CN209195409U - The connection structure of cage guide and mine shaft equipment with it - Google Patents

The connection structure of cage guide and mine shaft equipment with it Download PDF

Info

Publication number
CN209195409U
CN209195409U CN201821796400.8U CN201821796400U CN209195409U CN 209195409 U CN209195409 U CN 209195409U CN 201821796400 U CN201821796400 U CN 201821796400U CN 209195409 U CN209195409 U CN 209195409U
Authority
CN
China
Prior art keywords
connector
cage guide
connection structure
side plate
long hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821796400.8U
Other languages
Chinese (zh)
Inventor
孙扬
安建英
郭相参
王鹏飞
过曾明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China ENFI Engineering Corp
Original Assignee
China ENFI Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China ENFI Engineering Corp filed Critical China ENFI Engineering Corp
Priority to CN201821796400.8U priority Critical patent/CN209195409U/en
Application granted granted Critical
Publication of CN209195409U publication Critical patent/CN209195409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses the connection structure of cage guide and with its mine shaft equipment.Wherein the connection structure of cage guide is used to the cage guide being connected to buntons, which includes: the first connector, and first connector is adapted to be attached on the buntons;Second connector, second connector are adapted to be attached on the cage guide, and second connector is connected with first connector;Wherein, the tie point position of first connector and second connector is adjustable, so that link position of the cage guide on the buntons is adjustable.The connection structure adjustability of the cage guide is good, is easy to guarantee construction precision.

Description

The connection structure of cage guide and mine shaft equipment with it
Technical field
The utility model relates to mine fields, specifically, the utility model relates to the connection structure of cage guide and having Its mine shaft equipment.
Background technique
Vertical shaft is mine and other underground engineerings enter the logistics corridor of the underground space and the key of underground space development Project of primary importance;Recently as the increase of shaft depths, all difficulties have been highlighted in vertical shaft design.Steel guide is mentioned as vertical shaft Container guide frame is risen, has come to have played irreplaceable role always;With the increase of mine shaft depth, the promotion speed of container Directly affect economic benefit.With the increase for promoting speed, pit shaft Steel Structural Design science, installation accuracy etc. are proposed Higher requirement, the even challenge to original structure design.How under the premise of guaranteeing that structure is safe and reliable, steel is improved Cage guide installation accuracy;Meanwhile meeting the science of steel guide connection and the realizability of actual installation, this is to perplex structure always One problem of design.
, many factors such as mechanization degree lower, environment poor, measurement accuracy be not easy guarantee narrow by shaft space Limitation realizes that high accuracy install pit shaft steel construction is a difficult technical work.Existing cage guide connection structure design exists Adjustability is poor, installation accuracy guarantees difficult, live punching secondary damage structure and is easy to cause brokenly component surface erosion resistant coating Many deficiencies such as bad solve to improve cage guide installation accuracy to be to solve one of the key technical problems that deep shaft high-speed smooth is promoted.
Utility model content
The utility model is intended to solve at least some of the technical problems in related technologies.For this purpose, this reality It is to propose the connection structure of cage guide and with its mine shaft equipment with a novel purpose.The connection knot of the cage guide Structure adjustability is good, is easy to guarantee construction precision.
In the one aspect of the utility model, the utility model proposes a kind of connection structure of cage guide, the connection Structure is used to the cage guide being connected to buntons, and the connection structure of embodiment according to the present utility model, the cage guide includes: First connector, first connector are adapted to be attached on the buntons;Second connector, second connector are suitable for It is connected on the cage guide, and second connector is connected with first connector;Wherein, first connector and institute The tie point position for stating the second connector is adjustable, so that link position of the cage guide on the buntons is adjustable.
According to the connection structure of the cage guide of the utility model embodiment, the first connector and the second connector are distinguished first It is connected and fixed with buntons and cage guide, then the first connector and the second connector is fixed, realize cage guide and buntons Connection.Wherein, the tie point position of the first connector and the second connector is adjustable, is easier to the relative position of cage guide and buntons In adjusting, to be easier to guarantee construction precision.Meanwhile each component can directly carry out group after prefabrication at the construction field (site) Dress, saves the damage and anti-corrosion damage layer at the scene to processes such as component punchings, so as to avoid element structure.It uses as a result, The connection structure design of the cage guide of the utility model embodiment can either effectively promote installation accuracy, and be beneficial to guarantee to be installed into Degree promotes engineering economy and social benefit.
Optional, first connector includes the first side plate and the second side plate, first side plate and described second side Plate is arranged in a mutually vertical manner, and first side plate is connected with the buntons, and second side plate is connected with second connector.
Optional, the connection structure of the cage guide further comprises: bolt kit, and the bolt kit is suitable for described in fixation Second side plate and second connector.
Optional, include the first long hole on second side plate, includes the second long hole on second connector;Described One long hole extends along the width direction of second side plate, and second long hole prolongs along the length direction of second connector It stretches;First long hole and second long hole are equipped with, to make the bolt kit pass through first long hole and institute It states the second long hole and fixation is attached to second side plate and second connector.
Optional, the bolt kit, first long hole and second long hole include two, two described first Long hole is separately positioned on the both ends of second side plate, and two second long holes are separately positioned on the two of second connector End.
Optional, the connection structure of the cage guide further comprises: adjusting gasket, and the adjusting gasket setting is described the Between two side plates and second connector.
Optional, position corresponding with first long hole and second long hole has opening in the adjusting gasket.
In the another aspect of the utility model, the utility model proposes a kind of mine shaft equipments.It is practical new according to this The embodiment of type, is equipped with cage guide and buntons in the pit shaft of the mine shaft equipment, cage guide institute through the foregoing embodiment The connection structure stated is fixed on the buntons.
According to the mine shaft equipment of the utility model embodiment, by using the connection knot of the cage guide of above-described embodiment Structure makes the relative position of cage guide and buntons be easier to adjust, to be easier to guarantee construction precision.Meanwhile in connection structure Each component can be assembled directly at the construction field (site), be saved at the scene to processes such as component punchings, to keep away after prefabrication Damage and the anti-corrosion damage layer of element structure are exempted from.According to the mine shaft equipment of the utility model embodiment by using above-mentioned The connection structure of the cage guide of embodiment can either effectively promote installation accuracy, and be beneficial to guarantee installation progress, promote engineering warp Ji property and social benefit.
Optional, the connection structure includes multiple, length direction setting of multiple connection structures along the cage guide.
The additional aspect and advantage of the utility model will be set forth in part in the description, partially will be from following description In become obvious, or recognized by the practice of the utility model.
Detailed description of the invention
The above-mentioned and/or additional aspect and advantage of the utility model from the description of the embodiment in conjunction with the following figures will Become obvious and be readily appreciated that, in which:
Fig. 1 is the structural schematic diagram according to the connection structure of the cage guide of the utility model embodiment;
Fig. 2 is another viewing angle constructions schematic diagram according to the connection structure of the cage guide of the utility model embodiment;
Fig. 3 is another viewing angle constructions schematic diagram according to the connection structure of the cage guide of the utility model embodiment;
Fig. 4 is the structural schematic diagram of the first connector in the connection structure according to the cage guide of the utility model embodiment;
Fig. 5 is the structural schematic diagram of the second connector in the connection structure according to the cage guide of the utility model embodiment;
Fig. 6 is the structural schematic diagram of adjusting gasket in the connection structure according to the cage guide of the utility model embodiment.
Specific embodiment
The embodiments of the present invention are described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning Same or similar element or element with the same or similar functions are indicated to same or similar label eventually.Below by ginseng The embodiment for examining attached drawing description is exemplary, it is intended to for explaining the utility model, and should not be understood as to the utility model Limitation.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", " length ", " width Degree ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model It is described with simplifying, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation structure It makes and operates, therefore should not be understood as limiting the present invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.The meaning of " plurality " is at least two, such as two in the description of the present invention, It is a, three etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected;It can be directly connected, can also can be in two elements indirectly connected through an intermediary The interaction relationship of the connection in portion or two elements, unless otherwise restricted clearly.For those of ordinary skill in the art For, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention unless specifically defined or limited otherwise, fisrt feature is in the second feature " on " or " down " It can be that the first and second features directly contact or the first and second features are by intermediary mediate contact.Moreover, first is special Sign can be fisrt feature above the second feature " above ", " above " and " above " and be directly above or diagonally above the second feature, or only Indicate that first feature horizontal height is higher than second feature.Fisrt feature under the second feature " below ", " below " and " below " can be with It is that fisrt feature is directly under or diagonally below the second feature, or is merely representative of first feature horizontal height less than second feature.
In the one aspect of the utility model, the utility model proposes a kind of connection structure of cage guide, with reference to Fig. 1~ 3, which is used to cage guide 1 being connected to buntons 2, embodiment according to the present utility model, the connection knot of the cage guide Structure includes: the first connector 3 and the second connector 4.Wherein, the first connector 3 is adapted to be attached on buntons 2;Second connection Part 4 is adapted to be attached on cage guide 1, and the second connector 4 is connected with the first connector 3;First connector 3 and the second connector 4 Tie point position it is adjustable so that position of the cage guide 1 on buntons 2 is adjustable.
According to the connection structure of the cage guide of the utility model embodiment, the first connector and the second connector are distinguished first It is connected and fixed with buntons and cage guide, then the first connector and the second connector is fixed, realize cage guide and buntons Connection.Wherein, the tie point position of the first connector and the second connector is adjustable, is easier to the relative position of cage guide and buntons In adjusting, to be easier to guarantee construction precision.Meanwhile each component can directly carry out group after prefabrication at the construction field (site) Dress, saves the damage and anti-corrosion damage layer at the scene to processes such as component punchings, so as to avoid element structure.It uses as a result, The connection structure design of the cage guide of the utility model embodiment can either effectively promote installation accuracy, and be beneficial to guarantee to be installed into Degree promotes engineering economy and social benefit.
Embodiment according to the present utility model, can be by the method for welding respectively by the first connector and buntons, the Two connectors are attached with cage guide.And then again by the way that the first connector and the second connector are connected and fixed, realize cage guide and The connection of buntons.As a result, when needing to adjust the relative position of cage guide and buntons, by using the first connector and second The long hole reserved on connector is adjusted, to improve construction precision and efficiency.
The structure of embodiment according to the present utility model, cage guide and buntons is not particularly restricted.It is practical new according to this Some embodiments of type, cage guide can use square steel or other fashioned iron, and buntons can use I-steel or other fashioned iron.
It is described in detail below with reference to Fig. 1~6 pair according to the connection structure of the cage guide of the utility model embodiment:
Embodiment according to the present utility model, the first connector 3 include the first side plate 31 and the second side plate 32, the first side plate 31 are arranged in a mutually vertical manner with the second side plate 32, and the first side plate 31 is connected with buntons 2, the second side plate 32 and 4 phase of the second connector Even.As shown in Figure 1, the section of the first connector 3 in the direction of the width is L shape, the first side plate 31 and the second side plate 32 distinguish shape As L-shaped two sides.Wherein, the first side plate 31 can be welded on buntons 2.
Embodiment according to the present utility model, with reference to Fig. 1, the connection structure of the cage guide of the utility model can also be further It include: bolt kit 5.Bolt kit 5 is suitable for fixing the second side plate 32 and the second connector 4.
Embodiment according to the present utility model includes the first long hole 6, the second connection on the second side plate 32 with reference to Figure 4 and 5 It include the second long hole 7 on part 4;First long hole 6 extends along the width direction of the second side plate 32, and the second long hole 7 is along the second connector 4 Length direction extend;First long hole 6 and second long hole 7 are equipped with, to make bolt kit 5 pass through the first long hole 6 Fixation is attached to the second side plate 32 and the second connector 4 with the second long hole 7.On second side plate 32 and the second connector 4 First long hole 6 and the second long hole 7 can be prefabricated in the factory to obtain, and avoid caused by being punched out at the construction field (site) to component Element structure damage.In addition, the first long hole 6 and the second long hole 7 extend in different directions respectively, combination is significantly improved The adjustable freedom degree of first connector 3 and the second connector 4 when connecting installation, to further make cage guide 1 and buntons 2 Relative position can easily be accommodated, and be conducive to improve construction precision.
Embodiment according to the present utility model, bolt kit 5, the first long hole 6 and the second long hole 7 may each comprise two, Two the first long holes 6 are separately positioned on the both ends of the second side plate 32, and two the second long holes 7 are separately positioned on the second connector 4 Both ends.It is used to carry out the second side plate 32 and the second connector 4 using two bolt kits 5 in each connection structure as a result, It is fixed, it on the one hand can be further improved the adjustable extent of component, on the other hand also help the stabilization of cage guide 1 Yu buntons 2 It is fixed.
The connection structure of embodiment according to the present utility model, the cage guide of the utility model can further include: adjust Gasket 8 is saved, adjusting gasket 8 is arranged between the second side plate 32 and the second connector 4.Pass through the thickness of control and regulation gasket 8 as a result, Degree, it is easy to the spacing of the second side plate 32 and the second connector 4 is adjusted, to further make the opposite position of cage guide 1 and buntons 2 Setting can easily be accommodated, and be conducive to improve construction precision.
Embodiment according to the present utility model, as shown in fig. 6, right with the first long hole 6 and the second long hole 7 in adjusting gasket 8 The position answered has opening 9.As a result, when being attached using bolt kit 5 to the second side plate 32 and the second connector 4, spiral shell Bolt external member can pass through opening 9.In some embodiments, adjusting gasket 8 can be formed by elastic material.Pass through control spiral shell as a result, The tightening of bolt external member is loosened, and the thickness of adjusting gasket 8 can be directly controlled.In further embodiments, adjusting gasket 8 can be by Rigid material is formed, and adjusts the relative position of cage guide 1 and buntons 2 by directly selecting the gasket of different-thickness.Thus into One step is convenient for the adjusting of 2 relative position of cage guide 1 and buntons.
In summary, according to the connection structure of the cage guide of the utility model embodiment, by the first long hole, the second long hole and The cooperation of bolt kit realizes buntons and is bolted entirely with cage guide, is three-dimensional adjustable, overcomes original Steel Structural Design and adjust Difficult problem solves vertical shaft installation accuracy and guarantees one of difficult point.Meanwhile buntons is solid with the welding of the first connector in advance Fixed, cage guide is welded and fixed with the second connector in advance, and for all components after prefabrication, construction site need to only carry out the first connection The bolt connection of part, the second connector and adjusting gasket is saved at the scene to processes such as component punchings, so as to avoid component The damage of structure and anti-corrosion damage layer.It can either effectively be promoted using the connection structure design of the cage guide of the utility model embodiment Installation accuracy, and be beneficial to guarantee installation progress, promote engineering economy and social benefit.
In the another aspect of the utility model, the utility model proposes a kind of mine shaft equipments.It is practical new according to this The embodiment of type, the pit shaft of the mine shaft equipment is interior to be equipped with cage guide and buntons, and wherein cage guide is described through the foregoing embodiment Connection structure be fixed on buntons.
According to the mine shaft equipment of the utility model embodiment, by using the connection knot of the cage guide of above-described embodiment Structure makes the relative position of cage guide and buntons be easier to adjust, to be easier to guarantee construction precision.Meanwhile in connection structure Each component can be assembled directly at the construction field (site), be saved at the scene to processes such as component punchings, to keep away after prefabrication The damage of element structure is exempted from.According to the mine shaft equipment of the utility model embodiment by using the cage guide of above-described embodiment Connection structure, can either effectively promote installation accuracy, but be beneficial to guarantee installation progress, promoted engineering economy and society effect Benefit.
Embodiment according to the present utility model, connection structure may include it is multiple, multiple connection structures can be along the length of cage guide Direction setting.
It should be noted that the mine shaft equipment of the utility model has the connection structure of cage guide described above Whole feature and advantage, this is no longer going to repeat them.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the utility model.In the present specification, to the schematic table of above-mentioned term It states and is necessarily directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be with It can be combined in any suitable manner in any one or more of the embodiments or examples.In addition, without conflicting with each other, this field Technical staff can by the feature of different embodiments or examples described in this specification and different embodiments or examples into Row combination and combination.
Although the embodiments of the present invention have been shown and described above, it is to be understood that above-described embodiment is Illustratively, it should not be understood as limiting the present invention, those skilled in the art are in the scope of the utility model Inside it can make changes, modifications, alterations, and variations to the above described embodiments.

Claims (9)

1. a kind of connection structure of cage guide, the connection structure is used to the cage guide being connected to buntons, which is characterized in that Include:
First connector, first connector are adapted to be attached on the buntons;
Second connector, second connector are adapted to be attached on the cage guide, and second connector and described first Connector is connected;
Wherein, the tie point position of first connector and second connector is adjustable, so that the cage guide is in the tank Link position on road beam is adjustable.
2. the connection structure of cage guide according to claim 1, which is characterized in that first connector includes the first side plate With the second side plate, first side plate is arranged in a mutually vertical manner with second side plate, first side plate and the buntons phase Even, second side plate is connected with second connector.
3. the connection structure of cage guide according to claim 2, which is characterized in that further comprise:
Bolt kit, the bolt kit are suitable for fixed second side plate and second connector.
4. the connection structure of cage guide according to claim 3, which is characterized in that include first long on second side plate Hole includes the second long hole on second connector;First long hole extends along the width direction of second side plate, described Second long hole extends along the length direction of second connector;First long hole and second long hole are equipped with, with Just the bolt kit is made to pass through first long hole and second long hole to second side plate and second connector It is attached fixation.
5. the connection structure of cage guide according to claim 4, which is characterized in that the bolt kit, first long hole It include two with second long hole, two first long holes are separately positioned on the both ends of second side plate, two institutes State the both ends that the second long hole is separately positioned on second connector.
6. the connection structure of cage guide according to claim 4 or 5, which is characterized in that further comprise:
Adjusting gasket, the adjusting gasket are arranged between second side plate and second connector.
7. the connection structure of cage guide according to claim 6, which is characterized in that long with described first in the adjusting gasket Hole and the corresponding position of second long hole have opening.
8. a kind of mine shaft equipment, which is characterized in that be equipped with cage guide and buntons, institute in the pit shaft of the mine shaft equipment Cage guide is stated to be fixed on the buntons by the described in any item connection structures of claim 1~7.
9. mine shaft equipment according to claim 8, which is characterized in that the connection structure includes multiple, Duo Gesuo The length direction that connection structure is stated along the cage guide is arranged.
CN201821796400.8U 2018-11-01 2018-11-01 The connection structure of cage guide and mine shaft equipment with it Active CN209195409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821796400.8U CN209195409U (en) 2018-11-01 2018-11-01 The connection structure of cage guide and mine shaft equipment with it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821796400.8U CN209195409U (en) 2018-11-01 2018-11-01 The connection structure of cage guide and mine shaft equipment with it

Publications (1)

Publication Number Publication Date
CN209195409U true CN209195409U (en) 2019-08-02

Family

ID=67410111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821796400.8U Active CN209195409U (en) 2018-11-01 2018-11-01 The connection structure of cage guide and mine shaft equipment with it

Country Status (1)

Country Link
CN (1) CN209195409U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339796A (en) * 2018-11-01 2019-02-15 中国恩菲工程技术有限公司 The connection structure of cage guide and mine shaft equipment with it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339796A (en) * 2018-11-01 2019-02-15 中国恩菲工程技术有限公司 The connection structure of cage guide and mine shaft equipment with it

Similar Documents

Publication Publication Date Title
CN209195409U (en) The connection structure of cage guide and mine shaft equipment with it
CN101781912B (en) Vertical positioning connection structure of tower body of tower mast mechanical equipment and foundation
CN109339796A (en) The connection structure of cage guide and mine shaft equipment with it
CN108252508A (en) A kind of building template and its application method
CN109537600A (en) Foundation pit enclosure wall assembled all steel crown beam
CN107988906A (en) A kind of high intensity anchorage
CN209412834U (en) A kind of assembled crown beam structure of foundation pit enclosure wall
CN205975956U (en) Prefabricated component
CN203654124U (en) Split-type steel box girder
CN105543429B (en) The fixed vexed pit of slab draw-in groove
CN205804363U (en) A kind of floating, fixing convertible pile foundation in water construction platform device
CN213085223U (en) Prefabricated piping lane hoist and mount steel truss
CN202467171U (en) Architectural aluminum alloy mould plate component
CN209277185U (en) A kind of foundation pit enclosure wall assembled all steel crown beam
CN202359570U (en) Piled raft foundation with improved foundation pit slopes
CN205475227U (en) Marine moving platform pile construction is equipped
CN207259962U (en) A kind of cable-stayed bridge Suo Liang connections steel anchor box
CN106436899B (en) A kind of connecting node and installation method of light steel truss structure
CN201581501U (en) Locating connection structure of tower structure and concrete foundation
CN202401386U (en) Cable bridge for frame bridge
CN209212250U (en) A kind of arc side wall steel form
CN206070251U (en) A kind of anti-seismic rail board
CN220599288U (en) Reinforcing structure for connecting existing column with steel column
CN209686648U (en) One kind is constructed for line-styled fabricated shear wall boxlike connecting node
CN214939277U (en) Large-scale steel bracket on concrete structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant