CN208981046U - A kind of sponge city pervious floor tile - Google Patents

A kind of sponge city pervious floor tile Download PDF

Info

Publication number
CN208981046U
CN208981046U CN201821535978.8U CN201821535978U CN208981046U CN 208981046 U CN208981046 U CN 208981046U CN 201821535978 U CN201821535978 U CN 201821535978U CN 208981046 U CN208981046 U CN 208981046U
Authority
CN
China
Prior art keywords
brick body
convex block
rhone
rainfall
floor tile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821535978.8U
Other languages
Chinese (zh)
Inventor
刘玉峰
钟义生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Haixing Ecology Technology Co Ltd
Original Assignee
Anhui Haixing Ecology Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Haixing Ecology Technology Co Ltd filed Critical Anhui Haixing Ecology Technology Co Ltd
Priority to CN201821535978.8U priority Critical patent/CN208981046U/en
Application granted granted Critical
Publication of CN208981046U publication Critical patent/CN208981046U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of sponge city pervious floor tiles, including brick body, the rhone having along the setting of brick body length direction is run through in the end face of brick body, brick body upper surface, which is run through, the drainage hole for being connected to rhone, there are two convex block one, the other end face of brick body is provided with the convex block two for contradicting convex block one for one end end face setting of brick body.The utility model has the following advantages that and effect: when rainfall, a part of rainfall is flow in drainage hole along diversion trench, another part rainfall is discharged into rhone along the gap between convex block one and convex block two, finally rainfall is come together in rhone, rainfall is emitted into filter well further along rhone, and is accumulated using rhone to rainfall.When fine day, so that air can circulate along connectivity part, makes the rainfall rapid evaporation in rhone into atmosphere so that the rainfall stored in rhone is communicated with atmosphere by the drainage hole on the gap and brick body between convex block one and convex block two, alleviate tropical island effect.

Description

A kind of sponge city pervious floor tile
Technical field
The utility model relates to floor tile field, in particular to a kind of sponge city pervious floor tile.
Background technique
Sponge city refers to that city can have in terms of adapting to environmental change and reply as sponge Good " elasticity ", water suction, water storage, infiltration, water purification when raining, the water stored when needing discharged and be used.Floor tile is Raw material are wanted with cement and based on gathering materials, made of processed, vibration pressurization or other moulding process, for being laid with urban road The concrete road surface of pavement, city square etc. and block, the plate of ground surface works etc..
The Chinese patent of authorization Publication No. CN104452524B discloses a kind of splashproof for being laid with ground dankly Brick, the floor tile include pedestal and the brick body for being fitted in pedestal upper surface, and pedestal is cuboid, and side is parallel four Side shape, end face is perpendicular to side;The upper surface of brick body is equipped with guiding gutter, and guiding gutter can be by the liquid drain of brick body upper surface It is discharged to pedestal.
Above-mentioned floor tile only has anti-spattering function and simple infiltration function, and floor tile does not have money saving function, works as rainfall When, a part of rainfall can be emitted into filter well or the network of waterways along guiding gutter, and another part penetrates into floor tile, but works as heavy rainfall When, the guiding gutter on floor tile and floor tile can not in time discharge rainfall, be easy to cause surface gathered water excessive, and then affect row People's trip, and above-mentioned floor tile can not form convection circulation with the external world, cause moisture to be difficult to evaporate, have much room for improvement.
Utility model content
The purpose of the utility model is to provide a kind of sponge city pervious floor tile, have that drainage is good, evaporation rate is fast Effect.
It is saturating that the above-mentioned technical purpose of the utility model has the technical scheme that a kind of sponge city is used Water floor tile, including brick body, the end face of brick body, which is run through, the rhone being arranged along brick body length direction, in brick body End face is through there is the drainage hole for being connected to the rhone, and there are two convex block one, the bricks for one end end face setting of brick body The other end face of body is provided with the convex block two for contradicting the convex block one.
It is first that road surface place mat is smooth when being laid with above-mentioned floor tile by using above-mentioned technical proposal, it is then that brick body is smooth Be layed in road surface.When laying, guarantee that the convex block one of brick body end is directed at the convex block two for being laid with the brick body end finished, this When convex block one and convex block two between form gap, finally marginal portion is filled up with sandstone again, and make the intracorporal draining of brick Slot is connected to the filter well on road surface, completes the laying of floor tile.When rainfall, rainfall falls to brick body surface, a part of rainfall along Drainage hole is flow in rhone, and another part rainfall is flow in the gap between convex block one and convex block two, finally collects rainfall In in rhone, rainfall is emitted into filter well further along rhone, and when filter well has little time in time to handle rainfall, Rainfall is accumulated using rhone, and then avoid surface gathered water excessively to influence pedestrian's trip.When rainfall finishes simultaneously fine day Afterwards, by the drainage hole on the gap and brick body between convex block one and convex block two, so that the rainfall stored in rhone and atmosphere It communicates, so that air can circulate along a few place's connectivity parts, and then makes the rainfall rapid evaporation in rhone into atmosphere, alleviate heat Island effect.
The utility model is further arranged to: the side side wall of brick body is provided with to be set along brick body length direction The positive stop strip set, the other side side wall of brick body are provided with the limiting slot for positive stop strip sliding insertion.
By using above-mentioned technical proposal, when being laid with brick body, one end that brick body is equipped with positive stop strip is contacted at into road surface Then another piece of brick body is taken out, the limit block alignment of brick body side wall has been laid with to the limit of the brick body side wall finished by end wall Slot pushes brick body to drive in positive stop strip sliding insertion limiting slot, and then two pieces of floor tiles is fixed to each other, and enhances steady between brick body It is qualitative, so that the road surface being laid with is more stable.
The utility model is further arranged to: brick body upper surface is provided with the water conservancy diversion for being connected to the drainage hole Slot.
By using above-mentioned technical proposal, rainfall can be guided in drainage hole along diversion trench by the way that diversion trench is arranged, Accelerate the flowing velocity of precipitation.
The utility model is further arranged to: the convex block one, the convex block two upper surface be equipped with filter screen.
Sundries is avoided to enter to drain by setting filter screen by extraneous filtering foreign by using above-mentioned technical proposal The blocking of rhone is caused in slot.
The utility model is further arranged to: the middle part roof of the rhone is provided with and brick body lower end surface phase Concordant reinforcing rod.
By using above-mentioned technical proposal, played a supportive role by the way that reinforcing rod is arranged, so enhance the stability of brick body with And anti-pressure ability.
The utility model is further arranged to: the end of the convex block one is provided with guide post, the end of the convex block two Portion is provided with the pilot hole for the guide post grafting.
By using above-mentioned technical proposal, by relatively sliding between setting guide post grafting pilot hole two pieces of brick bodies of limitation It is dynamic, and then enhance the stability between two pieces of brick bodies.
The utility model is further arranged to: the lower end surface of brick body is provided with multiple spines.
By using above-mentioned technical proposal, ground is pierced by setting spine, enhances the road holding between brick body and ground, into The stability of one step enhancing brick body.
The utility model is further arranged to: brick body upper surface is provided with multiple anti-skid bulges.
By using above-mentioned technical proposal, by the way that anti-skid bulge is arranged, when avoiding rain and snow weather, people's walking is skidded Phenomenon.
In conclusion the utility model has the following beneficial effects: a part of rainfall is flow to along diversion trench when rainfall In drainage hole, another part rainfall is discharged into rhone along the gap between convex block one and convex block two, finally collects rainfall It is emitted into filter well after in rhone.When fine day, pass through the draining on the gap and brick body between convex block one and convex block two Hole, so that air can circulate along connectivity part, makes the rainfall in rhone so that the rainfall stored in rhone is communicated with atmosphere Rapid evaporation alleviates tropical island effect into atmosphere.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of embodiment;
Fig. 2 is the structural schematic diagram of the convex block one of embodiment, guide post.
In figure: 1, brick body;11, anti-skid bulge;12, spine;13, drainage hole;14, diversion trench;2, positive stop strip;3, it limits Slot;4, convex block one;41, guide post;5, convex block two;51, pilot hole;6, filter screen;7, rhone;71, reinforcing rod.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
A kind of sponge city pervious floor tile, as shown in Figure 1 and Figure 2, including brick body 1,1 upper surface of brick body are provided with multiple Anti-skid bulge 11, the lower end surface of brick body 1 are provided with multiple spines 12.The side side wall of brick body 1 is provided with along 1 length direction of brick body The positive stop strip 2 of setting, the other side side wall of brick body 1 are provided with the limiting slot 3 for the sliding insertion of positive stop strip 2.One end end of brick body 1 Face setting is there are two convex block 1, and the other end face of brick body 1 is provided with the convex block 25 for contradicting convex block 1, convex block 1 End is provided with guide post 41, and the end of convex block 25 is provided with the pilot hole 51 for 41 grafting of guide post, convex block 1, convex block two 5 upper surface is equipped with filter screen 6.
It is first that road surface place mat is smooth when being laid with above-mentioned floor tile, then one piece of brick body 1 is taken out, brick body 1 is equipped with limit One end of item 2 contacts at the end wall on road surface, then takes out another piece of brick body 1, and the limit block alignment of 1 side wall of brick body has been spread If the limiting slot 3 of 1 side wall of brick body finished, brick body 1 is pushed to drive in the sliding insertion limiting slot 3 of positive stop strip 2, by two pieces of floor tile phases It is mutually fixed, then brick body 1 is fixed on ground by spine 12.Then one piece of brick body 1 is further taken out, so that 1 end of brick body Convex block 1 is directed at the convex block 25 for being laid with 1 end of brick body finished, and the guide post 41 on convex block 1 is just completely right at this time Pilot hole 51 on quasi- convex block 25 then pushes brick body 1 that convex block 1 and guide post 41 is driven to move, until guide rod grafting Pilot hole 51 and the abutting convex block 25 of convex block 1, and so on, floor tile is paved with road surface, and make the rhone 7 in brick body 1 It is connected to the filter well on road surface.Filter screen 6 is finally laid with to and is fixed on convex block 1 and the top of convex block 25, then with sandstone by side Edge point is filled up, and the laying of floor tile is completed.
As shown in Figure 1, the rhone 7 having along the setting of 1 length direction of brick body, the middle part of rhone 7 are run through in the end face of brick body 1 Roof is provided with the reinforcing rod 71 with 1 lower end surface flush of brick body.1 upper surface of brick body, which is run through, the draining for being connected to rhone 7 Hole 13,1 upper surface of brick body are provided with the diversion trench 14 for being connected to drainage hole 13.
When rainfall, rainfall falls to 1 surface of brick body, and a part of rainfall is flow in drainage hole 13 along diversion trench 14, then It is flow in rhone 7 along drainage hole 13, between another part rainfall is flow between convex block 1 and convex block 25 along filter screen 6 In gap, finally rainfall is come together in rhone 7, rainfall is emitted into filter well further along rhone 7, and works as filter well Not as good as when handling rainfall in time, rainfall is accumulated using rhone 7, and then surface gathered water is avoided excessively to influence pedestrian Trip.
When rainfall finishes and after fine day, by the drainage hole 13 on the gap and brick body 1 between convex block 1 and convex block 25, So that the rainfall stored in rhone 7 is communicated with atmosphere, so that air can circulate along a few place's connectivity parts, and then make rhone 7 Interior rainfall rapid evaporation alleviates tropical island effect into atmosphere.
Working principle: the inconsistent muti-piece brick body 1 of side wall is fixed on one by the cooperation of limited block and limiting slot 3 The inconsistent muti-piece brick body 1 in end is fixed on one by 41 grafting pilot hole 51 of guide post by body, and then by all brick bodies 1 It is paved with and is fixed on road surface.When rainfall, rainfall drop to 1 surface of brick body, and a part of rainfall flow to draining along diversion trench 14 In hole 13, another part rainfall is discharged into rhone 7 along the gap between convex block 1 and convex block 25, finally collects rainfall In in rhone 7, rainfall is emitted into filter well further along rhone 7, and when filter well has little time in time to handle rainfall When, rainfall is accumulated using rhone 7.When fine day, pass through gap between convex block 1 and convex block 25 and brick body 1 On drainage hole 13 so that the rainfall stored in rhone 7 is communicated with atmosphere so that air can circulate along a few place's connectivity parts, And then make the rainfall rapid evaporation in rhone 7 into atmosphere.
Specific embodiment is only the explanation to the utility model, is not limitations of the present invention, this field Technical staff can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but only It will be in the scope of the claims of the utility model all by the protection of Patent Law.

Claims (8)

1. a kind of sponge city pervious floor tile, it is characterised in that: including brick body (1), the end face of brick body (1), which is run through, edge The rhone (7) of brick body (1) length direction setting, brick body (1) upper surface, which is run through, is connected to the rhone (7) Drainage hole (13), one end end face setting of brick body (1) is there are two convex block one (4), the other end face of brick body (1) It is provided with the convex block two (5) for contradicting the convex block one (4).
2. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: the side of brick body (1) Side wall is provided with the positive stop strip (2) along the setting of brick body (1) length direction, and the other side side wall of brick body (1) is provided with For the limiting slot (3) of the positive stop strip (2) sliding insertion.
3. a kind of sponge city pervious floor tile according to claim 2, it is characterised in that: brick body (1) upper surface It is provided with the diversion trench (14) for being connected to the drainage hole (13).
4. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: the convex block one (4), described The upper surface of convex block two (5) is equipped with filter screen (6).
5. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: in the rhone (7) Portion's roof is provided with and the reinforcing rod (71) of brick body (1) lower end surface flush.
6. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: the end of the convex block one (4) Portion is provided with guide post (41), and the end of the convex block two (5) is provided with the pilot hole (51) for the guide post (41) grafting.
7. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: the lower end of brick body (1) Face is provided with multiple spines (12).
8. a kind of sponge city pervious floor tile according to claim 1, it is characterised in that: brick body (1) upper surface It is provided with multiple anti-skid bulges (11).
CN201821535978.8U 2018-09-19 2018-09-19 A kind of sponge city pervious floor tile Expired - Fee Related CN208981046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821535978.8U CN208981046U (en) 2018-09-19 2018-09-19 A kind of sponge city pervious floor tile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821535978.8U CN208981046U (en) 2018-09-19 2018-09-19 A kind of sponge city pervious floor tile

Publications (1)

Publication Number Publication Date
CN208981046U true CN208981046U (en) 2019-06-14

Family

ID=66784774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821535978.8U Expired - Fee Related CN208981046U (en) 2018-09-19 2018-09-19 A kind of sponge city pervious floor tile

Country Status (1)

Country Link
CN (1) CN208981046U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468645A (en) * 2019-07-25 2019-11-19 安徽新宇生态产业股份有限公司 A kind of sponge urban water-through brick
CN111676753A (en) * 2020-06-09 2020-09-18 叶远付 Water-absorbing floor tile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468645A (en) * 2019-07-25 2019-11-19 安徽新宇生态产业股份有限公司 A kind of sponge urban water-through brick
CN111676753A (en) * 2020-06-09 2020-09-18 叶远付 Water-absorbing floor tile

Similar Documents

Publication Publication Date Title
CN205420946U (en) Novel ecology that prevents surface gathered water road structure of permeating water
CN106087632B (en) A kind of laying brick for having both row's water storage function based on sponge urban construction
CN205474683U (en) Landscape permeable pavement
CN208981046U (en) A kind of sponge city pervious floor tile
CN109403181A (en) A kind of porous pavement
CN110629619A (en) Sponge type green land construction structure technology
CN109235182A (en) A kind of sponge-type road pavement structure
CN210507029U (en) Road drainage structure
CN205741824U (en) A kind of Pavement surface drainage system
CN209555684U (en) A kind of pervious surface and floor tile
CN109024131A (en) Pervious environment protection type road
CN209482090U (en) A kind of tunnel drainage pavement structure
CN209555685U (en) A kind of permeable environmental protection floor tile
CN205295833U (en) Brick permeates water in gap convenient to drainage
CN203160092U (en) A road rainwater collecting system for preventing water from gathering on road surfaces
CN206279413U (en) A kind of ecological permeable catchments overall road surface
CN205529791U (en) Concrete ecological garden road permeates water
CN108103878A (en) A kind of ecological floor file structure
CN204570428U (en) The permeable road structure in a kind of environmental protection gardens
CN213114153U (en) Road surface water permeable brick
CN208201563U (en) Permeable pavement skeleton and the porous pavement being laid with using the permeable pavement skeleton
CN204570903U (en) Road draining device
CN206784095U (en) A kind of town and country gardens anti-slip type water-permeable brick
CN209099098U (en) A kind of drainage type concrete road
CN206428544U (en) A kind of New-type paving tile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190614

CF01 Termination of patent right due to non-payment of annual fee