CN209195411U - A kind of speciality high risk mountain tunnel, which closes, point repairs structure - Google Patents

A kind of speciality high risk mountain tunnel, which closes, point repairs structure Download PDF

Info

Publication number
CN209195411U
CN209195411U CN201821947716.2U CN201821947716U CN209195411U CN 209195411 U CN209195411 U CN 209195411U CN 201821947716 U CN201821947716 U CN 201821947716U CN 209195411 U CN209195411 U CN 209195411U
Authority
CN
China
Prior art keywords
tunnel
line main
main tunnel
section
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821947716.2U
Other languages
Chinese (zh)
Inventor
吴秀雄
吴江涛
徐凯胜
袁安辉
薛廷贵
张坤
尹晟轩
王勃超
梁明松
漆新郑
李君�
王远彬
韩强
刘君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
China Railway No 5 Engineering Group Co Ltd
Electromechanical Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 5 Engineering Group Co Ltd, Electromechanical Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical China Railway No 5 Engineering Group Co Ltd
Priority to CN201821947716.2U priority Critical patent/CN209195411U/en
Application granted granted Critical
Publication of CN209195411U publication Critical patent/CN209195411U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

It closes to divide the utility model discloses a kind of speciality high risk mountain tunnel and repairs structure, including left line main tunnel (10) and right line main tunnel (8), pass through lateral service channel (9) connection between left line main tunnel (10) and right line main tunnel (8), pass through transverse passage-way (7) connection parallel heading (4) on the left of left line main tunnel (10), parallel heading (4) is lower than left line main tunnel (10), and left line main tunnel (10) is lower than right line main tunnel (8).The utility model becomes original two-wire list hole large cross-section tunnel based on the narrow-bore tunnel in single line list hole, leads advanced mode so that more light-gauge perforation is flat, effectively neutralizing construction risk.Laterally using from right line main tunnel be higher than left line main tunnel be higher than parallel heading, it is longitudinal use open roof, unimpeded, effectively neutralizing gushing water, prominent mud risk are drained in work progress.

Description

A kind of speciality high risk mountain tunnel, which closes, point repairs structure
Technical field
The utility model relates to a kind of conjunction of speciality high risk band perforation parallel heading point repair flat mountain tunnel, vertical section and Structural shape.
Background technique
With the fast development of China's economic society, the height in the raising of highway, railway infrastructure grade, especially mountain area The construction of fast railway, highway, building for long mountain tunnel can be more and more;Mountain tunnel can pass through various complicated geologicals Condition thus constitutes high risk long mountain tunnel.Long mountain tunnel, which generallys use, at present adds horizontal hole and inclined shaft with reality Existing " long tunnel hand-to-hand fight in tights ", but it is greater than I grade of high risky tunnel of speciality of 14km for length, the draining of inclined shaft counter-slope will increase construction instead Risk, large cross-section tunnel cross section are easy landslide and are unfavorable for reducing construction risk." long tunnel hand-to-hand fight in tights ", i.e., it is a plurality of oblique by being arranged Be connected outside well, horizontal hole and Tunnel, full tunnel import and export direction+inclined shaft, cross is wide open sets multiple work surface construction main tunnels, Ci Zhongshi Work technology has advantage, but the Shortcomings in terms of prevention and control construction risk in terms of accelerating construction progress, as dashed forward in constructing tunnel Water, prominent mud, inclined shaft due to be counter-slope from the direction to hole, cannot effectively drain, such as soft rock large deformation and landslide, will lead to It constructs and interrupts in a certain working face.Since main tunnel sectional form is two-wire list hole big cross section, soft rock section is still remained and is collapsed The risks such as side.When problem above bursts I grade of high risk, live construction personnel, mechanical equipment do not have the route of retreat, exist very Big construction safety risk.
Summary of the invention
Technical problem to be solved by the utility model is: at present when building long mountain tunnel using " long tunnel is short Beat " there are problems that construction safety risk, it put down by light-gauge perforation and leads advanced construction, used according to face country rock situation Wall rock geology situation in front of a variety of advance geology exploration methods and accurate forecast takes targetedly prevention to arrange in construction accordingly It applies, arrangement and method for construction dynamic adjustment, greatly reduces the risk of tunnel construction, construction safety is controllable.
The technical solution that the utility model is taken are as follows:
A kind of speciality high risk mountain tunnel, which closes, point repairs structure, including left line main tunnel and right line main tunnel, left line main tunnel and the right side By lateral service channel connection between line main tunnel, left line main tunnel left side passes through transverse passage-way and connects parallel heading, parallel heading Lower than left line main tunnel, left line main tunnel is lower than right line main tunnel.
Left line main tunnel front end is that section is repaired in main tunnel conjunction in tunnel, and main tunnel conjunction in tunnel, which is repaired section and closed through tunnel, point repairs variable cross-section greatly across crossing Become two tunnel main tunnels point behind Duan Duoci transformation tunnel section and repair section, a tunnel main tunnel point repairs section and extending to left tunnel line just Hole, another tunnel main tunnel point repair section and extend to Tunnel Right Line main tunnel.
Intermediate herringbone high, inlet and outlet are low is longitudinally respectively adopted in parallel heading, left tunnel line main tunnel and Tunnel Right Line main tunnel Longitudinal slope structure.
Parallel heading is lower than Tunnel Right Line main tunnel 0.3-0.6m lower than 1~2m of left tunnel line main tunnel, left tunnel line main tunnel.
It is one-tunnel two-tracks big cross section structure that section is repaired in main tunnel conjunction in tunnel, repairs variable cross-section through tunnel conjunction point and repeatedly becomes across changeover portion greatly After changing tunnel section, section is repaired in main tunnel conjunction in tunnel becomes two slightly smaller one-tunnel one-track tunnel structures of cross section, i.e. two tunnels are just Repair section in hole point.
Parallel heading is constructed in advance compared with main tunnel.
The beneficial effects of the utility model are as follows:
This technology uses " big tunnel is small to be beaten ", i.e., original two-wire list hole large cross-section tunnel is become with the small disconnected of single line list hole Based on the tunnel of face, advanced mode is led so that more light-gauge perforation is flat, effectively neutralizing construction risk.Laterally to adopt convenient for draining Open roof is used higher than parallel heading, longitudinal direction higher than left line main tunnel with right line main tunnel, unimpeded, effectively neutralizing is drained in work progress Gushing water, prominent mud risk.Flat lead of this technology perforation accurately verifies front geological condition in advance, has taken and has been directed to for the construction of lower step main tunnel The precautionary measures of property adjust arrangement and method for construction, effective prevention and control construction risk in time.Single port perforation in this technology tunnel is flat to be led, left line just Hole, right line main tunnel form flowing water, parallel operations, and each surface construction equilibrium that works carries out.
This division repairs that band perforation in tunnel is flat to lead superstructure the pattern relatively previous more inclined shafts of major long tunnel band and transverse passage-way knot Configuration formula has advance for I grade of high risky tunnel construction party face of speciality.
Detailed description of the invention
Fig. 1, which closes to divide, repairs speciality high risk mountain tunnel plan view
In figure, 1- penetrates through parallel heading import, the main tunnel import of the tunnel 2-, and section, 4- parallel heading, 5- are repaired in main tunnel conjunction in the tunnel 3- Tunnel, which closes to divide, repairs variable cross-section greatly across changeover portion, and the tunnel 6- main tunnel, which is divided, repairs section, the transverse passage-way of 7- parallel heading and left tunnel line main tunnel, 8- Tunnel Right Line main tunnel, the service channel of 9- left tunnel right line main tunnel, 10- left tunnel line main tunnel, 11- perforation parallel heading go out Mouthful, the positive hole outlet of 12- left tunnel line, the positive hole outlet of 13- Tunnel Right Line.
Specific embodiment
Embodiment: the main improvement structure of the present embodiment compared to the prior art: 1. on the left of the positive hole outlet of left tunnel line 30m setting perforation parallel heading 1, perforation parallel heading is connected with left tunnel line main tunnel by transverse passage-way, left line main tunnel and the right side Line main tunnel is connected by service channel;During 2. perforation parallel heading, left tunnel line main tunnel, Tunnel Right Line main tunnel are longitudinally respectively adopted Between high, herringbone longitudinal slope structure that inlet and outlet are low, left tunnel line main tunnel, left tunnel line main tunnel are laterally lower than using perforation parallel heading Underground water lower than Tunnel Right Line main tunnel, during effective ejectment construction and operation.3. tunnel main tunnel longitudinally use to divide and repair section and be Structure is repaired in main conjunction point.
Fig. 1 is that tunnel is flat, longitudinal plane structure pattern, including perforation parallel heading import 1, and tunnel main tunnel import 2, tunnel is just Hole, which is closed, repairs section 3, parallel heading 4, and tunnel, which closes to divide, repairs variable cross-section greatly across changeover portion 5, and tunnel main tunnel point repairs section 6, parallel heading and tunnel The transverse passage-way 7 of road left line main tunnel, Tunnel Right Line main tunnel 8, the service channel 9 of left tunnel right line main tunnel, left tunnel line main tunnel 10 are passed through Logical parallel heading outlet 11, the positive hole outlet 12 of left tunnel line, the positive hole outlet 13 of Tunnel Right Line.
Parallel heading 4 one penetrated through in positive 12 left side 30m of the hole outlet setting of left tunnel line, parallel heading 4 and left tunnel Line main tunnel 10 is connected by transverse passage-way 7, and left tunnel line main tunnel 12 is connected with 8 service channel 9 of Tunnel Right Line main tunnel.Left tunnel line is just Section 3 is repaired in connection tunnel main tunnel conjunction in 10 front end of hole, and it is one-tunnel two-tracks big cross section structure that section 3 is repaired in main tunnel conjunction in tunnel, is repaired through tunnel conjunction point Variable cross-section greatly across more than 5 transformation tunnels of changeover portion section after, tunnel main tunnel, which is closed, repairs section 3 to become the single holes in cross section slightly smaller 2 single Line tunnel structure (i.e. tunnel main tunnel point repairs section 6), full tunnel main tunnel cross section is with one-tunnel one-track tunnel (i.e. tunnel main tunnel point repairs section 6) Based on, a tunnel main tunnel point repairs section 6 and extends to left tunnel line main tunnel 10, and another tunnel main tunnel point repairs section 6 and extend to tunnel Right line main tunnel 8.
Parallel heading 4, left tunnel line main tunnel 10, Tunnel Right Line main tunnel 8 are longitudinal to be respectively adopted intermediate people high, inlet and outlet are low Word longitudinal slope structure, route are laterally lower than the about 1~2m of left tunnel line main tunnel 10, left tunnel line main tunnel 10 using perforation parallel heading 4 Underground water lower than the about 0.5m of Tunnel Right Line main tunnel 8, during effective ejectment construction and operation.

Claims (6)

1. a kind of speciality high risk mountain tunnel, which closes to divide, repairs structure, including left line main tunnel (10) and right line main tunnel (8), feature exists In: by lateral service channel (9) connection between left line main tunnel (10) and right line main tunnel (8), left line main tunnel (10) left side is logical Transverse passage-way (7) connection parallel heading (4) is crossed, parallel heading (4) is lower than left line main tunnel (10), and left line main tunnel (10) is just lower than right line Hole (8).
2. speciality high risk mountain tunnel according to claim 1, which closes to divide, repairs structure, it is characterised in that: left line main tunnel (10) Front end is that main tunnel conjunction in tunnel is repaired section (3), and main tunnel conjunction in tunnel repairs section (3) and closes that point to repair variable cross-section multiple across changeover portion (5) greatly through tunnel Become two tunnel main tunnels point behind transformation tunnel section to repair section (6), a tunnel main tunnel point repairs section (6) and extending to left tunnel line just Hole (10), another tunnel main tunnel point repair section (6) and extend to Tunnel Right Line main tunnel (8).
3. speciality high risk mountain tunnel according to claim 1, which closes to divide, repairs structure, it is characterised in that: parallel heading (4), Intermediate herringbone longitudinal slope structure high, inlet and outlet are low is longitudinally respectively adopted in left tunnel line main tunnel (10) and Tunnel Right Line main tunnel (8).
4. speciality high risk mountain tunnel according to claim 1, which closes to divide, repairs structure, it is characterised in that: parallel heading (4) It is lower than Tunnel Right Line main tunnel (8) 0.3-0.6m lower than (10) 1~2m of left tunnel line main tunnel, left tunnel line main tunnel (10).
5. speciality high risk mountain tunnel according to claim 2, which closes to divide, repairs structure, it is characterised in that: main tunnel conjunction in tunnel is repaired Section (3) is one-tunnel two-tracks big cross section structure, through tunnel close point repair variable cross-section greatly across changeover portion (5) repeatedly transformation tunnel section after, Section (3) is repaired in main tunnel conjunction in tunnel becomes two slightly smaller one-tunnel one-track tunnel structures of cross section, i.e. two tunnel main tunnels point repair section (6)。
6. speciality high risk mountain tunnel according to claim 1-5, which closes to divide, repairs structure, it is characterised in that: parallel Base tunnel (4) is constructed in advance compared with main tunnel.
CN201821947716.2U 2018-11-23 2018-11-23 A kind of speciality high risk mountain tunnel, which closes, point repairs structure Active CN209195411U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821947716.2U CN209195411U (en) 2018-11-23 2018-11-23 A kind of speciality high risk mountain tunnel, which closes, point repairs structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821947716.2U CN209195411U (en) 2018-11-23 2018-11-23 A kind of speciality high risk mountain tunnel, which closes, point repairs structure

Publications (1)

Publication Number Publication Date
CN209195411U true CN209195411U (en) 2019-08-02

Family

ID=67425821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821947716.2U Active CN209195411U (en) 2018-11-23 2018-11-23 A kind of speciality high risk mountain tunnel, which closes, point repairs structure

Country Status (1)

Country Link
CN (1) CN209195411U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502729A (en) * 2020-04-05 2020-08-07 中铁二院工程集团有限责任公司 Assembled special-shaped air duct for long-distance tunnel construction ventilation and construction method
CN113464147A (en) * 2021-07-22 2021-10-01 中铁五局集团成都工程有限责任公司 Construction method of soft rock large-span and variable-section tunnel
CN114109447A (en) * 2021-12-03 2022-03-01 中铁隧道局集团有限公司 Construction method for separately repairing end wall of tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111502729A (en) * 2020-04-05 2020-08-07 中铁二院工程集团有限责任公司 Assembled special-shaped air duct for long-distance tunnel construction ventilation and construction method
CN113464147A (en) * 2021-07-22 2021-10-01 中铁五局集团成都工程有限责任公司 Construction method of soft rock large-span and variable-section tunnel
CN114109447A (en) * 2021-12-03 2022-03-01 中铁隧道局集团有限公司 Construction method for separately repairing end wall of tunnel

Similar Documents

Publication Publication Date Title
CN209195411U (en) A kind of speciality high risk mountain tunnel, which closes, point repairs structure
WO2018171255A1 (en) Networked preferential gas migration passage construction and gas diversion drainage method
CN102720504A (en) Double-side-wall-pilot-hole subsection bench cut method construction method
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN104018874B (en) Method for pre-pumping working face gas by bedding drilling
CN112593999B (en) Directional long-drilling hydraulic permeability-increasing method for soft coal seam and/or soft and hard composite coal seam
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN107630686B (en) compact oil energy supplementing method for staggered displacement and imbibition displacement between horizontal well sections
CN103527198A (en) Hydraulic fracturing control method of cut tight roof/top coal
CN105239990A (en) Well spacing method for lateral displacement horizontal well of ultra-low permeability tight oil reservoir simulation local well
CN109723421B (en) Active prevention and control method for gas tunnel rock burst under high ground stress
CN105240046A (en) Drill hole layout method for gas extraction during primary mining and stoping of large mining height fully-mechanized face
CN102296963A (en) Construction method for ultra-long deep-buried road tunnel
CN104110270A (en) Method for controlling coal bed sulfuretted hydrogen in dynamic alkali injection mode
CN108180035B (en) Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam
WO2016107435A1 (en) Method operating outside of passageway for optimizing passageway regional stress field
CN105952468A (en) High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function
CN111322049B (en) Hydraulic fracturing track determination method based on drilling peeping instrument
CN204125851U (en) A kind of truss beam type shed hole structure
CN105927252B (en) It is a kind of to excavate big cross section underground space structure transforming methods of structural system using rectangular top pipe
CN105401973A (en) Method for performing extraction treatment on corner gas on work faces of adjacent roadways
CN204312093U (en) Rich water soft soil layer shallow-depth-excavation tunnel Full-face pouring ruggedized construction
CN103437774A (en) Shield excavation machining method
CN102644477A (en) Method for extracting gas of protected layer through wear layer drilling in protective layer airway high-position drilling field
CN105133571A (en) Plugging type connection method for deep hole inclined curtain and vertical curtain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190926

Address after: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Co-patentee after: The Fifth Engeering Co., Ltd. of China Railway 5th Bureau Group Co., Ltd.

Patentee after: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Co-patentee before: China Railway 5th Bureau Group Electromechanical Device Co., Ltd.

Patentee before: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

TR01 Transfer of patent right
CP02 Change in the address of a patent holder

Address after: 550003 No. 23, jujube Road, Yunyan District, Guizhou, Guiyang

Co-patentee after: The Fifth Engeering Co., Ltd. of China Railway 5th Bureau Group Co., Ltd.

Patentee after: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

Address before: 550003 Zao Shan Road, Nanming District, Guiyang, Guizhou Province, No. 23

Co-patentee before: The Fifth Engeering Co., Ltd. of China Railway 5th Bureau Group Co., Ltd.

Patentee before: CHINA RAILWAY NO.5 ENGINEERING GROUP CO., LTD.

CP02 Change in the address of a patent holder