CN208934130U - Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts - Google Patents
Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts Download PDFInfo
- Publication number
- CN208934130U CN208934130U CN201820044611.XU CN201820044611U CN208934130U CN 208934130 U CN208934130 U CN 208934130U CN 201820044611 U CN201820044611 U CN 201820044611U CN 208934130 U CN208934130 U CN 208934130U
- Authority
- CN
- China
- Prior art keywords
- straight tube
- nut
- steel
- anchor rib
- capped pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses Guan Shuanqiao muscle tile formulas between a kind of building iron concrete prefabricated parts to combine connectivity kit, including the first fastener inserts, the second fastener inserts, third connection component;First fastener inserts and second fastener inserts are realized by the third connection component to be connected.The combination connectivity kit of the utility model passes through the combined use of the first fastener inserts, the second fastener inserts and third connection component, realize the interconnection to components such as concrete prefabricated beam, plate, columns, it ensure that the globality and stability of building structure, construction cost and saving construction-time is greatly reduced, and this connection has the effect unique of simple, cheap, secured, antidetonation and damping.
Description
Technical field
The utility model relates to assembled architecture field, in particular to Guan Shuanqiao muscle piece between a kind of building iron concrete prefabricated parts
Block formula combines connectivity kit.
Background technique
Precast member for reinforcing bar concrete assembles detachable green building, due to the connection side between its prefabricated component before this
Formula lacks or cost is high or poor reliability or difficulty of construction are larger etc., causes to be widely applied.
Utility model content
The purpose of the utility model is to provide a kind of combination connectivity kit, the attended operation letter between building prefabricated components is realized
Just, easy to learn, and realization reduces cost and solid and reliable function.
To achieve the above object, the utility model provides Guan Shuanqiao muscle tile formula group between a kind of building iron concrete prefabricated parts
Close connectivity kit, including the first fastener inserts, the second fastener inserts, third connection component;First fastener inserts and described
Second fastener inserts are connected by the third connection component;First fastener inserts include: the first capped pipe, the first nut,
First bridge plate, the first straight tube, the first bi-steel, the first anchor rib (each one) of bilateral;Second fastener inserts include: second straight
Pipe, the second bi-steel, the second anchor rib (each one) of bilateral, pad, the second capped pipe;The third connection component includes: first to subtract
Shake gasket, the second cushioning piece, second axle plate, anti-become less severe gasket, the second nut, screw rod;First bridge plate, second bridge
Plate, first cushioning piece are provided with hole among second cushioning piece;The pad is polyhedron block, the pad
Opposite end is provided with hole;First anchor rib, two sides are U-shaped with respect to two;First anchor rib is erected at institute
It states on bi-steel;First straight tube is in the space that first bi-steel and two first anchor ribs are formed;It is described
First capped pipe, the first nut and the first bridge plate are sequentially connected;First bridge plate is close to the first straight tube setting;Described second
Anchor rib, two sides are U-shaped with respect to two;Second anchor rib is erected on the bi-steel;Second straight tube exists
In the space that second bi-steel and two second anchor ribs are formed;Second straight tube, pad and the second capped pipe according to
Secondary connection;Second straight tube is close to first fastener inserts direction;Second cushioning piece, the second axle plate, institute
Anti- become less severe gasket, second nut is stated to be sequentially connected;Second cushioning piece, the second axle plate, the anti-pad of becoming less severe
Piece, second nut are arranged in inside the pad close to inboard one end;First cushioning piece setting is described the
Between one straight tube and second straight tube;The screw rod penetrate through first capped pipe, the first nut, the first bridge plate, the first straight tube,
First bi-steel, the first anchor rib, the second straight tube, the second bi-steel, the second anchor rib, pad, the second capped pipe, the first resilient cushion
Piece, the second cushioning piece, second axle plate, anti-become less severe gasket, the second nut.
Wherein, two anchor ribs clip first bridge plate.
Wherein, first capped pipe, first nut, first bridge plate, first straight tube, first pair of steel
Muscle, first anchor rib are fixed as one.
Wherein, the first nut, first bridge plate, first straight tube, first bi-steel, first anchor rib
It is welded as a whole.
Wherein, the first nut, first bridge plate, first straight tube, first bi-steel, first anchor rib
It is bonded as one.
Wherein, second straight tube, second bi-steel, second anchor rib, the pad, second capped pipe
It is fixed as one.
Wherein, second straight tube, second bi-steel, second anchor rib, the pad, second capped pipe
It welds or is bonded as one.
Wherein, together with first capped pipe is bonded or welded with first nut.
Wherein, the first capped pipe internal diameter is greater than the first nut outer diameter;First capped pipe is set in described first
Outside nut.
Wherein, the first capped pipe internal diameter is less than the first nut outer diameter;The first capped pipe set is described to being connected in
First nut end.
As described above, the combination connectivity kit of the utility model passes through the first fastener inserts, the second fastener inserts and third
The combined use of connection component realizes the interconnection to components such as concrete prefabricated beam, plate, columns, ensure that the entirety of wall
Property and stability, and this connection has the effect of simple, secured, antidetonation and damping.
Detailed description of the invention
Fig. 1 be the utility model a kind of building iron concrete prefabricated parts between Guan Shuanqiao muscle tile formula combination connectivity kit decompose
Schematic diagram;
Fig. 2 be the utility model a kind of building iron concrete prefabricated parts between Guan Shuanqiao muscle tile formula combination connectivity kit combination
Schematic diagram;
Fig. 3 be the utility model concreting before scheme of installation;
Fig. 4 be the utility model concreting after become component connection schematic diagram.
First capped pipe 1, the first nut 2, the first bridge plate 3, the first straight tube 4, the first bi-steel 5, the first anchor rib 6, second
Straight tube 7, the second bi-steel 8, the second anchor rib 9, pad 10, the second capped pipe 11, the first cushioning piece 12, the second cushioning piece
13, second axle plate 14, anti-become less severe gasket 15, the second nut 16, screw rod 17.
Specific embodiment
To make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment
And referring to attached drawing, the utility model is further described.It should be understood that these descriptions are merely illustrative, and do not really want
Limit the scope of the utility model.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid not
Necessarily obscure the concept of the utility model.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, Guan Shuanqiao muscle tile formula combines connector sleeve between a kind of building iron concrete prefabricated parts
Part, including the first fastener inserts 18, the second fastener inserts 19, third connection component 20;First fastener inserts 18 and described
Second fastener inserts 19 are connected by the third connection component 20;First fastener inserts 18 include: the first capped pipe 1,
One nut 2, the first bridge plate 3, the first straight tube 4, the first bi-steel 5, the first anchor rib 6 (two opposite);Described second pre-buried group
Part 19 include: the second straight tube 7, the second bi-steel 8, the second anchor rib 9 (two opposite), pad 10,
Second capped pipe 11;The third connection component 20 includes: the first cushioning piece 12, the second cushioning piece 13, second
Bridge plate 14, anti-become less severe gasket 15, the second nut 16, screw rod 17;First bridge plate 3, the second axle plate 14, described first subtract
Hole is provided among shake gasket 12, second cushioning piece 13;The pad 10 is polyhedron block, the pad 10 opposite two
End is relatively set with hole, and pad 10 is the filling block of reserving hole;First anchor rib 6 is arranged two;Two described first
Anchor rib 6 is erected on the bi-steel;First straight tube 4 is in first bi-steel 5 and two first anchor ribs
In 6 spaces formed;First capped pipe 1, the first nut 2 and the first bridge plate 3 are sequentially connected;First bridge plate 3 is close to institute
State the setting of the first straight tube 4;Second anchor rib 9 is arranged two;Two second anchor ribs 9 are erected at the bi-steel
On;Second straight tube 7 is in the space that second bi-steel 8 and two second anchor ribs 9 are formed;Described second is straight
Pipe 7, pad 10 and the second capped pipe 11 are sequentially connected;Second straight tube 7 is close to 18 direction of the first fastener inserts;Described
Two cushioning pieces 13, the second axle plate 14, anti-become less severe gasket 15, second nut 16 are sequentially connected;Described second
Cushioning piece 13, the second axle plate 14, the anti-gasket 15 of becoming less severe, second nut 16 are arranged inside the pad 10
Close to inboard one end;First cushioning piece 12 is arranged between first straight tube 4 and second straight tube 7;It is described
Screw rod 17 penetrates through first capped pipe 1, the first nut 2, the first bridge plate 3, the first straight tube 4, the first bi-steel 5, the first anchor rib
6, the second straight tube 7, the second bi-steel 8, the second anchor rib 9, pad 10,11 first cushioning piece 12 of the second capped pipe, the second damping
Gasket 13, second axle plate 14, anti-become less severe gasket 15, the second nut 16;Wherein the first capped pipe 1, the first straight tube 4, the second capped pipe 11,
The cross section of second straight tube 7 can be round, rectangular, rectangle, polygon etc., and in-between hole can be such that screw rod 17 passes through;
Wherein pad 10 can be hexahedron, polyhedron, be side open box, cavity or bulk-solid items;Other first capped pipe 1 and
The one end of two capped pipes 11 outwardly blocks, and the first straight tube 4 and 7 both ends of the second straight tube communicate.
Further, two anchor ribs clip first bridge plate 3.
Further, first capped pipe 1, first nut 2, first bridge plate 3, first straight tube 4, described
First bi-steel 5, first anchor rib 6 are fixed as one.
Further, the first nut 2, first bridge plate 3, first straight tube 4, first bi-steel 5, described
One anchor rib 6 is welded as a whole.
Further, the first nut 2, first bridge plate 3, first straight tube 4, first bi-steel 5, described
One anchor rib 6 is bonded as one.
Further, second straight tube 7, second bi-steel 8, second anchor rib 9, the pad 10, institute
The second capped pipe 11 is stated to be fixed as one.
Further, second straight tube 7, second bi-steel 8, second anchor rib 9, the pad 10, institute
It states the welding of the second capped pipe 11 or is bonded as one.
Further, together with first capped pipe 1 is bonded or welded with first nut 2.
Further, 1 internal diameter of the first capped pipe is greater than 2 outer diameter of the first nut;First capped pipe 1 is set in institute
It states outside the first nut 2.
Further, 1 internal diameter of the first capped pipe is less than 2 outer diameter of the first nut;First capped pipe, 1 set of docking is set
In 2 end of the first nut.
Further, the pad 10 is side open box, can save the second capped pipe.
Further, the pad 10 is cavity or bulk-solid items, to connect the second capped pipe.
Further, the pad 10 can be removed after concreting becomes component.
Guan Shuanqiao muscle tile formula combines connectivity kit between the building iron concrete prefabricated parts of the utility model, for realizing reinforcing bar
Interconnection between the components such as concrete prefabricated beam (ground beam, top beam), plate (wallboard, top plate), column, pier.Using this reality
When with novel combination connectivity kit, the first fastener inserts and the second fastener inserts can first be connected and fixed molding respectively, then fix
It is embedded on the reinforcing bar before prefabricated components pour or mold, then casting concrete, reaches age to concrete, reuse third
First fastener inserts and the second fastener inserts are fixed together by connection component, can also will be each in the first fastener inserts
All parts directly fixation in a component and the second fastener inserts is embedded on the reinforcing bar before prefabricated components pour or mold, so
After-pouring concrete reaches age to concrete, reuses third connection component for the first fastener inserts and the second fastener inserts
It is fixed together.
As described above, the combination connectivity kit of the utility model passes through the first fastener inserts, the second fastener inserts and third
The combined use of connection component realizes the interconnection to components such as concrete prefabricated beam, plate, columns, ensure that the entirety of wall
Property and stability, and this connection has the effect of simple, secured, antidetonation and damping.
It should be understood that the above-mentioned specific embodiment of the utility model is used only for exemplary illustration or explains this reality
With novel principle, without constituting limitations of the present invention.Therefore, in the spirit and scope without departing from the utility model
In the case of any modification, equivalent substitution and improvement done or element increase and decrease etc., should be included in the protection scope of the utility model
Within.In addition, the appended claims for the utility model are intended to cover fall into attached claim scope and boundary or this model
Enclose whole change and modification in the equivalent form with boundary.
Claims (10)
1. Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts, which is characterized in that pre- including first
Embedded component (18), the second fastener inserts (19), third connection component (20);
First fastener inserts (18) and second fastener inserts (19) are realized by the third connection component (20) to be connected
It connects;
First fastener inserts (18) include: the first capped pipe (1), the first nut (2), the first bridge plate (3), the first straight tube (4),
First bi-steel (5), the first anchor rib (6);
Second fastener inserts (19) include: the second straight tube (7), the second bi-steel (8), the second anchor rib (9), pad
(10), the second capped pipe (11);
The third connection component (20) include: the first cushioning piece (12), the second cushioning piece (13), second axle plate (14),
Anti- become less severe gasket (15), the second nut (16), screw rod (17);
First bridge plate (3), the second axle plate (14), first cushioning piece (12), second cushioning piece
(13) intermediate to be provided with hole;
The pad (10) is polyhedron block, and pad (10) opposite end is provided with hole;
First anchor rib (6) two sides are U-shaped with respect to two;First anchor rib (6) is erected at the bi-steel
On;First straight tube (4) is in the space that first bi-steel (5) is formed with two first anchor ribs (6);
First capped pipe (1), the first nut (2) and the first bridge plate (3) are sequentially connected;
First bridge plate (3) is close to the first straight tube (4) setting;
Second anchor rib (9) two sides are U-shaped with respect to two;Second anchor rib (9) is erected at the bi-steel
On;Second straight tube (7) is in the space that second bi-steel (8) is formed with two second anchor ribs (9);
Second straight tube (7), pad (10) and the second capped pipe (11) are sequentially connected;Second straight tube (7) is close to described the
One fastener inserts (18) direction;
Second cushioning piece (13), the second axle plate (14), anti-the become less severe gasket (15), second nut (16)
It is sequentially connected;
Second cushioning piece (13), the second axle plate (14), anti-the become less severe gasket (15), second nut (16)
It is arranged internal close to inboard one end in the pad (10);
First cushioning piece (12) is arranged between first straight tube (4) and second straight tube (7);
The screw rod (17) penetrates through first capped pipe (1), the first nut (2), the first bridge plate (3), the first straight tube (4), first
Bi-steel (5), the first anchor rib (6), the second straight tube (7), the second bi-steel (8), the second anchor rib (9), pad (10), second
(11) first cushioning piece (12) of capped pipe, the second cushioning piece (13), second axle plate (14), anti-become less severe gasket (15), the second spiral shell
Between female (16).
2. combination connectivity kit according to claim 1, which is characterized in that the first anchor rib (6) folder of two sides two
First bridge plate (3).
3. combination connectivity kit according to claim 1, which is characterized in that first capped pipe (1), first nut
(2), first bridge plate (3), first straight tube (4), first bi-steel (5), first anchor rib (6) are fixed as
One.
4. combination connectivity kit according to claim 3, which is characterized in that the first nut (2), first bridge plate (3),
First straight tube (4), first bi-steel (5), first anchor rib (6) are welded as a whole.
5. combination connectivity kit according to claim 3, which is characterized in that the first nut (2), first bridge plate (3),
First straight tube (4), first bi-steel (5), first anchor rib (6) are bonded as one.
6. combination connectivity kit according to claim 1, which is characterized in that second straight tube (7), second pair of steel
Muscle (8), second anchor rib (9), the pad (10), second capped pipe (11) are fixed as one.
7. combination connectivity kit according to claim 6, which is characterized in that second straight tube (7), second pair of steel
Muscle (8), second anchor rib (9), the pad (10), second capped pipe (11) welding are bonded as one.
8. according to claim 1, any combination connectivity kit in 2,3 or 6, which is characterized in that first capped pipe (1) and
First nut (2) is bonded or welded together.
9. according to claim 1, any combination connectivity kit in 2,3 or 6, which is characterized in that in first capped pipe (1)
Diameter is greater than the first nut (2) outer diameter;It is external that first capped pipe (1) is set in first nut (2).
10. according to claim 1, any combination connectivity kit in 2,3 or 6, which is characterized in that first capped pipe (1)
Internal diameter is less than the first nut (2) outer diameter;First capped pipe (1) is to being connected in the first nut (2) end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820044611.XU CN208934130U (en) | 2018-01-11 | 2018-01-11 | Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820044611.XU CN208934130U (en) | 2018-01-11 | 2018-01-11 | Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208934130U true CN208934130U (en) | 2019-06-04 |
Family
ID=66713511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820044611.XU Expired - Fee Related CN208934130U (en) | 2018-01-11 | 2018-01-11 | Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208934130U (en) |
-
2018
- 2018-01-11 CN CN201820044611.XU patent/CN208934130U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205224335U (en) | High strength thermal insulation wall | |
CN106003365A (en) | Heat insulation structure based on 3D-printed reinforced masonry | |
CN104032854B (en) | Assembled T-shaped mixing coupled wall and construction method thereof | |
CN206815666U (en) | A kind of connecting node of multilayer wallboard and wallboard and floor | |
CN102995756A (en) | Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method | |
CN103981953B (en) | Shearing resistance connecting structure for steel tube concrete beam and column node | |
CN208934130U (en) | Guan Shuanqiao muscle tile formula combines connectivity kit between a kind of building iron concrete prefabricated parts | |
CN104652608B (en) | Assembly type exterior wall and beam connecting structure | |
CN103469902A (en) | Full-rigidity steel pipe concrete column connecting node | |
CN104032855B (en) | Assembled cross mixing coupled wall and construction method thereof | |
CN205577153U (en) | Installation node of wallboard connecting piece and wallboard | |
JP3320708B1 (en) | Joint structure of steel column beam and joint method of steel column beam | |
CN207959529U (en) | Overlap wall vertically with horizontal member roof connecting node | |
CN217630662U (en) | External and internal pressure type steel plate confined recycled concrete shear wall with frame | |
CN104032862B (en) | Assembled girder steel seam line L shape mixing coupled wall and construction method thereof | |
CN216041320U (en) | Assembled subway station | |
CN110258309A (en) | A kind of normal formula segment pier stud and its assembling method | |
CN205444565U (en) | Wallboard connected node | |
CN107882199A (en) | A kind of assembled architecture damping device | |
CN109594651A (en) | A kind of steel pipe fashioned iron regeneration concrete column-PEC steel girder frame and assembly method | |
CN107740536A (en) | A kind of damping type beam body for building | |
CN205171684U (en) | Connecting piece is used to precast concrete spare | |
CN103603265A (en) | Closure section steel shell of turning continuous beam | |
CN104047380B (en) | Assembled girder steel seam T-shaped mixing coupled wall and construction method thereof | |
CN209817222U (en) | Connection node of coincide floor and wall body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 Termination date: 20200111 |
|
CF01 | Termination of patent right due to non-payment of annual fee |