CN209162648U CN201821763973.0U CN201821763973U CN209162648U CN 209162648 U CN209162648 U CN 209162648U CN 201821763973 U CN201821763973 U CN 201821763973U CN 209162648 U CN209162648 U CN 209162648U
Authority
CN
China
Prior art keywords
support
transfer
support platform
platform
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821763973.0U
Other languages
Chinese (zh)
Inventor
王新力
任勇
杨科健
黄禹
董亮
耿立峰
李俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201821763973.0U priority Critical patent/CN209162648U/en
Application granted granted Critical
Publication of CN209162648U publication Critical patent/CN209162648U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of support devices for shifting between very heavy top beam in the construction of high-speed rail box beam erection, including shifting support platform, three support frames are fixed with below transfer support platform, it is equipped with bolt feet below each support post, rotates bolt feet to adjust the height for the transfer support platform being located at the top of support post;The bottom for shifting support platform is equipped with longitudinal reinforcement reinforcing bar and transversely strengthening reinforcing bar, and the both ends of transfer support platform upper surface are equipped with gently sloping surface;Lateral connection is equipped between two adjacent support posts in transfer support platform length to support.When encountering T-type pinner in the construction of high-speed rail box beam erection, bracket is shifted between the beam of jack to be placed at pier cap, regulate the spiral feet below support post, transfer support platform is overlapped on the pinner both ends for needing to shift jack, it is toppled, is caused danger with preventing jack from rollover occurring in transfer process.Its is simple and quick, and safety labor-saving effectively raises construction efficiency.

Description

Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection
Technical field
The utility model relates to a kind of support device, particularly in high speed railway box Beams Erection Construction, temporary support The support device shifted between very heavy top beam.
Background technique
China express railway is built the booming period that is at present, in newly-built high-speed railway route, shared by bridge For specific gravity close to 50%, box beam erection construction is the construction method generally used in current science of bridge building.When high-speed railway bridge line When road is in earthquake octave band, need to install additional vertical and horizontal girder falling facility, design support pinner shape is T-type, this is just right Transfer causes very big difficulty between the beam of temporary support jack in box beam erection work progress.
Utility model content
For the above-mentioned prior art, the utility model provides a kind of for temporarily propping up in high speed railway box Beams Erection Construction The support device shifted between very heavy top beam is supportted, jack used in support box beam erection can be consolidated, to realize that jack exists It is shifted between beam during box beam erection, simple and quick, safety labor-saving effectively raises construction efficiency.
In order to solve the above-mentioned technical problem, the utility model one kind between very heavy top beam in the construction of high-speed rail box beam erection for turning The support device of shifting, including support platform is shifted, support frame, support frame as described above packet are fixed with below the transfer support platform Three support posts along transfer support platform length direction setting are included, are equipped with bolt feet below each support post, The bolt feet is rotated to adjust the height for the transfer support platform being located at the top of support post;The transfer support platform Bottom is equipped with longitudinal reinforcement reinforcing bar and transversely strengthening reinforcing bar, and the both ends of the transfer support platform upper surface are equipped with gently sloping surface;Edge It shifts and is equipped with lateral connection support between two support posts adjacent in support platform length.
Further, the support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection of the utility model, Wherein, transfer is that jack shifts between T-type pinner upper beam between the beam of jack, the face wheel profile of the transfer support platform Shape is the area shape of remainder after the small semicircle for removing the center of circle part on the basis of one semicircular, the radius of small semicircle Greater than the width of T-type pinner.
It is located in the middle between support post and the transversely strengthening reinforcing bar of the transfer support platform bottom and is equipped with bearing diagonal.
Compared with prior art, the utility model has the beneficial effects that since the utility model on pier cap by being arranged Suitable jack carries out shifting the platform of shifting between beam, and passes through the reinforcing of support post and multiple tracks reinforcing bar, is box beam erection mistake A stable platform has been built in transfer between the beam of interim jack in journey.It, can when support platform reaches the position of need of work Spiral feet below support post is adjusted, transfer support cushion is put surely well, prevents jack from sending out in transfer process Raw rollover is toppled, and is caused danger.The utility model can consolidate jack used in support box beam erection, to realize jack It is shifted between beam during box beam erection, simple and quick, safety labor-saving effectively raises construction efficiency.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the utility model support device.
In figure: 1- bolt feet, 2- support post, the support of 3- lateral connection, 4- bearing diagonal, 5- shift support platform, 6- Gently sloping surface, 7- longitudinal reinforcement reinforcing bar, 8- transversely strengthening reinforcing bar.
Specific embodiment
The utility model is described in further detail With reference to embodiment.
As shown in Figure 1, the utility model proposes it is a kind of for shifting between very heavy top beam in the construction of high-speed rail box beam erection The lower section of support device, including transfer support platform 5, the transfer support platform 5 is fixed with support frame, and support frame as described above includes Along three support posts 2 of transfer 5 length direction of support platform setting, the lower section of each support post 2 is equipped with bolt feet 1, the bolt feet 1 is rotated to adjust the height for the transfer support platform 5 for being located at 2 top of support post, i.e. 2 bottom of support post The bolt feet 1 in portion can carry out rotation and lifting according to pier cap situation;The bottom of the transfer support platform 5 is equipped with longitudinal reinforcement The both ends of reinforcing bar 7 and transversely strengthening reinforcing bar 8, transfer 5 upper surface of support platform are equipped with gently sloping surface 6, can facilitate jack Transfer support platform 5 up and down;Lateral connection branch is equipped between two adjacent support posts 2 in transfer 5 length of support platform Support 3.
Due to the utility model be applicable in occasion be more specifically jack beam between transfer be jack on T-type pinner It is shifted between beam, therefore, the face profile shape of the transfer support platform 5 is to remove the center of circle portion on the basis of one semicircular The area shape of remainder after the small semicircle divided, the radius of small semicircle are greater than the width of T-type pinner.
In order to enhance the stability of support device, it is being located in the middle support post 2 and 5 bottom of transfer support platform Transversely strengthening reinforcing bar 8 between be equipped with bearing diagonal 4.
When realizing that jack shifts between beam using the utility model support device, the support device of the utility model is moved It moves to operating position, that is, needs to carry out the pier position shifted between very heavy top beam.If using common feet, stability compared with Difference, therefore, bolt feet 1 in the utility model be equipped with rotation and lifting structure (lifting structure can be screw bolt and nut, but It is without being limited thereto) after support device reaches operating position, by adjusting bolt feet 1, enable to shift bracket in pier cap top pad It puts well surely, avoids jack from turning on one's side in moving process and topple, cause danger.By the transfer support platform of jack transfer bracket The gently sloping surface 6 of two sides is overlapped on the pier cap for needing shift between very heavy top beam, is moved to jack using rolling rod very heavy On top transfer bracket.The lower section for shifting support platform 5 is provided with three longitudinal reinforcement reinforcing bars 7 and five transversely strengthening reinforcing bars 8, really It protects jack transfer bracket and is able to bear the weight that box beam erection uses jack 350Kg.Using rolling rod frame jack from transfer The other side that pinner is moved in support platform completes to shift work between the beam of jack.Jack is smoothly placed on to frame case Behind the pinner side of beam, jack transfer bracket can be smoothly removed, box beam erection construction is continued.
Embodiment: when encountering T-type pinner in the construction of high-speed rail box beam erection, transfer bracket is placed on pier between the beam of jack At cap, the spiral feet below support post is regulated, transfer support platform is overlapped on the pinner both ends for needing to shift jack, It puts transfer support cushion surely well, is toppled, caused danger with preventing jack from rollover occurring in transfer process.The utility model branch Support arrangement is applied in newly-built overpass grand bridge box beam erection construction, and the utility model support device, which is placed in, more to be carried out Bolt feet 1 is adjusted to horizontal working condition is consolidated, utilizes rolling by the lower section of the T-type pinner shifted between the very heavy top beam of box beam Jack is moved to platform gently sloping surface 6 by rod and crowbar, by shifting support platform 5, jack is carried out to shift work between beam, complete After shifting between Cheng Liang, pier cap is smoothly withdrawn from by bracket is shifted between beam, carries out next hole box beam erection construction.The utility model branch Support arrangement can facilitate adjustment transfer support platform to adapt to pinner height by the rotation and lifting of spiral feet 1, realize supporting role. Lateral connection support 3 between each support post and bearing diagonal 4 simultaneously, can guarantee to support solid and reliable.The utility model Jack used in support box beam erection can be consolidated, is shifted between beam of jack during box beam erection with realizing, Simple and quick, safety labor-saving effectively raises construction efficiency.
Although the utility model is described above in conjunction with figure, the utility model is not limited to above-mentioned tool Body embodiment, the above mentioned embodiment is only schematical, rather than restrictive, the ordinary skill people of this field Member, in the case where not departing from the utility model aims, can also make many variations under the enlightenment of the utility model, these It belongs within the protection of the utility model.

Claims (3)

1. a kind of support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection, which is characterized in that including transfer Support platform (5), support frame is fixed with below the transfer support platform (5), and support frame as described above includes flat along transfer support Three support posts (2) of platform (5) length direction setting, are equipped with bolt feet (1) below each support post (2), revolve Turn the bolt feet (1) to adjust the height for the transfer support platform (5) being located at the top of support post (2);The transfer branch The bottom for supportting platform (5) is equipped with longitudinal reinforcement reinforcing bar (7) and transversely strengthening reinforcing bar (8), transfer support platform (5) upper surface Both ends be equipped with gently sloping surface (6);It is equipped with laterally between two adjacent support posts (2) in transfer support platform (5) length Connection support (3).
2. the support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection according to claim 1, feature It is, transfer is that jack shifts between T-type pinner upper beam between the beam of jack, the face wheel of transfer support platform (5) Profile shape is the area shape of remainder after the small semicircle for removing the center of circle part on the basis of one semicircular, small semicircle Radius is greater than the width of T-type pinner.
3. the support device according to claim 1 or claim 2 for shifting between very heavy top beam in the construction of high-speed rail box beam erection, special Sign is, is located in the middle between support post (2) and the transversely strengthening reinforcing bar (8) of described transfer support platform (5) bottom and sets There are bearing diagonal (4).
CN201821763973.0U 2018-10-28 2018-10-28 Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection Active CN209162648U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821763973.0U CN209162648U (en) 2018-10-28 2018-10-28 Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821763973.0U CN209162648U (en) 2018-10-28 2018-10-28 Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection

Publications (1)

Publication Number Publication Date
CN209162648U true CN209162648U (en) 2019-07-26

Family

ID=67335657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821763973.0U Active CN209162648U (en) 2018-10-28 2018-10-28 Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection

Country Status (1)

Country Link
CN (1) CN209162648U (en)

Similar Documents

Publication Publication Date Title
CN2846480Y (en) Guide beam type bridging machine for passing through tunnel
CN203007849U (en) Movable construction device for cast-in-place concrete crash barriers with hanging eaves
CN107386128A (en) Double-T shaped beam bridge changes beam construction system
CN207161110U (en) One kind construction open cut horseshoe shaped section tunnel roof self-travel type is mobile trolley used
CN212336714U (en) Self-propelled truss supporting template
CN105484164B (en) Spanning type bailey beam bracket and construction method thereof
CN205474844U (en) Straddle type beiLei beam support
CN106381814A (en) Cast-in-cantilever structure of movable crane formwork of zigzag-form steel web continuous box beam and construction method of cast-in-cantilever structure
CN207567659U (en) Double-T shaped beam bridge changes beam construction system
CN109914263B (en) Construction method for low-clearance beam erection of crossed underpass bridge
CN205857044U (en) A kind of novel construction beam
CN108914776B (en) A basket is hung in construction for municipal works and room are built
CN110904863A (en) Beam changing method with foldable beam changing machine
CN205557336U (en) Construct high mound from promoting walking template device
CN209162648U (en) Support device for being shifted between very heavy top beam in the construction of high-speed rail box beam erection
CN202148493U (en) Existing line reinforcing device in inclined jacking construction of penetrating railway frame bridge from the lower part with small incline angle and large height
CN112144401B (en) Bridge girder erection machine over-span method based on curve track and large longitudinal slope environment
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN206157557U (en) Hollow gate -type mound of railway bearing formula large -span prestressed concrete
CN106400700A (en) Double-line cantilever type bridge formation machine
CN113832863B (en) Method for double-frame bridge
CN217078420U (en) Linear girder steel self-propelled installation device that slides of adjustable bridge
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN105603878B (en) A kind of quick method for traversing in concrete box girder high-altitude
CN210194435U (en) Movable trolley for transverse prestress construction of continuous beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant