CN105952468A - High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function - Google Patents

High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function Download PDF

Info

Publication number
CN105952468A
CN105952468A CN201610511063.2A CN201610511063A CN105952468A CN 105952468 A CN105952468 A CN 105952468A CN 201610511063 A CN201610511063 A CN 201610511063A CN 105952468 A CN105952468 A CN 105952468A
Authority
CN
China
Prior art keywords
tunnel
open cut
cut tunnel
cross
microbarometric wave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610511063.2A
Other languages
Chinese (zh)
Inventor
史宪明
万晓燕
吴剑
陶伟明
郑波
冷希乔
刘志强
师亚龙
廖凯
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway Southwest Research Institute Co Ltd
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
China Railway Southwest Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC, China Railway Southwest Research Institute Co Ltd filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201610511063.2A priority Critical patent/CN105952468A/en
Publication of CN105952468A publication Critical patent/CN105952468A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a high-speed railway tunnel connecting open-cut tunnel with a micro-pressure wave alleviation function. The cross section of the connecting open-cut tunnel is greater than the cross section of a front section and a rear section of tunnel connected with the connecting open-cut tunnel, and the cross section of the connecting open-cut tunnel is in a polygonal shape; and a plurality of groups of vertical openings are symmetrically formed in two side walls of the connecting open-cut tunnel. By giving the optimum cross section area, an opening position and a size of an open hole of the connecting open-cut tunnel, the micro-pressure wave at the opening of the tunnel can be maximally alleviated; and the open-cut tunnel can be used as a beneficial supplement for a conventional micro-pressure wave alleviation measure such as a tunnel inlet buffer structure and an inner tunnel auxiliary pit, and also has economy.

Description

A kind of Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel
Technical field
The present invention relates to Railway Tunnel design field, a kind of height with microbarometric wave mitigation capability Speed railway tunnel connects open cut tunnel.
Background technology
It is steep that slope is faced upward at Southwestern China Mountain Tunnels hole, is mostly " V " type cheuch, tunnel immediately adjacent to bridge, open-wire line spacing between tunnel Segment length is the least, the frequent access tunnel of train, and car internal gas pressure frequently changes, and " black hole " and " white hole " effect is violent so that Comfort of passenger reduces, and tunnel's entrance and exit is domatic has rockfall to be distributed more, affects traffic safety, therefore when Tunnel Design How relatively will be connected by open cut tunnel by Xiao Ming's distance between centers of tracks tunnel group, both to have can guarantee that the comfort level of passenger inside the vehicle, it is also possible to effectively avoid danger The threat to vehicle in use of the rock falling rocks.Tunnel group defines a relatively long tunnel by open cut tunnel after being connected, according to both at home and abroad Scholar's research, the train of speed per hour 300km is easily generated microbarometric wave in the tunnel of a length of about 8km and intensifies phenomenon, namely Say that train its barometric wave wavefront gradients produced behind the tunnel entering this length becomes larger when can propagate in tunnel therewith, In this case, the tunnel originally meeting microbarometric wave national standard may exceed the corresponding of national regulation after open cut tunnel connects Index.
The size of microbarometric wave and compressional wave arrive the pressure gradient (pressure differential in the unit interval) during tunnel exit It is directly proportional, by controlling barometric gradient during compressional wave arrival tunnel exit, it is possible to achieve slow down the purpose of microbarometric wave intensity. Generally, Railway Tunnel is that the measure that alleviation microbarometric wave is taked has following several:
(1) outside Tunnel, build the buffer structure of uiform section top or side mouth;
(2) outside Tunnel, build section expansion type or broadening formation buffer structure;
(3) in tunnel, the decompression configuration such as vertical shaft, transverse passage-way, service gallery are built.
These tunnel portal affiliated facilities have played bigger effect in terms of alleviating hole microbarometric wave, but there is also as follows Not enough: the action principle of hole buffer structure is to enter tunnel at train to start just to play the effect of reduction microbarometric wave, actual On for having microbarometric wave to intensify the tunnel of effect, be only inadequate starting to reduce, tunnel portal buffer structure multipotency Making microbarometric wave reduce about 50%, intensifying the non-fragment orbit tunnel of growing up of effect, actual remission effect in case of there is microbarometric wave The most less better, sometimes can not reach expection remission effect.
Construction cost can be caused significantly to increase it addition, build the decompression configuration such as vertical shaft, transverse passage-way, service gallery in tunnel Add, and uneconomical.
Summary of the invention
For the problems referred to above, it is an object of the invention to provide one can alleviate microbarometric wave further and take into account economy Property Railway Tunnel connect open cut tunnel.Technical scheme is as follows:
A kind of Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel, connects the cross-sectional area of open cut tunnel more than its institute The cross-sectional area in two sections of tunnels before and after connection, and connect open cut tunnel cross section be polygon.
Further, the cross-sectional area of described connection open cut tunnel is 1.4:1 ~ 1.55:1 with the ratio of the cross-sectional area in tunnel.
Further, described connection open cut tunnel includes perpendicular sidewall, oblique sidewall and top;Top is planar structure, its side It is connected to perpendicular sidewall by oblique sidewall.
Further, connect to be symmetrically arranged with on the both sides sidewall of open cut tunnel and organize vertical openings more.
Further, the distance that outermost two vertical openings arrive homonymy tunnel face respectively is equal, is 6 ~ 8m.
Further, the spacing of two vertical openings that homonymy is adjacent is equal, and spacing is 2m.
Further, each vertical openings equivalently-sized, its width is 1m, a length of 4m of hoop.
Further, the lower edge of described vertical openings is 1.5m with the distance from bottom being connected open cut tunnel.
The invention has the beneficial effects as follows: the present invention has fully excavated and connected open cut tunnel as alleviating Railway Tunnel hole The effect of microbarometric wave, by providing connection open cut tunnel optimum section area, aperture position and bore size etc., can be farthest Alleviate tunnel portal microbarometric wave, can alleviate as conventional microbarometric waves such as service galleries in tunnel entrance buffer structure and tunnel The useful supplement of measure, and taken into account economy simultaneously.
Accompanying drawing explanation
Fig. 1 is the front view that the present invention has the Railway Tunnel connection open cut tunnel of microbarometric wave mitigation capability.
Fig. 2 is the side view that the present invention has the Railway Tunnel connection open cut tunnel of microbarometric wave mitigation capability.
Fig. 3 is that tunnel group connects the numerical simulation relation curve ratio of the pressure gradient of measuring point and time before and after open-cut tunnel structure Relatively scheme.
In figure: 1-connects open cut tunnel;11-vertical openings;12-erects sidewall;The oblique sidewall of 13-;14-top;2-tunnel.
Detailed description of the invention
The present invention will be further described with specific embodiment below in conjunction with the accompanying drawings.As it is shown in figure 1, one has micro-air pressure The Railway Tunnel of ripple mitigation capability connects open cut tunnel, and the cross-sectional area connecting open cut tunnel 1 is more than two sections of tunnels before and after it is connected The cross-sectional area in road 2, and connect open cut tunnel 1 cross section be polygon.
The mechanism produced from microbarometric wave, the factor affecting microbarometric wave intensity includes that train enters the speed in tunnel Degree, the blockage ratio (ratio that train cross-sectional area is long-pending with tunnel cross sectional) etc. in tunnel, i.e. speed during train entrance tunnel is the biggest, The microbarometric wave produced when blockage ratio is the biggest is the strongest.So immovable in the speed per hour and current existing construction ensureing train Under premise, increase the cross-sectional area connecting open cut tunnel 1, be then significantly reduced the blockage ratio of open cut tunnel section, and then delay to a great extent Solve the impact of microbarometric wave.
Connecting the cross-sectional area of open cut tunnel 1 with the cross-sectional area optimal proportion in tunnel 2 is 1.55:1, it is contemplated that open cut tunnel buffering knot The occupation of land problem of structure, can the most suitably reduce the cross-sectional area of open cut tunnel.The ratio that the present embodiment uses is 1.4: 1。
Existing connection open cut tunnel cross section mostly is circular, and when using template construction, complex process, difficulty of construction is relatively Greatly.For reducing difficulty of construction, use the structure of band corner angle as far as possible, i.e. connect open cut tunnel cross section and use polygon.? Simple situation uses rectangular cross section for connecting open cut tunnel, but rectangular cross section easily produces air-swirl in edges and corners, increases The complexity in flow field near train, is unfavorable for the alleviation of tunnel portal microbarometric wave.So the present embodiment uses obtuse angle polygon Tee section, connects open cut tunnel and includes perpendicular sidewall 12, oblique sidewall 13 and top 14;Top 14 is planar structure, and its side passes through oblique side Wall 13 is connected to perpendicular sidewall 12.
For increasing microbarometric wave remission effect further, also can be symmetrical arranged in connection open cut tunnel two side and organize vertical openings more 11.The present embodiment, as a example by the connection open cut tunnel of a length of 20m, connects cross-sectional area is tunnel area 1.4 times of open cut tunnel, and is Uiform section polygonized structure, as in figure 2 it is shown, connect open cut tunnel lateral symmetry to arrange 4 groups of vertical openings, outermost two of homonymy erects The distance arriving homonymy tunnel face to opening 11 respectively is equal, is 6 ~ 8m;The spacing of two vertical openings 11 that homonymy is adjacent is equal, Spacing is 2m;Each vertical openings 11 equivalently-sized, its width is 1m, a length of 4m of hoop.The upper edge of vertical openings 11 is not Exceed the upper edge of perpendicular sidewall 12, i.e. do not extend on oblique sidewall 13 and top 14, lower edge and the distance from bottom being connected open cut tunnel 1 For 1.5m, so can effectively prevent hydrops and falling rocks from entering from vertical openings and connect open cut tunnel.
As a example by above-mentioned vertical openings 11 position and size, and speed is 300km/h, train cross-sectional area 11.6m2, tunnel Road cross-sectional area is 100m2, connect a length of 20m of open cut tunnel, connecting open cut tunnel cross-sectional area is 140m2Time, before tunnel group connects open cut tunnel As it is shown on figure 3, wherein, abscissa is the time to the numerical simulation relation curve comparison diagram of the pressure gradient of rear measuring point and time, Unit is s;Vertical coordinate is barometric gradient, and unit is kPa/s;Curve a is the pressure connecting open cut tunnel front measuring point described in the present embodiment Power gradient calculation curve;Curve b is the barometric gradient calculated curve connecting open cut tunnel rear measuring point described in the present embodiment.Can from figure To find out, when tunnel group connects the structure that open cut tunnel uses the present embodiment, it is positioned at the pressure ladder of open-cut tunnel structure Tunnel ahead measuring point Degree peak value is 6.20kPa/s, and the peak value of pressure gradient being positioned at tunnel, open-cut tunnel structure rear measuring point is 3.87kPa/s, pressure ladder Degree peak value reduces 38%.Owing to barometric gradient is directly proportional to the microbarometric wave peak value at tunnel exit, therefore, tunnel exit is micro- Barometric wave peak value will also decrease about 38%, and its effect of easing stress is notable.

Claims (8)

1. a Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel, it is characterised in that connect open cut tunnel (1) Cross-sectional area is more than the cross-sectional area of two sections of tunnels (2) before and after it is connected, and the cross section connecting open cut tunnel (1) is polygon Shape.
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 1 connects open cut tunnel, and its feature exists In, the cross-sectional area of described connection open cut tunnel (1) is 1.4:1 ~ 1.55:1 with the ratio of the cross-sectional area in tunnel (2).
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 1 connects open cut tunnel, and its feature exists Perpendicular sidewall (12), oblique sidewall (13) and top (14) are included in, described connection open cut tunnel (1);Top (14) is planar structure, its side Limit is connected to perpendicular sidewall (12) by oblique sidewall (13).
4. connect open cut tunnel according to the Railway Tunnel with microbarometric wave mitigation capability described in any one of claim 1-3, It is characterized in that, connect to be symmetrically arranged with on the both sides sidewall of open cut tunnel (1) and organize vertical openings (11) more.
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 4 connects open cut tunnel, and its feature exists In, the distance that outermost two vertical openings (11) arrive homonymy tunnel face respectively is equal, is 6 ~ 8m.
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 4 connects open cut tunnel, and its feature exists In, the spacing of two vertical openings (11) that homonymy is adjacent is equal, and spacing is 2m.
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 4 connects open cut tunnel, and its feature exists Equivalently-sized in, each vertical openings (11), its width is 1m, a length of 4m of hoop.
The Railway Tunnel with microbarometric wave mitigation capability the most according to claim 4 connects open cut tunnel, and its feature exists In, the lower edge of described vertical openings (11) is 1.5m with the distance from bottom being connected open cut tunnel (1).
CN201610511063.2A 2016-06-30 2016-06-30 High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function Pending CN105952468A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610511063.2A CN105952468A (en) 2016-06-30 2016-06-30 High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610511063.2A CN105952468A (en) 2016-06-30 2016-06-30 High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function

Publications (1)

Publication Number Publication Date
CN105952468A true CN105952468A (en) 2016-09-21

Family

ID=56902196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610511063.2A Pending CN105952468A (en) 2016-06-30 2016-06-30 High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function

Country Status (1)

Country Link
CN (1) CN105952468A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440547A (en) * 2018-12-21 2019-03-08 福州大学 High-speed rail tunnel exit denoising structure
CN111322085A (en) * 2020-03-19 2020-06-23 中南大学 Railway tunnel capable of relieving pressure fluctuation inside tunnel
CN112282786A (en) * 2020-11-06 2021-01-29 太原理工大学 Micro-pressure wave retarding method for long and large tunnel of high-speed railway
CN112395679A (en) * 2020-11-23 2021-02-23 河北工程大学 Equal-stage ladder type tunnel buffer structure and design optimization method thereof
CN114837690A (en) * 2022-05-26 2022-08-02 中南大学 Tunnel micro-pressure wave relieving method based on pressure relief space angle
CN114872739A (en) * 2022-04-24 2022-08-09 中南大学 High-speed magnetic suspension railway tunnel capable of relieving tunnel pressure wave and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814920A (en) * 2006-03-08 2006-08-09 上海市隧道工程轨道交通设计研究院 Multi-hole-wall buffering mode
CN201106157Y (en) * 2007-10-29 2008-08-27 中铁二院工程集团有限责任公司 High-speed railway tunnel opening micropressure wave buffering establishment
CN103016024A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 Buffer structure of single-track tunnel portal of high-speed rail
CN103032079A (en) * 2012-12-31 2013-04-10 中铁第四勘察设计院集团有限公司 Constant annular width bevel type tunnel opening buffer structure
CN103670436A (en) * 2013-11-29 2014-03-26 西南交通大学 Lateral stripped sonic boom control structure of high-speed rail tunnel portal
CN205823291U (en) * 2016-06-30 2016-12-21 中铁西南科学研究院有限公司 A kind of Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814920A (en) * 2006-03-08 2006-08-09 上海市隧道工程轨道交通设计研究院 Multi-hole-wall buffering mode
CN201106157Y (en) * 2007-10-29 2008-08-27 中铁二院工程集团有限责任公司 High-speed railway tunnel opening micropressure wave buffering establishment
CN103016024A (en) * 2012-12-31 2013-04-03 中铁第四勘察设计院集团有限公司 Buffer structure of single-track tunnel portal of high-speed rail
CN103032079A (en) * 2012-12-31 2013-04-10 中铁第四勘察设计院集团有限公司 Constant annular width bevel type tunnel opening buffer structure
CN103670436A (en) * 2013-11-29 2014-03-26 西南交通大学 Lateral stripped sonic boom control structure of high-speed rail tunnel portal
CN205823291U (en) * 2016-06-30 2016-12-21 中铁西南科学研究院有限公司 A kind of Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴剑等: "隧道群之间的连接明洞对车内瞬变压力变化规律的影响研究", 《第十二届海峡两岸隧道与地下工程学术与技术研讨会》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109440547A (en) * 2018-12-21 2019-03-08 福州大学 High-speed rail tunnel exit denoising structure
CN111322085A (en) * 2020-03-19 2020-06-23 中南大学 Railway tunnel capable of relieving pressure fluctuation inside tunnel
CN111322085B (en) * 2020-03-19 2022-02-15 中南大学 Railway tunnel capable of relieving pressure fluctuation inside tunnel
CN112282786A (en) * 2020-11-06 2021-01-29 太原理工大学 Micro-pressure wave retarding method for long and large tunnel of high-speed railway
CN112282786B (en) * 2020-11-06 2023-02-28 太原理工大学 Micro-pressure wave retarding method for long and large tunnel of high-speed railway
CN112395679A (en) * 2020-11-23 2021-02-23 河北工程大学 Equal-stage ladder type tunnel buffer structure and design optimization method thereof
CN112395679B (en) * 2020-11-23 2022-08-02 河北工程大学 Equal-stage ladder type tunnel buffer structure and design optimization method thereof
CN114872739A (en) * 2022-04-24 2022-08-09 中南大学 High-speed magnetic suspension railway tunnel capable of relieving tunnel pressure wave and construction method thereof
CN114872739B (en) * 2022-04-24 2023-10-03 中南大学 High-speed magnetic levitation railway tunnel capable of relieving tunnel pressure wave and construction method thereof
CN114837690A (en) * 2022-05-26 2022-08-02 中南大学 Tunnel micro-pressure wave relieving method based on pressure relief space angle

Similar Documents

Publication Publication Date Title
CN105952468A (en) High-speed railway tunnel connecting open-cut tunnel with micro-pressure wave alleviation function
CN205823291U (en) A kind of Railway Tunnel with microbarometric wave mitigation capability connects open cut tunnel
CN105804116B (en) The genuine section structure built jointly with pipe gallery is worn under a kind of
CN104314614B (en) A kind of mining arc anti-shock bulkhead wall and its construction method
CN103670436B (en) Railway Tunnel hole lateral straps formula sonic boom controls structure
CN104197796A (en) Annular layering blasting shock absorption method for shallowly-buried large-section tunnel to pass underneath existing building
CN107180404A (en) The waterway effect and tide riding level of a kind of tidal level trend dual factors control determine method
CN103075173A (en) High-position inclined E-type ventilation system of coal face
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN113063709A (en) Method for determining curtain under complex aquifer condition
CN209195411U (en) A kind of speciality high risk mountain tunnel, which closes, point repairs structure
CN101929339A (en) Micro-pressure wave retardance structure for tunnel trunk of high-speed railway
CN102765394A (en) Low-air-pressure aerotrain
CN103470269B (en) Seam high efficiency buffer structure between Railway Tunnel hole
CN102128036A (en) Construction method of cross section-expanded loop type depressurizing portal for high-speed railway tunnel
CN109751076A (en) For being equipped with the escape structure and its escape method of the horizontal tunnel of deep shaft
CN205823292U (en) A kind of Railway Tunnel microbarometric wave alleviates device
CN102678132B (en) Anti-rockfall reinforced concrete open-cut tunnel structure
CN202690074U (en) Falling-rock preventing reinforced concrete open cut tunnel structure
CN104480918B (en) A kind of siphon outlet conduit of hydraulic performance excellence and application process thereof
CN203614111U (en) Break joint-type efficient buffer structure of high-speed railway tunnel portal
CN101812991B (en) Construction method for loop type hypobaric holes of railway tunnel
CN110714798A (en) Drainage distribution method for sill pillar-free mine stope
CN203130093U (en) 80kmh tunnel widening limitation structure form
CN107386135B (en) General optimization method for wind-prevention facilities of railways in wind area under strong wind environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160921