Critical YUNNAN NO 5 CONSTRUCTION ENGINEERING Co
Priority to CN 91207215 priority Critical patent/CN2092578U/en
Publication of CN2092578U publication Critical patent/CN2092578U/en
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an operation frame for the construction of a high-rise building, comprising a plurality of unit operation frames which are arranged along the circumference wall bodies of a building. Each unit operation frame is fixed on a wall or a cylinder by a support seat. The operation frame for the construction of a high-rise building can be automatically lifted and lowered; meanwhile, a safe insurance system is arranged. The operation frame for the construction of a high-rise building is mainly suitable for the construction of a high-rise building. The operation frame for the construction of a high-rise building substitutes a scaffold, and the operation frame for the construction of a high-rise building can lift a template. Building and safety guard materials can be greatly saved. The operation frame for the construction of a high-rise building has the advantages of low manufacturing cost, safety, portability, flexibility, easy implementation, etc.

Description

Self-hoist, self-protect scaffold for high building
But the utility model relates to a kind of automatic lifting and is provided with the handling frame of safeties, is applicable to high-building construction.
In high-building construction, using the widest handling frame is scaffold.Scaffold is taken to the high-altitude by ground, and it is many to take steel, takes and tears inconvenience open, and the security protection condition is poor, can not automatic lifting, and can only make the constructing operation frame, can not transport construction material.
The purpose of this utility model, provide a kind of can automatic lifting, security insurance arranged, save the high-building construction handling frame of steel, it can not only replace scaffold to carry out structure and decorative operation, can also transport construction materials such as exterior sheathing simultaneously.
Below in conjunction with description of drawings concrete structure of the present utility model and enforcement approach.
Accompanying drawing 1 is: the positive facade structural representation of unit operations frame
Accompanying drawing 2 is: the side elevation structural representation of unit operations frame
Accompanying drawing 3 is: bearing and skeleton syndeton exploded view
Accompanying drawing 4 is: hang arm and bearing syndeton exploded view.
Crosshead comprise a plurality of around the building built-in unit operations frame on wall or the post. Each unit operations frame is barricaded as steel pipe skeleton 1 by steel pipe 14 and connection fastener 15, should carry out local welding on the skeleton, reinforce antiskid, seals with safety net around the skeleton.
2. each unit operations frame has four layer operation platforms 16, and wherein topmost one deck is interim operating desk, below three layers be the fixing operation platform, the spacing of every layer operation platform can be according to the construction object, in line with The principle design of handled easily.
3. each unit operations frame has six layers of bearing 3, divides the upper, middle and lower-ranking setting.Through-wall bolt 44 is fixed in bearing on wall or the post 2, and each bearing passes through a guide pad 5 and a bolt 6 again with the steel pipe skeleton support fixation simultaneously.Because four guide pipes 7 of steel pipe skeleton are controlled between bearing and the guide pad, therefore whole steel pipe skeleton just is fixed on wall or the cylinder, and has avoided the horizontal movement of steel pipe skeleton.
4. each unit operations frame is hung arm 8 with two, can be connected with bearing by bolt 9, and the opposing party who hangs arm has hook 10, is hanging two Chain blocks 11, and wire rope 12 is walked around the bottom that assembly pulley 13 catches handling frame.
5. the lifting lifting of handling frame is achieved in that in the time need climbing, and the bearing of hanging arm and upper strata is connected and fixed, and removes lower floor's bearing, and the pulling Chain block rises to handling frame needs the position, with the bearing of removing handling frame top and wall or post is fixed again; When handling frame will descend, will hang arm and be fixed on the bearing of middle level, remove the upper strata bearing, the pulling Chain block drops to handling frame needs position, the upper strata bearing week of dismounting to go to the fixing use of bottom.
6. two Chain blocks are independently born lifting lifting effect for one in operating process, and another is lifting thereupon, reach insurance, the safing effect followed the tracks of.
Compared with the prior art, the utlity model has following advantage:
1. but attached wall or post automatic lifting, easy to operate, flexible.
2. save a large amount of setting up and the security protection material.
3. fixing firm and solid with wall or cylinder, and the directed support of guide pipe is arranged, handling frame is solid and reliable.
4. the safety net sealing is arranged all around, be provided with the tracking safeties, ensured handling safety.
5. cheap, easy enforcement.
Enforcement engineering of the present utility model is the high-rise building of tubular construction, and the design number of plies is 18 layers, and whenever high layer by layer 3 meters, the standard width of a room in an old-style house is 4 meters.
This project outrigger is made up of 42 unit operations framves, and body of wall is arranged around the building.
8.5 meters of each unit operations floor heights, long 3.7 meters, wide 0.8 meter.Handling frame is barricaded as with steel pipe and fastener.Each unit operations frame is made up of four operating platforms, and interlamellar spacing from bottom to top is respectively 2.1 meters, 2.3 meters and 1.8 meters, and the Beijing South Maxpower Technology Co. Ltd's power that opens of each Chain block is 2 tons, and starting stroke is 4 meters.
The overall structure of handling frame and concrete structure are shown in accompanying drawing 1, accompanying drawing 2, accompanying drawing 3 and accompanying drawing 4, and implementation as previously mentioned.

Claims (2)

1, the handling frame used of a kind of high-building construction, but steel pipe skeleton 1 held stationary that it is characterized by each unit operations frame on wall or post 2, concrete fixed support mode is:
A. each unit operations frame has six cover bearings 3, divides three layers to fix by through-wall bolt 4 and wall or post;
B. guide pad 5 is controlled between bearing and the guide pad by the guide pipe 7 of bolt 6 with steel pipe skeleton, to avoid the steel pipe skeleton horizontal movement.
2, handling frame according to claim 1 is characterized by each unit operations frame and hangs arm 8 with two, is connected with bearing by bolt 9, is hanging two Chain blocks 11 on the hook 10 of extension arm, and wire rope 12 is walked around assembly pulley 13 and caught the handling frame bottom.
CN 91207215 1991-04-25 1991-04-25 Self-hoist, self-protect scaffold for high building Expired - Lifetime CN2092578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91207215 CN2092578U (en) 1991-04-25 1991-04-25 Self-hoist, self-protect scaffold for high building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91207215 CN2092578U (en) 1991-04-25 1991-04-25 Self-hoist, self-protect scaffold for high building

Publications (1)

Publication Number Publication Date
CN2092578U true CN2092578U (en) 1992-01-08

Family

ID=4916705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91207215 Expired - Lifetime CN2092578U (en) 1991-04-25 1991-04-25 Self-hoist, self-protect scaffold for high building

Country Status (1)

Country Link
CN (1) CN2092578U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146729A (en) * 2011-04-29 2011-08-10 山东齐鲁石化建设有限公司 Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN104153557A (en) * 2014-07-09 2014-11-19 成都绿迪科技有限公司 Frame guide rail type attached lifting scaffold
CN106351434A (en) * 2016-10-11 2017-01-25 西安科技大学 Bamboo joint-shaped facade super high-rise building structure adhesion type climbing frame and lifting method
CN110820569A (en) * 2019-10-28 2020-02-21 同济大学 Liftable suspension platform device for rollover construction and working method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146729A (en) * 2011-04-29 2011-08-10 山东齐鲁石化建设有限公司 Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN102146729B (en) * 2011-04-29 2012-12-26 山东齐鲁石化建设有限公司 Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN104153557A (en) * 2014-07-09 2014-11-19 成都绿迪科技有限公司 Frame guide rail type attached lifting scaffold
CN106351434A (en) * 2016-10-11 2017-01-25 西安科技大学 Bamboo joint-shaped facade super high-rise building structure adhesion type climbing frame and lifting method
CN106351434B (en) * 2016-10-11 2018-08-17 西安科技大学 A kind of laemodipodiform alien invasion super-high building structure adhesion type climbing frame and method for improving
CN110820569A (en) * 2019-10-28 2020-02-21 同济大学 Liftable suspension platform device for rollover construction and working method thereof

Similar Documents

Publication Publication Date Title
CN208518310U (en) All steel type attachment type raise scaffold
CN106088565A (en) The method of tiltedly climbing of attachment type raise scaffold and attachment type raise scaffold
CN107700719A (en) A kind of hanging method of high-rise building glass curtain wall
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN2092578U (en) Self-hoist, self-protect scaffold for high building
CN212103679U (en) A construction platform for installation of assembled tower
CN212406043U (en) Guide frame lifting type multistage operation platform system
CN202441045U (en) Rail-type electric attached lifting scaffold
CN205000656U (en) From over -and -under type material cycling platform
CN216662305U (en) Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN214302804U (en) Double-layer hanging basket of riding horse type
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN211899584U (en) Super high-rise lower-hanging operation platform
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN114165061A (en) Construction method of vertical transportation system
CN2216104Y (en) Hanging lift scaffold
CN207003989U (en) External hanging type scaffold is climbed in one kind
CN212926977U (en) Can have enough to meet need formula high-rise fire control gallery inner courtyard operation platform
CN110778095A (en) External protection frame of assembled structure
CN2177059Y (en) Top lifting adhesive double stretching arm outer scaffold
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN218375096U (en) Overhanging steel pipe scaffold for internal and external operation of building with wide upper part and narrow lower part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term