CN207568153U - Floor concrete casting operation platform is built in a kind of room - Google Patents

Floor concrete casting operation platform is built in a kind of room Download PDF

Info

Publication number
CN207568153U
CN207568153U CN201721647059.5U CN201721647059U CN207568153U CN 207568153 U CN207568153 U CN 207568153U CN 201721647059 U CN201721647059 U CN 201721647059U CN 207568153 U CN207568153 U CN 207568153U
Authority
CN
China
Prior art keywords
trestle
operation platform
built
concrete casting
floor concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721647059.5U
Other languages
Chinese (zh)
Inventor
徐孟陶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721647059.5U priority Critical patent/CN207568153U/en
Application granted granted Critical
Publication of CN207568153U publication Critical patent/CN207568153U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of rooms to build floor concrete casting operation platform,Including supporting rack and pedestal,Trestle is installed at the center of the base upper surface,Described trestle one end offers card slot,The trestle other end is fixedly connected with fixture block,Crossbeam is installed at the top of the trestle,The beam surface upper offers sliding slot,Slide bar is installed with inside the sliding slot,The slide bar outer wall is socketed with sliding block,The sliding block side is fixedly connected with fixed plate,The both ends of the beam surface upper are symmetrically installed with fixed pulley,This room is built floor concrete casting operation platform and is coordinated by sliding block and fixed pulley,Fixed plate can be pulled to be moved on crossbeam by drawstring,It can be with shift position in casting concrete so as to facilitate worker,The assembling of trestle is facilitated by fixture block and card slot cooperation,The height of rack can be changed by the combination of trestle,So as to meet the needs of different constructions.

Description

Floor concrete casting operation platform is built in a kind of room
Technical field
The utility model is related to construction engineering technical field, floor concrete casting operation platform is built in specially a kind of room.
Background technology
When floor concrete casting construction is built in room, operating personnel are existing to trample on the floor bar skeleton bound more, Inevitably cause floor bar framework deformation, displacement, structure reinforcing bars protective layer thickness insufficient, especially two layers of reinforcing bar composition Framework of steel reinforcement upper strata negative reinforcement is caused to sink, during slab surfaces Troweling press finishing operation, operating personnel wears waterproof rubber overshoes more and tramples The operation on the concrete surface just poured can equally cause floor construction reinforcing bar to deform and shift, and the above problem may be made Floor construction appearance quality is built into room, has slackened floor construction load-carrying properties.
1. existing room is built after floor concrete casting operation platform assembles, a position, worker's division can only be fixed on Fu at work, can not shift position, can only vibrate to concrete at one's side, be unfavorable for the needs of site operation in this way.
2. the certain of floor concrete casting operation platform most of height at work is built in existing room, also have a small amount of It is highly adjustable, but these height-adjustable operation platform assemblings are slow, and waste is needed if increasing height for a long time Operation platform could be promoted, this reduces working efficiencies, increase the concreting time, so needing to build existing room Floor concrete casting operation platform is improved.
Utility model content
The purpose of this utility model is to provide a kind of rooms to build floor concrete casting operation platform, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides following technical solution:Floor concrete casting operation is built in a kind of room Rack, including supporting rack and pedestal, support frame as described above includes the first supporting rack and the second supporting rack, first supporting rack and the Two supporting racks respectively include trestle and crossbeam, and trestle, described trestle one end are installed at the center of the base upper surface Card slot is offered, the trestle other end is fixedly connected with fixture block, and the fixture block and the side of card slot joint are plugged with anchor bolt, Crossbeam is installed at the top of the trestle, the beam surface upper offers sliding slot, cunning is installed with inside the sliding slot Bar, the slide bar outer wall are socketed with sliding block, and the sliding block side is fixedly connected with fixed plate, the side of the fixed plate upper surface It offers fixing groove, operation plate, the both ends of the beam surface upper is installed with by fixing bolt inside the fixing groove Fixed pulley symmetrically is installed with, the fixed plate both sides are symmetrically fixedly connected with the drawstring through fixed pulley, and the drawstring is another One end is bonded in fixed plate upper surface.
Preferably, the fixture block coordinates with card slot.
Preferably, the fixed pulley coordinates with sliding block.
Preferably, the trestle side is installed with cat ladder.
Preferably, the base bottom is uniformly installed with 3 universal wheels.
Compared with prior art, the beneficial effects of the utility model are:
1st, the utility model is coordinated by sliding block and fixed pulley, fixed plate can be pulled to be moved on crossbeam by drawstring, Can be with shift position in casting concrete so as to facilitate worker, when in use, assembled operation platform, which is mounted on, to be needed Want the place of casting concrete, people are climbed by cat ladder at the top of supporting rack, are then stood on operation plate, when needing to move During position, worker need to only hold one end of drawstring, and due to the cooperation of sliding block and slide bar, drawstring drives fixed plate to move around fixed pulley Dynamic, so as to which fixed plate drives operation plate movement, until operation plate is moved to the region for needing work, such worker does not need to back and forth Mobile operation platform can change operating position, facilitate work.
2nd, the utility model facilitates the assembling of trestle by fixture block and card slot cooperation, can be changed by the combination of trestle Become the height of rack, so as to meet the needs of different constructions, when needing casting concrete, pedestal is fixedly mounted on workspace On the ground in domain, assembling trestle is then carried out by the cooperation of fixture block and card slot, until trestle highly meets site operation needs, Fixture block is reinforced in card slot by anchor bolt again so that it is convenient to the assembling of operation platform, less assembling operation rack when Between, it improves work efficiency.
Description of the drawings
Fig. 1 is the utility model main view section figure structure schematic representation;
Fig. 2 is the utility model overlooking the structure diagram;
Fig. 3 bows main view sectional view A portions structure diagram for the utility model.
In figure:1- supporting racks;2- pedestals;The first supporting racks of 3-;The second supporting racks of 4-;5- trestles;6- cat ladders;7- fixture blocks; 8- card slots;9- anchor bolts;10- crossbeams;11- sliding slots;12- slide bars;13- sliding blocks;14- fixed plates;15- fixing grooves;16- fixes spiral shell Bolt;17- operation plates;18- fixed pulleys;19- drawstrings;20- universal wheels.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the utility model provides a kind of technical solution:Floor concrete casting operation post is built in a kind of room Frame, including supporting rack 1 and pedestal 2, support frame as described above 1 includes the first supporting rack 3 and the second supporting rack 4, first supporting rack 3 Trestle 5 and crossbeam 10 are respectively included with the second supporting rack 4, trestle 5, institute are installed at the center of 2 upper surface of pedestal It states 5 one end of trestle and offers card slot 8,5 other end of trestle is fixedly connected with fixture block 7, the fixture block 7 and 8 joint of card slot Side be plugged with anchor bolt 9,5 top of trestle is installed with crossbeam 10, and 10 upper surface of crossbeam offers sliding slot 11, Slide bar 12 is installed with inside the sliding slot 11,12 outer wall of slide bar is socketed with sliding block 13, and 13 side of sliding block is fixed It is connected with fixed plate 14, the side of 14 upper surface of fixed plate offers fixing groove 15, by solid inside the fixing groove 15 Determine bolt 16 and be installed with operation plate 17, the both ends of 10 upper surface of crossbeam are symmetrically installed with fixed pulley 18, described 14 both sides of fixed plate are symmetrically fixedly connected with the drawstring 19 through fixed pulley 18, and 19 other end of drawstring is bonded in fixed plate 14 Upper surface.
The fixture block 7 coordinates with card slot 8, card slot 8 is coordinated to use by fixture block 7, facilitates the peace installation and dismantling between trestle 5 It unloads, the fixed pulley 18 coordinates with sliding block 13, coordinates the mobile operation plate 17 easy to use of sliding block 13 by fixed pulley 18, so as to side Worker the phenomenon that construct, 5 side of trestle is installed with cat ladder 6, and worker can pass through the climbing of cat ladder 6 to operation post On frame, 2 bottom of pedestal is uniformly installed with 3 universal wheels 20, and operation post can be easily moved by universal wheel 20 Frame.
Operation principle:When in use, when needing casting concrete, pedestal 2 is fixedly mounted on to the ground of working region On, assembling trestle 5 is then carried out by the cooperation of fixture block 7 and card slot 8, until 5 height of trestle meets site operation needs, then lead to Anchor bolt 99 is crossed to reinforce fixture block 7 in the card slot 8 so that it is convenient to the assembling of operation platform, less assembling operation rack when Between, it improves work efficiency, then assembled operation platform is mounted on to the place for needing casting concrete, people are by climbing Then 6 climbing of ladder stands and casting concrete, when needing shift position, worker is carried out on operation plate 17 to 1 top of supporting rack One end of drawstring 19 need to be only held, due to the cooperation of sliding block 13 and slide bar 12, drawstring 19 drives fixed plate 14 around fixed pulley 18 Mobile, so as to which fixed plate 14 drives operation plate 17 to move, until operation plate 17 is moved to the region for needing work, such worker is not Operating position can be changed by needing to move back and forth operation platform, facilitate work.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any this practical relationship or sequence.Moreover, term " comprising ", "comprising" or its any other variant are intended to Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case of the principle and spirit for not departing from the utility model, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. floor concrete casting operation platform is built in a kind of room, including supporting rack (1) and pedestal (2), it is characterised in that:The branch Support (1) includes the first supporting rack (3) and the second supporting rack (4), and first supporting rack (3) and the second supporting rack (4) are respectively Including trestle (5) and crossbeam (10), trestle (5), the trestle (5) are installed at the center of pedestal (2) upper surface One end offers card slot (8), and trestle (5) other end is fixedly connected with fixture block (7), and the fixture block (7) engages with card slot (8) The side at place is plugged with anchor bolt (9), is installed with crossbeam (10) at the top of the trestle (5), crossbeam (10) upper surface is opened Equipped with sliding slot (11), slide bar (12) is installed with inside the sliding slot (11), slide bar (12) outer wall is socketed with sliding block (13), sliding block (13) side is fixedly connected with fixed plate (14), and the side of fixed plate (14) upper surface offers admittedly Determine slot (15), the fixing groove (15) is internal to be installed with operation plate (17), the crossbeam (10) by fixing bolt (16) The both ends of upper surface are symmetrically installed with fixed pulley (18), and fixed plate (14) both sides are symmetrically fixedly connected with through fixed sliding The drawstring (19) of (18) is taken turns, drawstring (19) other end is bonded in fixed plate (14) upper surface.
2. floor concrete casting operation platform is built in a kind of room according to claim 1, it is characterised in that:The fixture block (7) coordinate with card slot (8).
3. floor concrete casting operation platform is built in a kind of room according to claim 1, it is characterised in that:The fixed pulley (18) coordinate with sliding block (13).
4. floor concrete casting operation platform is built in a kind of room according to claim 1, it is characterised in that:The trestle (5) side is installed with cat ladder (6).
5. floor concrete casting operation platform is built in a kind of room according to claim 1, it is characterised in that:The pedestal (2) bottom is uniformly installed with 3 universal wheels (20).
CN201721647059.5U 2017-12-01 2017-12-01 Floor concrete casting operation platform is built in a kind of room Expired - Fee Related CN207568153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721647059.5U CN207568153U (en) 2017-12-01 2017-12-01 Floor concrete casting operation platform is built in a kind of room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721647059.5U CN207568153U (en) 2017-12-01 2017-12-01 Floor concrete casting operation platform is built in a kind of room

Publications (1)

Publication Number Publication Date
CN207568153U true CN207568153U (en) 2018-07-03

Family

ID=62689207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721647059.5U Expired - Fee Related CN207568153U (en) 2017-12-01 2017-12-01 Floor concrete casting operation platform is built in a kind of room

Country Status (1)

Country Link
CN (1) CN207568153U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644791A (en) * 2019-10-16 2020-01-03 四川齐峰建设工程有限公司 Concrete pouring platform is built in room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644791A (en) * 2019-10-16 2020-01-03 四川齐峰建设工程有限公司 Concrete pouring platform is built in room

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN1028556C (en) Building construction system
CN202390930U (en) Vibration-absorbing and anti-collapsing support of staircase
CN208668817U (en) A kind of light-duty armored concrete formula precast stair
CN108589773A (en) A kind of construction system and form of construction work of piping lane engineering
CN108118620A (en) For the whole self-crawling type integrated platform and its construction method of bridge tower construction
CN210976535U (en) Building external climbing type building construction operation platform
CN207568153U (en) Floor concrete casting operation platform is built in a kind of room
CN204876578U (en) Building construction system
TWI673418B (en) External wall cantilever construction platform and its assembly method
CN204876577U (en) Building construction system
CN210767945U (en) Brick-concrete building with underground added layer
CN209568688U (en) A kind of elevating construction platform
TWM557287U (en) Exterior-wall cantilever type construction platform
CN207847033U (en) A kind of scaffold for building convenient for adjusting
CN105019657A (en) Building construction system
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
JP5532468B1 (en) Formwork support member in the slab
CN109879179A (en) A kind of assembling type steel structure tower crane platform
CN204876579U (en) Building construction system
CN205100543U (en) Novel construction system of commercial mansion
CN212866952U (en) Low-rise floor is protector for concrete placement
CN211143684U (en) A remove scaffold frame for building engineering
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
CN105178602A (en) Building construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

Termination date: 20181201