CN209040847U - A kind of settlement Control structure for being applicable in cheuch section lid and holing - Google Patents

A kind of settlement Control structure for being applicable in cheuch section lid and holing Download PDF

Info

Publication number
CN209040847U
CN209040847U CN201821864840.2U CN201821864840U CN209040847U CN 209040847 U CN209040847 U CN 209040847U CN 201821864840 U CN201821864840 U CN 201821864840U CN 209040847 U CN209040847 U CN 209040847U
Authority
CN
China
Prior art keywords
lid
arch
holing
applicable
control structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821864840.2U
Other languages
Chinese (zh)
Inventor
郭奕明
张永杰
叶钰梁
周维政
陈乐平
张文豪
马文琪
梅智鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201821864840.2U priority Critical patent/CN209040847U/en
Application granted granted Critical
Publication of CN209040847U publication Critical patent/CN209040847U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A kind of settlement Control structure for being applicable in cheuch section lid and holing, the multiple rows of reinforced concrete stirring device laid on ground, along tunnel extending direction is supported for lid arch two sides arch springing including being vertically cast in, sand-gravel cushion on reinforced concrete stirring device, being used to support lid arch, and the steel hinge line that lid arch is connected and fixed with preliminary bracing structure are set.The utility model is designed reasonably, it is easy for construction, ground settlement, hole Vault settlement, barrel sedimentation and the stability for improving cheuch section region slopes can be efficiently controlled, reduce construction disaster, effectively control the prolonged vehicle dynamic load bring tunnel subsidence in later operation, project cost can also be saved, reduces and settles bring difficulty and risk during covering hole work progress and later normal operation.

Description

A kind of settlement Control structure for being applicable in cheuch section lid and holing
Technical field
The utility model relates to a kind of settlement Control structures for being applicable in cheuch section lid and holing.
Background technique
With the fast development of the western basic means of transportation in China, a large amount of Tunnel Engineering has been emerged in large numbers everywhere.The west in China Portion, the mountain ridge, area in length and breadth, will will appear a large amount of Tunnel Passing mountain ridge cheuch section, this will unavoidably form cheuch section an ultra shallow Tunnel is buried, and digging method construction can guarantee to reduce the shadow to ambient enviroment under the premise of super Shallow Section construction supporting safety It rings, and traffic above-ground can be restored in a short time, cover and cut construction method surpasses in Shallow Section in tunnel has other construction methods not have Superiority, now have begun it is expanded should in mountain area constructing tunnel, so the following mountain ridge super shallow-buried tunnel construction middle cover dig Method construction can be more and more.But in general, for mountain ridge coombe throughout the year by the erosion of rainwater, geological environment is generally poor, tunnel Situations such as Surrounding Rock Strength is low, stability is poor, rock mass loose crushing, also seeps water with a degree of earth's surface, frequent occurrence tunnel It collapses or even natural slope failure landslide, holes supporting construction to lid and later normal operation use brings difficulty and risk.
Utility model content
The utility model solve the deficiencies in the prior art and provide it is a kind of design rationally, it is easy for construction, can effectively control Ground settlement, hole Vault settlement, barrel sedimentation and the stability for improving cheuch section region slopes processed, reduce the suitable of construction disaster The settlement Control structure holed with cheuch section lid.
To achieve the goals above, the utility model adopts the following technical solution:
A kind of settlement Control structure for being applicable in cheuch section lid and holing, including be vertically cast in for lid arch two sides arch springing support On reinforced concrete stirring device, use is arranged in the multiple rows of reinforced concrete stirring device laid on ground, along tunnel extending direction In the sand-gravel cushion of Supporting cover arch, and the steel hinge line that lid arch is connected and fixed with preliminary bracing structure.
Further, the adjacent reinforced concrete stirring device of every row is equipped with overlapping region.
Further, the overlapping region length is 100mm.
Further, the length of the reinforced concrete stirring device is 3m, diameter 700mm.
Further, one end of the steel hinge line is fixed on the billet of lid arch arch springing by the first anchor cable fixing piece, The other end of the steel hinge line by the second anchor cable fixing piece be fixed on tunnel get out of a predicament or an embarrassing situation preliminary bracing steel arch-shelf on.
Further, corrosion protective layer is set with outside the steel hinge line.
Further, the steel strand wires are equipped with certain prestressing force.
The utility model is by being arranged reinforced concrete stirring device in arch springing to guarantee the normal of lid arch before lid arch construction Using and stability.After lid arch construction finishes, then the boring construction under lid arch, lid arch arch springing and tunnel are got out of a predicament or an embarrassing situation initial stage branch Steel arch-shelf in shield is connected with prestress anchorage cable, can be efficiently controlled during tunnel operation afterwards in this way due to long-term Vehicle dynamic load and the sedimentation generated.
In conclusion the utility model is designed reasonably, easy for construction, can efficiently control ground settlement, hole Vault settlement, Barrel sedimentation and the stability for improving cheuch section region slopes, reduce construction disaster, effectively control in later operation Prolonged vehicle dynamic load bring tunnel subsidence, moreover it is possible to save project cost, reduce lid hole work progress and with Bring difficulty and risk are settled during normal operation afterwards.
Detailed description of the invention
Fig. 1 is the view in transverse section that the utility model is mounted on tunnel.
Fig. 2 is the structural schematic diagram of the utility model reinforced cement earth stake.
Fig. 3 is the position Figure 1A detail drawing.
Fig. 4 is the position Figure 1B detail drawing.
Fig. 5 is the sectional view of Fig. 4.
Fig. 6 is anchor cable floor plan at the utility model lid arch.
In attached drawing, 1. reinforced concrete stirring devices, 2. armored concrete copings, 3. joint bars, 4. lid arches, 5. 2 linings, 6. First anchor cable fixing piece, 7 billets, 8. steel strand wires, 9. preliminary bracing structures, 10. steel arch-shelf wing plates, 11. steel arch-shelf floors, 12, the second anchor cable fixing piece, 13 sand-gravel cushions.
Specific embodiment
The utility model in order to better understand is made utility model further detailed with reference to the accompanying drawing and embodiment Describe in detail bright, but the embodiments of the present invention is not limited only to this, and the protection scope of the utility model is also related to art technology Personnel according to the utility model design it is conceivable that equivalent technologies mean.
As shown in Figures 1 to 6, a kind of settlement Control structure for being applicable in cheuch section lid and holing, including lid arch 4, preliminary bracing Structure 9 and two linings 5 are laid with two rows of reinforced cements in the ground for 4 support of lid arch, along the two sides countermeasure of tunnel extending direction Native mixing pile 1, the reinforced concrete stirring device 1 include concrete-pile, the reinforced concrete soil pressure being arranged at the top of concrete-pile Top plate 2, the joint bar 3 being arranged in concrete-pile are laid with the sandstone pad for being used to support lid arch 4 on reinforced concrete stirring device 1 Layer 13, after lid arch 4 is supported on the sand-gravel cushion, tunneling, and lay in tunnel preliminary bracing structure with Two linings 5, when laying preliminary bracing structure, lay steel arch-shelf in it, and the steel arch-shelf includes steel arch-shelf wing plate 10 and steel arch Frame floor 11, then be connected and fixed lid arch 4 with preliminary bracing structure by steel hinge line 8, the adjacent reinforced cement earth stirring of every row Stake 1 is equipped with overlapping region, and the overlapping region length is 100mm, and the length of the reinforced concrete stirring device 1 is 3m, diameter For 700mm.
Specifically, one end of the steel hinge line 8 is fixed on the billet 7 of lid 4 arch springings of arch by the first anchor cable fixing piece 6 On, the other end of the steel hinge line 8 is fixed on tunnel by the second anchor cable fixing piece 12 and gets out of a predicament or an embarrassing situation the steel arch-shelf wing of preliminary bracing On plate 10, corrosion protective layer is set with outside the steel hinge line, the steel strand wires 8 are equipped with certain prestressing force.
Lower mask body introduces the construction procedure of this structure:
After the completion of preparation of construction process, in conjunction with the practical geological condition in scene and design drawing requirement, rationally it is configured to face When gutter and face upward slope intercepting ditch;Earth's surface row intercepts water after system perfecting, excavates lid and digs earthing body in section, digs section to lid immediately after excavation Side slope, lid dig section and tunneling section junction faces upward slope and carries out supporting;Lid, which is dug, covers arch and steel tube shed with the construction of tunneling junction, to guarantee Lid digs the stability with tunneling section joining place;After the completion of above-mentioned operation after verification construction is accurate rationally, lid is encircleed at arch springing Ground takes composite foundation to handle, and improves its bearing capacity, steps are as follows for Specific construction: (1) lid arch arch springing under ground take it is compound Basement process, reinforced concrete stirring device composite foundation of constructing at arch springing, the long 3m diameter of specially two campsheds are the single shaft of 700mm Reinforced concrete stirring device, the reinforcing bar of pile body two sides placement diameter 12mm, Soil-cement stake top add the reinforcing bar of 20cm thickness Concrete coping after waiting reinforced concrete stirring devices construction to finish maintenance 28 days, is arranged on reinforced concrete stirring device top 20cm sand-gravel cushion;(2) lid arch arch springing and the tunnel steel arch-shelf in preliminary bracing of getting out of a predicament or an embarrassing situation are connected with prestress anchorage cable, utilization Directional drilling machine drills out pilot hole in soil layer, and the steel strand wires with corrosion protective covering housing are passed through from pilot hole and imposed pre- Stress, connection cover arch arch springing and tunnel get out of a predicament or an embarrassing situation in steel arch-shelf, can efficiently control so afterwards tunnel operation process In the sedimentation that is generated due to long-term vehicle dynamic load.
In addition, it should be noted that, this patent is not limited to above embodiment, as long as its part does not specify specific size Or shape, then the part can be any size or shape adaptable with its structure, no matter and making in its material composition Any variation, it is all to be designed using structure provided by the utility model, all it is a kind of deformation of the utility model, is considered as Within scope of protection of the utility model.

Claims (7)

1. a kind of settlement Control structure for being applicable in cheuch section lid and holing, it is characterised in that: including being vertically cast in for lid arch two Side arch springing supports the multiple rows of reinforced concrete stirring device laid on ground, along tunnel extending direction, and setting is stirred in reinforced cement earth Mix sand-gravel cushion in stake, being used to support lid arch, and the steel hinge line that lid arch is connected and fixed with preliminary bracing structure.
2. the settlement Control structure according to claim 1 for being applicable in cheuch section lid and holing, it is characterised in that: every row is adjacent Reinforced concrete stirring device be equipped with overlapping region.
3. the settlement Control structure according to claim 2 for being applicable in cheuch section lid and holing, it is characterised in that: the coincidence Zone length is 100mm.
4. the settlement Control structure according to claim 3 for being applicable in cheuch section lid and holing, it is characterised in that: the reinforcement The length of cement mixing method is 3m, diameter 700mm.
5. according to claim 1 to the settlement Control structure for being applicable in cheuch section lid described in one of 4 and holing, it is characterised in that: One end of the steel hinge line is fixed on the billet of lid arch arch springing by the first anchor cable fixing piece, the other end of the steel hinge line By the second anchor cable fixing piece be fixed on tunnel get out of a predicament or an embarrassing situation preliminary bracing steel arch-shelf on.
6. the settlement Control structure according to claim 5 for being applicable in cheuch section lid and holing, it is characterised in that: the steel hinge Corrosion protective layer is set with outside line.
7. the settlement Control structure according to claim 6 for being applicable in cheuch section lid and holing, it is characterised in that: the steel hinge Line is equipped with certain prestressing force.
CN201821864840.2U 2018-11-13 2018-11-13 A kind of settlement Control structure for being applicable in cheuch section lid and holing Expired - Fee Related CN209040847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821864840.2U CN209040847U (en) 2018-11-13 2018-11-13 A kind of settlement Control structure for being applicable in cheuch section lid and holing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821864840.2U CN209040847U (en) 2018-11-13 2018-11-13 A kind of settlement Control structure for being applicable in cheuch section lid and holing

Publications (1)

Publication Number Publication Date
CN209040847U true CN209040847U (en) 2019-06-28

Family

ID=67041821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821864840.2U Expired - Fee Related CN209040847U (en) 2018-11-13 2018-11-13 A kind of settlement Control structure for being applicable in cheuch section lid and holing

Country Status (1)

Country Link
CN (1) CN209040847U (en)

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
CN106498950A (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body
CN109630127A (en) A kind of construction method of rich water soft stratum ultra-deep shield vertical shaft
CN210598987U (en) Subway station based on single-layer four-guide-hole and middle-guide-hole inner pile foundation
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable
CN109441456A (en) A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN110629671A (en) Suspension bridge anchorage and construction method thereof
CN109898521A (en) A kind of anchored pile supporting and construction method for foundation pit external corner
CN113216980A (en) Complex weak surrounding rock shallow-buried bias tunnel and construction method
CN109235490A (en) Retaining wall and its construction method
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN103147444A (en) Foundation pit enclosure structure capable of realizing supporting while excavating and foundation pit excavating method
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN101691759A (en) Construction method for digging composite environmental protection base of anchorage bar adding rock
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN209195412U (en) A kind of tunnel structure suitable for weak Facility-sliding strata
CN209040847U (en) A kind of settlement Control structure for being applicable in cheuch section lid and holing
CN111560959A (en) Excavation and supporting method for shield starting well foundation pit adjacent to subway
CN208815560U (en) A kind of structure of Underground Subway Station construction period full station sealing
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN212642730U (en) Collapsible loess area tunnel passes people's air defense structure
CN213773384U (en) Deep basal pit side slope protection reinforcing bar net fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628

Termination date: 20201113

CF01 Termination of patent right due to non-payment of annual fee