CN104528506A - Mine hoist and unhooking test method thereof - Google Patents

Mine hoist and unhooking test method thereof Download PDF

Info

Publication number
CN104528506A
CN104528506A CN201410838885.2A CN201410838885A CN104528506A CN 104528506 A CN104528506 A CN 104528506A CN 201410838885 A CN201410838885 A CN 201410838885A CN 104528506 A CN104528506 A CN 104528506A
Authority
CN
China
Prior art keywords
cage
mine hoist
mine
oil cylinder
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410838885.2A
Other languages
Chinese (zh)
Other versions
CN104528506B (en
Inventor
徐淮北
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Mining Group Co Ltd
Original Assignee
Huaibei Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Mining Group Co Ltd filed Critical Huaibei Mining Group Co Ltd
Priority to CN201410838885.2A priority Critical patent/CN104528506B/en
Publication of CN104528506A publication Critical patent/CN104528506A/en
Application granted granted Critical
Publication of CN104528506B publication Critical patent/CN104528506B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/14Applications of loading and unloading equipment
    • B66B17/16Applications of loading and unloading equipment for loading and unloading mining-hoist cars or cages
    • B66B17/20Applications of loading and unloading equipment for loading and unloading mining-hoist cars or cages by moving vehicles into, or out of, the cars or cages

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a mine hoist and an unhooking test method of the mine hoist, and relates to the technical field of coal mine hoists. The mine hoist comprises a mine hoist body and a hoisting cage, the mine hoist body and a ground well mouth rail are arranged to form an inclination angle, an adjustable lifting rod is arranged at the bottom of the mine hoist body to be connected with the ground well mouth rail, the mine hoist body and the hoisting cage are connected through a horizontal lap joint bridge, and the horizontal lap joint bridge is connected with the mine hoist body through a horizontal adjusting oil cylinder. The fixed end of the horizontal adjusting oil cylinder is connected with the mine hoist body, and the telescopic end of the horizontal adjusting oil cylinder is connected with the horizontal lap joint bridge. The mine hoist is connected with a prop pulling hoist in the hoisting cage through a traction rope. The transition stage between an empty cage test and a heavy cage test is achieved, work time and the personnel labor are effectively saved, safety risks are reduced, and work efficiency and work quality are improved.

Description

A kind of mine hoist and unhook test method thereof
Technical field
The present invention relates to coal mine gig technical field, particularly a kind of mine hoist and unhook test method thereof.
Background technology
" new to install or falling protector after overhaul according to " safety regulations in coal mine " the 413 article regulation, unhooks must be carried out and test, can use after qualified.To the vertical cage falling protector in use, within every 6 months, test of not breaking off relations for 1 time should be carried out, carry out test of breaking off relations for 1 time every year." colliery auxiliary shaft use single wire winding type mine gig, supporting the use 5 tons of cages, is shaft of vertical well.Each cage uses 2 check bands, supports the use BF112 catching device.According to " safety regulations in coal mine " requirement, during annual stop production to overhaul, do test of breaking off relations completely, first do once the slack tank test of not on-load, the test of the band heavy load that then tries again.For many years, adopt following scheme to carry out unhook test: after cage hoisting to upper well head, to improve 1.5 meters more always, well head bottom cage 66 cun of steel pipes are closed, steel pipe is paved with 30 pieces of planks, 300, plank upper berth saw foam straw bag, after the tank pressure that falls is real, becket bridle removed by tank cap, hang detacher, make marks in positions such as the catching device chock of cage both sides and check band, cage main tie, derrick energy dispersers after then playing 1.5 meters, tank, then carry out subsequent operation.After finishing slack tank test, then remove saw foam straw bag, plank, steel pipe, push 2 joint loaded vehicle after the horizontal retort that falls, then play 1.5 meters, tank, more again spread the secondary operations such as steel pipe, plank, saw foam straw bag.
, there is following drawback in this original method:
1, slack tank test then can not do the test of heavy tank after finishing, and the steel pipe must laid original, plank, saw foam straw bag are removed, and falls to cannedly entering again to lay steel pipe, plank, saw foam straw bag after loaded vehicle.Two hook cages add up the laying of needs 4 times and the repetitive process of dismounting, lose time in pole.2, each laying and dismounting steel pipe, plank, saw foam straw bag etc., personnel stand in well head construction, are absolutely unsafe.
3, repeatedly repeat, the objects such as steel pipe, plank, straw bag easily fall into pit shaft, cause the accident.
4, lay and remove steel pipe, plank, saw foam straw bag etc., needing the many people in well head both sides to transmit object, personnel demand amount is large, lavishes labor on.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of Height Adjustable mine hoist with cage.
To achieve these goals, the technical scheme that the present invention takes is: a kind of mine hoist, comprise mine hoist body, mine hoist body and ground well head track are that inclination angle is arranged, the bottom of described mine hoist body arranges adjustable lifting bar and is connected with ground well head track, described mine hoist body with overlap bridge by level between winding cage and be connected, described level overlap joint bridge is connected by Level tune oil cylinder with mine hoist body; The fixed end of described Level tune oil cylinder connects mine hoist body, and telescopic end connects level overlap joint bridge; Described mine hoist is connected with drawing hoist by pull-cord.
Preferably, described winding cage is storage cage, arranges and carries a car, year car leads pull-cord and is connected with drawing hoist in described storage cage.
Preferably, described adjustable lifting bar comprises the left-handed screw on top and the right handed screw of bottom, by regulating adjustable lifting bar to be connected between left-handed screw with right handed screw, described right handed screw by lock screw and ground well head track affixed.
Preferably, described Level tune oil cylinder is pneumatic oil cylinder.
The invention also discloses a kind of test method of mine hoist, comprise the steps,
After A, cage hoisting to upper well head, continuation is proposed 1.5 meters of stopping productions;
B, be transported to well head entry side with the above-mentioned cage of mining ordinary flat handlebar;
C, this cage is fixed on wellhead ground track;
D, utilize fully contacting of the horizontal lap segment of hydraulic ram adjustment and cage tank inner orbit;
E, use orbit inclination setting device adjust the inclination angle of track, and horizontal lap segment is the level of state gradually;
The drawing hoist of F, cage opposite side puts rope gradually, through cage inside, by haulage cable along the upward slope orbit transports of this device to entry side;
G, fag end are connected with loaded vehicle, are drawn loaded vehicle in tank by drawing hoist traction;
H, with hydraulic ram by horizontal lap segment jack-up, make front end overlapping part depart from tank inner orbit completely;
I, after this, fall tank, removes cage becket bridle, installs detacher, plays tank, does and starting test of breaking off relations.
The invention has the beneficial effects as follows: this unhook experimental set-up achieve the test of cage slack tank and heavy tank test between transition period, avoid canopy tank sequence of maneuvers repeatedly, actv. is saved work-hours, is manually measured, and reduces security risk, improves work efficiency and workmanship.
Accompanying drawing explanation
Fig. 1 is the structural representation of mine hoist of the present invention:
Fig. 2 is the structural representation of the adjustable lifting bar of mine hoist of the present invention;
Fig. 3 is the structural representation of the lock screw of mine hoist of the present invention;
Wherein: 1. mine hoist body, 2. adjustable lifting bar, 3. ground well head track, 4. winding cage, 5. level overlap joint bridge, 6. Level tune oil cylinder, 7. pull-cord, 8. drawing hoist, 9. year car, 10. left-handed screw, 11. right handed screw, 12. lock screws.
Detailed description of the invention
In order to deepen the understanding of the present invention, below in conjunction with embodiment and Fig. 1, Fig. 2, Fig. 3, the invention will be further described, and this embodiment, only for explaining the present invention, does not form the restriction of scope.
A kind of mine hoist, comprise mine hoist body 1, mine hoist body 1 is arranged in inclination angle with ground well head track 3, the bottom of described mine hoist body 1 arranges adjustable lifting bar 2 and is connected with ground well head track 3, described mine hoist body 1 with overlap bridge 5 by level between winding cage 4 and be connected, described level overlap joint bridge 5 is connected by Level tune oil cylinder 6 with mine hoist body 1; The fixed end of described Level tune oil cylinder 6 connects mine hoist body 1, and telescopic end connects level overlap joint bridge 5; Described mine hoist is connected with drawing hoist 8 by pull-cord 7.
Winding cage 4 in the present invention is storage cage, arranges and carries a car 9, year car 9 leads pull-cord 7 and is connected with drawing hoist 8 in described storage cage.Adjustable lifting bar 2 in the present invention comprises the left-handed screw 10 on top and the right handed screw 11 of bottom, and by regulating adjustable lifting bar 2 to be connected between left-handed screw 10 with right handed screw 11, described right handed screw 11 is affixed by lock screw 12 and ground well head track 3.The Level tune oil cylinder 6 adopted in the present invention is pneumatic oil cylinder.
The invention also discloses a kind of test method of mine hoist, comprise the steps,
After A, cage hoisting to upper well head, continuation is proposed 1.5 meters of stopping productions;
B, be transported to well head entry side with the above-mentioned unhook experimental set-up of mining ordinary flat handlebar;
C, this device is fixed on wellhead ground track;
D, utilize fully contacting of the horizontal lap segment of hydraulic ram adjustment and cage tank inner orbit;
E, use orbit inclination setting device adjust the inclination angle of track, and horizontal lap segment is the level of state gradually;
The drawing hoist of F, cage opposite side puts rope gradually, through cage inside, by haulage cable along the upward slope orbit transports of this device to entry side;
G, fag end are connected with loaded vehicle, are drawn loaded vehicle in tank by drawing hoist traction;
H, with hydraulic ram by horizontal lap segment jack-up, make front end overlapping part depart from tank inner orbit completely;
I, after this, fall tank, removes cage becket bridle, installs detacher, plays tank, does and starting test of breaking off relations.
More specifically, the present invention adopts 24kg/m track to be made as between slack tank that an inclination angle is 19 degree (adjustable angle) and heavy tank to pass in and out the transition apparatus of loaded vehicle, decreases the process repeating for 2 times to lay (and dismounting) steel pipe, plank, saw foam straw bag.In use, this device is placed on cage west side and enters Che Kou, installs drawing hoist on ground, well head east side, utilizes winch to draw 2 joint loaded vehicle turnover cages.
The track plagioclase of this device 4.5 meters, it is 1.5 meters that the level parallel with winding cage 4 overlaps bridge 5 track length, and gauge is 600mm.Tilting section and level overlap joint bridge 5 welding groove steel sleeper, spacing is 800mm, and the angle of tilting section and level overlap joint bridge 5 is adjustable.The angle of tilting section: rely on 4 pairs of vertical adjusting screw rods of taking root on wellhead ground track to realize.The angle of horizontal segment: rely on hydraulic ram to realize adjustable angle.The contact site that the end of horizontal segment and tank inner orbit overlap: for activity overlaps, the bounce-back avoiding cage during loaded vehicle turnover tank is trembleed and affects the stability of this device.This device is fixed on the mode on the ground rail of well head west side: to the bottom of adjustable lifting bar 2 be U-shaped steel plate make, left-hand thread on ground rail, rely on lock screw 12 be fixed.
Above-described is only the preferred embodiment of the present invention, it should be pointed out that for the person of ordinary skill of the art, and without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (5)

1. a mine hoist, comprise mine hoist body and winding cage, mine hoist body and ground well head track are that inclination angle is arranged, it is characterized in that: the bottom of described mine hoist body arranges adjustable lifting bar and is connected with ground well head track, described mine hoist body with overlap bridge by level between winding cage and be connected, described level overlap joint bridge is connected by Level tune oil cylinder with mine hoist body; The fixed end of described Level tune oil cylinder connects mine hoist body, and telescopic end connects level overlap joint bridge; Described mine hoist is connected with the drawing hoist in winding cage by pull-cord.
2. mine hoist according to claim 1, is characterized in that: described winding cage is storage cage, arranges and carries a car, year car leads pull-cord and is connected with drawing hoist in described storage cage.
3. mine hoist according to claim 1, it is characterized in that: described adjustable lifting bar comprises the left-handed screw on top and the right handed screw of bottom, by regulating adjustable lifting bar to be connected between left-handed screw with right handed screw, described right handed screw by lock screw and ground well head track affixed.
4. mine hoist according to claim 1, is characterized in that: described Level tune oil cylinder is pneumatic oil cylinder.
5. the unhook test method of the mine hoist according to any one of claim 1-4, is characterized in that: comprise the steps,
After A, cage hoisting to upper well head, continuation is carried 1-3 rice and stop production;
B, be transported to well head entry side with cage on mining ordinary flat handlebar;
C, this cage is fixed on wellhead ground track;
D, utilize fully contacting of the horizontal lap segment of hydraulic ram adjustment and cage tank inner orbit;
E, use orbit inclination setting device adjust the inclination angle of track, and horizontal lap segment is the level of state gradually;
The drawing hoist of F, cage opposite side puts rope gradually, through cage inside, by haulage cable along the upward slope orbit transports of this device to entry side;
G, fag end are connected with loaded vehicle, are drawn loaded vehicle in tank by drawing hoist traction;
H, with hydraulic ram by horizontal lap segment jack-up, make front end overlapping part depart from tank inner orbit completely;
I, after this, fall tank, removes cage becket bridle, installs detacher, plays tank, does and starting test of breaking off relations.
CN201410838885.2A 2014-12-30 2014-12-30 Mine hoist and unhooking test method thereof Active CN104528506B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410838885.2A CN104528506B (en) 2014-12-30 2014-12-30 Mine hoist and unhooking test method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410838885.2A CN104528506B (en) 2014-12-30 2014-12-30 Mine hoist and unhooking test method thereof

Publications (2)

Publication Number Publication Date
CN104528506A true CN104528506A (en) 2015-04-22
CN104528506B CN104528506B (en) 2017-05-17

Family

ID=52844205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410838885.2A Active CN104528506B (en) 2014-12-30 2014-12-30 Mine hoist and unhooking test method thereof

Country Status (1)

Country Link
CN (1) CN104528506B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107020540A (en) * 2017-06-06 2017-08-08 安徽理工大学 A kind of adjustable shock-absorbing bracket of mine head sheave grooving truning fixture
CN107134728A (en) * 2017-05-23 2017-09-05 国网四川省电力公司阿坝供电公司 It is easy to mobile DC power system
CN118619060A (en) * 2024-06-24 2024-09-10 武汉市云竹机电新技术开发有限公司 A comprehensive test device for overwinding, overrelease and runaway protection tests

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2791630Y (en) * 2005-04-18 2006-06-28 刘洪智 Device for testing heavy-load dehooking of bicycle
CN2873718Y (en) * 2006-02-14 2007-02-28 中国矿业大学 Anti-falling device brake performance detector
CN201193169Y (en) * 2008-01-31 2009-02-11 上海市建筑科学研究院(集团)有限公司 Detection experiment device for construction hoist anti-falling safety device
CN201765119U (en) * 2010-07-27 2011-03-16 山西兰花科技创业股份有限公司 Mancar unhooking tester of inclined shaft
CN204490290U (en) * 2014-12-30 2015-07-22 淮北矿业(集团)有限责任公司 A kind of mine hoist

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2791630Y (en) * 2005-04-18 2006-06-28 刘洪智 Device for testing heavy-load dehooking of bicycle
CN2873718Y (en) * 2006-02-14 2007-02-28 中国矿业大学 Anti-falling device brake performance detector
CN201193169Y (en) * 2008-01-31 2009-02-11 上海市建筑科学研究院(集团)有限公司 Detection experiment device for construction hoist anti-falling safety device
CN201765119U (en) * 2010-07-27 2011-03-16 山西兰花科技创业股份有限公司 Mancar unhooking tester of inclined shaft
CN204490290U (en) * 2014-12-30 2015-07-22 淮北矿业(集团)有限责任公司 A kind of mine hoist

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107134728A (en) * 2017-05-23 2017-09-05 国网四川省电力公司阿坝供电公司 It is easy to mobile DC power system
CN107020540A (en) * 2017-06-06 2017-08-08 安徽理工大学 A kind of adjustable shock-absorbing bracket of mine head sheave grooving truning fixture
CN118619060A (en) * 2024-06-24 2024-09-10 武汉市云竹机电新技术开发有限公司 A comprehensive test device for overwinding, overrelease and runaway protection tests

Also Published As

Publication number Publication date
CN104528506B (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN201458596U (en) Crane with self-dismounting device
CN107201721A (en) Stay cable installation construction method
CN101845958A (en) Fully mechanized coal face bracket withdrawing method and withdrawing bracket traction spring exerciser
CN107165062B (en) A method of removing Existing Railway Line gate-type pier capping beam protecting canopy frame
CN107585668A (en) Auxiliary shaft, combined shaft tail rope change construction technology
CN104631329A (en) Method for adjusting overall line shape of continuous catwalk of suspension bridge
CN107355248A (en) A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting
CN104528506B (en) Mine hoist and unhooking test method thereof
CN105971654A (en) Process for rapidly assembling shield-type hydraulic support underground
CN202245865U (en) Head wheel hoisting device of sintering machine
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN109296374B (en) TBM hoisting and translation method for deep well enclosed space
CN208121566U (en) Cableway apparatus for examination and repair
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
DE202022103661U1 (en) Double machine lifting system for constructing the internal structure of a chimney
CN204490290U (en) A kind of mine hoist
CN203755166U (en) Simple lifting device for constructors to go up and down
CN207004137U (en) A kind of power tower
CN106939536B (en) A kind of coal mine inclined shaft assembled is laid a railway track construction method
CN205387935U (en) Lifting bracket of mining machine
CN106437174B (en) Rail transport device for inclined operation surface and construction method thereof
CN104085823B (en) Subway is laid a railway track gantry crane dismounting and transport rotary lifter
CN207434821U (en) A kind of Liftable type is uncoupled support roller combination unit
CN203832507U (en) Flexible vehicle blocking bar lifting device
CN208716705U (en) It is a kind of to apply to the transfer tool for being mounted on small space oil cooler

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant