CN104652608B - A connection structure between an assembled exterior wall and beams - Google Patents
A connection structure between an assembled exterior wall and beams Download PDFInfo
- Publication number
- CN104652608B CN104652608B CN201510059720.XA CN201510059720A CN104652608B CN 104652608 B CN104652608 B CN 104652608B CN 201510059720 A CN201510059720 A CN 201510059720A CN 104652608 B CN104652608 B CN 104652608B
- Authority
- CN
- China
- Prior art keywords
- wall
- prefabricated
- hole
- reserved
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
Description
技术领域technical field
本发明涉及装配式建筑领域,具体涉及一种装配式外墙与梁的连接结构。The invention relates to the field of prefabricated buildings, in particular to a connection structure between prefabricated exterior walls and beams.
背景技术Background technique
传统的建筑业是高污染、高耗能、环境不友好的产业,其工业化程度低,水耗、能耗、人工垃圾、污水排放量大,不符合国家节能和环保的可持续发展政策,而且需要大量的劳动力。随着我国人口老龄化的不断加剧,资源和能源的持续紧张,传统的建造方式已不再符合社会的发展要求。近年来,随着人们生活水平的不断提高,人们对住宅等建筑行业的建筑速度、建筑造价、施工质量及节能环保等的要求也不断提高,并逐步走向现代装配式建筑体系。采用装配式结构,可以工厂预制、现场装配,实现住宅产业化,同时可以有效提高材料在建筑节能和结构性能和结构性能的效率、节约能源与资源,减少建筑垃圾和环境的不良影响,降低施工场地限制等。建筑工业化是未来建筑业的发展方向,而装配式建筑也是近几年来各大建筑企业争相研究的热点。要想提高装配式建筑的整体性,关键是处理好构件之间的连接。The traditional construction industry is a high-pollution, high-energy-consuming, and environmentally unfriendly industry. Its industrialization level is low, and its water consumption, energy consumption, artificial waste, and sewage discharge are large, which does not conform to the sustainable development policy of the country for energy conservation and environmental protection. A lot of labor is required. As my country's aging population continues to intensify and resources and energy continue to be strained, traditional construction methods no longer meet the requirements of social development. In recent years, with the continuous improvement of people's living standards, people's requirements for construction speed, construction cost, construction quality, energy conservation and environmental protection of residential and other construction industries have also been continuously improved, and they are gradually moving towards modern prefabricated building systems. The prefabricated structure can be prefabricated in the factory and assembled on site to realize the industrialization of housing. At the same time, it can effectively improve the efficiency of materials in building energy saving, structural performance and structural performance, save energy and resources, reduce construction waste and adverse effects on the environment, and reduce construction. Site restrictions, etc. The industrialization of construction is the development direction of the construction industry in the future, and the prefabricated building is also a hot spot that major construction companies are competing to study in recent years. In order to improve the integrity of the prefabricated building, the key is to deal with the connection between the components.
发明内容Contents of the invention
本发明要解决的技术问题是提供一种装配式外墙与梁的连接结构,其提高了建筑结构的装配率,且稳定性好,增加了抗震性能,可以节约大量人力。The technical problem to be solved by the present invention is to provide an assembled outer wall and beam connection structure, which improves the assembly rate of the building structure, has good stability, increases the anti-seismic performance, and can save a lot of manpower.
本发明的技术方案是:一种装配式外墙与梁的连接结构,包括预制外墙板、预制梁和叠合楼板,所述预制外墙板上部设有墙顶预留孔洞,预制外墙板底部设有墙底预埋件;所述预制梁两端设有柱子,预制梁一侧设有与墙底预埋件相对应的梁内侧预留孔洞,在梁内侧预留孔洞内设有钢筋和现浇部;梁内侧预留孔洞外侧设有伸出部分,伸出部分上设有与预制外墙板的墙顶预留孔洞相对应的梁外侧预留孔洞,墙顶预留孔洞和梁外侧预留孔洞内设有钢筋和现浇部;所述预制梁中设有梁顶预埋件,梁顶预埋件与叠合楼板相连接;所述预制外墙板、预制梁和叠合楼板通过后浇带连接。The technical solution of the present invention is: an assembled exterior wall and beam connection structure, including prefabricated exterior wall panels, prefabricated beams and laminated floor slabs, the upper part of the prefabricated exterior wall panels is provided with holes reserved on the top of the wall, and the prefabricated exterior walls The bottom of the slab is provided with embedded parts at the bottom of the wall; the two ends of the prefabricated beam are provided with columns, and one side of the prefabricated beam is provided with a reserved hole on the inner side of the beam corresponding to the embedded part at the bottom of the wall. Reinforcement and cast-in-place part; there is an extension part outside the reserved hole on the inner side of the beam, and the reserved hole on the outer side of the beam corresponds to the reserved hole on the top of the wall of the prefabricated external wall panel on the extended part, and the reserved hole on the top of the wall and There are steel bars and cast-in-place parts in the reserved holes on the outside of the beam; the beam top embedded parts are arranged in the prefabricated beam, and the beam top embedded parts are connected with the laminated floor; the prefabricated external wall panels, prefabricated beams and laminated floors Connected by post-cast tape.
作为优选方案,所述预制外墙板的数量至少为两块。As a preferred solution, the number of the prefabricated exterior wall panels is at least two.
作为优选方案,所述预制外墙板两侧设有槽口。As a preferred solution, notches are provided on both sides of the prefabricated exterior wall panels.
作为优选方案,所述预制外墙板通过槽口浇筑混凝土形成整体,并使用封胶和PE棒进行封堵。As a preferred solution, the prefabricated exterior wall panel is formed as a whole by pouring concrete through slots, and sealed with glue and PE rods.
作为优选方案,所述预制外墙板上部设有临时固定斜支撑预埋件、预留吊装孔和预留临时固定孔洞。As a preferred solution, the upper part of the prefabricated exterior wall panel is provided with temporary fixing oblique support embedded parts, reserved hoisting holes and reserved temporary fixing holes.
作为优选方案,所述预制梁的伸出部分上设有与预留吊装孔相对应的吊装口。As a preferred solution, the protruding part of the prefabricated beam is provided with a hoisting opening corresponding to the reserved hoisting hole.
作为优选方案,所述墙顶预留孔洞、临时固定斜支撑预埋件、预留吊装孔和预留临时固定孔洞的数量均至少为两个,所述墙顶预留孔洞、临时固定斜支撑预埋件、预留吊装孔和预留临时固定孔洞均沿预制外墙板的中心线对称分布。As a preferred solution, the number of the reserved holes on the top of the wall, the embedded parts for temporarily fixing the inclined supports, the reserved hoisting holes and the reserved temporary fixing holes are at least two, and the reserved holes on the top of the wall, the temporarily fixed inclined supports The embedded parts, reserved hoisting holes and reserved temporary fixing holes are distributed symmetrically along the centerline of the prefabricated exterior wall panels.
作为本发明的一种改进,所述预留吊装孔内设有预埋螺栓。As an improvement of the present invention, embedded bolts are provided in the reserved hoisting holes.
作为优选方案,所述墙底预埋件由带孔的矩形铁件和钢筋组成。As a preferred solution, the embedded part at the bottom of the wall is composed of rectangular iron parts with holes and steel bars.
作为优选方案,所述梁顶预埋件由均匀分布的钢筋组成。As a preferred solution, the beam top embedded part is composed of evenly distributed steel bars.
本发明预制外墙板采用工厂流水线预制的方式制成,提高了建筑结构的装配率,预制外墙板与梁的连接方式简单,工效高,可以节约大量人力,外墙板之间的竖缝通过浇筑细石混凝土使之连为一体;预制外墙板的上部和下部均与预制梁紧密连接,增加了其稳定性;后浇带浇筑混凝土使预制外墙板、预制梁和叠合楼板有机地连接在一起,提高整个装配式建筑的整体性,使装配式建筑牢固可靠,抗震性能增加。The prefabricated exterior wall panel of the present invention is made by factory assembly line prefabrication, which improves the assembly rate of the building structure. The connection method between the prefabricated exterior wall panel and the beam is simple, the work efficiency is high, and a large amount of manpower can be saved. It is connected as a whole by pouring fine stone concrete; the upper and lower parts of the prefabricated external wall panels are closely connected with the prefabricated beams, which increases its stability; the post-pouring concrete makes the prefabricated external wall panels, prefabricated beams and laminated floors organic The ground is connected together to improve the integrity of the entire prefabricated building, making the prefabricated building firm and reliable, and increasing its seismic performance.
附图说明Description of drawings
图1为实施例1的预制外墙板的结构示意图。FIG. 1 is a schematic structural view of the prefabricated exterior wall panel of Embodiment 1.
图2为实施例1的预制外墙板的横向剖视图。FIG. 2 is a transverse cross-sectional view of the prefabricated exterior wall panel of Embodiment 1. FIG.
图3为实施例1的墙底预埋件的结构示意图。FIG. 3 is a schematic structural view of the embedded part at the bottom of the wall in Embodiment 1. FIG.
图4为实施例1的预制外墙板的接缝连接的结构示意图。FIG. 4 is a structural schematic diagram of the seam connection of the prefabricated exterior wall panels in Embodiment 1. FIG.
图5为实施例1的预制梁的结构示意图。FIG. 5 is a schematic structural view of the prefabricated beam of Embodiment 1. FIG.
图6为图5的A-A向视图。Fig. 6 is a view along the line A-A of Fig. 5 .
图7为实施例1的预制外墙板顶部与上方预制梁连接的结构示意图。Fig. 7 is a schematic structural diagram of the connection between the top of the prefabricated exterior wall panel and the upper prefabricated beam in Embodiment 1.
图8为实施例1的预制外墙板底部与下方预制梁连接的结构示意图。Fig. 8 is a structural schematic diagram of the connection between the bottom of the prefabricated exterior wall panel and the lower prefabricated beam in Embodiment 1.
具体实施方式detailed description
实施例1Example 1
如图1至图7所示,一种装配式外墙与梁连接构造,包括预制外墙板1、预制梁12和叠合楼板16。预制外墙板1上部设有墙顶预留孔洞2、临时固定斜支撑预埋件3、预留吊装孔4和预留临时固定孔洞5。墙顶预留孔洞2、临时固定斜支撑预埋件3、预留吊装孔4和预留临时固定孔洞5的数量均至少为两个,且均沿预制外墙板1的中心线对称分布。2个预留吊装孔4分别分布在预制外墙板1的左右两部分,用于对预制外墙板1的吊装。临时固定斜支撑预埋件3和预留临时固定孔洞5用于对预制外墙板1安装时的临时固定。As shown in FIGS. 1 to 7 , a prefabricated external wall and beam connection structure includes a prefabricated external wall panel 1 , a prefabricated beam 12 and a laminated floor 16 . The upper part of the prefabricated exterior wall panel 1 is provided with a reserved hole 2 on the top of the wall, a temporary fixed oblique support embedded part 3, a reserved hoisting hole 4 and a reserved temporary fixed hole 5. There are at least two reserved holes 2 on the top of the wall, temporarily fixed oblique support embedded parts 3 , reserved hoisting holes 4 and reserved temporary fixing holes 5 , and they are all symmetrically distributed along the center line of the prefabricated exterior wall panel 1 . The two reserved hoisting holes 4 are respectively distributed in the left and right parts of the prefabricated exterior wall panel 1 for hoisting the prefabricated exterior wall panel 1 . Temporary fixed oblique support embedded parts 3 and reserved temporary fixed holes 5 are used for temporary fixing of prefabricated exterior wall panels 1 during installation.
预制外墙板1的底部设有墙底预埋件6。墙底预埋件6由带孔的矩形铁件和钢筋组成,如图3所示。钢筋通过焊接形式连接在矩形铁件上并深入预制外墙体1内,外露部分带有孔洞,用于和下方的预制梁12连接。预制外墙板1两侧设有槽口7,槽口7位于预制外墙板1中。预制外墙板1的数量至少为两块,当两块预制外墙板1安装时会形成竖缝,通过向竖缝中浇筑混凝土,可以将其连接形成整体,其中槽口7使两块预制外墙板1连接更结实稳定。浇筑后,使用封胶14和PE棒15进行封堵作保温处理。The bottom of the prefabricated exterior wall panel 1 is provided with a wall bottom embedded part 6 . The embedded part 6 at the bottom of the wall consists of rectangular iron parts with holes and steel bars, as shown in Figure 3. The steel bar is connected to the rectangular iron piece by welding and goes deep into the prefabricated outer wall 1 , and the exposed part has holes for connecting with the prefabricated beam 12 below. Notches 7 are provided on both sides of the prefabricated exterior wall panel 1 , and the notches 7 are located in the prefabricated exterior wall panel 1 . The number of prefabricated exterior wall panels 1 is at least two. When two prefabricated exterior wall panels 1 are installed, vertical joints will be formed. By pouring concrete into the vertical joints, they can be connected to form a whole. The notches 7 make the two prefabricated exterior wall panels 1 The external wall panel 1 is connected more firmly and stably. After pouring, sealant 14 and PE rod 15 are used to seal for heat preservation.
预制梁12两端设有柱子11,将预制梁12夹在柱子11的中间。预制梁12一侧设有与墙底预埋件6相对应的梁内侧预留孔洞9,在梁内侧预留孔洞内9设有钢筋和现浇部。墙底预埋件6伸出墙体部分上的孔洞和下方预制梁12的梁内侧预留孔洞9对齐后进行注浆,然后再插入钢筋进行连接,完成预制外墙板1的底部与下方预制梁12的连接。The two ends of the prefabricated beam 12 are provided with pillars 11 , and the prefabricated beam 12 is sandwiched between the pillars 11 . One side of the prefabricated beam 12 is provided with a reserved hole 9 inside the beam corresponding to the embedded part 6 at the bottom of the wall, and a steel bar and a cast-in-place part are arranged in the reserved hole 9 inside the beam. The embedded part 6 at the bottom of the wall protrudes from the hole on the wall part and the reserved hole 9 on the inner side of the beam of the prefabricated beam 12 below is aligned, and then grouting is performed, and then steel bars are inserted for connection to complete the bottom of the prefabricated exterior wall panel 1 and the prefabricated bottom. Beam 12 connection.
梁内侧预留孔洞9外侧设有伸出部分,伸出部分上设有与墙顶预留孔洞2相对应的梁外侧预留孔洞8。墙顶预留孔洞2和梁外侧预留孔洞8内均设有钢筋和现浇部,即墙顶预留孔洞2和上方预制梁12上的梁外侧预留孔洞8对齐后进行注浆,然后再插入钢筋进行连接。预制梁12中设有梁顶预埋件13,其为均匀分布的钢筋。梁顶预埋件13与叠合楼板16相连接。预制梁12的伸出部分上设有与预留吊装孔4相对应的吊装口10,用于吊装预制梁12时固定缆索。吊装口10设有两个,关于预制梁12的中心线对称。The outside of the reserved hole 9 inside the beam is provided with a protruding part, and the protruding part is provided with a reserved hole 8 on the outside of the beam corresponding to the reserved hole 2 on the top of the wall. Both the reserved hole 2 on the top of the wall and the reserved hole 8 on the outside of the beam are equipped with steel bars and cast-in-place parts, that is, the reserved hole 2 on the top of the wall and the reserved hole 8 on the outside of the beam on the prefabricated beam 12 above are aligned and then grouted, and then Then insert the reinforcement to connect. The prefabricated beam 12 is provided with beam top embedded parts 13, which are evenly distributed steel bars. The beam top embedded part 13 is connected with the laminated floor 16 . The protruding part of the prefabricated beam 12 is provided with a hoisting opening 10 corresponding to the reserved hoisting hole 4 for fixing cables when hoisting the prefabricated beam 12 . There are two hoisting openings 10, which are symmetrical about the center line of the prefabricated beam 12.
梁内侧预留孔洞9上端设有后浇带17。预制外墙板1、预制梁12和叠合楼板16通过后浇带17连接。The upper end of the reserved hole 9 inside the beam is provided with a post-casting belt 17 . The prefabricated exterior wall panels 1 , prefabricated beams 12 and laminated floor slabs 16 are connected by post-casting strips 17 .
通过预制外墙板1的上部和底部分别与预制梁12相连接的连接方式使预制外墙板1与预制梁12更牢固,同时槽口7使外墙之间以及后浇带17使预制外墙板1、预制梁12和叠合楼板16之间牢固连接,安全可靠,增加了装配式建筑结构的整体性。The prefabricated exterior wall panel 1 and the prefabricated beam 12 are made stronger by connecting the upper part and the bottom of the prefabricated exterior wall panel 1 with the prefabricated beam 12 respectively, and the notches 7 make the prefabricated exterior wall panel 1 and the prefabricated exterior wall The wall panels 1, prefabricated beams 12 and laminated floor slabs 16 are firmly connected, safe and reliable, and increase the integrity of the prefabricated building structure.
实施例2:一种装配式外墙与梁的连接结构,包括预制外墙板、预制梁和叠合楼板,所述预制外墙板上部设有墙顶预留孔洞,预制外墙板底部设有墙底预埋件;所述预制梁两端设有柱子,预制梁一侧设有与墙底预埋件相对应的梁内侧预留孔洞,在梁内侧预留孔洞内设有钢筋和现浇部;梁内侧预留孔洞外侧设有伸出部分,伸出部分上设有与墙顶预留孔洞相对应的梁外侧预留孔洞,墙顶预留孔洞和梁外侧预留孔洞内设有钢筋和现浇部;所述预制梁中设有梁顶预埋件,梁顶预埋件与叠合楼板相连接;所述预制外墙板、预制梁和叠合楼板通过后浇带连接。预制外墙板上的预留吊装孔内设有预埋螺栓,用于吊装。Embodiment 2: A connection structure between a prefabricated exterior wall and a beam, including a prefabricated exterior wall panel, a prefabricated beam, and a laminated floor. There are embedded parts at the bottom of the wall; the two ends of the prefabricated beam are provided with columns, and one side of the prefabricated beam is provided with a reserved hole on the inner side of the beam corresponding to the embedded part at the bottom of the wall. Casting part; there is a protruding part on the outside of the reserved hole on the inner side of the beam. On the protruding part, there is a reserved hole on the outer side of the beam corresponding to the reserved hole on the top of the wall. In the reserved hole on the top of the wall and on the outer side of the beam, there are Reinforcing bars and cast-in-place parts; the prefabricated beams are provided with beam top embedded parts, and the beam top embedded parts are connected to the laminated floor; the prefabricated exterior wall panels, prefabricated beams and laminated floors are connected through post-casting strips. There are pre-embedded bolts in the reserved hoisting holes on the prefabricated exterior wall panels for hoisting.
其他结构与实施例1相同。Other structures are the same as in Embodiment 1.
上面结合附图对本发明的实施方式作了详细说明,但是本发明并不限于上述实施方式,例如预制外墙板不仅可以通过预留吊装孔用来吊装,还可以通过在预制外墙板上部预埋螺栓来进行吊装,总之在所述领域普通技术人员所具备的知识范围内,对本发明的精神和原则之内所作的任何修改、等同替代和改进等,其均应涵盖在本发明请求保护的技术方案范围之内。The embodiments of the present invention have been described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. For example, the prefabricated exterior wall panels can not only be used for hoisting by reserving hoisting holes, but also can be prefabricated on the top of the prefabricated exterior wall panels. In short, any modification, equivalent replacement and improvement made within the spirit and principles of the present invention within the knowledge of the ordinary skilled person in the field shall be covered by the claimed protection of the present invention. within the technical scope.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510059720.XA CN104652608B (en) | 2015-02-05 | 2015-02-05 | A connection structure between an assembled exterior wall and beams |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510059720.XA CN104652608B (en) | 2015-02-05 | 2015-02-05 | A connection structure between an assembled exterior wall and beams |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104652608A CN104652608A (en) | 2015-05-27 |
| CN104652608B true CN104652608B (en) | 2017-01-25 |
Family
ID=53244195
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510059720.XA Expired - Fee Related CN104652608B (en) | 2015-02-05 | 2015-02-05 | A connection structure between an assembled exterior wall and beams |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104652608B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105220809B (en) * | 2015-10-26 | 2018-01-16 | 济南轨道交通集团有限公司 | A kind of arch top plate and the attachment structure and its construction method of bracket stake |
| CN106522372B (en) * | 2016-09-20 | 2019-01-15 | 上海迅铸建筑科技有限公司 | A kind of hybrid integrated house and construction method |
| CN106284685A (en) * | 2016-10-14 | 2017-01-04 | 南通联泷建筑材料有限公司 | A kind of wallboard and the post-cast strip attachment structure of floor plates |
| CN108867880B (en) * | 2018-09-12 | 2023-11-14 | 江西嘉致建设有限公司 | Assembled reinforced concrete building |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1062929C (en) * | 1997-05-31 | 2001-03-07 | 杨绍林 | House building method by using paper faced straw board |
| US6698150B1 (en) * | 1998-06-09 | 2004-03-02 | Brentmuir Developments (1993) Limited | Concrete panel construction system |
| CN101597920A (en) * | 2008-06-02 | 2009-12-09 | 蒋正波 | Assembled type building construction and method thereof |
| CN103114663B (en) * | 2013-03-07 | 2015-01-14 | 浙江省建筑科学设计研究院有限公司 | Assemble type multifunctional outer wall body and production and installation method thereof |
| CN103726607A (en) * | 2014-01-20 | 2014-04-16 | 王睿敏 | Wall board for assembling integral shear wall, shear wall and construction method of shear wall |
| CN204475529U (en) * | 2015-02-05 | 2015-07-15 | 中国建筑第七工程局有限公司 | The syndeton of a kind of assembling type outer wall and beam |
-
2015
- 2015-02-05 CN CN201510059720.XA patent/CN104652608B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN104652608A (en) | 2015-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205857448U (en) | A kind of assembly concrete shear wall structure | |
| CN105089178B (en) | A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls | |
| CN102635118B (en) | Square steel pipe concrete supporting structure for foundation pit support | |
| CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
| CN204826308U (en) | Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall | |
| CN103696514A (en) | T-frame component and lightweight concrete body fabricated shear wall and connection structure thereof | |
| CN104652608B (en) | A connection structure between an assembled exterior wall and beams | |
| CN203808292U (en) | Assembly type gridded shear wall structure system | |
| CN110821256A (en) | Prefabricated assembled biochemical pool of sewage plant and installation method thereof | |
| CN108775084B (en) | Steel-concrete composite prefabricated beam and prefabricated column connection structure and construction method | |
| CN204475529U (en) | The syndeton of a kind of assembling type outer wall and beam | |
| CN108643396A (en) | Assembled built-in heat insulation layer foamed concrete composite wall-light steel frame connecting node | |
| CN105569222A (en) | Vertical connection technology for precast assembled large panel shear walls with concealed supports | |
| CN208039457U (en) | Novel fabricated reinforced concrete frame structure | |
| CN201730456U (en) | Combined prefabricated concrete door and window mounting auxiliary frame | |
| CN105421614B (en) | Construction method of prefabricated shear wall dry vertical connection joints | |
| CN109653404A (en) | First fill the construction method and structural system of prefabricated big plate filled wall concrete structure | |
| CN106049754A (en) | Standard assembly section of assembly-type concrete composite column and composite column formed through assembly section | |
| CN206189454U (en) | Piping lane | |
| CN205475877U (en) | Compound outer thermal insulation walling system of assembled self preservation temperature wallboard | |
| CN103696512A (en) | Z-frame component and lightweight concrete body fabricated shear wall and connection structure thereof | |
| CN203808291U (en) | Prefabricated lattice shear wallboard | |
| CN113323190A (en) | Template-free assembled steel truss-recycled concrete combined shear wall and construction method thereof | |
| CN203475609U (en) | Connecting structure of composite floor slab and steel tube shear wall of building | |
| CN108571065A (en) | The assembled steel tendon concrete frame structure of connector is connected to based on steel plate |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20160704 Address after: Henan province Zhengzhou City 450000 East Road No. 108 Applicant after: China Construction Seventh Engineering Division. Corp. Ltd. Applicant after: The Fourth Company Ltd. of China Construction Seventh Engineering Co., Ltd. Address before: Henan province Zhengzhou City 450000 East Road No. 108 Applicant before: China Construction Seventh Engineering Division. Corp. Ltd. |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170125 Termination date: 20210205 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |