- Publication number
- CN206308626U CN206308626U CN201621401118.6U CN201621401118U CN206308626U CN 206308626 U CN206308626 U CN 206308626U CN 201621401118 U CN201621401118 U CN 201621401118U CN 206308626 U CN206308626 U CN 206308626U
- Authority
- CN
- China
- Prior art keywords
- pier
- fixed
- hanging basket
- bridge pier
- operating platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 239000002965 rope Substances 0.000 claims abstract description 13
- 210000002356 Skeleton Anatomy 0.000 claims abstract description 12
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 4
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 4
- 239000011425 bamboo Substances 0.000 claims description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims 2
- 240000003917 Bambusa tulda Species 0.000 claims 1
- 238000011105 stabilization Methods 0.000 abstract description 4
- 238000009434 installation Methods 0.000 description 6
- 238000003466 welding Methods 0.000 description 5
- 241001330002 Bambuseae Species 0.000 description 3
- 238000011068 load Methods 0.000 description 3
- 230000003014 reinforcing Effects 0.000 description 3
- 230000000630 rising Effects 0.000 description 3
- 239000000725 suspension Substances 0.000 description 2
- 229910000754 Wrought iron Inorganic materials 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Abstract
The utility model discloses a kind of operating platform for installing bridge pier pier shaft top hanging basket, including skeleton, hoist engine, fixed pulley and fixed steel wire rope;The skeleton is marked time including horizontal plane, facade guardrail and top supporting frame;The hoist engine is installed on the top supporting frame, and the fixed pulley is fixed on bridge pier top surface, and the messenger of dragging of the hoist engine is wound in the fixed pulley;Described fixed steel wire rope one end is fixed in the top supporting frame, and the other end is detachably secured on the pre-buried hanging basket angle steel of bridge pier pier shaft by hook;The horizontal plane is marked time with gap, and the gap matches with bridge pier pier shaft.The utility model carries out position descending operation by being fixed on the fixed pulley of pier top by hoist engine, hanging basket angle steel using fixed steel wire rope with pre-plugged in pier shaft is fixed, make simple, it is easy to operate, platform stabilization is good, strong applicability, can save manpower and fund input, and working security is high.
Description
Technical field
The utility model is related to a kind of operating platform for installing bridge pier pier shaft top hanging basket.
Background technology
With the extensive development of modernized railway, round ended pier is also being updated, and is widely used in each bar iron
During road is built.According to Pier Design and later maintenance requirement, pier shaft top is provided with totally-enclosed hanging basket, and for maintenance, personnel provide operation
Platform.Because round ended pier pier cap part is designed using variable cross-section, hanging basket cannot set operating platform, working face letter when installing
Single, potential safety hazard is larger, and cannot ensure installation quality.Typically hanging basket peace can only be carried out using crane installation personnel of slinging at present
Dress, equipment is heavy, and space is big needed for operation, and operating flexibility is poor, there is very big potential safety hazard, at the same crane lease expenses compared with
Greatly, cost increases, and is limited by place, and crane is without operation side.
Utility model content
The purpose of this utility model is sling using crane to solve the totally-enclosed hanging basket in current round ended pier pier shaft top
Installation personnel install required operating space greatly, the technical problem that potential safety hazard is big and equipment cost is high.
In order to solve the above-mentioned technical problem, the utility model provides a kind of operation for installing bridge pier pier shaft top hanging basket
Platform, including skeleton, hoist engine, fixed pulley and fixed steel wire rope;
The skeleton is marked time including horizontal plane, facade guardrail and top supporting frame;
The hoist engine is installed on the top supporting frame, and the fixed pulley is fixed on bridge pier top surface, the hoist engine
Drag messenger and be wound in the fixed pulley;
Described fixed steel wire rope one end is fixed in the top supporting frame, and the other end is detachably secured to by hook
On the pre-buried hanging basket angle steel of bridge pier pier shaft;
The horizontal plane is marked time with gap, and the gap matches with bridge pier pier shaft.
Further, the horizontal plane is marked time and upper is completely covered with pedal.
Further, the pedal is bamboo slab rubber.
Further, the pedal thickness is 12mm.
Further, the horizontal plane is marked time and is welded by angle steel.
Further, the size of the angle steel is 75mm × 75mm × 5mm.
Further, the facade guardrail and top supporting frame by size for the square steel welding of 40mm × 60mm × 5mm
Into.
Compared with prior art, the utility model has the advantages that:
The utility model carries out position descending operation by being fixed on the fixed pulley of pier top by hoist engine, using fixed steel wire
The hanging basket angle steel with pre-plugged in pier shaft of restricting is fixed, and makes simple, and easy to operate, platform stabilization is good, applicability
By force, manpower and fund input can be saved, working security is high.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is side view of the present utility model;
Fig. 3 is top view of the present utility model.
In figure, steel wire rope 1;Hoist engine 2;Facade guardrail 3;Horizontal plane marks time 4;Pedal 5;Gap 6;Top supporting frame 7;Pier
Body 8.
Specific embodiment
Make preferred detailed description to the utility model presently in connection with accompanying drawing.These accompanying drawings are simplified schematic diagram, only
Basic structure of the present utility model is illustrated in a schematic way, therefore it only shows the composition relevant with the utility model.
As Figure 1-3, the operating platform for installing bridge pier pier shaft top hanging basket of the present utility model, including skeleton,
Hoist engine 2, fixed pulley(Not shown in figure)With fixed steel wire rope 1;
Skeleton is marked time 4, facade guardrail 3 and top supporting frame 7 including horizontal plane;
Hoist engine 2 is installed in top supporting frame 7, and fixed pulley is fixed on bridge pier top surface, and the messenger of dragging of hoist engine 2 is wound in
Fixed pulley;
Fixed one end of steel wire rope 1 is fixed in top supporting frame 7, and the other end is detachably secured to bridge pier pier by hook
The pre-buried hanging basket angle steel of body 8(Not shown in figure)On;
Horizontal plane marks time 4 with gap 6, and gap 6 matches with bridge pier pier shaft 8, makes this operating platform close proximity to pier shaft
8, facilitate the installation of hanging basket.
Preferably, horizontal plane is marked time and be completely covered with pedal 5 on 4.
Preferably, pedal 5 is bamboo slab rubber.
Preferably, the thickness of pedal 5 is 12mm.
Preferably, horizontal plane is marked time and 4 is welded by angle steel.
Preferably, the size of angle steel is 75mm × 75mm × 5mm.
Preferably, facade guardrail 3 and top supporting frame 7 are welded by the square steel that size is 40mm × 60mm × 5mm.
This operating platform makes and using following following steps:
The first step:Cutting stock is carried out to guardrail square steel and angle steel of marking time according to pier top is longitudinally wide;
Second step:According to blanking situation welded framework, when skeleton is welded by the way of overlap joint, while using HPB300 φ
14 reinforcing bars are reinforced to skeleton junction;Installation is marked time bamboo slab rubber pedal;It is symmetrically welded 3 suspension ring(Suspension ring are used when welding
The reinforcing bars of HPB300 φ 16 are welded from skeleton bottom, it is ensured that be connected firmly);
3rd step:Operating platform is first checked fixed pulley fixing situation, it is ensured that stability under loading using preceding, secondly right
Skeleton welding situation is checked, if not prison welding is solid, is strengthened rear using the reinforcing bars of HPB300 φ 14 and be can be used;
4th step:The personnel for taking the operating platform switch the control traction platform rising of hoist engine 2 by hand-held hoist engine,
Operating platform forbids loading when rising, and operating personnel symmetrically stand, and make both sides balancing the load;When rising to hanging basket installation site,
Stop lifting, two fixed steel wire ropes 1 are articulated in respectively by hook and are embedded on the hanging basket angle steel of the both sides of pier shaft 8, while
Mark time 4 gap 6 of horizontal plane engages matching with pier shaft 8, makes platform keep stabilization not rock, and workman can now carry out hanging basket peace
Industry is pretended, fixed steel wire rope 1 is unloaded after installing, operation hoist engine switch control hoist engine 2 platform that plays drops to ground.
Operating platform answers running check, and repair welding is periodically carried out to lap-joint, extends the service life of operating platform.
This operating platform makes simple, and easy to operate, platform stabilization is good, strong applicability, can save manpower and fund is thrown
Enter, working security is high.
With above-mentioned according to desirable embodiment of the present utility model as enlightenment, by above-mentioned description, related work people
Member can carry out various changes and amendments in the range of without departing from this utility model technological thought completely.This reality
The content on specification is not limited to new technical scope, it is necessary to its technology is determined according to right
Property scope.
Claims (7)
1. be used for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that including skeleton, hoist engine, fixed pulley and
Fixed steel wire rope;
The skeleton is marked time including horizontal plane, facade guardrail and top supporting frame;
The hoist engine is installed on the top supporting frame, and the fixed pulley is fixed on bridge pier top surface, and dragging for the hoist engine is drawn
Rope is wound in the fixed pulley;
Described fixed steel wire rope one end is fixed in the top supporting frame, and the other end is detachably secured to bridge pier by hook
On the pre-buried hanging basket angle steel of pier shaft;
The horizontal plane is marked time with gap, and the gap matches with bridge pier pier shaft.
2. it is according to claim 1 for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that the water
Plane is marked time and upper is completely covered with pedal.
3. it is according to claim 2 for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that it is described to step on
Plate is bamboo slab rubber.
4. according to Claims 2 or 3 for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that institute
Pedal thickness is stated for 12mm.
5. it is according to claim 1 for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that the water
Plane is marked time and is welded by angle steel.
6. it is according to claim 1 for install bridge pier pier shaft top hanging basket operating platform, it is characterised in that the angle
The size of steel is 75mm × 75mm × 5mm.
7. the operating platform for installing bridge pier pier shaft top hanging basket according to claim 1, it is characterised in that described vertical
Face guardrail and top supporting frame are by size for the square steel of 40mm × 60mm × 5mm is welded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621401118.6U CN206308626U (en) | 2016-12-20 | 2016-12-20 | Operating platform for installing bridge pier pier shaft top hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621401118.6U CN206308626U (en) | 2016-12-20 | 2016-12-20 | Operating platform for installing bridge pier pier shaft top hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206308626U true CN206308626U (en) | 2017-07-07 |
Family
ID=59252632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621401118.6U Active CN206308626U (en) | 2016-12-20 | 2016-12-20 | Operating platform for installing bridge pier pier shaft top hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206308626U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881927A (en) * | 2017-10-10 | 2018-04-06 | 岩土科技股份有限公司 | A kind of apparatus for examination and repair of bridge bearing platform and its casing |
CN113123231A (en) * | 2021-05-12 | 2021-07-16 | 衡橡科技股份有限公司 | Rotary lifting type bridge inspection vehicle |
-
2016
- 2016-12-20 CN CN201621401118.6U patent/CN206308626U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107881927A (en) * | 2017-10-10 | 2018-04-06 | 岩土科技股份有限公司 | A kind of apparatus for examination and repair of bridge bearing platform and its casing |
CN113123231A (en) * | 2021-05-12 | 2021-07-16 | 衡橡科技股份有限公司 | Rotary lifting type bridge inspection vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206308626U (en) | Operating platform for installing bridge pier pier shaft top hanging basket | |
CN203855895U (en) | Mobile jib operation platform for constructing and overhauling bridges | |
CN107795122A (en) | Concrete stack shell constructing device and construction method | |
CN106976797A (en) | Three suspension centres turn round suspender | |
CN107762065A (en) | A kind of flooring steel beam structure and floor steel beam construction method | |
CN104973517B (en) | A kind of electronic gantry platform that installs for sintering machine head device and its using method | |
CN202429923U (en) | Travelling cable crane | |
CN203834369U (en) | Device capable of being rotated by 360 degrees and vertically lifted for bridge | |
CN102659017A (en) | Steel column hoisting system | |
CN205330690U (en) | Cloth welding platform truck is hung to tunnel water proofing board | |
CN102275829B (en) | Frame high-altitude piece mounting method of dry quenching lifter device | |
CN208167536U (en) | A kind of operation platform removed for bridge temporary support | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN105253793B (en) | Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop | |
CN204040442U (en) | A kind of integral lifting elevator hoistways operating platform | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN203613464U (en) | Slip form construction cargo transportation device | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN105569692A (en) | Trolley for welding tunnel waterproof board hanging cloth | |
CN206917297U (en) | A kind of large-span steel girder upper air installing system in place | |
CN207124420U (en) | Be easy to carry the vehicle moving crossing frame of storage | |
CN106121254B (en) | The construction method of heavy component transportation system after a kind of disassembly of contrary sequence method | |
CN206815861U (en) | Assembled outfeed platforms | |
CN205953375U (en) | Can dismantle and tower crane attachment jacking platform of independent assortment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |