CN209027381U - A kind of blasting system for rock roadway in coal mine blast working - Google Patents

A kind of blasting system for rock roadway in coal mine blast working Download PDF

Info

Publication number
CN209027381U
CN209027381U CN201821782006.9U CN201821782006U CN209027381U CN 209027381 U CN209027381 U CN 209027381U CN 201821782006 U CN201821782006 U CN 201821782006U CN 209027381 U CN209027381 U CN 209027381U
Authority
CN
China
Prior art keywords
roadway
powder stick
eye
coal mine
periphery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821782006.9U
Other languages
Chinese (zh)
Inventor
任培良
李欣
郭强强
崔峰
吕磊
史正伟
崔超民
王昊
李华超
黄志丹
张烁
贾栋楠
曹拓拓
李绍乐
史前进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIN'AN COAL MINE OF HENAN DAYOU ENERGY CO Ltd
Original Assignee
XIN'AN COAL MINE OF HENAN DAYOU ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIN'AN COAL MINE OF HENAN DAYOU ENERGY CO Ltd filed Critical XIN'AN COAL MINE OF HENAN DAYOU ENERGY CO Ltd
Priority to CN201821782006.9U priority Critical patent/CN209027381U/en
Application granted granted Critical
Publication of CN209027381U publication Critical patent/CN209027381U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to coal mine tunnel initating field, specifically a kind of blasting system for rock roadway in coal mine blast working.Including the multiple cut shots being provided on roadway excavation section and the multiple periphery holes opened up along roadway excavation section rim, offer diameter hollow eye in the center of roadway excavation section, diameter hollow eye to open up inclination angle consistent with the roadway construction gradient;The bottom hole position of cut shot is filled with the first explosion powder stick, and the position between the eye mouth for being located at cut shot in cut shot and the first explosion powder stick is sealed equipped with loess stemming;The bottom hole position of periphery hole is filled with the second explosion powder stick, water cannon mudding is successively arranged by the eye mouth direction of the second explosion powder stick towards periphery hole in periphery hole and loess stemming seals, the water that water stemming material package includes cylindrical sealing shroud and is poured in secret set.The utility model can greatly improve the efficiency of stone drifting by improving the average drilling depth in development blasting construction.

Description

A kind of blasting system for rock roadway in coal mine blast working
Technical field
It is specifically a kind of for the quick-fried of rock roadway in coal mine blast working the utility model relates to coal mine tunnel initating field Broken system.
Background technique
Coal mining starts to exploit towards underground deeper inside in recent years, and must just face one towards the exploitation of underground deeper inside Series new reality and technical problem, such as the subterranean depth stress of primary rock are larger, cause the clamping action of rock significantly greater, with Also there are some new problems in driling explosion technology and theory of blasting simultaneously for this, how to realize the high efficient driving of rock gangway, always It is that coal mine roadway tunnels faced main problem.
There are mainly two types of underground passage tunneling construction process is current: first is that using mechanized construction, this method automation Degree is high, and operation safety is continuous, but since mechanical equipment volume is larger, can not flexibly put to good use in underground passage, and machinery is set Standby price is high, cutter easy consumption, so that its adaptation range is limited;Another method is the method using perforating explosion, this method Variation strong adaptability to geological conditions, China's stone drifting usually use perforating blasting.
Although blasting procedure in coal mine underground stone drifting using extremely wide, it is many due to the shortcoming of theoretical research There is no enough theories to carry out guiding construction when coal mine and mine construction, causes drivage efficiency lower, routine in the prior art Development blasting construction is primarily present that average drilling depth is low, and usually 1.2-1.4m, is not well positioned to meet coal mine roadway speedy drivage Demand.
Utility model content
The utility model is intended to provide a kind of blasting system for rock roadway in coal mine blast working, by improving development blasting Average drilling depth in construction greatly improves the efficiency of stone drifting.
In order to solve the above technical problems, the technical solution adopted in the utility model are as follows: one kind is used for rock roadway in coal mine explosion The blasting system of construction is provided with multiple cut shots on roadway excavation section including uniform intervals and along roadway excavation section Multiple periphery holes that edge interval opens up offer diameter hollow eye, major diameter in the center of roadway excavation section Open up inclination angle, the depth 55-65m, diameter 150-155mm consistent with the roadway construction gradient of hollow eye;The hole of cut shot Bottom position is filled with the first explosion powder stick, the position between the eye mouth for being located at cut shot in cut shot and the first explosion powder stick Loess stemming envelope is installed;The bottom hole position of periphery hole is filled with the second explosion powder stick, by the second explosion in periphery hole The eye mouth direction of powder stick towards periphery hole is successively arranged water cannon mudding and loess stemming envelope, and water stemming material package includes the close of cylinder Big envelope and the water being poured in secret set.
Preferably, the length of water cannon mudding is that loess stemming seals 2.8-3 times of length in periphery hole.
Preferably, sealing shroud is made of vinyon, and the diameter of sealing shroud is corresponding with periphery hole.
Preferably, cut shot and periphery hole are each perpendicular to roadway excavation section and open up.
Preferably, the first explosion powder stick and the second explosion powder stick are three-level emulsion.
Beneficial effect
The utility model can effectively improve stone drifting efficiency.Diameter hollow eye opens up, and is on the one hand broken after explosion Cutting for rock provides certain space;On the other hand, so that explosion after roadway excavation section on country rock generate it is bigger Tensile stress then generates more scope of freedoms, convenient for further driving.Water cannon mudding is used in periphery hole, it will be previous quick-fried Broken stress wave propagation conductor becomes aqueous medium from air dielectric, to reach the energy storage effect of Explosion stress wave, improves the benefit of explosive With rate, while water stemming material explodes simultaneously when explosive charge, and water just forms misty distribution in air, can play depositing dust, cooling and Absorb the effect of toxic and harmful gas.
From the point of view of drivage efficiency, the former every big gun Dan Jinwei 1-1.2m of stone drifting, drill footage per month maintains 60m or so, passes through this For the every big gun list of utility model into improving to 2-2.4m, drill footage per month can be promoted to 80-100m.
From the point of view of economic benefit, the driving material cost of existing conventional techniques is 4357 yuan/m, 4.2 works/m.By this reality With novel, manpower consumption has 4.2 works/m to be reduced to 2.6 works/m, 175 yuan of every work, and labour cost reduces by 280 yuan/m;
To sum up, the utility model can provide the sufficient time for working face protrusion-dispelling engineering, and working face is drawn a circle to approve in advance, to solution Excavation replacement imbalance provides strong basis, and back production improved efficiency 30% is calculated by annual 3 working faces of delineation, can synergy 1426.9 Wan Yuan/year.
Detailed description of the invention
Fig. 1 is the distribution schematic diagram of diameter hollow eye, cut shot and periphery hole in the utility model;
Fig. 2 is the diagrammatic cross-section of periphery hole part in the utility model;
Fig. 3 is the diagrammatic cross-section of cut shot part in the utility model;
Marked in the figure: 1, roadway excavation section, 2, diameter hollow eye, 3, cut shot, 4, periphery hole, 5, loess big gun Mudding, 6, water cannon mudding, the 7, first explosion powder stick, the 8, second explosion powder stick.
Specific embodiment
As shown in Figure 1, a kind of blasting system for rock roadway in coal mine blast working of the utility model, including uniform intervals The multiple cut shots 3 being provided on roadway excavation section 1 and the multiple periphery big guns opened up along 1 edge interval of roadway excavation section Eye 4.Cut shot 3 and periphery hole 4 in Fig. 1 only clearly identify its distributing position and use, and is actually used in, cut shot 3 and the distributing position of periphery hole 4 still use in routine techniques and open up mode.
Unlike routine techniques, the utility model offers in major diameter in the center of roadway excavation section 1 Empty eye 2.Major diameter refers to that its diameter much larger than cut shot 3 and periphery hole 4, has reached 150-155mm.It is hollow to refer to the hole Middle part fills explosive.The main function of diameter hollow borehole is: on the one hand providing centainly for cutting for detritus after explosion Space;On the other hand, it so that the country rock on roadway excavation section 1 after explosion generates bigger tensile stress, then generates more More scope of freedom, convenient for further driving.
Diameter hollow eye 2 in the present embodiment favours the distribution of roadway excavation section 1, opens up inclination angle and roadway construction The gradient is consistent, to achieve the purpose that increase the explosion scope of freedom during this circulation driving.The depth of diameter hollow eye 2 is 55- 65m, to achieve the purpose that persistently to play a role in development blasting.
As shown in figure 3, cut shot 3 is opened up perpendicular to roadway excavation section 1, it is identical as conventional blasting method driving technology, this Utility model is filled with the first explosion powder stick 7 in the bottom hole position of cut shot 3, positioned at cut shot 3 in cut shot 3 Position between eye mouth and the first explosion powder stick 7 is equipped with Huang and crosses stemming envelope 5.
It is opened up as shown in Fig. 2, periphery hole 4 is also perpendicular to roadway excavation section 1, the bottom hole position of periphery hole 4 is filled out Equipped with the second explosion powder stick 8.It is different from conventional blasting method driving technology, by the second explosion powder stick 8 towards periphery in periphery hole 4 The eye mouth direction of borehole 4 is successively arranged water cannon mudding 6 and Huang crosses stemming envelope 5, and water cannon mudding 6 includes cylindrical and uses polyethylene The sealing shroud of plastic material production and the water being poured in secret set, the diameter of sealing shroud are corresponding with periphery hole 4.This implementation In example, the total depth of periphery hole 4 is 20000m, and the length of the second explosion powder stick 8 therein is 220mm, the length of water cannon mudding 6 Degree is 1330mm, and the length of loess stemming is 450mm, in a preferred embodiment, the length of water cannon mudding 6 in periphery hole 4 Degree crosses 2.8-3 times that stemming seals 5 length for Huang.
The first explosion powder stick 7 and the second explosion powder stick 8 in the present embodiment in cut shot 3 and periphery hole 4 are all made of The three-level emulsion of diameter 32mm.First explosion powder stick 7 and the second explosion powder stick 8 are ignited by electric cap, electric cap Payment to a porter passes through cut shot 3 respectively and the eye mouth position of periphery hole 4 draws and is connected with detonation equipment.

Claims (5)

1. a kind of blasting system for rock roadway in coal mine blast working, including uniform intervals are provided on roadway excavation section (1) Multiple cut shots (3) and multiple periphery holes (4) for being opened up along roadway excavation section (1) edge interval, it is characterised in that: Offered diameter hollow eye (2) in the center of roadway excavation section (1), diameter hollow eye (2) open up inclination angle with The roadway construction gradient is consistent, depth 55-65m, diameter 150-155mm;The bottom hole position of cut shot (3) is filled with first It explodes powder stick (7), is set in the position in cut shot (3) between the eye mouth of cut shot (3) and the first explosion powder stick (7) There is loess stemming to seal (5);The bottom hole position of periphery hole (4) is filled with the second explosion powder stick (8), in the periphery hole (4) by The eye mouth direction of second explosion powder stick (8) towards periphery hole (4) is successively arranged water cannon mudding (6) and loess stemming envelope (5), water Stemming seals the water that (6) include cylindrical sealing shroud and are poured in secret set.
2. a kind of blasting system for rock roadway in coal mine blast working according to claim 1, it is characterised in that: periphery big gun The length of water cannon mudding (6) is 2.8-3 times that loess stemming seals (5) length in eye (4).
3. a kind of blasting system for rock roadway in coal mine blast working according to claim 1, it is characterised in that: sealing shroud It is made of vinyon, the diameter of sealing shroud is corresponding with periphery hole (4).
4. a kind of blasting system for rock roadway in coal mine blast working according to claim 1, it is characterised in that: slotting big gun Eye (3) and periphery hole (4) are each perpendicular to roadway excavation section (1) and open up.
5. a kind of blasting system for rock roadway in coal mine blast working according to claim 1, it is characterised in that: first is quick-fried Explosive cartridge (7) and the second explosion powder stick (8) are three-level emulsion.
CN201821782006.9U 2018-10-31 2018-10-31 A kind of blasting system for rock roadway in coal mine blast working Expired - Fee Related CN209027381U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821782006.9U CN209027381U (en) 2018-10-31 2018-10-31 A kind of blasting system for rock roadway in coal mine blast working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821782006.9U CN209027381U (en) 2018-10-31 2018-10-31 A kind of blasting system for rock roadway in coal mine blast working

Publications (1)

Publication Number Publication Date
CN209027381U true CN209027381U (en) 2019-06-25

Family

ID=66908778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821782006.9U Expired - Fee Related CN209027381U (en) 2018-10-31 2018-10-31 A kind of blasting system for rock roadway in coal mine blast working

Country Status (1)

Country Link
CN (1) CN209027381U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111457800A (en) * 2020-04-14 2020-07-28 郑州信息科技职业学院 Straight-eye barrel-shaped cutting hole arrangement structure and roadway straight-eye barrel-shaped cutting blasting method thereof
CN113188391A (en) * 2021-06-10 2021-07-30 嵩县金牛有限责任公司 Blasting method for soft rock roadway tunneling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111457800A (en) * 2020-04-14 2020-07-28 郑州信息科技职业学院 Straight-eye barrel-shaped cutting hole arrangement structure and roadway straight-eye barrel-shaped cutting blasting method thereof
CN113188391A (en) * 2021-06-10 2021-07-30 嵩县金牛有限责任公司 Blasting method for soft rock roadway tunneling

Similar Documents

Publication Publication Date Title
CN108225137B (en) Rock roadway in coal mine tunnels cumulative smooth Hydraulic Blasting structure and method
AU650904B2 (en) Controlled fracture method and apparatus for breaking hard compact rock and concrete materials
CN205940311U (en) High efficiency water pressure demolition unit
CN204718510U (en) A kind of novel joint-cutting quick-burning charge monoblock type photoface exploision device
CN209027381U (en) A kind of blasting system for rock roadway in coal mine blast working
CN104453898A (en) Deep hole blasting and static water injecting combining coal seam weakening method
CN102878874A (en) Deep-hole pre-splitting blasting grouting method
CN103206903A (en) Hard roof directional pressurized explosion control method
WO2023005344A1 (en) Underground tunneling blasting advanced protection wall dust suppression method
CN110879027A (en) Efficient energy-gathered blasting rapid tunneling method for half coal rock roadway
CN203837604U (en) Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling
CN110173238A (en) The anti-reflection extraction of high seam three-dimensional roadway layout networking explosion thick gas method entirely
CN111397455A (en) Combined detonation method for accurately controlling blasting effect in tunneling
CN109855496A (en) Hard rock integrates 16 years of age formula deep hole Cut Blasting method in tunnel
CN107762511B (en) A kind of class strip-type coal-mining method cut top filling and close on goaf
CN204902692U (en) Blasting system is blockked up in tunnel tunnelling big gun hole water seal
CN108362179A (en) A kind of energy saving cut shot method of star
CN109186390B (en) Open-air deep hole blasting water interval-coupled charging blasting method and special water column bag
CN109827484A (en) A kind of huge thick tight roof orientation presplitting of highly gassy mine loosens method
CN108708722A (en) A method of being used for the efficient prevention bump of low air permeability coal seam
CN113188391A (en) Blasting method for soft rock roadway tunneling
CN106352749B (en) A kind of method of tunnelling periphery hole homogeneous energy explosion
CN206522138U (en) The steel for shot structure of small section tunnel Cut Blasting
CN104879128A (en) Steep-dip ultra-thick coalbed mining technique based on top-coal advancing pre-detonation weakening
CN104153781A (en) Inverted order induced fracturing caving mining method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190625

Termination date: 20191031

CF01 Termination of patent right due to non-payment of annual fee