CN208918294U - The baffle plate assembly that segmentation for concrete pours - Google Patents

The baffle plate assembly that segmentation for concrete pours Download PDF

Info

Publication number
CN208918294U
CN208918294U CN201821201607.6U CN201821201607U CN208918294U CN 208918294 U CN208918294 U CN 208918294U CN 201821201607 U CN201821201607 U CN 201821201607U CN 208918294 U CN208918294 U CN 208918294U
Authority
CN
China
Prior art keywords
concrete
baffle plate
metal plate
plate assembly
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821201607.6U
Other languages
Chinese (zh)
Inventor
高国来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaolong Engineering Co Ltd
Original Assignee
Gaolong Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gaolong Engineering Co Ltd filed Critical Gaolong Engineering Co Ltd
Priority to CN201821201607.6U priority Critical patent/CN208918294U/en
Application granted granted Critical
Publication of CN208918294U publication Critical patent/CN208918294U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of baffle plate assembly that the segmentation for concrete pours, and includes metal plate, mounting base and limiting device, metal plate is for block concrete unit and is formed with protrusion thereon;Mounting base is separably set on metal plate and for planting force transmission element;Limiting device is detachably combined with protrusion, temporarily to maintain the relative position of metal plate and concrete unit;Above-mentioned baffle plate assembly can be used on the mounting base of plant force transmission element in installing on metal plate in advance, not needing arrival construction site can apply, and can also save the troublesome and time such as need to could drilled one by one with drilling machine after concrete unit initial set and plant force transmission element.

Description

The baffle plate assembly that segmentation for concrete pours
Technical field
The utility model is the baffle plate assembly poured for the segmentation of concrete, for surrounding the barricade of all round closure, And filling concrete wherein and is waited into its initial set.
Background technique
Figure 1A to 1H is please referred to, is to become known for the segmentation of concrete to pour the schematic diagram of engineering.
In the laying project of general concrete, it may be intended to be laid with because the area of total construction area is big or design requirement Total construction area of concrete is divided into several sectional areas, and is segmented casting concrete in order.
During the segmentation casting concrete of each sectional area, as shown in Figure 1A, first with a plurality of planks 100 or Wall surface (the non-formula of figure) around the cooperation of plank 100 is around the barricade of all round closure out, then as shown in Figure 1B, concrete 200 is filled It infuses wherein and waits its initial set hardening.As shown in Figure 1 C, the concrete 200 is surrounded in the plank or plank with peripheral wall surface Made of first solidification forming in barricade.Then, as shown in figure iD, all planks 100 are separated from the concrete 200, it is described The side that concrete 200 contacts the plank 100 and hardens is flat surface.Then, as referring to figure 1E, in the concrete The mark of the position mark of half height just prebored hole on 200 sides, for using boring bar tool 300 in described mixed in such as Fig. 1 F Seriatim Drilling goes out hole 220 on 200 sides of solidifying soil, and concentrates viscose glue (not shown) in each hole 220.For another example Fig. 1 G It is shown, transmission rod 230 is inserted in each hole 220 and exposes a segment length, and viscose glue is waited to harden and make the power transmission Bar 230 is fixed in described hole 220, the schematic diagram that the segmentation casting concrete of the sectional area as described in Fig. 1 H is completed.It connects The step of getting off, carrying out the concreting engineering of next section of sectional area, repeat above-mentioned Figure 1A to 1H, and with the coagulation Soil 200 with the transmission rod 230 as barricade wherein while, i.e., next section concrete is close to the concrete 200, the part that the transmission rod 230 exposes is embedded in next section concrete, is used for the concrete where it Stress is transferred to the concrete of other sectional areas, and can avoid concrete in flattening course because by pressure warpage and deformation.
However, the above-mentioned segmentation for becoming known for concrete pours engineering, it is necessary to could be dismantled after waiting 200 initial set of concrete Form the plank 100 of barricade, and appropriate position trace mark 210 and Drilling hole 220 on concrete 200, then one by one in Poured into hole 220 viscose glue and plant transmission rod 230, whole process needs take a substantial amount of time with manually.Also, it is waiting In concrete initial set forming process, plank may be shunk because absorbing moisture, and may influence the water of concrete formation rear surface Pingdu and shape.In addition, plank may because rough surface and it is uneven due to increase contact area between concrete, cause Concrete and plank closely in conjunction with and it is not easy to disassemble, and the concrete generation when separating plank and concrete is be easy to cause to collapse angle The problem of.
Utility model content
One purpose of the utility model is to solve work consuming when the above-mentioned segmentation for becoming known for concrete pours engineering cost The problem of, and improve in known technology because using plank as barricade due to influence concrete formation shape and causing to collapse angle etc. scarce It falls into.
For the above-mentioned purpose and other purposes, the utility model disclose a kind of baffle group that the segmentation for concrete pours Part, includes metal plate, a plurality of mounting bases and limiting device, and the metal plate has opposite and the first flat table Face and second surface, the first surface are used for block concrete unit, are formed with protrusion on the second surface;The peace Dress seat is separably set on the first surface, and the mounting base is for planting force transmission element;The limiting device with it is described Protrusion detachably combines, temporarily to maintain the relative position of the metal plate Yu the concrete unit.
In above-mentioned baffle plate assembly, the metal plate includes the first plate unit and the second plate unit, the first plate list First and described second plate unit has L-type section, forms institute after first plate unit and the second plate unit closing assembling State protrusion.
In above-mentioned baffle plate assembly, first plate unit is respectively provided with corresponding screw hole with second plate unit, with It fixes and fits together for bolt.
In above-mentioned baffle plate assembly, the limiting device includes pedestal, support rod, locating part and fixture, the support rod It is set to the pedestal, the locating part is movably arranged on the support rod and against the support protrusion, described Fixture is for gripping the protrusion and the locating part.
In above-mentioned baffle plate assembly, the limiting device has longitudinally adjusted device and lateral adjuster, described longitudinally adjusted Device includes that first sleeve, adjustment screw and extension rod, the first sleeve are movably sheathed on the support rod and pass through The adjustment screw locking is supported to the support rod, and the extension rod is laterally extended by the first sleeve side, the cross It include that second sleeve and adjustment screw, the second sleeve are movably sheathed on the extension rod and pass through institute to adjuster It states adjustment screw locking and supports the extension rod, the locating part is set in the second sleeve.
In above-mentioned baffle plate assembly, there are a plurality of handling holes on the metal plate, have in the mounting base and correspond to The fixation hole of the handling hole, with by screw by the mounting base in conjunction with the metal plate.
In above-mentioned baffle plate assembly, the mounting base has triangular shape groove, and the force transmission element is rectangular slab.
Whereby, the baffle plate assembly of above-mentioned the utility model embodiment can be used in installing on metal plate slotting in advance The mounting base for setting force transmission element, not needing arrival construction site can apply, and can also save scene need to be after concrete unit initial set The troublesome and time such as it could drill one by one with drilling machine and plant force transmission element.Also, the metal plate of the baffle plate assembly will not Contraction distortion due to water suction, and can avoid damaging in concrete unit not initial set forming because of metal plate deformation, and then keep away Exempt to influence the shape face levelness that the baffle plate assembly is shaped in concrete unit initial set.In addition, the gold of the baffle plate assembly Category plate body surface is smooth and is easier to separate with the concrete unit for having hardened initial set, and can reduce force disassembly baffle plate assembly when institute Cause to collapse the chance at angle.
Detailed description of the invention
Figure 1A to 1H is to become known for the segmentation of concrete to pour the process schematic of engineering.
Fig. 2 is the structural schematic diagram of the baffle plate assembly of the utility model embodiment.
Fig. 3 is the structural schematic diagram of another angle of baffle plate assembly of the utility model embodiment.
Fig. 4 A to 4F is that the process that the baffle plate assembly of the utility model embodiment pours engineering for the segmentation of concrete is shown It is intended to.
Fig. 5 is the structural schematic diagram of another embodiment of metal plate in the baffle plate assembly of the utility model embodiment.
Appended drawing reference
1 baffle plate assembly
2 concrete units
3 force transmission elements
10 metal plates
10 ' metal plates
11 first surfaces
12 second surfaces
13 protrusions
14 handling holes
15 screws
16 first plate units
17 second plate units
18 screw holes
19 bolts
20 mounting bases
21 fixation holes
22 triangular shape grooves
30 limiting devices
31 pedestals
32 support rods
33 locating parts
34 fixtures
35 longitudinally adjusted devices
351 first sleeves
352 adjustment screws
353 extension rods
36 lateral adjusters
361 second sleeves
362 adjustment screws
100 planks
200 concrete
210 marks
220 holes
230 transmission rods
300 boring bar tools
Specific embodiment
To fully understand the purpose of this utility model, feature and effect, now by following specific embodiments, and cooperate institute Attached schema, is described in detail the utility model, illustrates as after:
Segmentation of the baffle plate assembly of the utility model embodiment for concrete pours in engineering, specifically, concrete Laying project in, may be intended to be laid with total construction area of concrete because the area of total construction area is big or design requirement Several sectional areas are divided into, and are segmented casting concrete in order, in the segmentation casting concrete process of each sectional area In, the baffle plate assembly is first passed through around the barricade for going out all round closure, and filling concrete wherein and is waited into its initial set.
First referring to figure 2. and 3, the baffle plate assembly 1 of the utility model embodiment includes metal plate 10, a plurality of installations Seat 20 and limiting device 30, the metal plate 10 have opposite and flat first surface 11 and a second surface 12, and described the One surface is used for block concrete unit 2 (see Fig. 4 D-4F), is formed with protrusion 13 on the second surface 12;The peace Dress seat 20 is separably set on the first surface 11, and the mounting base is for planting force transmission element 3 (see Fig. 4 F);It is described Limiting device 30 is detachably combined with the protrusion 13, temporarily to maintain the metal plate 10 and the concrete unit 2 relative position waits 2 initial set of concrete unit and sizing, while is embedded to the mounting base 20 and being fixed on described In concrete unit 2.
In this present embodiment, the limiting device 30 includes pedestal 31, support rod 32, locating part 33 and fixture 34, described Support rod 32 is set to the pedestal 31, and the locating part 33 is movably arranged on the support rod 32 and against support institute Protrusion 13 is stated, wherein the locating part 33 can be plate body, position can be adjusted relative to the pedestal 31 movement, so that described Locating part 33 is corresponding to the position of the protrusion 13, and the fixture 34 is for gripping the protrusion 13 and the limit Position part 33, the fixture 34 can but be not limited to clamp.
Furthermore, the limiting device 30 can have longitudinally adjusted device 35 and lateral adjuster 36, longitudinal tune Whole device 35 includes that first sleeve 351, adjustment screw 352 and extension rod 353, the first sleeve 351 are movably sheathed on institute It states on support rod 32 and is locked by the adjustment screw 352 and supported to the support rod 32, the extension rod 353 is by described the One sleeve, 351 side is laterally extended, and the lateral adjuster 36 is comprising second sleeve 361 and adjusts screw 362, and described second set Cylinder 361 is movably sheathed on the extension rod 353 and supports the extension rod by the adjustment screw 362 locking 353, the locating part 33 is set in the second sleeve 361, and whereby, the position of the locating part 33 can pass through the longitudinal direction Adjuster 35 and the lateral adjuster 36 adjust, and so that the locating part 33 is supported the contact protrusion 13.
Accordingly, the longitudinally adjusted device 35 can longitudinally be moved by the first sleeve 351 on the support rod 32, When the height and position of the locating part 33 corresponds to the protrusion 13, locks the adjustment screw 352 and support its locking The support rod 32 is pushed up, and then secures the above the height of longitudinally adjusted device 35 and lateral adjuster 36 and locating part 33 thereon Position, then, the lateral adjuster 36 can laterally be moved by the second sleeve 361 on the extension rod 353, when When the locating part 33 can support the contact protrusion 13, locks the adjustment screw 362 and its locking is made to support described prolong Boom 353 positions the locating part 33 in the second sleeve 361 in turn.
In this present embodiment, there are a plurality of handling holes 14 on the metal plate 10, have in the mounting base 20 pair The fixation hole 21 of the handling hole 14 is answered, the mounting base to be combined with the metal plate 10 by screw 15, the peace Dress seat 20 is fixed on the first surface 11 of the metal plate 10 with constant spacing arrangement.
The mounting base 20 of the present embodiment has triangular shape groove 22, and the force transmission element 3 is rectangular slab, and the force transmission element 3 is used In the triangular shape groove 22 for being inserted in the mounting base 20 and expose half except the concrete unit 2.The biography The part that power part 3 exposes concrete unit 2 will be embedded in the concrete unit that next section pours, and the force transmission element 3 is used for The stress of concrete unit where it is transferred to other concrete units, to avoid concrete unit in flattening course because By pressure warpage and deformation.
A to 4F referring to figure 4., for the process for pouring engineering in concrete segmentation using the baffle plate assembly 1 of the present embodiment Schematic diagram.
It is described depending on length of the length and height of the metal plate 10 according to the concrete being laid in engineering The length of metal plate 10 is greater than or equal to the length or width of corresponding concrete, and the height of the metal plate 10 is substantially It is two times or more of the height of the concrete.
As shown in Figure 4 A, the mounting base 20 can be installed in advance on the first surface 11 of the metal plate 10, Each mounting base 20 is penetrated by the handling hole 14 of the second surface 12 of the metal plate to each mounting base with two screws 15 In 20 fixation hole 21, the mounting base 20 is combined with the metal plate 10.Wherein, the position of the mounting base 20 It sets, depending on quantity and distance each other are according to the length and height of the concrete unit to be laid with.Wherein, the installation Seat 20 is arranged in the metal plate 10 on the center line of half height, i.e., the height and position of the described mounting base 20 is corresponding In the position of the half of height of the concrete unit to be laid with apart from bottom surface.
As shown in Figure 4 B, the ready-portioned zonule for being intended to casting concrete can be to be installed with the mounting base 20 in advance One or more metal plates 10 around go out all round closure barricade, for purposes of illustration only, only showing a baffle group in schema Part, but the barricade of all round closure can from a plurality of baffle plate assemblies with surrounding buildings or the wall surface of other structures institute it is common Around formation.
As shown in Figure 4 C, it is detachably combined by the limiting device 30 with the protrusion, and can temporarily remain every The barricade for all round closure that one metal plate 10 is uprightly surrounded out with holding.
As shown in Figure 4 D, concrete is directed in barricade and forms concrete unit 2, the first of each metal plate 10 Concrete unit 2 described in the block of surface.
It as shown in Figure 4 E, first will locking metal plate 10 and mounting base 20 after the just coalescence forming of concrete unit 2 Screw 15 remove, one or more of metal plates 10 are separated from the concrete unit 2, and make the mounting base 20 indwellings are in the concrete unit 2.
As illustrated in figure 4f, the force transmission element 3 is planted in each mounting base 20, so as to completing pouring for concrete unit 2 Engineering.
Then pouring for next section concrete unit is carried out, step is roughly the same with above-mentioned Fig. 4 A to 4F, and with described Concrete unit 2 have the force transmission element 3 as barricade wherein while, i.e., next section concrete unit is close to described Concrete unit 2, the half of the force transmission element 3 are embedded in next section concrete unit.
In above-mentioned the present embodiment, the metal plate 10 is steel plate, and integrally formed with the protrusion 13.But its is unlimited In this, metal plate 10 ' as shown in Figure 5 may include the first plate unit 16 and the second plate unit 17, first plate unit 16 And second plate unit 17 has L-type section, first plate unit 16 and shape after 17 closing of the second plate unit assembling At the protrusion 13.Wherein, first plate unit 16 is respectively provided with corresponding screw hole 18 with second plate unit 17, with It fixes and fits together for bolt 19.
In conclusion the baffle plate assembly of the utility model embodiment can be used on plant in installing on metal plate in advance The mounting base of force transmission element, not needing arrival construction site can apply, and can also save scene need to be after concrete unit initial set The troublesome and time such as it can drill one by one with drilling machine and plant force transmission element.Also, the metal plate of the baffle plate assembly will not be because It absorbs water and contraction distortion, and can avoid damaging in concrete unit initial set forming because of metal plate deformation, and then avoid Influence the shape face levelness that the baffle plate assembly is shaped in concrete unit initial set.In addition, the metal of the baffle plate assembly Plate body surface is smooth and is easier to separate with the concrete unit for having hardened initial set, and can drop when force dismantles baffle plate assembly and cause to collapse The chance at angle.
The utility model is hereinbefore disclosed with preferred embodiment, but it will be understood by those skilled in the art that described Embodiment is only used for describing the utility model, and is not construed as limitation the scope of the utility model.It should be noted that it is all with The embodiment equivalent variation and displacement, should all be set as being covered by the scope of the utility model.Therefore, the utility model Protection scope, which is worked as, to be subjected to the definition of the claims.

Claims (7)

1. a kind of baffle plate assembly that the segmentation for concrete pours, characterized by comprising:
Metal plate, has opposite and flat first surface and second surface, and the first surface is used for block concrete Unit is formed with protrusion on the second surface;
A plurality of mounting bases are separably set on the first surface, and the mounting base is for planting force transmission element;And
Limiting device is detachably combined with the protrusion, temporarily to maintain the metal plate and the concrete unit Relative position.
2. baffle plate assembly according to claim 1, which is characterized in that the metal plate includes the first plate unit and second Plate unit, first plate unit and second plate unit have L-type section, first plate unit and the second plate list The protrusion is formed after first closing assembling.
3. baffle plate assembly according to claim 2, which is characterized in that first plate unit and second plate unit point Not Ju You corresponding screw hole, fitted together so that bolt is fixed.
4. according to claim 1 to baffle plate assembly described in any claim in 3, which is characterized in that the limiting device packet Containing pedestal, support rod, locating part and fixture, the support rod is set to the pedestal, and the locating part is movably arranged at On the support rod and against the protrusion is supported, the fixture is for gripping the protrusion and the locating part.
5. baffle plate assembly according to claim 4, which is characterized in that the limiting device has longitudinally adjusted device and transverse direction Adjuster, the longitudinally adjusted device include that first sleeve, adjustment screw and extension rod, the first sleeve are movably sheathed on It supports on the support rod and by adjustment screw locking to the support rod, the extension rod is by the first sleeve side Face is laterally extended, and the lateral adjuster includes that second sleeve and adjustment screw, the second sleeve are movably sheathed on institute It states on extension rod and the extension rod is supported by adjustment screw locking, the locating part is set to the second sleeve On.
6. baffle plate assembly according to claim 5, which is characterized in that there are a plurality of handling holes on the metal plate, There is the fixation hole of the corresponding handling hole, to pass through screw for the mounting base and the metal plate knot in the mounting base It closes.
7. baffle plate assembly according to claim 6, which is characterized in that the mounting base has triangular shape groove, the biography Power part is rectangular slab.
CN201821201607.6U 2018-07-27 2018-07-27 The baffle plate assembly that segmentation for concrete pours Active CN208918294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821201607.6U CN208918294U (en) 2018-07-27 2018-07-27 The baffle plate assembly that segmentation for concrete pours

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821201607.6U CN208918294U (en) 2018-07-27 2018-07-27 The baffle plate assembly that segmentation for concrete pours

Publications (1)

Publication Number Publication Date
CN208918294U true CN208918294U (en) 2019-05-31

Family

ID=66701484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821201607.6U Active CN208918294U (en) 2018-07-27 2018-07-27 The baffle plate assembly that segmentation for concrete pours

Country Status (1)

Country Link
CN (1) CN208918294U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031002A (en) * 2020-09-08 2020-12-04 浙江世润建创科技发展有限公司 Pile-supported ecological slope protection and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112031002A (en) * 2020-09-08 2020-12-04 浙江世润建创科技发展有限公司 Pile-supported ecological slope protection and construction method

Similar Documents

Publication Publication Date Title
CA3043511C (en) Load transfer plate pocket and method of employing same
US8756898B1 (en) Apparatus and method for joining adjacent concrete panels
CN108952165B (en) Construction method for prefabricating and embedding row of sleeve pipe assemblies
CN105908977A (en) Joint bar construction structure and method
CN204622272U (en) A kind of adjustable prefabricated waist slab steel mold
CN208918294U (en) The baffle plate assembly that segmentation for concrete pours
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
KR101606439B1 (en) Spacer for fixing between truss girder and deck plate combine
US20060272268A1 (en) Fireproof precast element with securement structure
CN107246145B (en) Concrete floor slab placement equipment and construction method for preserved pipeline hole
CN204570393U (en) A kind of double-block type bed plate limited impression builds servicing unit
CN116378428A (en) Construction method of longitudinal rib superimposed shear wall structure wall
CN113215898B (en) Assembled cement board force transmission component, cement board and preparation and construction methods thereof
CN205857745U (en) Joint bar constructing structure
CN208718360U (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN105221836A (en) Location of pipeline erecting device
KR20120049687A (en) Pipe support for construction
JP7288390B2 (en) Foundation construction method and foundation
KR100953962B1 (en) Floating construction apparatus for boundary stone
CN210629019U (en) Cable preset holding tank for high-rise building
KR101544985B1 (en) Socket type precast concrete panel and paving method using the same
CN220166979U (en) Pipeline pouring fixing device
KR101723440B1 (en) Hydraulic supporter and alignment apparatus for girders of bridge
CN219548376U (en) Side form formwork device
TWM506174U (en) Blocking board component for sectional concreting of concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant