CN209161244U - For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material - Google Patents
For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material Download PDFInfo
- Publication number
- CN209161244U CN209161244U CN201821892413.5U CN201821892413U CN209161244U CN 209161244 U CN209161244 U CN 209161244U CN 201821892413 U CN201821892413 U CN 201821892413U CN 209161244 U CN209161244 U CN 209161244U
- Authority
- CN
- China
- Prior art keywords
- channel steel
- support frame
- waterproof
- elevator
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
For efficiently solving super high-rise building duplex elevator waterproof, the tool of preventing dropped material, in the elevator shaft above elevator, including the sequentially spaced anti-water flushing device of top droop formula from top to bottom, working plate and second layer waterproof shock plate, the anti-water flushing device of top droop formula includes the waterproof layer being sequentially arranged from outside to inside, high-intensitive strike plate and channel steel support frame one, working plate and second layer waterproof shock plate are laid on respectively on channel steel support frame two and channel steel support frame three, the column that support is used to support channel steel support frame two and second layer waterproof shock plate is equipped between channel steel support frame two and working plate, three bottom surface of channel steel support frame and one low side bottom surface of channel steel support frame are equipped with longitudinal retractable support lever.The setting of the utility model three-layer protection plate prevents the Natural Water of construction water, rainy day from entering hoistway, damages to lift facility, ensure that construction elevator can be used under various weather conditions.
Description
Technical field
The utility model belongs in construction the technical field for being directed to construction of super highrise building elevator, especially suitable for making
The vertical transport pressure of engineering staff and material is solved with duplex elevator, solves super high-rise building jump particularly for efficient
The tool of layer elevator waterproof, preventing dropped material.
Background technique
For elevator class special equipment, water is fatal hidden danger, therefore during elevator installation and operation, it is necessary to accomplish thorough
Bottom is cut off the water supply, and top elevator shaft structure hot work in progress, and hoistway is in outdoor state, and construction water, the Natural Water of rainy day are very
It is possible that flowing into hoistway, lift facility is damaged, while elevator shaft worker is constructing, the risk of various high pendant objects is always
In the presence of.Therefore, the installation of super high-rise building duplex elevator and operation phase security protection, are the construction Difficulties of construction elevator.
The tool of super high-rise building duplex elevator waterproof, preventing dropped material is by setting up preventing dropped material above moving machine room, preventing
Rainwater multiple tracks protects interlayer to have the function that security protection.It properly protects between frame and hoistway simultaneously, prevents object
It falls, and elevator shaft is separated by closing screen, thus guarantee that construction elevator can be used under various weather conditions, round-the-clock 24
Hour operation.
Utility model content
The purpose of the utility model is to provide for efficiently solving super high-rise building duplex elevator waterproof, the work of preventing dropped material
Tool, to solve construction water, Natural Water of rainy day etc. in the prior art may flow elevator shaft, damage to lift facility,
Then the technology for influencing the safe and highly efficient operation of super high-rise building duplex elevator is asked.
To achieve the above objectives, the present invention adopts the following technical solutions:
Elevator for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, above elevator
In road, it is characterised in that: including the sequentially anti-water flushing device of spaced top droop formula, working plate and the second layer from top to bottom
Waterproof shock plate, the anti-water flushing device of top droop formula include the waterproof layer being sequentially arranged from outside to inside, high-intensitive protecting against shock
Plate and channel steel support frame one, the working plate and second layer waterproof shock plate are laid on channel steel support frame two and channel steel respectively
Support, which is equipped with, in braced frame three, between the channel steel support frame two and working plate is used to support channel steel support frame two and the
The column of two layers of waterproof shock plate, three bottom surface of channel steel support frame and one low side bottom surface of channel steel support frame are equipped with longitudinal direction
Retractable support lever, described longitudinal direction retractable support lever one end are put off in the hole to be provided being set on rear wall, and the other end is overlapped on
On floor.
It is further preferred that three bottom surface of channel steel support frame is at least provided with three longitudinal retractable support levers.
Further, I-steel cushion block, the I-steel pad are equipped between longitudinal retractable support lever and floor
Block is the I-steel of Q235 steel production, and I-steel specification is the mm of 200 mm × 200 × 8 mm × 12mm.
Further, the channel steel support frame one, channel steel support frame two are identical with three structure of channel steel support frame,
For frame structure made of being welded and fixed as horizontal, cannelure steel, it is divided into 450mm and/or 500mm between channel steel, channel steel is by Q235 steel
The channel steel that the specification of material production is 160mm × 63mm.
Further, the high-intensitive strike plate, second layer waterproof shock plate and working plate be Q235 grades, 5mm ~
7mm thick steel plate, and it is equipped with guide rail preformed hole.
Further, longitudinal retractable support lever includes external square steel and is built in the scalable of external square steel both ends
Bar.
In addition, being equipped between the high intensity strike plate and adjacent elevator shaft for preventing water from leaving from gap
Water-proof strip.
It is further preferred that the column is two rows, it is arranged respectively close to the elevator shaft side wall of the two sides Hou Qiang.
Compared with prior art the utility model have the characteristics that and the utility model has the advantages that
The utility model is rushed in the anti-water flushing device of top droop formula of elevator shaft top layout, working plate second layer waterproof
Plate is hit as protective barrier, above-mentioned three-layer protection plate prevents falling object from falling through into hoistway, while the waterproof layer at top, Yi Jigao
The water-proof strip being laid between intensity strike plate and elevator inner wall, being used in combination of waterproof layer and water-proof strip prevent construction water,
The Natural Water of rainy day enters hoistway, damages to lift facility, ensure that construction elevator can make under various weather conditions
With round-the-clock 24 hours safe and highly efficient operations, it is ensured that the overall progress of engineering.
Detailed description of the invention
Fig. 1 is the structure of tool of the utility model for efficiently solving super high-rise building duplex elevator waterproof, preventing dropped material
Schematic diagram;
Fig. 2 be the utility model relates to column and channel steel support frame two structural schematic diagram;
Fig. 3 be the utility model relates to longitudinal retractable support lever set up structural schematic diagram.
Appended drawing reference: 1- working plate;2- second layer waterproof shock plate;3- waterproof layer;4- high intensity strike plate;5- channel steel
Braced frame one;6- channel steel support frame two;7- channel steel support frame three;8- column;The longitudinal direction 9- retractable support lever;After 10-
Wall;11- hole to be provided;12- floor;13- I-steel cushion block;15- elevator shaft side wall;16- elevator shaft.
Specific embodiment
To make technological means of the utility model, character of innovation, reaching purpose and effect is easy to understand, below
The present invention will be further described.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, be it is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art can also be public based on the claim of this application book and specification institute
For the content opened using obvious other technical solutions, these technical solutions include using doing to the embodiment recorded herein
The technical solution of any obvious substitutions and modifications out.
For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, as shown in Figure 1, being set on elevator
In the elevator shaft 16 of side, including the sequentially anti-water flushing device of spaced top droop formula, working plate 1 and second from top to bottom
Layer waterproof shock plate 2, the anti-water flushing device of top droop formula include the waterproof layer 3 being sequentially arranged from outside to inside, high-intensitive protecting against shock
Plate 4 and channel steel support frame 1, working plate 1 and second layer waterproof shock plate 2 are laid on channel steel support frame 26 and slot respectively
On bracing members frame 37, between channel steel support frame 26 and working plate 1 be equipped with support be used to support channel steel support frame 26 and
The column 8 of second layer waterproof shock plate 2,37 bottom surface of channel steel support frame are equipped with vertical with one 5 low side bottom surface of channel steel support frame
To retractable support lever 9, as shown in figure 3,9 one end of longitudinal retractable support lever is put off in the hole to be provided 11 being set on rear wall 10
Interior, the other end is overlapped on floor 12, and 37 bottom surface of channel steel support frame is longitudinal at least provided with three longitudinal retractable support levers 9
I-steel cushion block 13 is equipped between retractable support lever 9 and floor 12, I-steel cushion block 13 is the I-shaped of Q235 steel production
Steel, I-steel specification are the mm of 200 mm × 200 × 8 mm × 12mm, channel steel support frame 1, channel steel support frame 26
It is identical with 37 structure of channel steel support frame, as shown in Fig. 2, being frame structure made of being welded and fixed as horizontal, cannelure steel, slot
450mm and/or 500mm is divided between steel, channel steel is the channel steel for being 160mm × 63mm by the specification that Q235 steel make;It is high-intensitive
Strike plate 4, second layer waterproof shock plate 2 and working plate 1 are Q235 grades, 5mm ~ 7mm thick steel plate, and it is reserved to be equipped with guide rail
Hole;Longitudinal retractable support lever 9 includes external square steel and the telescopic rod for being built in external square steel both ends;High-intensitive strike plate
The water-proof strip for preventing water from leaving from gap is equipped between 4 and adjacent elevator shaft;Column 8 is two rows, respectively close to rear
The elevator shaft side wall 15 of 10 two sides of wall is arranged.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (8)
1. the tool for efficiently solving super high-rise building duplex elevator waterproof, preventing dropped material, the elevator shaft above elevator
(16) in, it is characterised in that: including from top to bottom sequentially the anti-water flushing device of spaced top droop formula, working plate (1) and
Second layer waterproof shock plate (2), the anti-water flushing device of top droop formula include the waterproof layer (3) being sequentially arranged from outside to inside,
High-intensitive strike plate (4) and channel steel support frame one (5), the working plate (1) and second layer waterproof shock plate (2) are spread respectively
Be located on channel steel support frame three (7) and channel steel support frame two (6), the channel steel support frame two (6) and working plate (1) it
Between be equipped with support and be used to support the column (8) of channel steel support frame two (6) and second layer waterproof shock plate (2), the channel steel branch
Support frame frame three (7) bottom surface and channel steel support frame one (5) low side bottom surface are equipped with longitudinal retractable support lever (9), the longitudinal direction
Retractable support lever (9) one end is put off in the hole to be provided (11) being set on rear wall (10), and the other end is overlapped on floor (12).
2. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
Be: channel steel support frame three (7) bottom surface is at least provided with three longitudinal retractable support levers (9).
3. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
It is: is equipped with I-steel cushion block (13) between the longitudinal direction retractable support lever (9) and floor (12), the I-steel cushion block
It (13) is the I-steel of Q235 steel production, I-steel specification is the mm of 200 mm × 200 × 8 mm × 12mm.
4. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
Be: the channel steel support frame one (5), channel steel support frame two (6) are identical with channel steel support frame three (7) structure, are
Frame structure made of being welded and fixed as horizontal, cannelure steel is divided into 450mm and/or 500mm between channel steel, and channel steel is by Q235 steel
The specification of production is the channel steel of 160mm × 63mm.
5. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
Be: the high intensity strike plate (4), second layer waterproof shock plate (2) and working plate (1) are Q235 grades, 5mm ~ 7mm thickness
Steel plate, and it is equipped with guide rail preformed hole.
6. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
Be: the longitudinal direction retractable support lever (9) includes external square steel and the telescopic rod for being built in external square steel both ends.
7. as described in claim 1 for efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material, feature
It is: is equipped with the waterproof for preventing water from leaving from gap between the high intensity strike plate (4) and adjacent elevator shaft
Item.
8. as described in claim 1 ~ 7 any one for efficiently solving super high-rise building duplex elevator waterproof, preventing dropped material
Tool, it is characterised in that: the column (8) is two rows, is arranged respectively close to the elevator shaft side wall (15) of rear wall (10) two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892413.5U CN209161244U (en) | 2018-11-16 | 2018-11-16 | For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821892413.5U CN209161244U (en) | 2018-11-16 | 2018-11-16 | For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209161244U true CN209161244U (en) | 2019-07-26 |
Family
ID=67338550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821892413.5U Active CN209161244U (en) | 2018-11-16 | 2018-11-16 | For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209161244U (en) |
-
2018
- 2018-11-16 CN CN201821892413.5U patent/CN209161244U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926669B (en) | A kind of Construction Method of Metro Station | |
CN206591862U (en) | A kind of subway overhead station construction protecting platform car | |
CN203334198U (en) | Novel shed tunnel structure | |
KR100777937B1 (en) | Construcion safety working cage with scaffold | |
CN102502378A (en) | Climbing elevator for building construction | |
CN103277112A (en) | Tunnel engineering train type rapid lifting and folding working platform | |
CN209161244U (en) | For efficiently solving the tool of super high-rise building duplex elevator waterproof, preventing dropped material | |
CN107740352A (en) | The isolating and protecting platform and construction method of bridge maintaining transformation are shared applied to rail-road | |
CN202611714U (en) | Tunnel assembly type construction trolley without welding | |
CN201436366U (en) | Construction hanging scaffold for mining shaft equipment | |
CN103046734B (en) | Environment-friendly flame-retardant scaffold system | |
CN208415124U (en) | A kind of railroad bridge protecting canopy frame structure | |
CN205976546U (en) | A rail transport device for sloping scope of operation | |
CN206346524U (en) | Portable job shop | |
CN205654063U (en) | Tower crane concrete cap's safety protection platform is demolishd in high altitude | |
CN106437174B (en) | It is a kind of for tilting the track conveying device and its construction of work surface | |
CN107745714A (en) | A kind of new cross section pipeline layout in inter-city passenger rail underground station and station layer storey height design | |
RU2361087C1 (en) | Section of support of mini face of thick steeply inclined coal bed | |
CN203905051U (en) | High-voltage wire protection device for subway construction | |
CN207093095U (en) | Immersed tube tunnel pipe inner structure system | |
CN203361024U (en) | Completely-closed insulation device for construction over railway | |
CN203080702U (en) | Waterproof structure of external wall and steel bottom die floor stab in steel-structured building | |
CN205804207U (en) | A kind of water power visits cave cave mouth safety device | |
CN207685189U (en) | A kind of dust excluding hood of coke oven | |
JP2015025351A (en) | Evacuation equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |