CN209083204U - Anti- well drilling steel pipe sleeve - Google Patents

Anti- well drilling steel pipe sleeve Download PDF

Info

Publication number
CN209083204U
CN209083204U CN201821858139.XU CN201821858139U CN209083204U CN 209083204 U CN209083204 U CN 209083204U CN 201821858139 U CN201821858139 U CN 201821858139U CN 209083204 U CN209083204 U CN 209083204U
Authority
CN
China
Prior art keywords
sleeve
steel pipe
connecting plate
section
pipe sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821858139.XU
Other languages
Chinese (zh)
Inventor
张金虎
宗磊
李良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huainan Mining Group Co Ltd
Original Assignee
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huainan Mining Group Co Ltd filed Critical Huainan Mining Group Co Ltd
Priority to CN201821858139.XU priority Critical patent/CN209083204U/en
Application granted granted Critical
Publication of CN209083204U publication Critical patent/CN209083204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides anti-well drilling steel pipe sleeve, and steel pipe sleeve includes multi-section sleeve, and multi-section sleeve joins end to end to form steel pipe sleeve.Multi-section sleeve is connected by connection structure head and the tail;The connection structure includes sleeve away from above and below along the multiple bolts of certain distance position welding, connecting plate;Bolt passes through sleeve wall;Screw hole there are two being opened up on the connecting plate;Spacing between two screw holes is equal with the upper and lower adjacent two screw rod spacing of two connections sleeve;Connecting plate passes through two screw holes also cross the bolt of upper and lower two sections sleeve, and is fixed by nut.Utility model has the advantages that steel bushing processing is novel, using bolt and connecting plate, connection speed is improved, worker is easy to operate when sleeve is installed.

Description

Anti- well drilling steel pipe sleeve
Technical field
The utility model relates to underground coal mine anti-well drilling technique field, specifically anti-well drills steel pipe sleeve.
Background technique
After anti-well drilling construction, previous drilling installation steel bushing mostly use chain block or it is slow twist be power promoted or Installation sleeve is transferred, to weld based on Hua Lanpan tightens up a screw, sleeve connection operating difficulties is taken time and effort for connection between sleeve.
Utility model content
The technical problems to be solved in the utility model be how Quick connection sleeve cylinder.
The utility model solves above-mentioned technical problem by the following technical programs:
Anti- well drilling steel pipe sleeve, steel pipe sleeve includes multi-section sleeve, and multi-section sleeve joins end to end to form steel pipe sleeve.
Preferably, multi-section sleeve is connected by connection structure head and the tail;The connection structure includes sleeve away from above and below along certain Distance and position welds multiple bolts, connecting plate;Bolt passes through sleeve wall;Screw hole there are two being opened up on the connecting plate;Two Spacing between screw hole is equal with the upper and lower adjacent two screw rod spacing of two connections sleeve;Connecting plate passes through two screw holes simultaneously Across the bolt of upper and lower two sections sleeve, and fixed by nut.
Preferably, the upper and lower edge of each sleeve is evenly equipped with 4 bolts.
Preferably, edge is further fixed on guide plate on the sleeve.
Preferably, edge is evenly equipped with 4 pieces of guide plates on the sleeve;The horn-like guide channel that 4 pieces of guide plates surround.
Utility model has the advantages that
Steel bushing processing is novel, using bolt and connecting plate, keeps upper and lower two section sleeve connections quick, easy for construction, in addition Using guide plate, can quick alignment, reduce labor intensity, it is time saving and energy saving.
Detailed description of the invention
Fig. 1 is the attachment structure schematic diagram of 2 steel pipe sleeve of the utility model embodiment;
Fig. 2 is the structural schematic diagram of 2 middle sleeve connecting plate of the utility model embodiment;
Fig. 3 is the structural schematic diagram for installing cross girder steel in the utility model embodiment 2 in first section sleeve.
Specific embodiment
To make the structure feature to the utility model and the effect of being reached has a better understanding and awareness, to compared with Good examples and drawings cooperate detailed description, are described as follows:
Embodiment 1
Anti- well drilling installation steel pipe sleeve construction technique, using pneumatic cucurbit as promoting power, by sleeve from it is vertical now Mouth promotes the mode that side assembles to top, is promoted suitable for reading to vertical eye by all steel bushings and is fixed, finally with concrete pair Hole wall carries out filling reinforcing.Specifically includes the following steps:
(1) sleeve is processed
1, sleeve 1 is processed with 5mm steel plate, diameter 1000mm, and head saves high 1000mm, remaining sleeve 1 is 1500mm high, every section weight 183kg, drilling 10 section sleeves 1 (14.5m) of set, always weighs about 1830kg.
2, the 11# I-steel for suturing two right-angled intersections in first section sleeve 1 with M20 screw, forms cross girder steel 11, is used for Wirerope is fastened when lifting, as shown in figure 3,
3, every section sleeve 1 away from it is upper it is lower along the position 150mm pass through sleeve 1 uniformly weldering 4 M20 bolts 12, stitched in between sleeve 1 Connection is closed, as shown in Figure 1 and Figure 2.
(2) construction method
1, boom hoist cable connects: pneumatic cucurbit 40T anchor chain is hung in the U-shaped capplce of chamber support, by a diameter 18.5mm wirerope upper end card becket bridle hangs over pneumatic cucurbit, and the other end is transferred to vertical mouth now, and wirerope is consolidated using 3 secondary rope cards It is scheduled on the 11# steel I-beam 11 that first section 1 inner cross of sleeve is intersected, restrict card spacing 200mm.
2, steel bushing 1 connects:
(1) start pneumatic cucurbit above to be mentioned first segment sleeve 1, stop when above mentioning to sleeve 1 away from bottom plate heights 1600mm, By standing the operator of mouth now, the second section sleeve 1 is moved on to and has been promoted immediately below sleeve 1, and confirmed and welded on two section sleeves 1 4 12 consistencies from top to bottom of M20 bolt, with 10mm thick steel plate process 13 top nut of connecting plate suture.
(2) because of vertical eye chamber height limit suitable for reading and cucurbit travel limit, every promotion suture one section sleeve, 1 ommatidium top operation Personnel will block rope again, and sleeve 1 lands when card rope again, and repetitive operation later is successively sutured by processing number, until end Save sleeve 1.
3, steel bushing 1 is fixed:
(1) etc. after 10 section sleeves 1 promote suture, it is suitable for reading on head section sleeve 1 along the downward position 200mm bolt Two 2000mm long 10# channel steels on 12, channel steel are carried on a shoulder pole on bottom plate.
(2) after sleeve 1 is fixed, consolidation by grouting is carried out to the gap between sleeve 1 and the vertical eye borehole wall, eye is suitable for reading to be applied by standing Worker person is manually in the milk with slurry.
(3) safety notice
1, when pneumatic cucurbit is fixed on U-shaped canopy with anchor chain, it is necessary to non-skid feature that is solid and reliable, and wanting.
2, eye personnel suitable for reading are stood, when entering progress operation within the scope of 5 meters away from vertical eye mouth, it is necessary to wear safety rope.
3, it stands after eye sleeve 1 installs, it is necessary to covered tightly with plank by jacket wall is suitable for reading, prevent sundries from falling into intraocularly.It stands now Operating personnel, forbidding to stand carries out operation in the lower section of just opposition eye.
4, sleeve 1 is in sewing process, when moving alignment to 12 operation of bolt, is operated with specific purpose tools such as pointed cones, sternly Taboo directly prevents hand from crushing injury with hand.
Embodiment 2
As shown in Figure 1 and Figure 2, anti-well drilling steel pipe sleeve, applied to steel pipe sleeve construction work described in above-described embodiment 1 Skill, steel pipe sleeve 1 include multi-section sleeve 1, and multi-section sleeve 1 is connected by connection structure head and the tail.The connection structure includes sleeve 1 Away from above and below along the welding of certain distance position 4 bolts 12, connecting plate 13;4 bolts 12 are evenly distributed on 1 surrounding of sleeve, and spiral shell Bolt 12 is horizontal through 1 barrel of sleeve;Screw hole there are two being opened up on the connecting plate 13;Spacing and upper and lower two between two screw holes The adjacent two screw rod spacing of a connection sleeve 1 are equal;Connecting plate 13 is by two screw holes also cross upper and lower two sections sleeve 1 Bolt 12, and fixed by nut.
Edge is further fixed on 4 pieces of guide plates 14 on the sleeve 1;The horn-like guide channel that 4 pieces of guide plates 14 surround.Up and down Two sleeves 1 are in alignment, by 4 pieces of guiding of guide plate 14, it can be achieved that quick alignment.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only the principles of the present invention, the utility model also has respectively on the premise of not departing from the spirit and scope of the utility model Kind changes and improvements, these changes and improvements are both fallen in the range of claimed invention.The requires of the utility model Protection scope defined by appended claims and its equivalent.

Claims (4)

  1. The steel pipe sleeve 1. anti-well drills, it is characterised in that: steel pipe sleeve includes multi-section sleeve, and multi-section sleeve joins end to end to form steel Pipe sleeve cylinder;Multi-section sleeve is connected by connection structure head and the tail;The connection structure includes sleeve away from above and below along certain distance position Weld multiple bolts, connecting plate;Bolt passes through sleeve wall;Screw hole there are two being opened up on the connecting plate;Between two screw holes Spacing it is equal with the upper and lower adjacent two screw rod spacing of two connections sleeve;Connecting plate is by two screw holes also cross upper and lower The bolt of two section sleeves, and fixed by nut.
  2. The steel pipe sleeve 2. anti-well according to claim 1 drills, it is characterised in that the upper and lower edge of each sleeve is evenly equipped with 4 Root bolt.
  3. The steel pipe sleeve 3. anti-well according to claim 2 drills, it is characterised in that: edge is further fixed on guiding on the sleeve Plate.
  4. The steel pipe sleeve 4. anti-well according to claim 3 drills, it is characterised in that: edge is evenly equipped with 4 pieces on the sleeve Guide plate;The horn-like guide channel that 4 pieces of guide plates surround.
CN201821858139.XU 2018-11-08 2018-11-08 Anti- well drilling steel pipe sleeve Active CN209083204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821858139.XU CN209083204U (en) 2018-11-08 2018-11-08 Anti- well drilling steel pipe sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821858139.XU CN209083204U (en) 2018-11-08 2018-11-08 Anti- well drilling steel pipe sleeve

Publications (1)

Publication Number Publication Date
CN209083204U true CN209083204U (en) 2019-07-09

Family

ID=67123637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821858139.XU Active CN209083204U (en) 2018-11-08 2018-11-08 Anti- well drilling steel pipe sleeve

Country Status (1)

Country Link
CN (1) CN209083204U (en)

Similar Documents

Publication Publication Date Title
CN102659017A (en) Steel column hoisting system
CN107142954B (en) Steel hanging box lifting system for integral lifting and lifting method thereof
CN206367981U (en) It is a kind of to facilitate the hanging beam mechanism that separating component is lifted in shield auger
CN209083204U (en) Anti- well drilling steel pipe sleeve
CN102182150A (en) Installation method of externally hung steel template for anti-collision guardrail construction outside viaduct
CN206308626U (en) Operating platform for installing bridge pier pier shaft top hanging basket
CN102352628A (en) Filling pile concrete guide pipe assembling and disassembling device and construction method thereof
CN116715177A (en) Blast furnace maintenance platform and cooling wall replacement method
CN208473928U (en) A kind of perpendicular slitting mining open stope afterwards filling system
CN109339794A (en) Anti- well drilling installation steel pipe sleeve construction technique and steel pipe sleeve
CN104528506B (en) Mine hoist and unhooking test method thereof
CN112227378B (en) Auxiliary device for hoisting reinforcement cage
CN2594442Y (en) Monosegment detachable vertically lifting derrick and its lifting device
CN208235590U (en) A kind of rectangle vertical shaft sliding sash turning-over
CN206636239U (en) A kind of suspension installation system for being used to install interlayer girder steel
CN201265018Y (en) Combined type blast furnace cooling wall mounting auxiliary device
CN111332946A (en) A lift by crane equipment for side slope protection construction
CN210882136U (en) Mining scraper rail clamping device and system thereof
CN217126734U (en) Tower crane luffing motor replacing device
CN205077876U (en) Machine and stressing jack linkage are worn to restraint by prestress wire
CN212356327U (en) Traction device for dismounting and mounting large tower crane
CN212269392U (en) Rig pylon undercarriage
CN216109859U (en) Safety net hanging device
CN204490290U (en) A kind of mine hoist
CN204552780U (en) Modified form anchor restorer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant