CN203189063U CN 201320194924 CN201320194924U CN203189063U CN 203189063 U CN203189063 U CN 203189063U CN 201320194924 CN201320194924 CN 201320194924 CN 201320194924 U CN201320194924 U CN 201320194924U CN 203189063 U CN203189063 U CN 203189063U
Authority
CN
China
Prior art keywords
support
offset
filling
upper strata
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320194924
Other languages
Chinese (zh)
Inventor
孙凯华
吕文宏
刘鹏亮
孙万明
祝琨
崔锋
田锦州
颜丙双
刘贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Zhongneng Coalfield Co., Ltd.
Tiandi Science and Technology Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN 201320194924 priority Critical patent/CN203189063U/en
Application granted granted Critical
Publication of CN203189063U publication Critical patent/CN203189063U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an airtight device for filling a support roadway. The airtight device for filling the support roadway comprises a steel-structural supporting device, a flexible airtight device and a connecting piece, wherein the steel-structural supporting device is connected with the flexible airtight device through the connecting piece. The airtight device for filling the support roadway has the advantages that a flexible and airtight steel-structural support is low in labor intensity and low in manufacturing cost and can be used repeatedly, a filling process and a filling body can be observed conveniently, and sampling difficulty is reduced.

Description

Filling offset obturator
Technical field
The utility model relates to coal mine work area obturator technical field, particularly an a kind of filling offset obturator.
Background technology
The airtight method that still adopts the wall of laying bricks of present filling offset, it is big to exist the labour intensity of building a wall, and cost is higher, can not reuse, and is unfavorable for observing stowing operation, has increased the sampling difficulty.
The utility model content
Technical problem to be solved in the utility model provides a kind of filling offset obturator that reduces the sampling difficulty.
For solving the problems of the technologies described above, the utility model provides a kind of filling offset obturator to comprise steel work bracing or strutting arrangement, connector and flexible encapsulated device; Described steel work bracing or strutting arrangement is connected with described flexible encapsulated device by described connector.
Further, described steel work bracing or strutting arrangement is the one-sided support of right-angled triangle, and detachable; The one-sided support of described right-angled triangle is connected to each other by connector.
Further, described steel work bracing or strutting arrangement comprises upper strata right-angled triangle support, lower floor's right-angled trapezium support, bolt, earth anchor and support member;
Described upper strata right-angled triangle support is connected with described lower floor right-angled trapezium support by described bolt;
Described lower floor right-angled trapezium support passes through described earth anchorage at the offset base plate;
Described support member is fixed on the vertical straight arm of angle of described upper strata right-angled triangle support, lower floor's right-angled trapezium support.
Further, be provided with V-shaped rest and first pole in the right-angled triangle support of described upper strata;
Described V-shaped rest is fixed on the horizontal right-angle side of described upper strata right-angled triangle support, and an end is connected with the vertical straight arm of angle of upper strata right-angled triangle support, and the other end is connected with the hypotenuse of upper strata right-angled triangle;
One end of the described first pole level is connected the vertical straight arm of angle of upper strata right-angled triangle support, and the other end is connected the hypotenuse of upper strata right-angled triangle.
Further, described lower floor right-angled trapezium support comprises second pole and the 3rd pole;
Described second pole, one end is connected with the hypotenuse of described lower floor right-angled trapezium support, and the other end is connected with the vertical straight arm of angle of described lower floor right-angled trapezium support;
Described the 3rd pole one end is connected with the hypotenuse of described lower floor right-angled trapezium support, and the other end is connected with the base of described lower floor right-angled trapezium support.
Further, described earth anchor is fixed by pressing beam and pulling plug; Described earth anchor comprises tiltedly anchor, the first vertical earth anchor and the second vertical earth anchor.
Further, described connector is square steel pipe; Described square steel pipe is fixed on described steel work bracing or strutting arrangement by described support member.
Further, described flexible encapsulated device comprises sealing sponge, cystosepiment, waterproof colour bar cloth, batten, bolt, offset top board, offset base plate and steel mesh reinforcement; Described bolt is fixed on sealing sponge, cystosepiment, waterproof colour bar cloth and batten on described offset top board, offset base plate and the both sides rib from inside to outside successively; Described steel mesh reinforcement is connected with described square steel pipe.
Further, described waterproof colour bar cloth is provided with the filling mouth.
Further, this flexible encapsulated steel structure support also comprises gib headed bolt, and described gib headed bolt is with the connection of staggering of described square steel pipe.
The flexible encapsulated steel structure support labour intensity that the utility model provides is little, and cost is low, can reuse, and is beneficial to observe stowing operation and obturation, has reduced the sampling difficulty.
Description of drawings
The steel structure support structural representation that Fig. 1 provides for the utility model embodiment;
Fig. 2 arranges schematic diagram for entrance to a lane facade square steel pipe that the utility model embodiment provides;
The structural representation of the tiltedly anchor that Fig. 3 provides for the utility model embodiment;
The structural representation of the vertical earth anchor that Fig. 4 provides for the utility model embodiment;
The flexible encapsulated apparatus structure schematic diagram that Fig. 5 provides for the utility model embodiment;
The steel work bracing or strutting arrangement that Fig. 6 provides for the utility model embodiment and colour bar cloth be connected vertical cross section figure;
The square steel pipe lap structural representation that Fig. 7 provides for the utility model embodiment;
The gib headed bolt structural representation that Fig. 8 provides for the utility model embodiment.
The specific embodiment
Referring to Fig. 1-8, a kind of flexible encapsulated steel structure support that the utility model embodiment provides, it comprises steel work bracing or strutting arrangement, connector and flexible encapsulated device.Wherein, the steel work bracing or strutting arrangement is connected with the flexible encapsulated device by connector.The steel work bracing or strutting arrangement is detachable, at right angles leg-of-mutton one-sided support.One-sided support interconnects by connector.The steel work bracing or strutting arrangement can comprise upper strata right-angled triangle support 2, lower floor's right-angled trapezium support 7, bolt support member 12 and earth anchor.Upper strata right-angled triangle support 2 is connected with lower floor right-angled trapezium support 7 by bolt 4 and bolt 14.Lower floor's right-angled trapezium support 7 by earth anchorage at offset base plate 11.Earth anchor is by pressing beam 24 and pulling plug 25 fixing.Earth anchor comprises tiltedly anchor 10, the first vertical earth anchor 9 and the second vertical earth anchor 8.Earth anchor is stone bolt.Support member 12 is fixed on the vertical straight arm of angle of upper strata right-angled triangle support 2, lower floor's right-angled trapezium support 7.Upper strata right-angled triangle support 2 comprises V-shaped rest 3 and first pole 1; V-shaped rest 3 is fixed on the horizontal right-angle side of upper strata right-angled triangle support, and an end is connected with the vertical straight arm of angle of upper strata right-angled triangle support, and an end is connected with the hypotenuse of upper strata right-angled triangle support; One end of first pole, 1 level is connected with the vertical straight arm of angle of upper strata right-angled triangle support, and an end is connected with the hypotenuse of upper strata right-angled triangle support.Lower floor's right-angled trapezium support 7 comprises second pole 5 and the 3rd pole 6; Second pole, 5 one ends are connected with the hypotenuse of lower floor right-angled trapezium support 7, and an end is connected with the vertical straight arm of angle of lower floor right-angled trapezium support 7; The 3rd pole 6 one ends are connected with the hypotenuse of lower floor right-angled trapezium support 7, and an end is connected with the base of lower floor right-angled trapezium support 7.Connector is square steel pipe 13, or other similar pipes.Square steel pipe 13 is fixed on the steel work bracing or strutting arrangement by support member 12.The flexible encapsulated device comprises sealing sponge 17, cystosepiment 21, waterproof colour bar cloth 20, batten 19, bolt 18, offset top board 16, offset base plate 11 and steel mesh reinforcement 15.Bolt 18 with sealing sponge 17, cystosepiment 21, waterproof colour bar cloth 20 and batten 19 by interior for being fixed on successively outward on offset top board 16, offset base plate 11 and the both sides rib.Steel mesh reinforcement 15 is connected with square steel pipe 13.On the waterproof colour bar cloth 20 filling mouth 23 is arranged.This flexible encapsulated steel structure support also comprises gib headed bolt 22; Gib headed bolt 22 is with the square steel pipe connection of staggering.
Treat airtight lanewidth 5.4m, the high 3.3m(of the offset both spacing of offset both sides rib is 5.4m, the spacing of offset top board and offset base plate is 3.3m), it is as follows to build filling lane obturator technology: one-sided support processing and fabricating finishes and is transported to the job location, determine earlier closed position, according to airtight position in the punching footpath 35mm of bearing, the boring of dark 300mm, again according to the thickness of support, determine to make a call to 60 ° tiltedly anchor to go out the place, ground be 100mm with fixing horizontal range of holing; The position consistency of the position of anchor 10 and one-sided support tiltedly, tiltedly anchor is respectively 1300mm and 1400mm along the spacing of vertical working direction.Two vertical earth anchors are respectively 750mm and 1750mm with the spacing along the parallel roadways direction of anchor tiltedly.Tiltedly anchor becomes 60 ° angle with ground, requires to draw logical line when making earth anchor, guarantees that earth anchor is at same straight line.Pre-buried and the acceptance(check) of embedded part, clear up basic ground, the horizontal connection side's steel pipe of one deck support (in the 1.2m absolute altitude scope) is installed, one deck support (3) is installed again, continue to install two layers of horizontal connection side's steel pipe of support (in the 1.2m-3m absolute altitude scope) after the installation, two layers of support (3) are installed again, one-sided support and support adopt square steel pipe to be connected with bearing, the length of square steel pipe is respectively 1700mm and 3200mm, the rectangular steel pipe of 2300mm more than offset base plate face at 200mm, 400mm, 700mm, 1000mm, 1400mm, 1800mm, 2200mm, 2800mm, 3100mm height (square steel pipe center absolute altitude) is located to arrange, the support member that 70mm is arranged at the right-angle side of the right-angled triangle support of steel work bracing or strutting arrangement and right-angled trapezium support, absolute altitude is positioned at the rectangular steel pipe of 3200mm bottom, support horizontal square steel pipe, connect the rectangular steel pipe of one-sided support and 3200mm.The double steel bar net that equidistantly is staggeredly arranged then tightens earth anchor, regulates the support verticality, again embedded part system of fastening inspection.Sealing sponge and cystosepiment are pressed in bearing and roof and floor support inner side successively, the top is followed successively by waterproof colour bar cloth and batten, with expansion bolt sealing sponge, cystosepiment, waterproof colour bar cloth and batten is ordered on bearing and roof and floor for being close to template outward successively by interior.The spacing of expansion bolt is 150mm on floor and lane, both sides wall, is 200mm at roof and floor.
It should be noted last that, the above specific embodiment is only unrestricted in order to the technical solution of the utility model to be described, although with reference to example the utility model is had been described in detail, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement the technical solution of the utility model, and not breaking away from the spirit and scope of technical solutions of the utility model, it all should be encompassed in the middle of the claim scope of the present utility model.

Claims (10)

1. a filling offset obturator is characterized in that, comprising:
Steel work bracing or strutting arrangement, connector and flexible encapsulated device;
Described steel work bracing or strutting arrangement is connected with described flexible encapsulated device by described connector.
2. filling offset obturator according to claim 1 is characterized in that:
Described steel work bracing or strutting arrangement is the one-sided support of right-angled triangle, and detachable;
The one-sided support of described right-angled triangle is connected to each other by connector.
3. filling offset obturator according to claim 2 is characterized in that:
Described steel work bracing or strutting arrangement comprises upper strata right-angled triangle support, lower floor's right-angled trapezium support, bolt, earth anchor and support member;
Described upper strata right-angled triangle support is connected with described lower floor right-angled trapezium support by described bolt;
Described lower floor right-angled trapezium support passes through described earth anchorage at the offset base plate;
Described support member is fixed on the vertical straight arm of angle of described upper strata right-angled triangle support, lower floor's right-angled trapezium support.
4. filling offset obturator according to claim 3 is characterized in that:
Be provided with V-shaped rest and first pole in the right-angled triangle support of described upper strata;
Described V-shaped rest is fixed on the horizontal right-angle side of described upper strata right-angled triangle support, and an end is connected with the vertical straight arm of angle of upper strata right-angled triangle support, and the other end is connected with the hypotenuse of upper strata right-angled triangle;
One end of the described first pole level is connected the vertical straight arm of angle of upper strata right-angled triangle support, and the other end is connected the hypotenuse of upper strata right-angled triangle.
5. filling offset obturator according to claim 3 is characterized in that:
Described lower floor right-angled trapezium support comprises second pole and the 3rd pole;
Described second pole, one end is connected with the hypotenuse of described lower floor right-angled trapezium support, and the other end is connected with the vertical straight arm of angle of described lower floor right-angled trapezium support;
Described the 3rd pole one end is connected with the hypotenuse of described lower floor right-angled trapezium support, and the other end is connected with the base of described lower floor right-angled trapezium support.
6. filling offset obturator according to claim 3 is characterized in that:
Described earth anchor is fixed by pressing beam and pulling plug; Described earth anchor comprises tiltedly anchor, the first vertical earth anchor and the second vertical earth anchor.
7. filling offset obturator according to claim 3 is characterized in that:
Described connector is square steel pipe; Described square steel pipe is fixed on described steel work bracing or strutting arrangement by described support member.
8. filling offset obturator according to claim 7 is characterized in that:
Described flexible encapsulated device comprises sealing sponge, cystosepiment, waterproof colour bar cloth, batten, bolt, offset top board, offset base plate and steel mesh reinforcement;
Described bolt is fixed on sealing sponge, cystosepiment, waterproof colour bar cloth and batten on described offset top board, offset base plate and the both sides rib from inside to outside successively;
Described steel mesh reinforcement is connected with described square steel pipe.
9. filling offset obturator according to claim 8 is characterized in that:
Described waterproof colour bar cloth is provided with the filling mouth.
10. filling offset obturator according to claim 7 is characterized in that, also comprises:
Gib headed bolt, described gib headed bolt is with the connection of staggering of described square steel pipe.
CN 201320194924 2013-04-17 2013-04-17 Airtight device for filling support roadway Expired - Fee Related CN203189063U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320194924 CN203189063U (en) 2013-04-17 2013-04-17 Airtight device for filling support roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320194924 CN203189063U (en) 2013-04-17 2013-04-17 Airtight device for filling support roadway

Publications (1)

Publication Number Publication Date
CN203189063U true CN203189063U (en) 2013-09-11

Family

ID=49105929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320194924 Expired - Fee Related CN203189063U (en) 2013-04-17 2013-04-17 Airtight device for filling support roadway

Country Status (1)

Country Link
CN (1) CN203189063U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711518A (en) * 2014-01-03 2014-04-09 山东汇发矿业科技有限公司 Portable mine filling retaining wall
CN104329119A (en) * 2014-08-29 2015-02-04 中煤科工集团西安研究院有限公司 Control method for aggregate outflow through mine dynamic water sealing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711518A (en) * 2014-01-03 2014-04-09 山东汇发矿业科技有限公司 Portable mine filling retaining wall
CN104329119A (en) * 2014-08-29 2015-02-04 中煤科工集团西安研究院有限公司 Control method for aggregate outflow through mine dynamic water sealing

Similar Documents

Publication Publication Date Title
CN106907159B (en) Shallow-buried underground excavation subway station separated open type structure and construction method thereof
WO2015196872A1 (en) Method for removing hydraulic support for solid filling coal mining
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN108625894B (en) Waste rock filling three-dimensional grouting construction method for horizontal working face of short-wall roadway mining
CN109162296B (en) Single-side formwork supporting system and construction method for pouring outer wall by utilizing same
CN202370525U (en) Post grouting construction structure of shaft wall of weathering bed rock section of return air vertical shaft
WO2022122052A1 (en) Comprehensive construction method for shallow buried section of tunnel using urban railway mine tunneling method
CN105625471A (en) Prefabricated comprehensive pipe gallery
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN105780808A (en) Assembly type precast comprehensive pipe gallery
CN104895314A (en) Truss platform for high and large space top plate concrete construction
CN105625470A (en) Assembled prefabricated comprehensive pipe gallery
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN105443143A (en) Tunnel support device of coal mine goaf and construction method thereof
CN203189063U (en) Airtight device for filling support roadway
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN203334661U (en) Scaffold-hole-free formwork construction device for brick-concrete structure construction column
CN105625466A (en) Assembled prefabricated comprehensive pipe gallery
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN108678767B (en) Excavation and yielding-rigid combined supporting construction method for extruded large-deformation surrounding rock tunnel
CN202731960U (en) Mine goaf filling and roadway retaining device system
CN203130097U (en) Small guide pipe for grouting
CN202390848U (en) Foundation structure of pile cap of communication iron tower
CN105332720B (en) The construction method of I-shaped steel skeleton water-proof sealing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANXI ZHONGNENG COAL FIELD CO., LTD.

Effective date: 20130904

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Kaihua

Inventor after: Tian Jinzhou

Inventor after: Yan Bingshuang

Inventor after: Liu Gui

Inventor after: Lv Wenhong

Inventor after: Liu Pengliang

Inventor after: Zhao Lixin

Inventor after: Sun Wanming

Inventor after: He Rong

Inventor after: Zhu Kun

Inventor after: Zheng Tianbin

Inventor after: Cui Feng

Inventor before: Sun Kaihua

Inventor before: Lv Wenhong

Inventor before: Liu Pengliang

Inventor before: Sun Wanming

Inventor before: Zhu Kun

Inventor before: Cui Feng

Inventor before: Tian Jinzhou

Inventor before: Yan Bingshuang

Inventor before: Liu Gui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN KAIHUA LV WENHONG LIU PENGLIANG SUN WANMING ZHU KUN CUI FENG TIAN JINZHOU YAN BINGSHUANG LIU GUI TO: SUN KAIHUA LV WENHONG LIU PENGLIANG ZHAO LIXIN SUN WANMING HE RONG ZHU KUN ZHENG TIANBIN CUI FENG TIAN JINZHOU YAN BINGSHUANG LIU GUI

TR01 Transfer of patent right

Effective date of registration: 20130904

Address after: 100013 Chaoyang District, Hepingli Youth Ditch Road, No. 5, No.

Patentee after: Tiandi Science & Technology Co., Ltd.

Patentee after: Shaanxi Zhongneng Coalfield Co., Ltd.

Address before: 100013 Chaoyang District, Hepingli Youth Ditch Road, No. 5, No.

Patentee before: Tiandi Science & Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130911

Termination date: 20150417