CN208685789U - Support system for prefabricated balcony - Google Patents

Support system for prefabricated balcony Download PDF

Info

Publication number
CN208685789U
CN208685789U CN201821144400.XU CN201821144400U CN208685789U CN 208685789 U CN208685789 U CN 208685789U CN 201821144400 U CN201821144400 U CN 201821144400U CN 208685789 U CN208685789 U CN 208685789U
Authority
CN
China
Prior art keywords
support
balcony
board member
brace
upright bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821144400.XU
Other languages
Chinese (zh)
Inventor
何炳泉
高永辉
汤序霖
陈慕贞
陈如理
周哲
谢添佳
林奕鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd filed Critical GUANGZHOU MACHINE FACILITIES CONSTRUCTION GROUP CO Ltd
Priority to CN201821144400.XU priority Critical patent/CN208685789U/en
Application granted granted Critical
Publication of CN208685789U publication Critical patent/CN208685789U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to the technical fields of construction, disclose a kind of support system for prefabricated balcony, supporting frame is put up on lower layer's balcony board member, the connecting pin of brace is fixed on lower layer's floor by swell fixture, brace and supporting frame form triangular support, it can effectively prevent supporting frame and turn up and overhanging component is caused to topple, and, the precast beam connecting with balcony board member to be installed is connected to one end of support beam, one end of balcony board member is overlapped on precast beam, the other end is connected on buttress, the both ends of support beam are kept balance by the pressure of balcony board member and the pressure of precast beam respectively, and then it consolidates and supports balcony board member, guarantee the installation accuracy of prefabricated balcony.

Description

Support system for prefabricated balcony
Technical field
The utility model relates to the technical fields of construction, more particularly to a kind of supporter for prefabricated balcony System.
Background technique
Assembled architecture is the Building technology that country greatly develops at present.Since the appearance of building needs, prefabricated balcony Balcony board member may use sketch plate, i.e. the shape of the balcony board member of the balcony board member and lower layer on upper layer is different, such as Lower layer is the balcony board member of indent, and upper layer is the balcony board member of evagination.
Existing abnormity balcony slab is still using the supporting way of full hall steel pipe scaffold, and special-shaped balcony slab is different from general Logical balcony slab, center of gravity is irregular, and the support system of full hall steel pipe scaffold forms rock-steady structure by multispan in length and breadth, by Power form is indefinite, and there are the danger that overhanging component topples, and the precision that will also result in when prefabricated balcony board member is installed obtains Less than guarantee, facade effect is seriously affected;In addition, the support system of full hall steel pipe scaffold is typically all in length and breadth across ruler Very little quite to need a large amount of steel pipe and fastener, materials'use amount is big, does not meet energy conservation and environmental protection requirement.
Utility model content
The purpose of the utility model is to provide a kind of support systems for prefabricated balcony, can consolidate support balcony board member It prevents overhanging component from toppling, guarantees the installation accuracy of balcony board member.
To solve the above-mentioned problems, the utility model provides a kind of support system for prefabricated balcony, including rectangle Supporting frame and brace, the top of support frame as described above body are equipped with support beam, and the support beam is equipped with buttress;The brace One end and support frame as described above body is hinged so that the brace has the freedom degree rotated around support frame as described above body, the oblique pull The other end of bar is equipped with connecting pin.
Further, support frame as described above body includes the square being formed by connecting by multiple upright bar groups being parallel to each other and more cross bars The top of each upright bar group is arranged in shape frame, the support beam;
Each upright bar group includes two upright bars along rectangular frame width direction arrangement, and the every upright bar is equal Perpendicular with cross bar described in every, the every upright bar is connect with cross bar described in every using sheath buckle type.
Further, the upright bar group is 3 groups, and the distance between adjacent two upright bars are not more than 1000mm.
Further, the top of the upright bar is equipped with jacking.
Further, the bottom of the upright bar is equipped with bracket.
Further, the brace is connect with support frame as described above body using rotary buckle.
The utility model provides a kind of support system for prefabricated balcony, support frame and brace including rectangle, tool The connecting pin of brace is fixed in use, put up supporting frame on lower layer's balcony board member by body by swell fixture On lower layer's floor, brace and supporting frame form triangular support, and brace can be pressurized but also tension, can effectively prevent branch Support rebuilds or renovate into overhanging component in vitro and topples, moreover, the precast beam connecting with balcony board member to be installed is connected to support beam One end, lift balcony board member when, one end of balcony board member is overlapped on precast beam, and the other end is connected on buttress, is held The both ends of joist are kept balance by the pressure of balcony board member and the pressure of precast beam respectively, to prop up by support beam action Support body, which can prop up precast beam but also prop up balcony board member, keeps stress balance, and the load of balcony board member is transmitted through buttress To support beam, then supporting frame is transferred to by support beam and finally reaches lower layer's balcony board member, and then firm supports balcony slab Component guarantees the installation accuracy of prefabricated balcony.
Detailed description of the invention
Fig. 1 is the schematic side view of the support system for prefabricated balcony in the utility model embodiment;
Fig. 2 is the schematic top plan view of the support system for prefabricated balcony in the utility model embodiment;
Fig. 3 is the rectangular frame schematic diagram of the support system in the utility model embodiment;
Fig. 4 is that prefabricated balcony plate lifts flow chart in the embodiment of the present invention.
In figure, 1, supporting frame;2, brace;3, balcony board member;4, lower layer's balcony board member;5, cantilever beam;6, pre- Beam processed;7, prefabricated post;8, lower layer's floor;101, support beam;102, buttress;103, upright bar group;104, cross bar;105, turn buckle Part;106, jacking;107, bracket;201, connecting pin;301, steel tongue and groove;501, bearing plate;502, groove;1031, upright bar.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
In the description of the present invention, it should be understood that term " on ", "lower", "left", "right", "top", "bottom" etc. The orientation or positional relationship of instruction is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model It is described with simplifying, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific orientation structure It makes and operates, therefore should not be understood as limiting the present invention.
In conjunction with shown in Fig. 1~4, a kind of support for prefabricated balcony of the utility model embodiment is schematically showed System, supporting frame 1 and brace 2 including rectangle, the top of supporting frame 1 are equipped with support beam 101, set in support beam 101 There is buttress 102, support beam 101 is generally fashioned iron, and buttress 102 is steel buttress 102, and one end of fashioned iron is arranged in buttress 102, generally It is welded and fixed with support beam 101;One end of brace 2 is flexibly connected with supporting frame 1 so that brace 2 has around supporting frame The freedom degree of 1 rotation, the other end of brace 2 are equipped with connecting pin 201, and in the present embodiment, brace 2 and supporting frame 1 are used Rotary buckle 105 connects, and rotary buckle 105 is generally located on the center of supporting frame 1, and is generally located on supporting frame 1 host node position, host node are the cross bar 104 of supporting frame 1 and the tie point of upright bar 1031.When specifically used, in lower layer Supporting frame 1 is put up on balcony board member 4, and the connecting pin 201 of brace 2 is fixed on lower layer's floor by swell fixture On, the angle of brace 2 is determined according to the center of gravity of balcony board member 3 and setting-out position, brace 2 and the formation of supporting frame 1 Triangular support, brace 2 can be pressurized but also tension, can effectively prevent supporting frame 1 and turns up and overhanging component is caused to topple, and And the precast beam 6 connecting with balcony board member 3 to be installed is connected to one end of support beam 101, when lifting balcony board member 3, One end of balcony board member 3 is overlapped on precast beam 6, and the other end is connected on buttress 102, the both ends of support beam 101 respectively by The pressure of balcony board member 3 and the pressure of precast beam 6 and keep balancing, by the effect of support beam 101 so that supporting frame 1 both Precast beam 6 can be propped up and balcony board member 3 can be propped up and keep stress balance, the load of balcony board member 3 is transferred to through buttress 102 Support beam 101, then supporting frame 1 is transferred to by support beam 101 and finally reaches lower layer's balcony board member 4, and then consolidates and supports Balcony board member 3.
Further, supporting frame 1 includes being formed by connecting by multiple upright bar groups 103 being parallel to each other and Duo Gen cross bar 104 Rectangular frame, the top of each upright bar group 103 is arranged in support beam 101;Each upright bar group 103 includes along rectangular frame width Two upright bars 1031 of direction arrangement, every upright bar 1031 is perpendicular with every cross bar 104, every upright bar 1031 and every cross Bar 104 is connected using sheath buckle type, i.e., directly hitch is welded in upright bar 1031, cross bar 104, which is directly plugged in hitch, to be connected It is fixed, the quantity of lens is greatly reduced, while also saving set-up time and labour, compared to full hall support frame, this reality The supporting frame 1 for applying example offer can also greatly reduce the quantity of upright bar 1031, simplify the arrangement of 3 lower section of balcony board member, be It is additionally arranged construction space below balcony slab, moreover, each upright bar group 103 only includes two arranged along rectangular frame width direction Upright bar 1031, so that the width of entire support system is smaller, for the special-shaped balcony slab of convex recessed setting, support system can also It is supported on lower layer's notch board with firm.Preferably, upright bar group 103 is 3 groups, and the distance between adjacent two upright bars 1031 are not more than 1000mm, the width of entire support system are no more than 2 meters, of length no more than 3 meters, adapt to the branch of most of special-shaped balcony slabs Support, generally, balcony board member 3 are supported on two sides, two sides stress balance using two support systems, and support consolidates.
The top of upright bar 1031 is equipped with jacking 106, and jacking 106 may be implemented to adjust the height of upright bar 1031 and then adjust whole The height of a support system, further, the bottom of upright bar 1031 are equipped with bracket 107, and bracket 107 is used to connect with basis.
In order to which the purpose of this utility model is better achieved, the utility model additionally provides a kind of installation side of prefabricated balcony Prefabricated balcony is mounted on building using the above-mentioned support system for prefabricated balcony by method, and prefabricated balcony includes balcony slab structure Part 3 and two cantilever beams 5, two cantilever beams 5 are mounted on the two sides of balcony board member 3, and branch is removed after being installed for bearing The load of balcony board member 3 after support body system, in the present embodiment, cantilever beam 5 is formed by concreting, and one end is installed with Steel bar end with 7 splice of prefabricated post of building floor for connecting, pre-buried bearing plate 501 in cantilever beam 5, bearing plate 501 Bottom is equipped with reinforcing bar anchor and is used to fix bearing plate 501, prevents bearing plate 501 in concreting shift or falls off, cantilever beam 5 Two sides open up fluted 502 respectively for connect with two adjacent balcony board members 3, groove 502 and the company of bearing plate 501 Logical, the two sides of balcony board member 3 are equipped with the steel tongue and groove 301 inserted with groove 502, through the inserting of steel tongue and groove 301 into groove 502 It is connect with bearing plate 501, after the completion of balcony board member 3 lifts, support system is removed, and the weight of balcony board member 3 just passes to On cantilever beam 5.
Specifically, referring to shown in Fig. 4, the installation method of prefabricated balcony includes the following steps:
Step 1,5 setting-out of balcony board member 3 to be installed and cantilever beam, determines installation site;
Step 2 generally builds two groups, two groups of support systems are used respectively according to setting-out as a result, support system is built at scene In supporting 3 bottom both ends of balcony board member to be installed, two groups of support systems are fixed on to the both ends of lower layer's balcony board member 4, So that 6 lower end of precast beam that the balcony board member 3 to be installed with upper layer is connect is connected in support beam 101, and by brace 2 Connecting pin 201 is connected and fixed with lower layer's floor, is generally fixed using swell fixture;
Step 3 installs the cantilever beam 5 of two sides, and does elevation review to the bearing plate of cantilever beam 5 501, adjusts cantilever beam 5 Position is until meet installation accuracy;
Step 4, cantilever beam 5 and precast beam 6 to two sides do size review, while according to the size of balcony board member 3 Size review is done to balcony board member 3, it is ensured that installation accuracy;
Step 5 lifts balcony board member 3, so that balcony board member 3 is connected on the buttress 102 of support system, specifically It is that the lower end of 3 beam of balcony board member is connected on buttress 102, the steel tongue and groove 301 of 3 two sides of balcony board member is plugged in cantilever beam 5 Groove 502 in so that steel tongue and groove 301 is overlapped on bearing plate 501;
Step 6, the adjustment of prefabricated balcony with check, specifically include the adjustment of cantilever beam 5 and balcony board member 3 and check, By adjusting the height of support system, the i.e. inclination angle of the adjustable balcony board member 3 of jacking 106 at 1031 top of adjusting upright bar Degree, adjustment is so that intermediate balcony board member 3 and three face of outer end face of two sides cantilever beam 5 is smooth, it is ensured that the peace of balcony board member 3 Precision is filled, the fissure of displacement is reduced, is conducive to the decoration of later period balcony slab, improves the alien invasion effect of building.
It further include the center of gravity calculation of balcony board member 3 in step 1, according to the weight of balcony board member 3 in the present embodiment Heart position determines the holding position of support beam 101 and the tilt angle of brace 2, it is ensured that the center of balcony board member 3 is fallen into In support system, so that same group of support system can prop up precast beam 6 but also prop up balcony board member 3.
In the present embodiment, in step 6 including 3 tilt angle of balcony board member adjustment and check and cantilever beam 5 pass in and out The adjustment in face with check, generally, the inclination angle that is inclined outwardly of setting balcony board member 3 is 0~-2 °.Further, above Corresponding size record is all carried out when the review of measurement each time of each step, provides size foundation for adjustment installation, it is ensured that installation Precision.
It should be understood that various information are described in the utility model using term " first ", " second " etc., but these Information should not necessarily be limited by these terms, these terms are only used to for same type of information being distinguished from each other out.For example, not departing from this In the case where utility model range, " first " information can also be referred to as " second " information, and similar, " second " information can also be with Referred to as " first " information.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change It also should be regarded as the protection scope of the utility model into replacement.

Claims (6)

1. a kind of support system for prefabricated balcony, which is characterized in that supporting frame and brace including rectangle, the branch The top of support body is equipped with support beam, and the support beam is equipped with buttress;One end of the brace and support frame as described above body are cut with scissors It connects so that the brace has the freedom degree rotated around support frame as described above body, the other end of the brace is equipped with connecting pin.
2. being used for the support system of prefabricated balcony as described in claim 1, which is characterized in that support frame as described above body includes by more The rectangular frame that a upright bar group being parallel to each other and more cross bars are formed by connecting, the support beam are arranged in each upright bar group Top;
Each upright bar group includes two upright bars along rectangular frame width direction arrangement, and the every upright bar is and often Cross bar described in root is perpendicular, and the every upright bar is connect with cross bar described in every using sheath buckle type.
3. being used for the support system of prefabricated balcony as claimed in claim 2, which is characterized in that the upright bar group is 3 groups, adjacent The distance between two upright bars are not more than 1000mm.
4. being used for the support system of prefabricated balcony as claimed in claim 3, which is characterized in that the top of the upright bar is equipped with top Support.
5. being used for the support system of prefabricated balcony as claimed in claim 3, which is characterized in that the bottom of the upright bar is equipped with support Seat.
6. being used for the support system of prefabricated balcony as described in claim 1, which is characterized in that the brace and the support Frame body is connected using rotary buckle.
CN201821144400.XU 2018-07-18 2018-07-18 Support system for prefabricated balcony Active CN208685789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821144400.XU CN208685789U (en) 2018-07-18 2018-07-18 Support system for prefabricated balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821144400.XU CN208685789U (en) 2018-07-18 2018-07-18 Support system for prefabricated balcony

Publications (1)

Publication Number Publication Date
CN208685789U true CN208685789U (en) 2019-04-02

Family

ID=65880992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821144400.XU Active CN208685789U (en) 2018-07-18 2018-07-18 Support system for prefabricated balcony

Country Status (1)

Country Link
CN (1) CN208685789U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678144A (en) * 2018-07-18 2018-10-19 广州机施建设集团有限公司 Support system and its installation method for prefabricated balcony
CN110230397A (en) * 2019-06-17 2019-09-13 陕西建工第三建设集团有限公司 A kind of construction method of building space dislocation overhanging balcony

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678144A (en) * 2018-07-18 2018-10-19 广州机施建设集团有限公司 Support system and its installation method for prefabricated balcony
CN108678144B (en) * 2018-07-18 2024-04-30 广州机施建设集团有限公司 Support system for prefabricated balcony and installation method thereof
CN110230397A (en) * 2019-06-17 2019-09-13 陕西建工第三建设集团有限公司 A kind of construction method of building space dislocation overhanging balcony
CN110230397B (en) * 2019-06-17 2021-02-05 陕西建工第三建设集团有限公司 Construction method of building space dislocation overhanging terrace

Similar Documents

Publication Publication Date Title
CN109056548B (en) Steel arch construction method
CN106192717B (en) Bridge steel and concrete mixing section and its installation method
CN111794119B (en) Temporary supporting system and hoisting method for basket type steel box tie bar arch
CN208685789U (en) Support system for prefabricated balcony
CN206736864U (en) Hydraulic self-lifting cantilever heavy type arch dam shuttering work platform
CN109680619A (en) A kind of steel truss beam sling Arch Bridge Construction method big suitable for environmental restrictions
CN207998792U (en) A kind of Hanging Basket rack mounting structure
CN109898399A (en) A kind of assembled Landscape Bridge and its assembling method
CN113250073A (en) After-loading method adjusting tool for large-span railway steel truss girder bridge large-tonnage spherical support
CN108678144A (en) Support system and its installation method for prefabricated balcony
CN208718334U (en) A kind of support frame of assembled architecture cantilevered plate
CN106958233B (en) For pouring the hydraulic self-lifting formula cantilever form construction method of Arch Dam Concrete
CN108729640A (en) A kind of supporting rack of assembled architecture cantilevered plate and overhanging method of plate installation
CN103866692A (en) Novel assembling method for bent cap bearing frame
CN110886218B (en) Main cable profile steel anchoring system of large-span suspension bridge and construction method
CN109736179B (en) Assembled construction method for tied arch bridge
CN208586899U (en) A kind of support frame with oblique jacking
CN111576227A (en) Construction method of main arch and auxiliary arch of double-flying-wing arch bridge and lifting appliance used by same
CN109914792A (en) A kind of underground garage beam form board supporting structure and construction method
CN202766974U (en) Bent cap bearing frame without full framing
CN108343162A (en) A kind of mounting structure and installation method of assembling-type precast hybrid beam and stiffened column
CN216040719U (en) Template support cantilever bearing structure
CN108978477A (en) A kind of cast-in-situ box girder shuttering supporting body assembly technology
CN204401462U (en) For the support of pier prestressed cap beam with extra length Construction Supporting System in water
CN212224587U (en) Construction steel platform for super-long overhanging structure of high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant