CN208934001U - A kind of hydraulic engineering afforestation earth-retaining wall - Google Patents
A kind of hydraulic engineering afforestation earth-retaining wall Download PDFInfo
- Publication number
- CN208934001U CN208934001U CN201820939424.8U CN201820939424U CN208934001U CN 208934001 U CN208934001 U CN 208934001U CN 201820939424 U CN201820939424 U CN 201820939424U CN 208934001 U CN208934001 U CN 208934001U
- Authority
- CN
- China
- Prior art keywords
- wall
- leg
- ground
- ground beam
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of hydraulic engineering afforestation earth-retaining walls, including slight slope, wall is poured on the left of the slight slope, the wall is connected with ground, and the left bottom of the wall has poured ground beam, the ground beam is connected with ground, the ground beam is connected by reinforcing bar with wall, and girder has been poured at the top of the ground beam, and the girder is connected by reinforcing bar with ground beam, auxiliary girder is poured on the right side of the girder, the auxiliary girder is connected by reinforcing bar with ground beam.The hydraulic engineering afforestation earth-retaining wall, pass through the cooperation between ground beam, transverse slat, first leg and the second supporting leg, under the action of supporting plate, supporting plate is supported to marking time, and the connection for making to mark time between ground beam is stronger, and then can climb up the scenery on the ornamental periphery of cushion cap by marking time, while having beautified environment, also facilitate and daily maintenance is carried out to the plant in flower pond, reduce the working strength of landscaping personnel, be suitble to promote the use of.
Description
Technical field
The utility model relates to hydraulic engineering technical field, specially a kind of hydraulic engineering afforestation earth-retaining wall.
Background technique
The common retaining wall in hydraulic engineering, mostly gravity type, constant weight formula, U-shaped structure etc., walls material is mixed
Solidifying soil and cemented rock structure, can not plant flowers and plants on this retaining wall, and flowerpot extremely uncoordinated, shadow again is placed on wall
Environmental beauty degree is rung, in the prior art, such as application No. is 201120395745.4 utility model patent includes the wall
Body upper end is equipped with flower pond, and the wall is concrete structure or cemented rock structure, and the colored pond bottom of pond is equipped with and communicates with wall
Drainage hole, although the utility model structure is simple, there are many deficiencies and defect, and in existing equipment, wall is set
Existing defects are counted, in use, the flower pond being arranged on wall, plantation and pouring are all very inconvenient, are that the work of staff increases
Formidable opponent keeps staff susceptible to while physical fatigue, and working efficiency reduces, in view of these situations, to avoid above-mentioned skill
Art problem, it is necessory to provide a kind of hydraulic engineering afforestation earth-retaining wall to overcome the defect in the prior art.
Utility model content
The purpose of this utility model is to provide a kind of hydraulic engineering afforestation earth-retaining walls, to solve to mention in above-mentioned background technique
Out the problem of.
To achieve the above object, the utility model provides the following technical solutions: a kind of hydraulic engineering afforestation earth-retaining wall, including
Slight slope has poured wall on the left of the slight slope, and the wall is connected with ground, and the left bottom of the wall has poured ground
Beam, the ground beam are connected with ground, and the ground beam is connected by reinforcing bar with wall, and girder, institute have been poured at the top of the ground beam
It states girder to be connected by reinforcing bar with ground beam, auxiliary girder has been poured on the right side of the girder, the auxiliary girder is connected by reinforcing bar with ground beam,
Crossbeam is poured at the top of the girder, the crossbeam is successively connected with auxiliary girder and wall by reinforcing bar, the top of the wall
Cushion cap is installed, the cushion cap and wall activity are clamped, it is evenly distributed with first leg at the top of the ground beam, described first
The bottom of leg is equipped with hook-type reinforcing bar, and the first leg is connected by hook-type reinforcing bar with ground beam, the left and right of the first leg
Two sides are mounted on the second supporting leg, and second supporting leg is connected by hook-type reinforcing bar with ground beam, the first leg and second
Transverse slat is installed, the transverse slat is weldingly connected with first leg and the second supporting leg, is equipped in the middle part of the transverse slat at the top of leg
Fixed plate is weldingly connected in the middle part of the fixed plate and transverse slat, and the outer left side of the fixed plate is welded with the second inclined plate, described
The external right side of fixed plate is welded with the first inclined plate, and first inclined plate is weldingly connected by reinforcing bar and wall, the fixed plate
Middle part be welded with riser, the riser is connected by reinforcing bar with Main Girder Welding, and the left end of the transverse slat is equipped with supporting plate, described
The left side of supporting plate builds and marks time, and connecting corner yard is equipped at the top of the cushion cap, the left and right sides of the connecting corner yard is pacified
Equipped with lateral steel joist, the transverse direction steel joist is hinged and connected with connecting corner yard, and the inside of the connecting corner yard is equipped with vertically
Steel joist, the vertical steel joist are connected by connecting corner yard with cushion cap, are hinged with fixed angles at the top of the vertical steel joist
Code, the fixed corner code are hinged and connected with vertical steel joist, and the inside of the fixed corner code is equipped with rough ground, the rough ground
Top decoration panel is installed, the decoration panel is connected by screw with rough ground, Hua Chi is installed at the top of the decoration panel,
Railing is installed at the top of the rough ground.
Preferably, the inside of the decoration panel is equipped with groove, is equipped with sole piece at the top of the transverse direction steel joist, described recessed
The inside of slot is equipped with block, and the inside of the block is equipped with compressed spring, and the end of the compressed spring is equipped with jacking block,
The inside of the sole piece is equipped with bail, and the bail is threadedly coupled with sole piece, and the bail and decoration panel activity are clamped, described
Decoration panel is connected by bail with sole piece.
Preferably, set square is mounted at left and right sides of the first leg, the set square and first leg are welded
It is connected.
Preferably, the top of the railing is equipped with handrail.
Preferably, the inside in the colored pond is equipped with drainpipe.
Compared with prior art, the utility model has the beneficial effects that the hydraulic engineering afforestation earth-retaining wall, by ground beam,
Cooperation between transverse slat, first leg and the second supporting leg, under the action of supporting plate, supporting plate is supported to marking time, and makes to mark time
Connection between ground beam is stronger, and then can climb up the scenery on the ornamental periphery of cushion cap by marking time, and has beautified environment
Meanwhile also facilitating and daily maintenance is carried out to the plant in flower pond, the working strength of landscaping personnel is reduced, to overcome tradition
For retaining wall in use, the flower pond being arranged on wall, plantation and pouring are all very inconvenient, increase by force for the work of staff
Enemy keeps staff susceptible to the shortcomings that while physical fatigue, working efficiency is reduced, overcomes existing hydraulic engineering greening
Retaining wall lack mark time be flower pond watering and fertilising bring inconvenience, the single disadvantage of utility function improves the hydraulic engineering
The working efficiency and service life of greening soil blocking wall avoid the flower pond in use, being arranged on wall, and plantation and pouring are all very
Inconvenience increases formidable opponent for the work of staff, while making staff is susceptible to arrive physical fatigue, what working efficiency reduced
Disadvantage also allows existing hydraulic engineering afforestation earth-retaining wall that more approvals can be commercially available, and improves the hydraulic engineering
The product quality of greening soil blocking wall saves the purchase cost of user, avoids the resource wave of hydraulic engineering afforestation earth-retaining wall
Take, is suitble to promote the use of.
Detailed description of the invention
Fig. 1 is the annexation figure of slight slope, wall and ground beam;
Fig. 2 is the annexation figure of the decoration panel of Fig. 1, Hua Chi and drainpipe;
The annexation figure of decoration panel, rough ground and lateral steel joist that Fig. 3 is Fig. 1.
In figure: 1, slight slope, 2, wall, 3, ground beam, 4, girder, 5, auxiliary girder, 6, crossbeam, 7, cushion cap, 8, mark time, 9, transverse slat,
10, fixed plate, the 11, first inclined plate, 12, riser, the 13, second inclined plate, 14, supporting plate, 15, first leg, the 16, second supporting leg, 17,
Hook-type reinforcing bar, 18, set square, 19, lateral steel joist, 20, vertical steel joist, 21, connecting corner yard, 22, rough ground, 23, fixation
Corner brace, 24, decoration panel, 25, Hua Chi, 26, drainpipe, 27, handrail, 28, railing, 29, groove, 30, bail, 31, sole piece, 32,
Block, 33, compressed spring, 34, jacking block.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of hydraulic engineering afforestation earth-retaining wall, including soil
Slope 1, slight slope are original riverbed, and the left side of slight slope 1 has poured wall 2, poured for armored concrete, weighted, and stability is high, wall
Body 2 is connected with ground, and the left bottom of wall 2 has poured ground beam 3, and fixed girder 4 supports supporting plate 14 with auxiliary girder 5, ground beam 3 with
Ground is connected, and ground beam 3 is connected by reinforcing bar with wall 2, and the top of ground beam 3 has poured girder 4, and girder 4 pours for armored concrete
It builds, is used to support cushion cap 7, girder 4 is connected by reinforcing bar with ground beam 3, and the right side of girder 4 has poured auxiliary girder 6, its is auxiliary to girder 4
Support is helped, makes stronger between cushion cap 7 and wall 2, auxiliary girder 6 is connected by reinforcing bar with ground beam 3, and the top of girder 4 has poured
Crossbeam 6, support cushion cap 7, keep cushion cap 7 and the connection of wall 2 stronger, crossbeam 6 pass through reinforcing bar successively with auxiliary girder 6 and wall 2
It is connected, the top of wall 2 is equipped with cushion cap 7, fixed decoration panel 24 and Hua Chi 25, and cushion cap 7 and 2 activity of wall are clamped, ground beam 3
Top is evenly distributed with first leg 15, and fixed transverse slat 9 fixes fixed plate 10, the left and right sides of first leg 15 is equal
Set square 18 is installed, increases the bearing capacity of first leg 15, transverse slat 9 and the connection of first leg 15 is reinforced, triangle
Plate 18 is weldingly connected with first leg 15, and the bottom of first leg 15 is equipped with hook-type reinforcing bar 17, by first leg 15 and second
Supporting leg 16 is fixed on ground beam 3, and first leg 15 is connected by hook-type reinforcing bar 17 with ground beam 3, the left and right sides of first leg 15
It is mounted on the second supporting leg 16, transverse slat 9 is supported, keeps transverse slat 9 and the connection of girder 4 stronger, the second supporting leg 16 passes through hook-type
Reinforcing bar 17 is connected with ground beam 3, and the top of first leg 15 and the second supporting leg 16 is equipped with transverse slat 9, and transverse slat 9 is steel construction, for branch
Bracketing plate 14 provides support, and transverse slat 9 is weldingly connected with first leg 15 and the second supporting leg 16, and the middle part of transverse slat 9 is equipped with fixation
Plate 10, fixed plate 10 are steel construction adapter, can be connected to the first inclined plate 11 and the second inclined plate 13 with wall 2 and girder 4
Together, fixed plate 10 and the middle part of transverse slat 9 are weldingly connected, and the outer left side of fixed plate 10 is welded with the second inclined plate 13, increase support
The bearing capacity of plate 14 keeps the connection between supporting plate 14 and transverse slat 9 stronger, and the external right side of fixed plate 10 is welded with first tiltedly
Plate 11, fixed transverse slat 9, keeps the connection between transverse slat 9 and wall 2 stronger, and the first inclined plate 11 is welded by reinforcing bar and wall 2
It is connected, the middle part of fixed plate 10 is welded with riser 12, and fixed plate 10 is connected on girder 4, promotes the stability of transverse slat 9, erects
Plate 12 is weldingly connected by reinforcing bar with girder 4, and the left end of transverse slat 9 is equipped with supporting plate 14,8 is supported to mark time, convenient for marking time 8
It builds, in order to avoid unstable situation occurs in the connection marked time between 8 and ground beam 3, the left side of supporting plate 14, which is built, marks time 8, is convenient for
The people watch the scenery of river bank, safeguard that the top of cushion cap 7 is equipped with connecting corner yard 21 to flower pond 25 convenient for landscaping personnel,
Fixed steel joist, the left and right sides of connecting corner yard 21 are mounted on lateral steel joist 19, flat for 7 water detection of cushion cap, are convenient for decoration panel
24 laying, lateral steel joist 19 are hinged and connected with connecting corner yard 21, and the inside of connecting corner yard 21 is equipped with vertical steel joist 20,
It is easily installed rough ground 22, vertical steel joist 20 is connected by connecting corner yard 21 with cushion cap 7, and the top of vertical steel joist 20 is hinged
There is fixed corner code 23, rough ground 22 is installed, fixed corner code 23 is hinged and connected with vertical steel joist 20, the inside peace of fixed corner code 23
Equipped with rough ground 22, the decoration panel 24 at fixed top provides support for decoration panel 24, and the top of rough ground 22 is equipped with decoration panel
24, decoration panel 24 is anticorrosive wood, keeps people more comfortable when walking, and the inside of decoration panel 24 is equipped with groove 29, and installation is internal
Block 32, the top of lateral steel joist 19 is equipped with sole piece 31, is connected with each other by screw thread and bail 30, decoration panel 24 is consolidated
Fixed, the inside of groove 29 is equipped with block 32, and fixed compressed spring 33 limits the displacement of compressed spring 33, the inside of block 32
Compressed spring 33 is installed, the coefficient of elasticity of compressed spring 33 is between 1-10N/CM, under the action of jacking block 34, drives compression
Spring 33 is inwardly compressed, and compressed spring 33 applies reaction force to jacking block 34, and bail 30 is held out against fixation, the end of compressed spring 33
Portion is equipped with jacking block 34, and under the action of compressed spring 33, bail 30 is fixed, and the inside of sole piece 31 is equipped with bail 30, right
The junction of two pieces of decoration panels 24 is fixed, and bail 30 is threadedly coupled with sole piece 31, and bail 30 and 24 activity of decoration panel are clamped,
Decoration panel 24 is connected by bail 30 with sole piece 31, and decoration panel 24 is connected by screw with rough ground 22, the top of decoration panel 24
Hua Chi 25 is installed, surrounding enviroment are beautified, the inside of Hua Chi 25 is equipped with drainpipe 26, in order to avoid rainwater is accumulated, reduces plant
Survival rate, the top of rough ground 22 are equipped with railing 28, promote security performance, the top of railing 28 is equipped with handrail 27, to row
People stops, in case pedestrian is overboard.
A kind of hydraulic engineering afforestation earth-retaining wall, the hydraulic engineering afforestation earth-retaining wall by slight slope 1, wall 2, ground beam 3, girder 4,
Auxiliary girder 5, crossbeam 6, cushion cap 7,8, transverse slat 9 of marking time, fixed plate 10, the first inclined plate 11, riser 12, the second inclined plate 13, supporting plate 14,
One supporting leg 15, the second supporting leg 16, hook-type reinforcing bar 17, set square 18, lateral steel joist 19, vertical steel joist 20, connecting corner yard 21
With the equal components composition of rough ground 22, the main fit dimension of reply components, especially interference fit size and phase before assembling
Closing precision is checked, Same Part with more than one piece screw (bolt) fasten when, each screw (bolt) need intersect, symmetrically, gradually,
It is even to tighten, it when construction, is slotted in the left side of original slight slope using hook machine, reinforcing bar binding is carried out by construction worker, by building template
It is fixed, concreting is carried out to building template, successively wall 2, ground beam 3, girder 4, auxiliary girder 5, crossbeam 6 and cushion cap 7 are carried out
Cast in situs need to use vibrating spear to vibrate the inside of building template when pouring, in case pouring has in rear concrete structure
Cavity, influences service life, after the completion of main body frame, using hook-type reinforcing bar 17 by first leg 15 and second on ground beam 3
Leg 16 is symmetrically fixed on ground beam 3, and transverse slat 9 is fixed in first leg 15 and the second supporting leg 16, fixed plate 10 is welded on
On transverse slat 9, push plate 14 is supported, carry out marking time on supporting plate 14 8 masonry, after the completion of 8 masonry of marking time, in cushion cap 7
Top carries out the laying of facing, first installs horizontal, vertical keel and carries out levelling, uses 21 pairs of connecting corner yard lateral steel joists 19 and perpendicular
It is fixed to steel joist 20, rough ground 22 is installed on lateral steel joist 19 and is fixed rough ground 22 using fixed corner code 23
On lateral steel joist 19, flower pond 25 is fixed on decoration panel 24 and by drainpipe by the mounting decoration panel 24 on rough ground 22
26 it is hidden be mounted below decoration panel 24, complete the construction working of the hydraulic engineering afforestation earth-retaining wall.
In the description of the present invention, it should be understood that term " coaxial ", " bottom ", " one end ", " top ",
The orientation or position of the instructions such as " middle part ", " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends "
Setting relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, and
It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore
It should not be understood as limiting the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ",
The terms such as " fixation ", " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or at one
Body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, can also indirectly connected through an intermediary, it can
To be the interaction relationship of connection or two elements inside two elements, unless otherwise restricted clearly, for this field
Those of ordinary skill for, can understand the concrete meaning of above-mentioned term in the present invention as the case may be.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of hydraulic engineering afforestation earth-retaining wall, including slight slope (1), it is characterised in that: poured wall on the left of the slight slope (1)
Body (2), the wall (2) are connected with ground, and the left bottom of the wall (2) has poured ground beam (3), the ground beam (3) with
Ground is connected, and the ground beam (3) is connected by reinforcing bar with wall (2), has been poured girder (4) at the top of the ground beam (3), described
Girder (4) is connected by reinforcing bar with ground beam (3), has been poured auxiliary girder (5) on the right side of the girder (4), the auxiliary girder (5) passes through steel
Muscle is connected with ground beam (3), has poured crossbeam (6) at the top of the girder (4), the crossbeam (6) by reinforcing bar successively with auxiliary girder
(5) it is connected with wall (2), is equipped with cushion cap (7) at the top of the wall (2), the cushion cap (7) and wall (2) activity are clamped,
It is evenly distributed with first leg (15) at the top of the ground beam (3), the bottom of the first leg (15) is equipped with hook-type reinforcing bar
(17), the first leg (15) is connected by hook-type reinforcing bar (17) with ground beam (3), the left and right sides of the first leg (15)
It being mounted on the second supporting leg (16), second supporting leg (16) is connected by hook-type reinforcing bar (17) with ground beam (3), and described first
It is equipped with transverse slat (9) at the top of leg (15) and the second supporting leg (16), the transverse slat (9) and first leg (15) and the second supporting leg
(16) it is weldingly connected, is equipped with fixed plate (10) in the middle part of the transverse slat (9), the middle part of the fixed plate (10) and transverse slat (9)
It is weldingly connected, the outer left side of the fixed plate (10) is welded with the second inclined plate (13), the external right side of the fixed plate (10)
It is welded with the first inclined plate (11), first inclined plate (11) is weldingly connected by reinforcing bar with wall (2), the fixed plate (10)
Middle part is welded with riser (12), and the riser (12) is weldingly connected by reinforcing bar with girder (4), the left end peace of the transverse slat (9)
Equipped with supporting plate (14), the left side of the supporting plate (14), which is built, marks time (8), is equipped with connecting corner yard at the top of the cushion cap (7)
(21), it is mounted on lateral steel joist (19) at left and right sides of the connecting corner yard (21), the transverse direction steel joist (19) and company
It connects corner brace (21) to be hinged and connected, the inside of the connecting corner yard (21) is equipped with vertical steel joist (20), the vertical steel joist
(20) it is connected by connecting corner yard (21) with cushion cap (7), is hinged with fixed corner code (23) at the top of the vertical steel joist (20),
The fixed corner code (23) is hinged and connected with vertical steel joist (20), and the inside of the fixed corner code (23) is equipped with rough ground
(22), it is equipped with decoration panel (24) at the top of the rough ground (22), the decoration panel (24) passes through screw and rough ground (22)
It is connected, is equipped with Hua Chi (25) at the top of the decoration panel (24), railing (28) are installed at the top of the rough ground (22).
2. a kind of hydraulic engineering afforestation earth-retaining wall according to claim 1, it is characterised in that: the decoration panel (24) it is interior
Portion is equipped with groove (29), is equipped with sole piece (31) at the top of the transverse direction steel joist (19), the inside installation of the groove (29)
Have block (32), the inside of the block (32) is equipped with compressed spring (33), and the end of the compressed spring (33) is equipped with
The inside of jacking block (34), the sole piece (31) is equipped with bail (30), and the bail (30) is threadedly coupled with sole piece (31), described
Bail (30) and decoration panel (24) activity are clamped, and the decoration panel (24) is connected by bail (30) with sole piece (31).
3. a kind of hydraulic engineering afforestation earth-retaining wall according to claim 1, it is characterised in that: the first leg (15)
The left and right sides is mounted on set square (18), and the set square (18) is weldingly connected with first leg (15).
4. a kind of hydraulic engineering afforestation earth-retaining wall according to claim 1, it is characterised in that: the top of the railing (28)
Handrail (27) are installed.
5. a kind of hydraulic engineering afforestation earth-retaining wall according to claim 1, it is characterised in that: the inside of the colored pond (25)
Drainpipe (26) are installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820939424.8U CN208934001U (en) | 2018-06-19 | 2018-06-19 | A kind of hydraulic engineering afforestation earth-retaining wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820939424.8U CN208934001U (en) | 2018-06-19 | 2018-06-19 | A kind of hydraulic engineering afforestation earth-retaining wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208934001U true CN208934001U (en) | 2019-06-04 |
Family
ID=66715196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820939424.8U Expired - Fee Related CN208934001U (en) | 2018-06-19 | 2018-06-19 | A kind of hydraulic engineering afforestation earth-retaining wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208934001U (en) |
-
2018
- 2018-06-19 CN CN201820939424.8U patent/CN208934001U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208220164U (en) | Architecture construction security maintenance cantilevered structure | |
CN208472756U (en) | Rim of a cup basis steel column installs verticality and absolute altitude adjuster | |
CN109763604A (en) | A kind of central steel cast steel Special-Shaped Column | |
CN205653902U (en) | Floor entrance to a cave block structure | |
CN203834926U (en) | Formwork erecting structure for bare concrete basement exterior wall | |
CN208934001U (en) | A kind of hydraulic engineering afforestation earth-retaining wall | |
CN214498388U (en) | Assembled overhanging formwork support bent | |
CN206521939U (en) | A kind of overhanging down-stayed scaffold | |
CN100430556C (en) | Combined multi functional steel frame | |
CN107965139A (en) | The plate face drop readily removable combined type of plate difference of height hangs die body system and construction method | |
CN208534069U (en) | The assembled support device of steel bar truss floor support plate composite floor system | |
CN203947769U (en) | Cooling tower bottom ring beam concrete cast-in-situ steel truss form bracing system | |
CN208685789U (en) | Support system for prefabricated balcony | |
CN110259084A (en) | A kind of construction site scaffold | |
CN204059901U (en) | A kind of high-altitude construction operation platform | |
CN216476335U (en) | Inclined frame concrete cylindrical formwork reinforcing system | |
CN104675102A (en) | Scaffold wall-linking element and scaffold construction method | |
CN113958120A (en) | Inclined frame concrete cylindrical formwork reinforcing system | |
CN208329667U (en) | A kind of horizontal hard protection system of integrated form floor edge | |
CN208220153U (en) | A kind of regulatable scaffold for building | |
CN207568153U (en) | Floor concrete casting operation platform is built in a kind of room | |
CN207686323U (en) | Diamond shape installation part and diamond shape mounting operation platform | |
CN207812978U (en) | A kind of heavy grade Sloping roof concreting job platform | |
CN205617763U (en) | Omnipotent support combined bay support element and omnipotent support combined bay | |
CN213927558U (en) | A assembled platform of unloading safely for construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 Termination date: 20200619 |
|
CF01 | Termination of patent right due to non-payment of annual fee |