CN107882199A - A kind of assembled architecture damping device - Google Patents
A kind of assembled architecture damping device Download PDFInfo
- Publication number
- CN107882199A CN107882199A CN201710944889.2A CN201710944889A CN107882199A CN 107882199 A CN107882199 A CN 107882199A CN 201710944889 A CN201710944889 A CN 201710944889A CN 107882199 A CN107882199 A CN 107882199A
- Authority
- CN
- China
- Prior art keywords
- shock
- absorbing
- wall
- installation groove
- steel beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
本发明公开了一种装配式建筑减震装置,它涉及装配式建筑用具技术领域;第一安装槽内设置有主钢槽架,第一安装槽的内侧壁上设置有第一浇筑槽,所述连接架的下侧设置有第二安装槽,所述第二安装槽的内部安装有减震钢梁,所述减震钢梁的外侧与墙板连接件连接,所述墙板连接件与混凝土墙板连接,所述墙板连接件的外侧壁上安装有减震垫块,所述第二安装槽与墙板连接件相对应的内侧壁上设置有第二浇筑槽,所述连接架的上下外侧壁上均安装有加强箍,所述减震钢梁的内部设置有大减震柱,所述大减震柱内设置有数个小减震柱,所述大减震柱的外侧壁上连接有连接耳;本发明便于实现快速装配与固定,且能实现减震与加强,其使用时强度高。
The invention discloses a prefabricated building shock absorbing device, which relates to the technical field of prefabricated building appliances; a main steel channel frame is arranged in a first installation groove, and a first pouring groove is arranged on the inner side wall of the first installation groove. The lower side of the connecting frame is provided with a second installation groove, and the inside of the second installation groove is installed with a shock-absorbing steel beam, and the outer side of the shock-absorbing steel beam is connected with the wallboard connector, and the wallboard connector is connected with the wallboard connector. Concrete wall panels are connected, shock-absorbing pads are installed on the outer wall of the wall panel connector, and a second pouring groove is provided on the inner wall corresponding to the second installation groove and the wall panel connector, and the connecting frame Reinforcing hoops are installed on the upper and lower outer walls of the steel beam, and a large shock-absorbing column is arranged inside the shock-absorbing steel beam, and several small shock-absorbing columns are arranged inside the large shock-absorbing column, and the outer wall of the large shock-absorbing column Connecting ears are connected on the top; the present invention is convenient for fast assembly and fixing, and can realize shock absorption and reinforcement, and has high strength during use.
Description
技术领域technical field
本发明涉及一种装配式建筑减震装置,属于装配式建筑用具技术领域。The invention relates to a prefabricated building damping device, which belongs to the technical field of prefabricated construction appliances.
背景技术Background technique
建筑以木结构建筑为主,西方的传统建筑以砖石结构为主。现代的建筑则是以钢筋混凝土为主。从广义上来说,建筑学是研究建筑及其环境的学科。建筑学是一门横跨工程技术和人文艺术的学科。建筑学所涉及的建筑艺术和建筑技术、以及作为实用艺术的建筑艺术所包括的美学的一面和实用的一面,它们虽有明确的不同但又密切联系,并且其分量随具体情况和建筑物的不同而大不相同。The buildings are mainly wooden structures, while the traditional western buildings are mainly masonry structures. Modern buildings are dominated by reinforced concrete. Broadly speaking, architecture is the study of buildings and their environments. Architecture is a discipline that straddles engineering technology and humanities. The architectural art and architectural technology involved in architecture, as well as the aesthetic and practical aspects of architectural art as a practical art, although they are clearly different, they are closely related, and their weight varies with the specific situation and the structure of the building. very different.
现有的装配式减震装置在使用时其强度低,且操作复杂,降低了安全性。The existing assembled shock absorbing device has low strength and complicated operation during use, which reduces safety.
发明内容Contents of the invention
针对上述问题,本发明要解决的技术问题是提供一种装配式建筑减震装置。In view of the above problems, the technical problem to be solved by the present invention is to provide a prefabricated building shock absorber.
本发明的一种装配式建筑减震装置,它包含连接架、主钢槽架、减震钢梁、墙板连接件、减震垫块、混凝土墙板、大减震柱、连接耳、小减震柱、加强箍;连接架的上侧设置有第一安装槽,所述第一安装槽内设置有主钢槽架,第一安装槽的内侧壁上设置有第一浇筑槽,所述连接架的下侧设置有第二安装槽,所述第二安装槽的内部安装有减震钢梁,所述减震钢梁的外侧与墙板连接件连接,所述墙板连接件与混凝土墙板连接,所述墙板连接件的外侧壁上安装有减震垫块,所述第二安装槽与墙板连接件相对应的内侧壁上设置有第二浇筑槽,所述连接架的上下外侧壁上均安装有加强箍,所述减震钢梁的内部设置有大减震柱,所述大减震柱内设置有数个小减震柱,所述大减震柱的外侧壁上连接有连接耳。A prefabricated building shock absorber of the present invention comprises a connecting frame, a main steel channel frame, a shock absorbing steel beam, a wall panel connector, a shock absorbing pad, a concrete wall plate, a large shock absorbing column, a connecting ear, a small Shock-absorbing columns, reinforcing hoops; the upper side of the connecting frame is provided with a first installation groove, and a main steel channel frame is arranged in the first installation groove, and a first pouring groove is arranged on the inner side wall of the first installation groove. The lower side of the connecting frame is provided with a second installation groove, and the inside of the second installation groove is installed with a shock-absorbing steel beam, and the outer side of the shock-absorbing steel beam is connected with the wall panel connector, and the wall panel connector is connected with the concrete Wallboard connection, shock absorbing pads are installed on the outer side wall of the wallboard connector, and a second pouring groove is arranged on the inner side wall corresponding to the second installation groove and the wallboard connector, and the connecting frame Reinforcing hoops are installed on the upper and lower outer walls, and a large shock-absorbing column is arranged inside the shock-absorbing steel beam, and several small shock-absorbing columns are arranged inside the large shock-absorbing column, and on the outer wall of the large shock-absorbing column The connection has connection ears.
作为优选,所述加强箍为调节式加强箍。Preferably, the reinforcing hoop is an adjustable reinforcing hoop.
作为优选,所述第一浇筑槽与第二浇筑槽均为弧形。Preferably, both the first casting groove and the second casting groove are arc-shaped.
作为优选,所述小减震柱为中空式减震柱。Preferably, the small shock absorbing column is a hollow shock absorbing column.
作为优选,所述连接架的外侧壁上设置有加强筋。Preferably, reinforcing ribs are provided on the outer wall of the connecting frame.
与现有技术相比,本发明的有益效果为:便于实现快速装配与固定,且能实现减震与加强,其使用时强度高。Compared with the prior art, the beneficial effect of the present invention is that it is convenient to realize rapid assembly and fixing, and can realize shock absorption and reinforcement, and has high strength during use.
附图说明Description of drawings
为了易于说明,本发明由下述的具体实施及附图作以详细描述。For ease of illustration, the present invention is described in detail by the following specific implementations and accompanying drawings.
图1为本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图中:1-连接架;2-主钢槽架;3-减震钢梁;4-墙板连接件;5-减震垫块;6-混凝土墙板;7-大减震柱;8-连接耳;9-小减震柱;10-加强箍;11-第一浇筑槽;12-第二浇筑槽。In the figure: 1-connecting frame; 2-main steel channel frame; 3-shock-absorbing steel beam; 4-wall panel connector; 5-shock-absorbing pad; 6-concrete wall panel; - connection ear; 9 - small shock absorbing column; 10 - reinforcement hoop; 11 - first pouring groove; 12 - second pouring groove.
具体实施方式Detailed ways
为使本发明的目的、技术方案和优点更加清楚明了,下面通过附图中示出的具体实施例来描述本发明。但是应该理解,这些描述只是示例性的,而并非要限制本发明的范围。此外,在以下说明中,省略了对公知结构和技术的描述,以避免不必要地混淆本发明的概念。In order to make the object, technical solution and advantages of the present invention clearer, the present invention is described below through specific embodiments shown in the accompanying drawings. It should be understood, however, that these descriptions are exemplary only and are not intended to limit the scope of the present invention. Also, in the following description, descriptions of well-known structures and techniques are omitted to avoid unnecessarily obscuring the concept of the present invention.
如图1所示,本具体实施方式采用以下技术方案:它包含连接架1、主钢槽架2、减震钢梁3、墙板连接件4、减震垫块5、混凝土墙板6、大减震柱7、连接耳8、小减震柱9、加强箍10;连接架1的上侧设置有第一安装槽,所述第一安装槽内设置有主钢槽架2,第一安装槽的内侧壁上设置有第一浇筑槽11,所述连接架1的下侧设置有第二安装槽,所述第二安装槽的内部安装有减震钢梁3,所述减震钢梁3的外侧与墙板连接件4连接,所述墙板连接件4与混凝土墙板6连接,所述墙板连接件4的外侧壁上安装有减震垫块5,所述第二安装槽与墙板连接件4相对应的内侧壁上设置有第二浇筑槽12,所述连接架1的上下外侧壁上均安装有加强箍10,所述减震钢梁3的内部设置有大减震柱7,所述大减震柱7内设置有数个小减震柱9,所述大减震柱7的外侧壁上连接有连接耳8。As shown in Figure 1, this specific embodiment adopts the following technical solutions: it includes a connecting frame 1, a main steel channel frame 2, a shock-absorbing steel beam 3, a wall panel connector 4, a shock-absorbing pad 5, a concrete wall panel 6, Large shock-absorbing column 7, connecting ear 8, small shock-absorbing column 9, reinforcing hoop 10; the upper side of the connecting frame 1 is provided with a first installation groove, and the main steel channel frame 2 is arranged in the first installation groove, and the first The inner side wall of the installation groove is provided with a first pouring groove 11, and the underside of the connecting frame 1 is provided with a second installation groove, and a shock-absorbing steel beam 3 is installed inside the second installation groove, and the shock-absorbing steel beam 3 is installed inside the second installation groove. The outer side of the beam 3 is connected with the wall panel connector 4, and the wall panel connector 4 is connected with the concrete wall panel 6, and the shock absorbing pad 5 is installed on the outer wall of the wall panel connector 4, and the second installation A second pouring groove 12 is provided on the inner side wall corresponding to the wall panel connector 4, and reinforcing hoops 10 are installed on the upper and lower outer side walls of the connecting frame 1, and the inside of the shock-absorbing steel beam 3 is provided with a large The shock absorbing column 7, the large shock absorbing column 7 is provided with several small shock absorbing columns 9, and the outer wall of the large shock absorbing column 7 is connected with connecting ears 8.
进一步的,所述加强箍10为调节式加强箍。Further, the reinforcing hoop 10 is an adjustable reinforcing hoop.
进一步的,所述第一浇筑槽11与第二浇筑槽12均为弧形。Further, the first casting groove 11 and the second casting groove 12 are both arc-shaped.
进一步的,所述小减震柱9为中空式减震柱。Further, the small shock absorbing column 9 is a hollow shock absorbing column.
进一步的,所述连接架1的外侧壁上设置有加强筋。Further, reinforcing ribs are provided on the outer wall of the connecting frame 1 .
本具体实施方式的工作原理为:在使用时,通过连接架1实现主钢槽架2的连接,且连接架1与主钢槽架2之间的缝隙实现浇筑,且浇筑时,通过第一浇筑槽11来实现浇筑,浇筑完成后通过加强箍10实现加强固定,第二连接槽实现减震钢梁3、墙板连接件4安装,且墙板连接件4与混凝土墙板6连接,同时第二浇筑槽能实现浇筑,提高强度,加强箍10实现加强固定,且减震垫块5实现墙板连接架4的减震,减震钢梁3通过大减震柱7与内部的小减震柱9实现减震,且连接耳8能提高大减震柱7的连接强度。The working principle of this specific embodiment is: when in use, the connection of the main steel channel frame 2 is realized through the connecting frame 1, and the gap between the connecting frame 1 and the main steel channel frame 2 is poured, and when pouring, through the first The pouring groove 11 realizes pouring, and after pouring is completed, it is strengthened and fixed by the reinforcing hoop 10, and the second connecting groove realizes the installation of the shock-absorbing steel beam 3 and the wall panel connector 4, and the wall panel connector 4 is connected with the concrete wall panel 6, and at the same time The second pouring trough can realize pouring, improve the strength, the reinforcing hoop 10 realizes strengthening and fixing, and the shock absorbing cushion block 5 realizes the shock absorption of the wall panel connecting frame 4, and the shock absorbing steel beam 3 passes through the large shock absorbing column 7 and the small shock absorber inside. The shock column 9 realizes shock absorption, and the connection ear 8 can improve the connection strength of the large shock absorber column 7 .
在本发明的描述中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, unless otherwise clearly specified and limited, the terms "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrated; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.
本发明使用到的标准零件均可以从市场上购买,异形件根据说明书的和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等常规手段,机械、零件和设备均采用现有技术中,常规的型号,加上电路连接采用现有技术中常规的连接方式,在此不再详述。The standard parts used in the present invention can be purchased from the market, and the special-shaped parts can be customized according to the instructions and the records of the accompanying drawings. The specific connection methods of each part adopt mature bolts, rivets, welding, etc. in the prior art. Conventional means, machinery, parts and equipment all adopt conventional models in the prior art, plus circuit connections adopt conventional connection methods in the prior art, and will not be described in detail here.
对于本领域技术人员而言,显然本发明不限于上述示范性实施例的细节,而且在不背离本发明的精神或基本特征的情况下,能够以其他的具体形式实现本发明。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本发明的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本发明内。不应将权利要求中的任何附图标记视为限制所涉及的权利要求。It will be apparent to those skilled in the art that the invention is not limited to the details of the above-described exemplary embodiments, but that the invention can be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. Accordingly, the embodiments should be regarded in all points of view as exemplary and not restrictive, the scope of the invention being defined by the appended claims rather than the foregoing description, and it is therefore intended that the scope of the invention be defined by the appended claims rather than by the foregoing description. All changes within the meaning and range of equivalents of the elements are embraced in the present invention. Any reference sign in a claim should not be construed as limiting the claim concerned.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710944889.2A CN107882199A (en) | 2017-10-12 | 2017-10-12 | A kind of assembled architecture damping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710944889.2A CN107882199A (en) | 2017-10-12 | 2017-10-12 | A kind of assembled architecture damping device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107882199A true CN107882199A (en) | 2018-04-06 |
Family
ID=61781370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710944889.2A Pending CN107882199A (en) | 2017-10-12 | 2017-10-12 | A kind of assembled architecture damping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107882199A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519768A (en) * | 2020-04-29 | 2020-08-11 | 中国一冶集团有限公司 | Assembled building shock-absorbing structure |
CN111916116A (en) * | 2020-07-29 | 2020-11-10 | 珠海大横琴科技发展有限公司 | Video monitoring storage device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201826392U (en) * | 2010-05-12 | 2011-05-11 | 赵世峰 | Reinforced concrete construction adopting precast reinforced building blocks, as well as vibration isolation and absorption system thereof |
CN205976051U (en) * | 2016-08-23 | 2017-02-22 | 江苏嘉图建筑科技有限公司 | Assembly type structure shock -absorbing structure |
CN107119814A (en) * | 2017-04-09 | 2017-09-01 | 北京工业大学 | External thermal insulation in-line combined wall and the practice with lead pipe coarse sand energy-dissipating and shock-absorbing key |
CN107143188A (en) * | 2017-07-05 | 2017-09-08 | 北京建筑大学 | A kind of new ancient Wood construction assembled power consumption reinforcing member |
CN107165303A (en) * | 2017-04-09 | 2017-09-15 | 北京工业大学 | External thermal insulation formula and cross combined wall and the practice with lead pipe coarse sand energy-dissipating and shock-absorbing key |
CN206530131U (en) * | 2017-02-14 | 2017-09-29 | 同济大学 | Assembled integral shock-absorbing support |
-
2017
- 2017-10-12 CN CN201710944889.2A patent/CN107882199A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201826392U (en) * | 2010-05-12 | 2011-05-11 | 赵世峰 | Reinforced concrete construction adopting precast reinforced building blocks, as well as vibration isolation and absorption system thereof |
CN205976051U (en) * | 2016-08-23 | 2017-02-22 | 江苏嘉图建筑科技有限公司 | Assembly type structure shock -absorbing structure |
CN206530131U (en) * | 2017-02-14 | 2017-09-29 | 同济大学 | Assembled integral shock-absorbing support |
CN107119814A (en) * | 2017-04-09 | 2017-09-01 | 北京工业大学 | External thermal insulation in-line combined wall and the practice with lead pipe coarse sand energy-dissipating and shock-absorbing key |
CN107165303A (en) * | 2017-04-09 | 2017-09-15 | 北京工业大学 | External thermal insulation formula and cross combined wall and the practice with lead pipe coarse sand energy-dissipating and shock-absorbing key |
CN107143188A (en) * | 2017-07-05 | 2017-09-08 | 北京建筑大学 | A kind of new ancient Wood construction assembled power consumption reinforcing member |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111519768A (en) * | 2020-04-29 | 2020-08-11 | 中国一冶集团有限公司 | Assembled building shock-absorbing structure |
CN111916116A (en) * | 2020-07-29 | 2020-11-10 | 珠海大横琴科技发展有限公司 | Video monitoring storage device |
CN111916116B (en) * | 2020-07-29 | 2021-08-27 | 珠海大横琴科技发展有限公司 | Video monitoring storage device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207032577U (en) | A kind of fabricated shear wall energy-dissipating and shock-absorbing horizontal connection device | |
CN202767252U (en) | Inner separating board type concrete filled square steel tube column and H type girder semi-rigid node | |
CN106759910A (en) | A kind of high-performance framework damper frame barrel structure system | |
CN206844302U (en) | A kind of Light-weight Steel Structures | |
CN107882199A (en) | A kind of assembled architecture damping device | |
CN208668930U (en) | Fabricated construction turning is installed by bracing means | |
CN202090467U (en) | Perforated type steel plate energy dissipating wall with inside hidden strengthening ribs | |
CN107795027A (en) | A kind of antidetonation hydraulic type slidably assembly apparatus | |
CN105839791B (en) | A kind of supporting bilateral plate node of overhanging cover board | |
CN206496150U (en) | A kind of hoisting structure of the light steel Assembled floor with floorboard | |
CN107740536A (en) | A kind of damping type beam body for building | |
CN205776787U (en) | A kind of support plug-in type beam column supporting bilateral plate node | |
CN210562830U (en) | Reinforced structure of indoor partition wall door opening | |
CN204298992U (en) | A kind of Novel truss-punching steel plate shear wall structure system | |
CN208168422U (en) | A kind of mixed form combination beam underpinning structure of the brick suitable for existing building building reconstruction | |
CN106996160A (en) | A kind of steel construction assembled wallboard | |
CN207974603U (en) | A kind of arc damping member for connecting wooden frame structure node | |
CN209323709U (en) | Wooden beam-column connection with damping | |
CN207063521U (en) | A kind of concrete column tie ruggedized construction | |
CN202280177U (en) | Semi-rigid frame-steel plate shear wall structure | |
CN206844476U (en) | A kind of house bilayer Side fascia assembling structure of light section steel structure | |
CN205637168U (en) | Support two curb plate nodes of bayonet support | |
CN207160222U (en) | A kind of house frame of light section steel structure and double-deck Side fascia assembly system | |
CN219690887U (en) | A concrete beam with good earthquake resistance | |
CN211228865U (en) | Constructional engineering damping beam column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180406 |