CN108589773A - A kind of construction system and form of construction work of piping lane engineering - Google Patents

A kind of construction system and form of construction work of piping lane engineering Download PDF

Info

Publication number
CN108589773A
CN108589773A CN201810414155.8A CN201810414155A CN108589773A CN 108589773 A CN108589773 A CN 108589773A CN 201810414155 A CN201810414155 A CN 201810414155A CN 108589773 A CN108589773 A CN 108589773A
Authority
CN
China
Prior art keywords
wall
piping lane
pedestal
plate
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810414155.8A
Other languages
Chinese (zh)
Other versions
CN108589773B (en
Inventor
孙鹏
曾友明
刘元德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN201810414155.8A priority Critical patent/CN108589773B/en
Publication of CN108589773A publication Critical patent/CN108589773A/en
Application granted granted Critical
Publication of CN108589773B publication Critical patent/CN108589773B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention relates to Construction Technology fields, disclose a kind of construction system and form of construction work of piping lane engineering, and construction system includes:Multiple support devices, supporting rack, wall form and top template;Support device can be moved along the length direction of piping lane, and the support device includes pedestal and support plate, and the support plate is connect with the base rotation;Supporting rack is set on the pedestal;Wall form is set to side of the support plate far from the pedestal;Top template is set on support frame as described above;Form of construction work uses construction system as described above.After pouring completion, template can be removed, support device, which is moved to next workshop section, to be continuing with;Supporting wall form and top template is completed by support device, without manually setting up and removing scaffold, template, is reduced the artificial amount of labour, is improved construction efficiency.

Description

A kind of construction system and form of construction work of piping lane engineering
Technical field
The present invention relates to Construction Technology field more particularly to a kind of construction systems and form of construction work of piping lane engineering.
Background technology
For pipe gallery class linear engineering, conventional template system is substantially constructs at twice or three times, i.e. bottom plate After having constructed, then wallboard of constructing, finally constructs and top plate or wallboard and top plate while constructing, each construction section repeats It sets up scaffold, formwork supporting plate, form removal, remove the work such as scaffold, materials hauling, since such linear engineering can not large area Arrange hoisting machinery, all processes are all to complete to realize by manually, this results in of high cost, low construction efficiency, and adopts It can not ensure presentation quality with conventional scattered spelling template.
Therefore, there is an urgent need for a kind of construction systems and form of construction work of piping lane engineering, to solve the above technical problems.
Invention content
It is an object of the present invention to proposing a kind of construction system of piping lane engineering, can wall be installed to mechanization Inside and outside template and top template, reduce the artificial amount of labour, have higher construction efficiency.
For this purpose, the present invention uses following technical scheme:
A kind of construction system of piping lane engineering, including:
Multiple support devices can be moved along the length direction of piping lane, and the support device includes pedestal and support plate, The support plate is connect with the base rotation;Supporting rack is set on the pedestal;Wall form is set to described Side of the support plate far from the pedestal;Top template, is set on support frame as described above.
Wall form is arranged in the support plate of support device, support plate is adjusted to predetermined angle, top template-setup exists On supporting rack, the wall form and top template of wall both sides cooperatively form the die cavity of wall main body and top plate, are pouring wall After the top plate of main body is completed, template is removed from wall and top plate, support device is by wall form and top template movement It to next workshop section, is continuing with, without manually setting up, removing and transport trestle and template, reduces the artificial amount of labour, carry High construction efficiency.
Preferably, the supporting rod between the pedestal and the support plate, the supporting rod are telescopic rod, the supporting rod Angle between the pedestal and the support plate.Supporting rod plays the angle for adjusting support plate and pedestal and the fixed support of support The effect of plate.
Preferably, the bottom of the pedestal is provided with pulley.Pulley can make support device successfully along the length of piping lane It moves in direction.
Preferably, the bottom of the pedestal is additionally provided with elevating mechanism, and the elevating mechanism can drive the pedestal liter Drop.When die-filling, elevating mechanism can make top template be moved upward to preset height, when form removal, can make top template and top Plate is detached from.
Preferably, the construction system of the piping lane engineering further includes angle mould, and the angle mould is connected to wall form and top Between template.Setting angle mould, which is suitable for wall, with top plate is not that right angle is connected but the case where there are a changeover portions.
Another object of the present invention is to propose a kind of form of construction work of piping lane engineering, can wall be installed to mechanization Inside and outside template and top template, reduce artificial use, have higher construction efficiency.
For this purpose, the present invention uses following technical scheme:
A kind of form of construction work of piping lane engineering, includes the following steps:
1) in a workshop section, the wall form on the inside of wall is adjusted to predetermined angle, top template is adjusted to preset height, Wall form on the inside of connection top template and wall;
2) wall form of wall outer side is adjusted to predetermined angle, and by the wall form and wall outer side on the inside of wall Wall form is connected and fixed;
3) roof steel bar is installed, and casting concrete forms wall main body and top plate;
4) by inside and outside wall wall form and top template removed from wall and top plate, and move to next work Section.
Wall form is arranged in the support plate of support device, support plate is adjusted to predetermined angle, top template-setup exists On supporting rack, the wall form and top template of wall both sides cooperatively form the die cavity of wall main body and top plate, are pouring wall After the top plate of main body is completed, template is removed from wall and top plate, support device is by wall form and top template movement It to next workshop section, is continuing with, without manually setting up, removing and transport trestle and template, reduces the artificial amount of labour, carry High construction efficiency.
Preferably, before installing wall form and the top template on the inside of wall, in the bottom mounting base steel of foundation pit The template of muscle, wall reinforcement foundation, built-in fitting, bottom plate and wall basis, and casting concrete forms bottom plate and wall base Plinth.
Preferably, wall main body reinforcing bar is installed not less than after 1.2Mpa in base plate strength.It is not less than in base plate strength It constructs, can be damaged to avoid to bottom plate when 1.2Mpa.
Preferably, step 4) executes after step 3) is completed 48 hours.The wall and top plate poured is after 48 hours The intensity that do not support oneself under the effect of external force can be reached.
Preferably, fog curing system is installed on bottom plate not less than after 1.2Mpa in base plate strength.Fog curing system System can carry out fog curing to bottom plate, wallboard and top plate, prevent from cracking.
Beneficial effects of the present invention are:Wall form is arranged in the support plate of support device, and support plate is adjusted to preset Angle, for top template-setup on supporting rack, the wall form and top template of wall both sides cooperatively form wall main body and top The die cavity of plate removes template after the top plate for pouring wall main body is completed from wall and top plate, and support device is by wall Template and top template are moved to next workshop section, are continuing with, and without manually setting up, removing and transport trestle and template, subtract Lack the artificial amount of labour, improves construction efficiency.
Description of the drawings
Fig. 1 is the structural schematic diagram of the construction system of piping lane engineering provided by the invention;
Fig. 2 is the structural schematic diagram of support device provided by the invention;
Fig. 3 is the partial enlarged view at A in Fig. 1;
Fig. 4 is the partial enlarged view at B in Fig. 1.
In figure:
11, support device;111, pedestal;112, support plate;113, supporting rod;114, mounting plate;115, connecting plate;116、 Dual direction drive mechanism;117, pulley;118, driving mechanism;119, elevating mechanism;
12, supporting rack;121, cross bar;122, montant;13, wall form;14, top template;15, angle mould;16, mould is connected Plate;17, the first stupefied item;18, the second stupefied item;19, mandril;1911, adjustable jack;20, connecting rod;21, Three-section water stop bolt; 22, reinforcing bar is connected;
31, plain concrete layer;32, bottom plate;33, the first built-in fitting;34, the second built-in fitting;35, steel plate for sealing water;36, it leads Rail;37, water pipeline;38, girder steel;39, bracing members;40, bracket.
Specific implementation mode
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill The every other embodiment that personnel are obtained without making creative work, shall fall within the protection scope of the present invention.
As shown in Figures 1 to 4, present embodiment discloses a kind of construction systems of piping lane engineering comprising support device 11, Supporting rack 12, wall form 13, top template 14 and angle mould 15.Support device 11 can be moved along the length direction of piping lane, branch Support arrangement 11 includes pedestal 111 and support plate 112, and support plate 112 is rotatablely connected with pedestal 111.Supporting rack 12 is set to pedestal On 111, wall form 13 is set in support plate 112, and top template 14 is set on supporting rack 12.
Wall form 13 is arranged in the support plate 112 of support device 11, and support plate 112 is adjusted to predetermined angle, top Template 14 is arranged on supporting rack 12, and the wall form 13 and top template 14 of wall both sides cooperatively form wall main body and top plate Die cavity template is removed from wall and top plate after the top plate for pouring wall main body is completed, support device 11 is by wall Template 13 and 14 plate of top die are moved to next workshop section, are continuing with, without manually setting up, removing and transport trestle and mould Plate reduces the artificial amount of labour, improves construction efficiency.
Mounting plate 114 is provided on pedestal 111, mounting plate 114 can horizontally slip along pedestal 111.It is arranged on mounting plate 114 There is connecting plate 115, connecting plate 115 is hinged with mounting plate 114, and support plate 112 is set on connecting plate 115.In formwork, will prop up Fagging 112 is adjusted to predetermined angle, and then mounting plate 114 drives wall form 13 to be moved to close to that side of wall, by wall Template 14 is moved at the side of wall;When form removal, mounting plate 114 drives wall form 14 to that sidesway far from wall It is dynamic, it is allowed to be detached from wall.
Supporting rod 113 and dual direction drive mechanism 116 (preferably bidirectional hydraulic pressure thousand in the present embodiment are provided on pedestal 111 Jin top), supporting rod 113 is telescopic rod, and 113 one end of supporting rod (is preferably cut with scissors with the rotation connection of support plate 112 in the present embodiment Connect), the other end is rotatablely connected with dual direction drive mechanism 116, and dual direction drive mechanism 116 can drive the end of supporting rod 113 left It moves right, when supporting rod 113 is adjusted to appropriate length, the angle between support plate 112 and pedestal 111 carries out coarse adjustment, double The angle that can be finely tuned between support plate 112 and pedestal 111 is moved left and right to driving mechanism 116, supporting rod 113 is also to support plate 112 support fixed functions.
The bottom of pedestal 111 is provided with pulley 117, and the inner side and outer side of wall is both provided with matched with pulley 117 Guide rail 36, pulley 117 are connected with driving mechanism 118 (being preferably motor in the present embodiment), and driving mechanism 118 can be with movable pulley 117 rotations, to keep support device 11 mobile along guide rail 36 (i.e. the length direction of piping lane).Pulley 117 and guide rail 36 are set, it can So that support device 11 is successfully moved along the length direction of piping lane, and while moving, will not deviate.
The bottom of the pedestal 111 of support device 11 on the inside of wall is additionally provided with elevating mechanism 119 (in the present embodiment preferably For hydraulic jack), elevating mechanism 119 can drive support device 11 to lift.When die-filling, elevating mechanism 119 can make top Template 14 is moved upward to preset height, when form removal, top template 14 can be made to be detached from top plate.
It is connected with top plate not instead of right angle on the inside of wall, there are when the case where chamfering of a transition, in wall It is connected with angle mould 15 between side template 13 and top template 14, in the present embodiment preferably, angle mould 15 and the wall on the inside of wall Template 13 is fixedly connected, and is detachably connected with top template 14 and can be rotated that (angle mould 15 and top template 14 are logical therebetween Cross hinge connection together);Can also angle mould 15 be fixedly connected with top template 14, it is removable with the wall form 13 on the inside of wall It unloads connection and (cornea 15 with the wall form 13 on the inside of wall by hinge connection together with) can be rotated therebetween, may be used also With on the inside of angle mould 15 and wall wall form 13 and top template 14 be rotatablely connected (passing through hinge connection).
Supporting rack 19 is that multiple montants 192 and cross bar 191 buckle the scaffold being fixed together by scaffold.Branch The bottom of support 19 is fixed on the pedestal 111 for the support device 11 being set on the inside of wall.
Wall form 13 and top template 14 in the present embodiment are metal form, are connected on the outside of template a plurality of Perpendicular to the first stupefied item 17 of foundation pit length direction setting, it is connected on the first stupefied item 17 a plurality of along the setting of foundation pit length direction The second stupefied item 18, the second stupefied item 18 is fixedly connected in support plate 112.
The present embodiment also discloses a kind of form of construction work of piping lane engineering comprising following steps:
1) smooth to the bottom progress of foundation pit in a workshop section, and be laid with a layer concrete and form plain concrete layer 31.
2) (general maintenance 24 hours is i.e. after the intensity of plain concrete layer 31 reaches and can carry out the construction requirement of next step Can), mounting base reinforcing bar, wall reinforcement foundation, built-in fitting, bottom plate and wall basis template, and casting concrete shape At bottom plate 32 and wall basis the construction of next step is carried out when 32 intensity of bottom plate is not less than 1.2MPa;Built-in fitting includes wall The guide rail 36 of inside install the first required built-in fitting 33, wall outer side guide rail 36 supporting beam connect with bottom plate 32 it is required Second built-in fitting 34 and the steel plate for sealing water 35 that is arranged at wall basis.
3) install wall main body reinforcing bar, while wall main body reinforcing bar is installed or install wall main body reinforcing bar it Afterwards, the guide rail 36 inside and outside wall is installed, the guide rail 36 on the inside of wall, which is directly laid with, to be fixed on the first built-in fitting 33, Bracing members 39 are set in wall outer side, one end of girder steel 38 is fixed on bracing members 39, and the other end is connected to by bracket 40 On two built-in fittings 34;Guide rail 36 on the inside of wall also needs installation fog curing system, fog curing system after installation is complete Bottom plate 32, wall and top plate are conserved by spraying, prevent from cracking.Fog curing system includes being arranged in guide rail 36 1 The water pipeline 37 of side is arranged at intervals with multiple nozzles on pipeline.
4) support device 11 inside and outside wall is moved to the workshop section, by the wall form 13 on the inside of wall adjust to Predetermined angle, and the wall form 13 on the inside of wall is moved at wall inner wall, start the adjustment of elevating mechanism 119 top template 14 and angle mould 15 to preset height.
5) wall form of wall outer side 13 is adjusted to predetermined angle, and the wall form of wall outer side 13 is moved to At wall outer wall, fixation is attached to the wall form 13 inside and outside wall using Three-section water stop bolt 21;Using even Reinforcing bar 22 is connect to be connected and fixed the wall form 13 of two outermost wall outer sides.
6) roof steel bar is installed, and casting concrete forms wall main body and top plate.
7) the wall main body and top plate poured after 48 hours, by the wall form 13 and top die inside and outside wall Plate 14 is removed from wall and top plate, and moves to next workshop section.
While carrying out step 4) construction, it is carried out at the same time step 1), 2) construction and 3) in next workshop section, ensures construction Continuity.
It is cleaned after form removable, and the brushing releasing agent in template, convenient for next form removal.
When the width of foundation pit is larger, polylith top template 14 is needed mutually to be spliced to form the template of top plate, in junction It is provided with connection template 16,16 lower section of connection template is provided with mandril 19, adjustable jack 191 is provided on mandril 19, adjustable Jacking 191 can adjust the height of connection template 16, be allowed to be in sustained height with the top template 14 in support device 11.Phase Two adjacent support devices 11 are fixed together using connecting rod 20, and connecting rod 20 will be in two neighboring support device 11 The cross bar 121 of supporting rack 12 and the pedestal 111 of support device 11 interconnect;It is next support device 11 to be moved to It needs to remove connecting rod 20 before workshop section.The template 14 and when wall form at the top of dismounting, connection template 16 is not removed, and waits pushing up Plate intensity removes connection template 16 and mandril 19 again after reaching 100%.
Wall form 13 is arranged in the support plate 112 of support device 11 in the form of construction work, and support plate 112 is adjusted to Predetermined angle, top template 14 are arranged on supporting rack 12, and the wall form 13 and top template 14 of wall both sides cooperatively form The die cavity of wall main body and top plate removes template after the top plate for pouring wall main body is completed from wall and top plate, props up Wall form 13 and 14 plate of top die are moved to next workshop section by support arrangement 11, are continuing with, wall basis and wall main body Stubble is once connect, reduces the number that wall connects stubble, reduces the usage amount of steel plate for sealing water 35;Without manually setting up, remove and Transport trestle and template reduce the artificial amount of labour, save production cost, improve construction efficiency.
Note that above are only presently preferred embodiments of the present invention and institute's application technology principle.It will be appreciated by those skilled in the art that The present invention is not limited to specific embodiments described here, can carry out for a person skilled in the art it is various it is apparent variation, It readjusts and substitutes without departing from protection scope of the present invention.Therefore, although being carried out to the present invention by above example It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also May include other more equivalent embodiments, and the scope of the present invention is determined by scope of the appended claims.

Claims (10)

1. a kind of construction system of piping lane engineering, which is characterized in that including:
Multiple support devices (11), can move along the length direction of piping lane, and the support device (11) includes pedestal (111) With support plate (112), the support plate (112) is rotatablely connected with the pedestal (111);
Supporting rack (12) is set on the pedestal (111);
Wall form (13) is set to side of the support plate (112) far from the pedestal (111);
Top template (14) is set on support frame as described above (12).
2. the construction system of piping lane engineering according to claim 1, which is characterized in that the pedestal (111) and the branch Supporting rod (113) is connected between fagging (112), the supporting rod (113) is telescopic rod, and the supporting rod (113) can adjust Save the angle between the pedestal (111) and the support plate (112).
3. the construction system of piping lane engineering according to claim 1, which is characterized in that the bottom of the pedestal (111) is set It is equipped with pulley (117).
4. the construction system of piping lane engineering according to claim 1, which is characterized in that the bottom of the pedestal (111) is also It is provided with elevating mechanism (119), the elevating mechanism (119) can drive the pedestal (111) to lift.
5. the construction system of piping lane engineering according to claim 1, which is characterized in that the construction system of the piping lane engineering Further include angle mould (15), the angle mould (15) is connected between wall form (13) and top template (14).
6. a kind of form of construction work of piping lane engineering, which is characterized in that include the following steps:
1) in a workshop section, the wall form (13) on the inside of wall is adjusted to predetermined angle, top template (14) is adjusted to preset Highly, the wall form (13) on the inside of top template (14) and wall is connected;
2) wall form of wall outer side (13) is adjusted to predetermined angle, and will be outside the wall form (13) and wall on the inside of wall The wall form (13) of side is connected and fixed;
3) roof steel bar is installed, and casting concrete forms wall main body and top plate;
4) by inside and outside wall wall form (13) and top template (14) removed from wall and top plate, and move to next Workshop section.
7. the form of construction work of piping lane engineering according to claim 6, which is characterized in that the wall mould on the inside of installation wall Before plate (13) and top template (14), in bottom mounting base reinforcing bar, wall reinforcement foundation, built-in fitting, the bottom plate mould of foundation pit The template of plate and wall basis, and casting concrete forms bottom plate (32) and wall basis.
8. the form of construction work of piping lane engineering according to claim 7, which is characterized in that in bottom plate (32), intensity is not less than After 1.2Mpa, wall main body reinforcing bar is installed.
9. the form of construction work of piping lane engineering according to claim 6, which is characterized in that step 4) is small in step 3) completion 48 When after execute.
10. the form of construction work of piping lane engineering according to claim 7, which is characterized in that in bottom plate (32), intensity is not less than After 1.2Mpa, fog curing system is installed on bottom plate (32).
CN201810414155.8A 2018-05-03 2018-05-03 Construction system and construction method for piping lane engineering Active CN108589773B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810414155.8A CN108589773B (en) 2018-05-03 2018-05-03 Construction system and construction method for piping lane engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810414155.8A CN108589773B (en) 2018-05-03 2018-05-03 Construction system and construction method for piping lane engineering

Publications (2)

Publication Number Publication Date
CN108589773A true CN108589773A (en) 2018-09-28
CN108589773B CN108589773B (en) 2021-03-12

Family

ID=63619602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810414155.8A Active CN108589773B (en) 2018-05-03 2018-05-03 Construction system and construction method for piping lane engineering

Country Status (1)

Country Link
CN (1) CN108589773B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386010A (en) * 2018-12-04 2019-02-26 中铁六局集团有限公司 Tunnel sidewalls support shuttering and tunnel variable section structure side wall jump section construction
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN112726665A (en) * 2020-12-29 2021-04-30 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN113980398A (en) * 2021-11-01 2022-01-28 济南金曰公路工程有限公司 Ethylene propylene diene monomer rubber and method for casting electric power channel in one step by adopting ethylene propylene diene monomer rubber
CN114232555A (en) * 2021-12-30 2022-03-25 中国水利水电第三工程局有限公司 High and large construction structure and method for integrally transferred dock buttress wall

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2733285A1 (en) * 2012-11-20 2014-05-21 Wolfgang Ebner Radio station
CN105133502A (en) * 2015-09-11 2015-12-09 中建七局第二建筑有限公司 Bridge pier stud concrete curing control device
CN205130100U (en) * 2015-11-17 2016-04-06 中国建筑土木建设有限公司 Spraying device for maintaining highway beam body
CN105586830A (en) * 2014-10-19 2016-05-18 杨宴敏 Bridge template support
CN205531313U (en) * 2016-02-04 2016-08-31 李明 Outer wall side form slipform device is construct to underground
CN106141713A (en) * 2016-08-31 2016-11-23 华南理工大学 A kind of vice clamping adjustable-angle support means
CN106431494A (en) * 2016-08-31 2017-02-22 中国冶集团有限公司 Automatic spraying system and method for shear wall curing
CN206110644U (en) * 2016-10-11 2017-04-19 王本猛 A stencil assembly for clear water concrete construction
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method
CN107142960A (en) * 2017-05-16 2017-09-08 中国建筑第六工程局有限公司 A kind of city piping lane construction method
CN206520080U (en) * 2017-02-28 2017-09-26 中国葛洲坝集团第一工程有限公司 A kind of intelligent precast construction curing means
CN206520081U (en) * 2017-03-01 2017-09-26 中国葛洲坝集团第一工程有限公司 A kind of aqueduct moves integrally type curing means
CN206545394U (en) * 2017-03-01 2017-10-10 安徽利凌建筑材料科技有限公司 A kind of aluminum alloy mould plate diagonal brace means for correcting
CN206752507U (en) * 2017-05-10 2017-12-15 天津九为新型材料有限公司 A kind of rear shifting formula mobile formwork for underground pipe gallery external wall construction
CN107524471A (en) * 2017-10-18 2017-12-29 北京建工路桥工程建设有限责任公司 A kind of tunnel end plugging construction method
CN206971270U (en) * 2017-07-25 2018-02-06 中国建筑第八工程局有限公司 Exterior wall formwork system in underground pipe gallery cast-in-place construction
CN207277192U (en) * 2017-09-22 2018-04-27 上海宝冶集团有限公司 Portable overhanging lifting platform for crash barrier template construction

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2733285A1 (en) * 2012-11-20 2014-05-21 Wolfgang Ebner Radio station
CN105586830A (en) * 2014-10-19 2016-05-18 杨宴敏 Bridge template support
CN105133502A (en) * 2015-09-11 2015-12-09 中建七局第二建筑有限公司 Bridge pier stud concrete curing control device
CN205130100U (en) * 2015-11-17 2016-04-06 中国建筑土木建设有限公司 Spraying device for maintaining highway beam body
CN205531313U (en) * 2016-02-04 2016-08-31 李明 Outer wall side form slipform device is construct to underground
CN106141713A (en) * 2016-08-31 2016-11-23 华南理工大学 A kind of vice clamping adjustable-angle support means
CN106431494A (en) * 2016-08-31 2017-02-22 中国冶集团有限公司 Automatic spraying system and method for shear wall curing
CN206110644U (en) * 2016-10-11 2017-04-19 王本猛 A stencil assembly for clear water concrete construction
CN206520080U (en) * 2017-02-28 2017-09-26 中国葛洲坝集团第一工程有限公司 A kind of intelligent precast construction curing means
CN206545394U (en) * 2017-03-01 2017-10-10 安徽利凌建筑材料科技有限公司 A kind of aluminum alloy mould plate diagonal brace means for correcting
CN206520081U (en) * 2017-03-01 2017-09-26 中国葛洲坝集团第一工程有限公司 A kind of aqueduct moves integrally type curing means
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method
CN206752507U (en) * 2017-05-10 2017-12-15 天津九为新型材料有限公司 A kind of rear shifting formula mobile formwork for underground pipe gallery external wall construction
CN107142960A (en) * 2017-05-16 2017-09-08 中国建筑第六工程局有限公司 A kind of city piping lane construction method
CN206971270U (en) * 2017-07-25 2018-02-06 中国建筑第八工程局有限公司 Exterior wall formwork system in underground pipe gallery cast-in-place construction
CN207277192U (en) * 2017-09-22 2018-04-27 上海宝冶集团有限公司 Portable overhanging lifting platform for crash barrier template construction
CN107524471A (en) * 2017-10-18 2017-12-29 北京建工路桥工程建设有限责任公司 A kind of tunnel end plugging construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386010A (en) * 2018-12-04 2019-02-26 中铁六局集团有限公司 Tunnel sidewalls support shuttering and tunnel variable section structure side wall jump section construction
CN110777659A (en) * 2019-10-17 2020-02-11 闫相明 Construction method of box culvert template system
CN112726665A (en) * 2020-12-29 2021-04-30 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN112726665B (en) * 2020-12-29 2023-01-20 海门市帕源路桥建设有限公司 Installation and construction method for bottom plate short wall formwork
CN113980398A (en) * 2021-11-01 2022-01-28 济南金曰公路工程有限公司 Ethylene propylene diene monomer rubber and method for casting electric power channel in one step by adopting ethylene propylene diene monomer rubber
CN114232555A (en) * 2021-12-30 2022-03-25 中国水利水电第三工程局有限公司 High and large construction structure and method for integrally transferred dock buttress wall

Also Published As

Publication number Publication date
CN108589773B (en) 2021-03-12

Similar Documents

Publication Publication Date Title
CN108589773A (en) A kind of construction system and form of construction work of piping lane engineering
CN106812120B (en) Hydraulic self-lifting truss type cantilever heavy arch dam template system
CN105736016B (en) Tunnel double-lining framework of steel reinforcement construction equipment and its application
CN106677211B (en) Early-dismantling assembly type pipe gallery aluminum mould trolley system for integrally casting wall and top plate and construction method thereof
CN113235472B (en) Concrete placement platform truck is contained to apron
CN206680962U (en) Hydraulic self-lifting truss-like cantilever heavy type arch dam template system
CN105909278A (en) Combined automatic control mold rack and use method
US10914083B2 (en) Wall-climbing concrete form lifting system
CN109680930A (en) Early-dismantling support system construction method
CN110682416A (en) Template system for prefabricating comprehensive pipe gallery and construction method thereof
CN212176540U (en) Hydraulic climbing formwork system formwork
US1722038A (en) Form for use in constructing monolithic sewers and the like
CN214993219U (en) Concrete placement platform truck is contained to apron
CN205578009U (en) Two lined steel bones RACK in tunnel equipment of being under construction
CN106836146B (en) Hydraulic self-lifting cantilever heavy arch dam template working platform
CN109356618A (en) A kind of simple integral movable type square type tunnel frame and its construction method
CN112942107A (en) Hydraulic creeping formwork construction process in cable tower construction process
CN110792038B (en) Self-propelled mold hanging tool and method for high-altitude cast-in-place of tie rod arch bridge beam
CN113047607A (en) Automatic adjustable and walking formwork system and operation method thereof
CN109944447B (en) Multi-slope roof concrete pouring method
CN202577952U (en) Hydraulic automatic lifting template of vertical shaft
CN106958233A (en) Hydraulic self-lifting formula cantilever form construction method for pouring Arch Dam Concrete
CN106812121B (en) Mold stripping and closing device for self-climbing cantilever template
CN206667192U (en) Hydraulic self-lifting cantilever heavy template
CN207268080U (en) A kind of Multifunction scaffold template for subway side wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant