CN209194970U - Detachable vertical well lift platform of superelevation layer - Google Patents

Detachable vertical well lift platform of superelevation layer Download PDF

Info

Publication number
CN209194970U
CN209194970U CN201822049917.7U CN201822049917U CN209194970U CN 209194970 U CN209194970 U CN 209194970U CN 201822049917 U CN201822049917 U CN 201822049917U CN 209194970 U CN209194970 U CN 209194970U
Authority
CN
China
Prior art keywords
bar
diagonal brace
brace
station
main brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822049917.7U
Other languages
Chinese (zh)
Inventor
武飞龙
李健
李琦
曲雅楠
岳崇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201822049917.7U priority Critical patent/CN209194970U/en
Application granted granted Critical
Publication of CN209194970U publication Critical patent/CN209194970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a detachable vertical well lift platform in superelevation layer, it includes: the operation panel, main diagonal brace, the bracing piece, the axis of rotation, fixed axle and round pin axle, the welding of operation panel top four corners department has rings, there is main diagonal brace below the operation panel through pivot swing joint, there is the pole setting below the operation panel through pivot swing joint, there is first diagonal brace outside main diagonal brace through pivot movable mounting, be equipped with the axis of rotation in the pole setting, axis of rotation one side is equipped with the fixed axle, the fixed axle is arranged in first diagonal brace, the round pin axle vertically runs through first diagonal brace and fixed axle, main diagonal brace inboard has the second diagonal brace through pivot swing joint. The above-mentioned embodiment of the utility model, hang detachable vertical well lifting platform to the operation surface layer through the tower crane and realize the well protection, guarantee construction operation safety, and the installation is dismantled conveniently, connects the fastening, accomodates convenient to carry after collapsible.

Description

A kind of detachable vertical hoistway promotion platform of Super High
Technical field
The utility model belongs to floor hoistway technical field of construction, more particularly to a kind of detachable vertical well of Super High Road promotes platform.
Background technique
China " civil buildings design general rule " GB50352-2005 regulation: when building height is more than 100m, no matter house and Public building is super high-rise building.In August, 1972 is built in the international high level that the city, Bethlehem of Pennsylvania, USA is held It builds in meeting, specially discusses and propose the classification and definition of skyscraper.With the continuous development of building trade, Super High is more next It is more welcome by people, this results in the construction of super high-rise building more and more.
And the difficulty of construction at vertical hoistway hole is larger in Super High, in super high rise structure work progress, how to guarantee The effective protection at vertical hoistway hole guarantees construction operation safety, how to accomplish the detachable utilization of protective platform, often surpass Heavy difficult point in high-level structure work progress.
Utility model content
The purpose of the utility model is to provide a kind of detachable vertical hoistways of Super High to promote platform, to solve Super High In vertical hoistway hole difficulty of construction it is larger, vertical hoistway entrance construction risk is larger, and protective platform installing and dismounting is difficult The technical issues of.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a kind of detachable vertical hoistway of Super High mentions Peaceful comprising: station, main brace bar, support rod, rotation axis, fixing axle and pin shaft, station top four corners It is welded with hanging ring, the station lower section is connected with main brace bar by shaft, lives below the station by shaft Dynamic to be connected with upright bar, the main brace bar outside is movably installed with the first diagonal brace by shaft, is equipped with rotation axis in the upright bar, The rotation axis side is equipped with fixing axle, and the fixing axle is placed in the first diagonal brace, and the pin shaft longitudinally penetrates through the first diagonal brace With fixing axle, the main brace bar inside is connected with the second diagonal brace by shaft, is equipped with hook, institute below the station It states and is provided with hanging hole on the second diagonal brace, the hanging hole is placed in hook.
The detachable vertical hoistway of for example above-mentioned Super High of the utility model promotes platform, further, the station one End lower section is symmetrically arranged with two main brace bars, is connected with cross bar one among the main brace bar;Below the station other end Two upright bars are symmetrically arranged with, cross bar two is connected among the upright bar, the upright bar lower end is equipped with support rod, and the support rod is logical Expansion bolt is crossed to connect with hoistway hole edge.
The detachable vertical hoistway of for example above-mentioned Super High of the utility model promotes platform, further, the main brace bar Lower section is equipped with the first fixation hole, and the second fixation hole is equipped with below the upright bar, and the main brace bar and upright bar are Contraband shape steel pipe, The planar end surface of the main brace bar is placed in outside, and the planar end surface of the upright bar is placed in inside, main oblique after the main brace bar rotation The planar end surface of strut and the flush end face contact of upright bar, and the first fixation hole and the second fixation hole are overlapped, the first fixation hole and second It is worn in fixation hole and is connected to bolt.
The detachable vertical hoistway of for example above-mentioned Super High of the utility model promotes platform, further, in the upright bar Between be provided with notch, after the fixing axle rotation, contacted across notch with the first diagonal brace.
In the above embodiments of the present invention, detachable vertical hoistway is promoted by platform by tower crane and is hung to operation Surface layer realizes hoistway protection, and cooperation diagonal brace is supported upright bar, guarantees construction operation safety, and easy for assemble or unload, connection Fastening, is stored after foldable, easy to carry.
Detailed description of the invention
By made detailed description in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will It becomes more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, in which:
Fig. 1 is that a kind of detachable vertical hoistway of the Super High of embodiment promotes platform schematic diagram;
Fig. 2 is the scheme of installation that a kind of detachable vertical hoistway of the Super High of embodiment promotes platform;
Fig. 3 is the first diagonal brace, upright bar, rotation axis, the connection schematic diagram of fixing axle and pin shaft.
In attached drawing, parts list represented by the reference numerals are as follows:
1, hanging ring;2, station;3, main brace bar;4, cross bar one;5, the first fixation hole;6, the first diagonal brace;7, second tiltedly Support;8, upright bar;9, support rod;10, the second fixation hole;11, cross bar two;12, it links up with;13, rotation axis;14, fixing axle;15, it sells Axis.
Specific embodiment
Hereinafter, the detachable vertical hoistway of Super High for describing the utility model with reference to the accompanying drawings promotes the reality of platform Apply example.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein The technical solution of any obvious substitutions and modifications out.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section Shape and its correlation.It note that for the ease of clearly showing the structure of each component of the utility model embodiment, respectively It is not drawn according to identical ratio between attached drawing.Identical reference marker is for indicating identical part.
Fig. 1-Fig. 3 shows a kind of detachable vertical hoistway of Super High of embodiment of the utility model and promotes platform, packet It includes: station 2, main brace bar 3, support rod 9, rotation axis 13, fixing axle 14 and pin shaft 15, the welding of 2 top four corners of station There is a hanging ring 1, main brace bar 3 is connected with by shaft below station 2, is connected with below station 2 by shaft Upright bar 8 is movably installed with the first diagonal brace 6 by shaft on the outside of main brace bar 3, is equipped with rotation axis 13, rotation axis 13 1 in upright bar 8 Side is equipped with fixing axle 14, and fixing axle 14 is placed in the first diagonal brace 6, and pin shaft 15 is longitudinal to penetrate through the first diagonal brace 6 and fixing axle 14, master Second diagonal brace 7 is connected with by shaft on the inside of hound 3, hook 12 is equipped with below station 2, is provided on the second diagonal brace 7 Hanging hole, hanging hole are placed in hook 12.
In the utility model above-described embodiment, two main brace bars 3, main brace are symmetrically arranged with below 2 one end of station Cross bar 1 is connected among bar 3;Two upright bars 8 are symmetrically arranged with below 2 other end of station, are connected with cross bar two among upright bar 8 11,8 lower end of upright bar is equipped with support rod 9, and support rod 9 is connect by expansion bolt with hoistway hole edge.Pass through cross bar 1 and cross 2 11 pairs of main brace bars 3 of bar and upright bar 8 further function as support firm effect, are connect by support rod 9 with hoistway hole edge, It can be supported to platform is promoted.
In the utility model above-described embodiment, it is equipped with the first fixation hole 5 below main brace bar 3, the is equipped with below upright bar 8 Two fixation holes 10, main brace bar 3 and upright bar 8 are Contraband shape steel pipe, and the planar end surface of main brace bar 3 is placed in outside, the flush end of upright bar 8 Face is placed in inside, after main brace bar 3 rotates, the planar end surface of main brace bar 3 and the flush end face contact of upright bar 8, and the first fixation hole 5 It is overlapped with the second fixation hole 10, is worn in the first fixation hole 5 and the second fixation hole 10 and be connected to bolt.Pass through the flush end of main brace bar 3 First fixation hole 5 and the second fixation hole 10 are attached by the flush end face contact in face and upright bar 8 convenient for bolt.
In the utility model above-described embodiment, the first diagonal brace 6 is Contraband shape steel pipe, and the middle of upright bar 8 is provided with notch, Gu It after dead axle 14 rotates, is contacted across notch with the first diagonal brace 6, the first diagonal brace 6 is provided with hole with 14 longitudinal direction of fixing axle, and pin shaft 15 is interspersed In hole.After fixing axle 14 is rotated by rotation axis 13, fixing axle 14 can be rotated in the first diagonal brace 6, pass through pin shaft 15 are inserted in hole, and fixing axle 14 and the first diagonal brace 6 can be fixed, so that the first diagonal brace 6 and upright bar 8 are fixed.
In the utility model above-described embodiment, it is painted with antirust paint for the former material processing of platform for making, passes through antirust Paint prevents platform from getting rusty, and improves service life.
In the utility model above-described embodiment, main brace bar 3 and upright bar 8 can be customized according to the height at floor hole, Meet main brace bar 3 and the upright bar 8 of floor hole height by customizing, the staff that is more convenient for constructs.
It uses principle and process: after the completion of first floor hoistway concreting, support rod 9 being fixed on by expansion bolt Hoistway hole edge, and station 2 is made to be located at the edge at upper one layer of hoistway hole simultaneously, main brace bar 3 is rotated, is made It obtains the first fixation hole 5 to be overlapped with the second fixation hole 10, the first fixation hole 5 and the second fixation hole is then punctured by fixing bolt In 10, the connection of main brace bar 3 and upright bar 8 is completed, the first diagonal brace 6 is rotated, the first brace 6 is contacted with upright bar 8, then Fixing axle 14 is rotated by rotation axis 13, is placed in fixing axle 14 in first diagonal brace 6, it is longitudinal through the by pin shaft 15 One diagonal brace 6 and fixing axle 14 complete the connection of the first diagonal brace 6 and upright bar 8, finally rotate the second diagonal brace 7, the second diagonal brace 7 is hung On the hook 12 under station 2, the connection of the second diagonal brace 7 and station 2 is completed;
It hangs wirerope on hanging ring 1, tower crane is connected above wirerope, platform will be promoted to corresponding hoistway by tower crane, After promotion platform is hung to work layer, the binding of work surface reinforcing bar, molding, concrete pouring construction are carried out, when upper layer concreting It completes, after the completion of wall form dismounting, hoistway protective device promotion can be carried out, after station is promoted, ensuring that station is solid People can be gone up after fixed and sets up crosshead;
After the completion of construction, support rod 9 is removed at hoistway edge, main brace bar 3, the first diagonal brace 6, the second diagonal brace 7 are torn open Under, device can be folded by shaft, convenient transportation and storage and turnover utilize.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also Other combinations between each technical characteristic can be carried out according to the purpose of invention, be subject to the purpose for realizing the utility model.

Claims (4)

1. a kind of detachable vertical hoistway of Super High promotes platform characterized by comprising station, main brace bar, support Bar, rotation axis, fixing axle and pin shaft, station top four corners are welded with hanging ring, pass through shaft below the station It is connected with main brace bar, the station lower section is connected with upright bar by shaft, passes through on the outside of the main brace bar Shaft is movably installed with the first diagonal brace, and rotation axis is equipped in the upright bar, and the rotation axis side is equipped with fixing axle, the fixation Axis is placed in the first diagonal brace, and the pin shaft longitudinally penetrates through the first diagonal brace and fixing axle, passes through shaft on the inside of the main brace bar It is connected with the second diagonal brace, hook is equipped with below the station, is provided with hanging hole on second diagonal brace, the hanging hole is placed in In hook.
2. the detachable vertical hoistway of Super High according to claim 1 promotes platform, which is characterized in that the station Two main brace bars are symmetrically arranged with below one end, are connected with cross bar one among the main brace bar;Under the station other end Side is symmetrically arranged with two upright bars, and cross bar two is connected among the upright bar, and the upright bar lower end is equipped with support rod, the support rod It is connect by expansion bolt with hoistway hole edge.
3. the detachable vertical hoistway of Super High according to claim 1 promotes platform, which is characterized in that the main brace It is equipped with the first fixation hole below bar, the second fixation hole is equipped with below the upright bar, the main brace bar and upright bar are Contraband shape steel Pipe, the planar end surface of the main brace bar are placed in outside, and the planar end surface of the upright bar is placed in inside, after the main brace bar rotation, The planar end surface of main brace bar and the flush end face contact of upright bar, and the first fixation hole and the second fixation hole are overlapped, the first fixation hole and It is worn in second fixation hole and is connected to bolt.
4. the detachable vertical hoistway of Super High according to claim 1 promotes platform, which is characterized in that described first tiltedly Support is Contraband shape steel pipe, and the middle of the upright bar is provided with notch and connects after the fixing axle rotation across notch and the first diagonal brace Touching, first diagonal brace and fixing axle are longitudinally provided with hole, and the pin shaft is interspersed in hole.
CN201822049917.7U 2018-12-07 2018-12-07 Detachable vertical well lift platform of superelevation layer Active CN209194970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822049917.7U CN209194970U (en) 2018-12-07 2018-12-07 Detachable vertical well lift platform of superelevation layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822049917.7U CN209194970U (en) 2018-12-07 2018-12-07 Detachable vertical well lift platform of superelevation layer

Publications (1)

Publication Number Publication Date
CN209194970U true CN209194970U (en) 2019-08-02

Family

ID=67428168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822049917.7U Active CN209194970U (en) 2018-12-07 2018-12-07 Detachable vertical well lift platform of superelevation layer

Country Status (1)

Country Link
CN (1) CN209194970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116397864A (en) * 2023-06-07 2023-07-07 山西省安装集团股份有限公司 Scaffold device for open caisson construction
CN116397864B (en) * 2023-06-07 2023-08-18 山西省安装集团股份有限公司 Scaffold device for open caisson construction

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN201228206Y (en) Self-made small-sized hoisting machine
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN207268073U (en) Novel flexible formwork bearing frame
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN209194970U (en) Detachable vertical well lift platform of superelevation layer
CN205531399U (en) Interim support frame is installed in high -order steel truss segmentation
CN105952129A (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN207090788U (en) A kind of special tie-beam for being used for two cranes and synchronously lifting
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN204456816U (en) One can promote supporting leg type elevator hoistway construction platform
CN203654754U (en) Double-layered overhanging type discharging platform
CN110453689A (en) Circular foundation pit lining wall formwork construction system and construction method
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN205444451U (en) H-shaped steel combined base for light house
CN204112692U (en) Simple and easy lift-type wellbore operations platform
CN201687083U (en) Suspension type template supporting structure with high-position integrated structure
CN203320922U (en) Supporting device for forming of elevator shaft template
CN210597326U (en) Precast concrete bearing structure that can assemble
CN202672694U (en) Circulating operation platform for hoistway construction
CN209339010U (en) Walking bridge floor faces side barrel structure

Legal Events

Date Code Title Description
GR01 Patent grant