CN209140188U - The flat section of penstock girth welding protects trolley - Google Patents
The flat section of penstock girth welding protects trolley Download PDFInfo
- Publication number
- CN209140188U CN209140188U CN201821956272.9U CN201821956272U CN209140188U CN 209140188 U CN209140188 U CN 209140188U CN 201821956272 U CN201821956272 U CN 201821956272U CN 209140188 U CN209140188 U CN 209140188U
- Authority
- CN
- China
- Prior art keywords
- layer
- ladder
- trolley
- penstock
- flat section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
Abstract
The utility model relates to the realm of building construction, i.e. the flat section of penstock girth welding protects trolley.It includes rack body, and car body is divided into three layers, and first layer is the bottom for placing welding equipment, there is trolley wheel below first layer, and ladder of marking time is arranged between every layer, and third layer is paved with floor, and every layer of platform surrounding and ladder are equipped with railing.Wherein, first layer is provided with ladder in two sides to the second layer, and the second layer to third layer is provided with ladder in two sides.Welding equipment can be placed in first layer, mobile, easy to use.Different parts are welded, this equipment can be elapsed in place, for different height, be selected for three layers of position, contraposition is accurate, meets live vertical and horizontal requirement.Instant to set, easy to use, flexible, operating efficiency is high, deep to be welcome by scene.
Description
Technical field
The utility model relates to the realm of building construction, i.e. the flat section of penstock girth welding protects trolley.
Background technique
In the prior art, construction diversion system penstock includes straight tube, bend pipe, gradient tube, manhole, is put more energy into
Pipe, thrust ring, seal ring and its manufacture, coating, transport, the installation of component etc., diversion system penstock weld usually in height
Idle job needs temporarily to set up welding platform, and the early-stage preparations time is long, large labor intensity.
Utility model content
The purpose of this utility model is in view of the above deficiencies and the default platform of welding equipment construction can be carried by providing one kind, right
Level is true, and the flat section of penstock girth welding easy to use protects trolley.
The technical solution of the utility model is: the flat section of penstock girth welding protects trolley, it is characterised in that packet
Include rack body, car body is divided into three layers, and first layer is the bottom for placing welding equipment, have trolley wheel below first layer, every layer it
Between setting mark time ladder, third layer is paved with floor, and every layer of platform surrounding and ladder are equipped with railing, and third layer railing is in trolley length
Direction is welded into triangle Inclined strut bent with I-steel.
Wherein, first layer is provided with ladder in two sides to the second layer, and the second layer to third layer is provided with ladder in two sides.
The utility model has the advantages that: 1, welding equipment can be placed in first layer, mobile, easy to use.2, welding is different
This equipment can be elapsed in place, for different height, be selected for three layers of position by position, and contraposition is accurate, and it is longitudinal to meet scene
With lateral requirement.3, instant to set, easy to use, flexible, operating efficiency is high, deep to be welcome by scene.
The embodiments of the present invention is described in further detail below in conjunction with attached drawing.
Detailed description of the invention
Fig. 1 is the utility model structure diagram.
Fig. 2 is Fig. 1 lateral plan structure diagram.
Specific embodiment
Referring to Fig. 1,2, parts title is as follows: car body 1, first layer 2, trolley wheel 3, ladder 4, third layer 5, the second layer 6,
Trolley periphery fence 7, upper trolley ladder 8, triangle Inclined strut bent 9.
Referring to Fig. 1,2, the flat section of penstock girth welding protects trolley, including rack body 1, and it is three layers that car body 1, which divides, the
One layer 2 is the bottom for placing welding equipment, and first layer 2 has trolley wheel 3 below, ladder 4 of marking time, third layer 5 is arranged between every layer
It is paved with floor, every layer of platform surrounding and ladder 4 are equipped with railing.
First layer 2 is provided with ladder 4 in two sides to the second layer 6, and the second layer 6 to third layer 5 is provided with ladder 4 in two sides.
Application method: trolley basis is welding H-bar, and third layer 5 sets up frame pipe, and frame bottom of the tube is welded on I-steel,
5 railing of third layer is welded into triangle Inclined strut bent 9 with I-steel in trolley length direction and assists, and increases trolley stability.Often
Layer operation platform and ladder setting railing and safety net.Pallet bottom designs guide wheel, with hoist engine tethered sliding, needs mobile trolley used
When, lifting lug and steel wire rope of windlass are connected by a snap, next welding position is moved to by rope traction.
It is described above, only specific embodiment of the present utility model, various illustrations are not to the reality of the utility model
The limitation of matter Composition of contents.
Claims (2)
1. the flat section of penstock girth welding protects trolley, it is characterised in that including rack body (1), car body (1) is divided into three layers,
First layer (2) is the bottom for placing welding equipment, and first layer (2) has trolley wheel (3) below, and ladder of marking time is arranged between every layer
(4), third layer (5) is paved with floor, and every layer of platform surrounding and ladder (4) are equipped with railing;Third layer (5) railing is in trolley length side
Triangle Inclined strut bent (9) are welded into I-steel.
2. the flat section of penstock girth welding described in accordance with the claim 1 protects trolley, it is characterised in that first layer (2) to the
It is provided with ladder (4) in two sides for two layers (6), the second layer (6) to third layer (5) is provided with ladder (4) in two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821956272.9U CN209140188U (en) | 2018-11-26 | 2018-11-26 | The flat section of penstock girth welding protects trolley |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821956272.9U CN209140188U (en) | 2018-11-26 | 2018-11-26 | The flat section of penstock girth welding protects trolley |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209140188U true CN209140188U (en) | 2019-07-23 |
Family
ID=67287451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821956272.9U Active CN209140188U (en) | 2018-11-26 | 2018-11-26 | The flat section of penstock girth welding protects trolley |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209140188U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111267064A (en) * | 2020-04-20 | 2020-06-12 | 中国水利水电第四工程局有限公司 | Large-inclination hydroelectric penstock assembling and welding trolley |
-
2018
- 2018-11-26 CN CN201821956272.9U patent/CN209140188U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111267064A (en) * | 2020-04-20 | 2020-06-12 | 中国水利水电第四工程局有限公司 | Large-inclination hydroelectric penstock assembling and welding trolley |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104150353B (en) | A kind of dismountable bridge crane of liftable | |
CN101512082A (en) | Arrangement for conveying concrete with a height-adjustable concrete-distributing mast | |
CN206233102U (en) | A kind of packaged type faces side operation work platform | |
CN202925866U (en) | Movable lifting work platform | |
CN104060541B (en) | A kind of little Hanging Basket and construction technology for installing intercepting drain thereof of sliding | |
CN202046430U (en) | Dock pier trailer | |
CN209140188U (en) | The flat section of penstock girth welding protects trolley | |
CN105569692A (en) | Trolley for welding tunnel waterproof board hanging cloth | |
CN203834373U (en) | Lifting movement mold carriage trolley for box culvert side wall formwork | |
CN202542382U (en) | Mountain high-slope construction material conveying device | |
CN104060543A (en) | Installation device of prefabricated bridge deck | |
CN105692449B (en) | The method that pile legs of self-elevating drilling platform spreading closes up | |
CN101177933B (en) | Bridge rib hoisting and supporting rack integral construction method and device | |
CN205558394U (en) | Three -dimensional car parking stall | |
CN204173814U (en) | One can uprise rubber tired crane | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN202729645U (en) | Tower crane with elevator | |
CN202181898U (en) | Special hanging scaffold for sheathing and building inner-layer well wall in vertical shaft sinking construction | |
CN202247682U (en) | Bridge crane for installing curtain board | |
CN209353221U (en) | A kind of packaged type cantilever job platform for the construction of side guardrail | |
CN206014347U (en) | A kind of penstock space curved segment is installed and uses Three-dimensional movable job platform | |
CN210763974U (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN210134360U (en) | Concrete tank car lift operation platform | |
CN207738266U (en) | Workover treatment with pressure automatic vertical lift truck | |
CN207537081U (en) | A kind of material ascending operation apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |