CN209083334U - A kind of quick vertical mold device of fire dam - Google Patents

A kind of quick vertical mold device of fire dam Download PDF

Info

Publication number
CN209083334U
CN209083334U CN201821886371.4U CN201821886371U CN209083334U CN 209083334 U CN209083334 U CN 209083334U CN 201821886371 U CN201821886371 U CN 201821886371U CN 209083334 U CN209083334 U CN 209083334U
Authority
CN
China
Prior art keywords
fire dam
bar
vertical
quick
vertical bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821886371.4U
Other languages
Chinese (zh)
Inventor
何向宁
赵地杰
陈勇
冯俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Hesheng Mining Technology Co Ltd
Original Assignee
Xuzhou Hesheng Mining Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Hesheng Mining Technology Co Ltd filed Critical Xuzhou Hesheng Mining Technology Co Ltd
Priority to CN201821886371.4U priority Critical patent/CN209083334U/en
Application granted granted Critical
Publication of CN209083334U publication Critical patent/CN209083334U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a kind of quick vertical mold devices of fire dam, including fire dam wall, the quick vertical mold device is made of vertical bar, horizon bar, oblique rod, the vertical bar, horizon bar are mutually connected by the way of hinged between oblique rod, the vertical bar is disposed vertically on the bottom plate of fire dam wall, horizon bar is fixed on the bottom plate of fire dam wall, oblique rod passes through flexible encapsulated bag and connect composition tripod structure with horizon bar and vertical bar, is placed with steel mesh between the vertical bar and flexible encapsulated bag.The utility model compared with prior art the advantages of be: the utility model is structurally reasonable, quick formwork erection when realizing closed, solves the problems, such as that fire dam inboard formwork erection monomer is unrenewable, reduces closed cost, improves the closed efficiency in tunnel.

Description

A kind of quick vertical mold device of fire dam
Technical field
The utility model relates to technical field of mine safety more particularly to a kind of quick vertical mold devices of fire dam.
Background technique
In coal production, in order to prevent spontaneous combustion of coal seam, harmful gases diffusion or gas explosion and influence to keep the safety in production, It usually establishes fire dam and closes the goaf scrapped, tail lane and connection roadway in time, by easy spontaneous combustion area, pernicious gas source or gas Accumulation regions are isolated, this is most important to mine safety production.All kinds of fire dams of China's coal-mine presently, there are main problem Have: the material property for 1. constructing fire dam is poor, and the masonry material and concrete of use belong to rigid material, under dynamic pressure effect, Easily cracking leaks out;2. constructing backward in technique, long in time limit, low efficiency, construction is main by hand;3. the material utilization amount of fire dam Greatly, the assistant conveyance amount of mine is increased.
For above situation, those skilled in the relevant art develop various quick vertical mold devices.Such as the closed engineering in part It is middle to cooperate steel mesh formwork erection, this device quick construction using hydraulic prop, but closed rear inboard monomer cannot recycle, and mention High closed cost.
Utility model content
The technical problems to be solved in the utility model is to overcome the above technological deficiency, quick formwork erection when providing a kind of closed, Closed cost is reduced, a kind of quick vertical mold device of fire dam of the closed efficiency in tunnel is improved.
In order to solve the above technical problems, technical solution provided by the utility model are as follows: a kind of quick vertical mold device of fire dam, Including fire dam wall, the quick vertical mold device is made of vertical bar, horizon bar, oblique rod, the vertical bar, horizon bar, It is mutually connected by the way of hinged between oblique rod, the vertical bar is disposed vertically on the bottom plate of fire dam wall, horizontal Bar is fixed on the bottom plate of fire dam wall, and oblique rod passes through flexible encapsulated bag and connect composition tripod with horizon bar and vertical bar Structure is placed with steel mesh between the vertical bar and flexible encapsulated bag.
Preferably, the quick vertical mold device is tripod structure.
Preferably, which is made of the vertical bar that is hinged, horizon bar, oblique rod.
Preferably, the vertical bar, horizon bar, oblique rod length be 1.5m-2.0m.
The utility model compared with prior art the advantages of be:
1, quick formwork erection guarantees that surface of wall flatness meets the requirements;
2, it solves the problems, such as that fire dam inboard formwork erection monomer is unrenewable, reduces closed cost;
3, the closed efficiency in tunnel is improved, it is easy to spread.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of quick vertical mold device of fire dam and construction method fire dam plane of arrangement Figure;
Fig. 2 be the utility model proposes a kind of quick vertical mold device of fire dam and the A-A cross-section structure of construction method show It is intended to;
Fig. 3 be the utility model proposes a kind of quick vertical mold device of fire dam and the formwork erection stereochemical structure of construction method show It is intended to;
Fig. 4 be the utility model proposes a kind of quick vertical mold device of fire dam and construction method tripod device it is three-dimensional Schematic diagram.
In figure: 1 fire dam wall, 2 flexible encapsulated bags, 3 steel meshes, 4 vertical bars, 5 horizon bars, 6 oblique rods.
Specific embodiment
The following describes the utility model in further detail with reference to the accompanying drawings.
Embodiment
Referring to Fig.1-4, the quick vertical mold device of a kind of fire dam, including fire dam wall 1, the quick vertical mold device is by erecting It is formed to bar 4, horizon bar 5, oblique rod 6, the vertical bar 4, horizon bar 5 are mutually connected by the way of hinged between oblique rod 6 It connecing, the vertical bar 4 is disposed vertically on the bottom plate of fire dam wall 1, and horizon bar 5 is fixed on the bottom plate of fire dam wall 1, Oblique rod 6 passes through flexible encapsulated bag 2 and connect composition tripod structure, the vertical bar 4 and flexibility with horizon bar 5 and vertical bar 6 Steel mesh 3 is placed between closed bag 2.
In the present embodiment, the specification of fire dam wall 1 is set as width 4000mm × high 3000mm × thickness 1500mm.
1. processing the vertical bar 4 of long 3000mm, long 1500mm using the steel pipe of 50 × 5mm of φ according to drift section size Oblique rod 6 each 6 of horizon bar 5, long 3350mm, and bolt will be used hinged between vertical bar 4, horizon bar 5 and oblique rod 6. 5000mm × 3600mm × 1800mm flexible encapsulated bag 2 is processed using air duct coated cloth, closed bag 2 closed abundant to guarantee In wall height and width direction, there are surplus capacities;
2. the side topmast shield in 1 thickness range of tunnel fire dam wall is wiped out and each slotting 200-300mm;
3. as shown in Figure 1, Figure 2, Fig. 3, arranges 3 supporting points, using 6 frame tripods, each 2 frame tripod of supporting point, and 3 branch Support point is evenly distributed, spacing 1200mm.Vertical bar 4, the horizon bar 5 of each tripod are assembled first, and vertical bar 4 is fixed on On top plate, horizon bar 5 is fixed on the bottom plate of fire dam wall 1, hangs flexible encapsulated bag 2, and by oblique rod 6 from flexible encapsulated Bag 2 passes through in reserved hole, then oblique rod 6 is connected with vertical bar 4, horizon bar 5, finally in vertical bar 4 and flexible encapsulated Assembling reinforcement net 3 between bag 2, steel mesh 3 are fixed in vertical bar 4;
Have the I type rapid sealing material of FSM- of micro-expansibility to flexible encapsulated 4. opening filling pump pumping after the completion of formwork erection Bag 2 is realized gradually backfilled enclosed;
5. it is sufficiently closed to realize, and after slurry liquid contacts to the top plate of fire dam wall 1, to continue filling 1-3 with pressure Minute.
It is worth noting that, vertical bar 4, horizon bar 5 and oblique rod 6 can be processed into the long 1.5m- of every section in the present embodiment The standard component of 2.0m is connected using screw thread or bolt between every pole part, and the rod length after connection is adjustable;Rod piece also can basis The size of drift section carries out customized;Oblique rod 6 can also be replaced with engineering plastics ABS or nylon66 fiber etc., and rapid sealing material is also It can be replaced with foamed cement, flexible encapsulated bag 2 is also not necessarily limited to be processed with air duct coated cloth.
The utility model and embodiments thereof are described above, this description is no restricted, shown in attached drawing Be also one of the embodiments of the present invention, actual structure is not limited to this.All in all if this field Those of ordinary skill is enlightened by it, without deviating from the purpose of the present invention, not inventively design with The similar frame mode of the technical solution and embodiment, all should belong to the protection range of the utility model.

Claims (4)

1. a kind of quick vertical mold device of fire dam, including fire dam wall (1), which is characterized in that the quick vertical mold device by Vertical bar (4), horizon bar (5), oblique rod (6) composition, the vertical bar (4), horizon bar (5), oblique rod are mutually adopted between (6) It is connected with hinged mode, the vertical bar (4) is disposed vertically on the bottom plate of fire dam wall (1), and horizon bar (5) is fixed on On the bottom plate of fire dam wall (1), oblique rod (6) passes through flexible encapsulated bag (2) and horizon bar (5) and vertical bar (6) connection group At tripod structure, steel mesh (3) are placed between the vertical bar (4) and flexible encapsulated bag (2).
2. the quick vertical mold device of a kind of fire dam according to claim 1, which is characterized in that the quick vertical mold device is Tripod structure.
3. the quick vertical mold device of a kind of fire dam according to claim 2, which is characterized in that the tripod structure is by mutual Hinged vertical bar (4), horizon bar (5), oblique rod (6) composition.
4. the quick vertical mold device of a kind of fire dam according to claim 1, which is characterized in that the vertical bar (4), level Bar (5), oblique rod (6) length be 1.5m-2.0m.
CN201821886371.4U 2018-11-15 2018-11-15 A kind of quick vertical mold device of fire dam Active CN209083334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821886371.4U CN209083334U (en) 2018-11-15 2018-11-15 A kind of quick vertical mold device of fire dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821886371.4U CN209083334U (en) 2018-11-15 2018-11-15 A kind of quick vertical mold device of fire dam

Publications (1)

Publication Number Publication Date
CN209083334U true CN209083334U (en) 2019-07-09

Family

ID=67124201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821886371.4U Active CN209083334U (en) 2018-11-15 2018-11-15 A kind of quick vertical mold device of fire dam

Country Status (1)

Country Link
CN (1) CN209083334U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184789A (en) * 2018-11-15 2019-01-11 徐州和盛矿业科技有限公司 A kind of quick vertical mold device of fire dam and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184789A (en) * 2018-11-15 2019-01-11 徐州和盛矿业科技有限公司 A kind of quick vertical mold device of fire dam and construction method

Similar Documents

Publication Publication Date Title
CN208294567U (en) A kind of fixation device for the soft mould pocket type mold pouring walling suitable for underground
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN209083334U (en) A kind of quick vertical mold device of fire dam
CN106245678A (en) Outer wall of basement single side formwork construction method based on steel pipe truss
CN102704483A (en) Method for taking cooling pipe network as building bottom plate multi-layer reinforced support frame
CN104314081A (en) Deep foundation pit driftway-free basement concrete pumping construction device
CN109184789A (en) A kind of quick vertical mold device of fire dam and construction method
CN105133622A (en) Closed enclosure system comprising supporting piles with specially-shaped sections and construction method thereof
CN205100527U (en) A cantilever construction platform for surmounting retaining wall
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN204920196U (en) Grout wallboard formwork
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN205116182U (en) Simple and easy excavation supporting system
CN203189063U (en) Airtight device for filling support roadway
CN204000936U (en) Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN208010365U (en) A kind of gateway opening type light section lining shuttering support system
CN208202337U (en) A kind of Roof of Super High-Rise Building transfinites flower stand overhanging girder construction
CN207659987U (en) Two prefabricated cabin assembly Pipe racks of superposed type
CN211598682U (en) PBA subway station pilot tunnel inner roof longitudinal beam pouring device
CN206860218U (en) A kind of shield machine integrally originates the interim station support frame in space
CN102587404B (en) Construction method for large-sized blast furnace foundation
CN206607881U (en) A kind of wall bracing device
CN111155553A (en) Back-pasting type rubber water stop structure and construction method of pipe gallery deformation joint
CN204703173U (en) A kind of steel mesh cage filling decomposable asymmetric choice net support
CN104481142A (en) Construction method of paired column formwork synchronous interlocking support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant