TWM506174U - Blocking board component for sectional concreting of concrete - Google Patents

Blocking board component for sectional concreting of concrete Download PDF

Info

Publication number
TWM506174U
TWM506174U TW104204630U TW104204630U TWM506174U TW M506174 U TWM506174 U TW M506174U TW 104204630 U TW104204630 U TW 104204630U TW 104204630 U TW104204630 U TW 104204630U TW M506174 U TWM506174 U TW M506174U
Authority
TW
Taiwan
Prior art keywords
concrete
baffle assembly
sleeve
metal plate
unit
Prior art date
Application number
TW104204630U
Other languages
Chinese (zh)
Inventor
Guo-Lai Gao
Original Assignee
Kao Long Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kao Long Engineering Co Ltd filed Critical Kao Long Engineering Co Ltd
Priority to TW104204630U priority Critical patent/TWM506174U/en
Publication of TWM506174U publication Critical patent/TWM506174U/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

用於混凝土之分段澆築之擋板組件Baffle assembly for segmental pouring of concrete

本創作用於混凝土之分段澆築之擋板組件,以供圍繞出四周封閉的擋牆,而將混凝土灌注其中並等待其初凝。This creation is used for the baffle assembly of concrete sectioning to surround the surrounding retaining wall and inject concrete into it and wait for its initial setting.

請參照圖1A至1H,其係習知用於混凝土之分段澆築工程的示意圖。Please refer to FIGS. 1A to 1H, which are schematic views of a conventional section casting process for concrete.

一般混凝土的鋪設工程中,係可能因總施工區域之面積大或設計需求,而將欲鋪設混凝土的總施工區域劃分為數個分段區域,並依順序分段澆築混凝土。In the general concrete laying process, the total construction area of the concrete to be laid may be divided into several section areas due to the large area of the total construction area or design requirements, and the concrete is poured in stages.

在各個分段區域的分段澆築混凝土過程中,如圖1A所示,係先利用複數個木板100或木板100配合周圍的壁面(圖未式)圍繞出四周封閉的擋牆,再如圖1B所示,將混凝土200灌注其中並等待其初凝硬化。如圖1C所示,該混凝土200係於該等木板或木板與周圍壁面圍繞而成的擋牆中初凝成型。接著,如圖1D所示,將所有木板100自該混凝土200上分離,該混凝土200接觸該木板100而硬化的側面係為平坦之表面。然後,如圖1E所示,在該混凝土200側面上一半高度的位置標記初預鑽孔的記號,以供如圖1F中藉由鑽孔工具300於該混凝土200側面上逐一地鑽鑿出孔洞220,並於每一孔洞220中貫注黏膠(圖未示)。再如圖1G所示,將傳力桿230插置於每一孔洞220中且露出一段長度,並等待黏膠硬化而使該等傳力桿230固定於該等孔洞220中,如圖1H中係該分段區域之分段澆 築混凝土完成的示意圖。接下來,係進行下一段分段區域之混凝土澆築工程,其係重複上述圖1A至1H的步驟,並以該混凝土200具有該等傳力桿230之一面作為擋牆的其中一面,即下一段混凝土係緊鄰該混凝土200,該等傳力桿230露出的部分係被埋設於下一段混凝土當中,其係用於將其所在之混凝土的受力傳遞至其他分段區域之混凝土,而可避免混凝土在整平過程中因受壓力翹曲及變形。In the process of section pouring concrete in each segment area, as shown in FIG. 1A, a plurality of wood boards 100 or wood boards 100 are used together with the surrounding wall surface (not shown) to surround the surrounding closed wall, and then as shown in FIG. 1B. As shown, the concrete 200 is poured therein and waits for its initial setting to harden. As shown in Fig. 1C, the concrete 200 is initially formed in a retaining wall surrounded by the wooden boards or wood boards and surrounding walls. Next, as shown in FIG. 1D, all of the boards 100 are separated from the concrete 200, and the side of the concrete 200 that is in contact with the board 100 is a flat surface. Then, as shown in FIG. 1E, the initial pre-drilled marks are marked at a position half the height on the side of the concrete 200 for drilling holes one by one on the side of the concrete 200 by the drilling tool 300 as shown in FIG. 1F. 220, and a glue is injected into each hole 220 (not shown). As shown in FIG. 1G, the force transmitting rod 230 is inserted into each of the holes 220 and exposed for a length, and waits for the adhesive to harden to fix the force transmitting rods 230 in the holes 220, as shown in FIG. 1H. Segmenting the segmented area Schematic diagram of the completion of concrete construction. Next, the concrete pouring project of the next section is performed, which repeats the steps of the above-mentioned FIGS. 1A to 1H, and the concrete 200 has one side of the force-transmitting rod 230 as one side of the retaining wall, that is, the next section The concrete system is adjacent to the concrete 200, and the exposed portions of the force transmission rods 230 are embedded in the next section of concrete, which is used to transfer the force of the concrete in which it is placed to the concrete of other segmented areas, and avoid concrete. Warped and deformed by pressure during the leveling process.

然而,上述習知用於混凝土之分段澆築工程,係必須等待混凝土200初凝後才能拆卸形成擋牆的木板100,並在混凝土200上適當位置處標註記號210及鑽鑿孔洞220,再逐一於孔洞220中灌入黏膠及插置傳力桿230,整個過程需要耗費大量的時間與人工。並且,在等待混凝土初凝成型過程中,木板可能因吸收水分而收縮,而可能影響混凝土成型後表面的水平度及形狀。另外,木板係可能因表面粗糙及凹凸不平而增加與混凝土之間的接觸面積,導致混凝土與木板緊密地結合而不易拆卸,而容易造成在分離木板與混凝土時混凝土產生崩角的問題。However, the above-mentioned conventional sectional casting process for concrete is required to wait for the concrete 200 to be initially set before disassembling the wooden board 100 forming the retaining wall, and mark the symbol 210 and the drilling hole 220 at appropriate positions on the concrete 200, and then one by one. Filling the hole 220 with the glue and inserting the force bar 230 requires a lot of time and labor. Moreover, while waiting for the initial setting of the concrete, the wood board may shrink due to moisture absorption, which may affect the level and shape of the surface after the concrete is formed. In addition, the wood board may increase the contact area with the concrete due to the rough surface and unevenness, resulting in the concrete being tightly coupled with the wood board without being easily disassembled, and easily causing the problem of the concrete falling apart when separating the wood board and the concrete.

本創作之一目的在於解決上述習知用於混凝土之分段澆築工程費時耗工的問題,並且改善習知技術中因採用木板作為擋牆而影響混凝土成型形狀及導致崩角等缺失。One of the aims of the present invention is to solve the problem of the above-mentioned conventional time-consuming labor for the concrete sectioning of concrete, and to improve the conventional technique in which the use of wood as a retaining wall affects the shape of the concrete and causes a collapse or the like.

為達上述目的及其他目的,本創作係揭露一種用於混凝土之分段澆築之擋板組件,包含一金屬板體、複數個安裝座及一限位裝置,該金屬板體,其係具有相對且平坦之一第一表面與一第二表面,該第一表面係用於擋止一混凝土單元,該第二表面上係形成有一凸出部;該等安裝座係可分離地設置於該 第一表面上,各該安裝座係用於插置一傳力件;該限位裝置係與該凸出部可拆地結合,以暫時地維持該金屬板體與該混凝土單元的相對位置。For the above purposes and other purposes, the present invention discloses a baffle assembly for segmental pouring of concrete, comprising a metal plate body, a plurality of mounting seats and a limiting device, the metal plate body having a relative And flattening one of the first surface and the second surface, the first surface is for blocking a concrete unit, and the second surface is formed with a protrusion; the mounting base is detachably disposed on the On the first surface, each of the mounting seats is configured to insert a force transmitting member; the limiting device is detachably coupled to the protruding portion to temporarily maintain the relative position of the metal plate body and the concrete unit.

上述之擋板組件中,該金屬板體係包含一第一板單元及一第二板單元,該第一板單元及該第二板單元係具有L型截面,該第一板單元與該第二板單元靠合組裝後係形成該凸出部。In the above baffle assembly, the metal plate system comprises a first plate unit and a second plate unit, the first plate unit and the second plate unit having an L-shaped cross section, the first plate unit and the second plate unit The protruding portion is formed after the plate unit is assembled and assembled.

上述之擋板組件中,該第一板單元與該第二板單元係分別具有對應之螺孔,以供螺栓固定而組裝在一起。In the above baffle assembly, the first plate unit and the second plate unit respectively have corresponding screw holes for bolting and assembling.

上述之擋板組件中,該限位裝置係包含一基座、一支撐桿、一限位件及一夾具,該支撐桿係設置於該基座,該限位件係可移動地設置於該支撐桿上並抵靠支撐該凸出部,該夾具係用於夾持固定該凸出部與該限位件。In the above baffle assembly, the limiting device comprises a base, a support rod, a limiting member and a clamp, the support rod is disposed on the base, and the limiting member is movably disposed on the The protrusion is supported on the support rod and the clamp is used for clamping and fixing the protrusion and the limiting member.

上述之擋板組件中,該限位裝置係具有一縱向調整器及一橫向調整器,該縱向調整器係包含一第一套筒、一調整螺絲及一延伸桿,該第一套筒係可移動地套設於該支撐桿上並藉由該調整螺絲鎖固抵頂至該支撐桿,該延伸桿係由該第一套筒側面橫向延伸,該橫向調整器係包含一第二套筒及一調整螺絲,該第二套筒係可移動地套設於該延伸桿上並藉由該調整螺絲鎖固抵頂該延伸桿,該限位件係設置於該第二套筒上。In the above baffle assembly, the limiting device has a longitudinal adjuster and a lateral adjuster, the longitudinal adjuster includes a first sleeve, an adjusting screw and an extension rod, and the first sleeve can be Movingly sleeved on the support rod and locked to the support rod by the adjusting screw, the extension rod extends laterally from the side of the first sleeve, and the lateral adjuster comprises a second sleeve and An adjusting screw is movably sleeved on the extension rod and locked against the extension rod by the adjusting screw, and the limiting member is disposed on the second sleeve.

上述之擋板組件中,該金屬板體上係具有複數個裝卸孔,各該安裝座上係具有對應各該裝卸孔之固定孔,以藉由螺絲將各該安裝座與該金屬板體結合。In the baffle assembly, the metal plate body has a plurality of loading and unloading holes, and each of the mounting bases has a fixing hole corresponding to each of the loading and unloading holes to combine the mounting seats with the metal plate body by screws. .

上述之擋板組件中,各該安裝座係具有一三角狀凹槽,該傳力件係為一矩形板。In the above baffle assembly, each of the mounting bases has a triangular groove, and the force transmitting member is a rectangular plate.

藉此,上述之本創作實施例之擋板組件係可預先地於金屬板體上裝設好用於插置傳力件的安裝座,不需要抵達施工現場即能施作,還可節省現場需待混凝土單元初凝後才能以鑽孔機逐一鑽孔及插置傳力件等麻煩與時間。並且,該擋板組件之金屬板體不會因吸水而收縮變形,而可避免在混凝土單元未初凝成形時因金屬板體變形而損壞,進而避免影響該擋板組件在混凝土單元初凝成形之形狀表面水平度。此外,該擋板組件之金屬板體係表面光滑而較易與已硬化初凝之混凝土單元分離,且可降低施力拆卸擋板組件時所造成崩角的機會。Therefore, the baffle assembly of the above-mentioned embodiment of the present invention can be pre-installed on the metal plate body for mounting the force transmitting member, and can be applied without reaching the construction site, thereby saving the site. It is necessary to wait for the concrete unit to be condensed before drilling and inserting the force transmitting parts one by one with the drilling machine. Moreover, the metal plate body of the baffle assembly does not shrink and deform due to water absorption, and can avoid damage caused by deformation of the metal plate body when the concrete unit is not initially formed, thereby avoiding affecting the initial setting of the baffle assembly in the concrete unit. The shape of the surface level. In addition, the metal plate system of the baffle assembly has a smooth surface and is relatively easy to separate from the hardened initial concrete unit, and can reduce the chance of disintegration caused by the force-removing baffle assembly.

1‧‧‧擋板組件1‧‧‧Baffle assembly

2‧‧‧混凝土單元2‧‧‧Concrete unit

3‧‧‧傳力件3‧‧‧transmitting parts

10‧‧‧金屬板體10‧‧‧Metal plate

11‧‧‧第一表面11‧‧‧ first surface

12‧‧‧第二表面12‧‧‧ second surface

13‧‧‧凸出部13‧‧‧Protruding

14‧‧‧裝卸孔14‧‧‧ loading and unloading holes

15‧‧‧螺絲15‧‧‧ screws

16‧‧‧第一板單元16‧‧‧ first board unit

17‧‧‧第二板單元17‧‧‧ second board unit

18‧‧‧螺孔18‧‧‧ screw holes

19‧‧‧螺栓19‧‧‧ bolts

20‧‧‧安裝座20‧‧‧ Mounting

21‧‧‧固定孔21‧‧‧Fixed holes

22‧‧‧三角狀凹槽22‧‧‧ triangular grooves

30‧‧‧限位裝置30‧‧‧Limiting device

31‧‧‧基座31‧‧‧ Pedestal

32‧‧‧支撐桿32‧‧‧Support rod

33‧‧‧限位件33‧‧‧Limited parts

34‧‧‧夾具34‧‧‧Clamp

35‧‧‧縱向調整器35‧‧‧Vertical adjuster

351‧‧‧第一套筒351‧‧‧First sleeve

352‧‧‧調整螺絲352‧‧‧Adjustment screw

353‧‧‧延伸桿353‧‧‧Extension rod

36‧‧‧橫向調整器36‧‧‧Horizontal adjuster

361‧‧‧第二套筒361‧‧‧Second sleeve

362‧‧‧調整螺絲362‧‧‧Adjustment screw

100‧‧‧木板100‧‧‧ plank

200‧‧‧混凝土200‧‧‧ concrete

210‧‧‧記號210‧‧‧ mark

220‧‧‧孔洞220‧‧‧ hole

230‧‧‧傳力桿230‧‧‧Dust lever

300‧‧‧鑽孔工具300‧‧‧Drilling tools

[圖1A至1H]係為習知用於混凝土之分段澆築工程的過程示意圖。[Figs. 1A to 1H] are schematic views of processes known in the art for segmental pouring of concrete.

[圖2]係本創作實施例之擋板組件的結構示意圖。2 is a schematic structural view of a baffle assembly of the present embodiment.

[圖3]係本創作實施例之擋板組件另一視向之結構示意圖。3 is a schematic structural view of another baffle assembly of the present embodiment.

[圖4A至4F]係為本創作實施例之擋板組件用於混凝土之分段澆築工程的過程示意圖。4A to 4F are schematic views showing the process of the baffle assembly of the present embodiment for the concrete pouring of concrete.

[圖5]係本創作實施例之擋板組件中金屬板體之另一實施態樣的結構示意圖。Fig. 5 is a structural schematic view showing another embodiment of the metal plate body in the baffle assembly of the present embodiment.

為充分瞭解本創作之目的、特徵及功效,茲藉由下述具體之實施例,並配合所附之圖式,對本創作做一詳細說明,說明如後: 本創作實施例之擋板組件係用於混凝土之分段澆築工程中,具體而言,混凝土的鋪設工程中,係可能因總施工區域之面積大或設計需求,而將欲鋪設混凝土的總施工區域劃分為數個分段區域,並依順序分段澆築混凝土,在各個分段區域的分段澆築混凝土過程中,係先藉由所述之擋板組件圍繞出四周封閉的擋牆,而將混凝土灌注其中並等待其初凝。In order to fully understand the purpose, features and effects of this creation, the following specific examples, together with the attached drawings, provide a detailed description of the creation, as explained below: The baffle assembly of the present embodiment is used in the concrete pouring construction of concrete. Specifically, in the concrete laying process, the total construction of the concrete to be laid may be due to the large area of the total construction area or the design requirement. The area is divided into several segmented areas, and the concrete is poured in stages. In the process of step-casting concrete in each segmented area, the concrete is first surrounded by the baffle assembly to surround the surrounding retaining wall. Fill it and wait for its initial setting.

首先請參照圖2及3,本創作實施例之擋板組件1係包含一金屬板體10、複數個安裝座20及限位裝置30,該金屬板體10係具有相對且平坦之一第一表面11與一第二表面12,該第一表面係用於擋止一混凝土單元2(請見圖4D-3F),該第二表面12上係形成有一凸出部13;該等安裝座20係可分離地設置於該第一表面11上,各該安裝座係用於插置一傳力件3(請見圖4B);該限位裝置30係與該凸出部13可拆地結合,以暫時地維持該金屬板體10與該混凝土單元2的相對位置,等待該混凝土單元2初凝及定型,同時使該等安裝座20埋入並固定於該混凝土單元2中。Referring to FIG. 2 and FIG. 3, the baffle assembly 1 of the present embodiment includes a metal plate body 10, a plurality of mounting bases 20, and a limiting device 30. The metal plate body 10 has a relatively flat and first one. a surface 11 and a second surface 12 for blocking a concrete unit 2 (see FIGS. 4D-3F), the second surface 12 is formed with a protrusion 13; the mounting seat 20 Separably disposed on the first surface 11 , each of the mounting seats is configured to insert a force transmitting member 3 (see FIG. 4B ); the limiting device 30 is detachably coupled to the protruding portion 13 To temporarily maintain the relative position of the metal plate body 10 and the concrete unit 2, wait for the concrete unit 2 to be initially set and set, and at the same time, the mounting bases 20 are buried and fixed in the concrete unit 2.

於本實施例中,該限位裝置30係包含一基座31、一支撐桿32、一限位件33及一夾具34,該支撐桿32係設置於該基座31,該限位件33係可移動地設置於該支撐桿32上並抵靠支撐該凸出部13,其中該限位件33係可為板體,其係可相對該基座31移動來調整位置,以使該限位件33對應至該凸出部13之位置,該夾具34係用於夾持固定該凸出部13與該限位件33,該夾具34係可但不限於為一夾鉗。In this embodiment, the limiting device 30 includes a base 31, a support rod 32, a limiting member 33 and a clamp 34. The support rod 32 is disposed on the base 31. The limiting member 33 The support member 32 is movably disposed on the support rod 32 and supports the protrusion portion 13 . The position limiting member 33 can be a plate body that can be moved relative to the base 31 to adjust the position. The positional portion 33 corresponds to the position of the protruding portion 13. The clamp 34 is used for clamping and fixing the protruding portion 13 and the limiting member 33. The clamping member 34 can be, but is not limited to, a clamp.

進一步而言,該限位裝置30係可具有一縱向調整器35及一橫向調整器36,該縱向調整器35係包含一第一套筒351、一調整螺絲352及一延伸桿353,該第一套筒351係可移動地套設於該支撐桿32上並藉由該調整螺絲352鎖固 抵頂至該支撐桿32,該延伸桿353係由該第一套筒351側面橫向延伸,該橫向調整器36係包含一第二套筒361及一調整螺絲362,該第二套筒361係可移動地套設於該延伸桿353上並藉由該調整螺絲362鎖固抵頂該延伸桿353,該限位件33係設置於該第二套筒361上,藉此,該限位件33的位置係可藉由該縱向調整器35及該橫向調整器36來調整,而使該限位件33抵頂接觸該凸出部13。Further, the limiting device 30 can have a longitudinal adjuster 35 and a lateral adjuster 36. The longitudinal adjuster 35 includes a first sleeve 351, an adjusting screw 352 and an extension rod 353. A sleeve 351 is movably sleeved on the support rod 32 and locked by the adjusting screw 352 The extension rod 353 is laterally extended from the side of the first sleeve 351. The lateral adjuster 36 includes a second sleeve 361 and an adjusting screw 362. The second sleeve 361 is attached to the support rod 32. The limiting rod 33 is detachably disposed on the extension rod 353, and the limiting member 33 is disposed on the second sleeve 361. The limiting member is disposed on the second sleeve 361. The position of 33 can be adjusted by the longitudinal adjuster 35 and the lateral adjuster 36, so that the limiting member 33 abuts against the protruding portion 13.

據此,該縱向調整器35係可藉由該第一套筒351於該支撐桿32上縱向地移動,當該限位件33之高度位置對應於該凸出部13時,鎖緊該調整螺絲352而使其鎖固抵頂該支撐桿32,進而固定住該縱向調整器35及其上之橫向調整器35與限位件33的高度位置,接著,該橫向調整器36係可藉由該第二套筒361於該延伸桿353上橫向地移動,當該限位件33可抵頂接觸該凸出部13時,鎖緊該調整螺絲362而使其鎖固抵頂該延伸桿353進而使該第二套筒361上的限位件33定位。Accordingly, the longitudinal adjuster 35 can be longitudinally moved on the support rod 32 by the first sleeve 351. When the height position of the limiting member 33 corresponds to the protruding portion 13, the adjustment is locked. The screw 352 is locked to the top of the support rod 32, thereby fixing the height position of the longitudinal adjuster 35 and the lateral adjuster 35 and the limiting member 33 thereon, and then the lateral adjuster 36 can be The second sleeve 361 is laterally moved on the extension rod 353. When the limiting member 33 can abut against the protruding portion 13, the adjusting screw 362 is locked to lock against the extension rod 353. The positioner 33 on the second sleeve 361 is further positioned.

於本實施例中,該金屬板體10上係具有複數個裝卸孔14,各該安裝座20上係具有對應各該裝卸孔14之固定孔21,以藉由螺絲15將各該安裝座與該金屬板體10結合,該等安裝座20係以固定間距排列固定於該金屬板體10之第一表面11上。In the embodiment, the metal plate body 10 has a plurality of loading and unloading holes 14 , and each of the mounting bases 20 has a fixing hole 21 corresponding to each of the loading and unloading holes 14 to connect the mounting bases with the screws 15 . The metal plate body 10 is coupled, and the mounting seats 20 are fixed to the first surface 11 of the metal plate body 10 at a fixed pitch.

本實施例之安裝座20係具有一三角狀凹槽22,該傳力件3係為一矩形板,各該傳力件3係用於被插置於各該安裝座20之三角狀凹槽22中且露出一半於該混凝土單元2之外。該等傳力件3露出混凝土單元2之部分係將被埋設於下一段澆築之混凝土單元中,該等傳力件3係用於將其所在之混凝土單元的受力傳遞至其他混凝土單元,以避免混凝土單元在整平過程中因受壓力翹曲及變形。The mounting seat 20 of the embodiment has a triangular groove 22, and the force transmitting member 3 is a rectangular plate, and each of the force transmitting members 3 is used for being inserted into the triangular groove of each of the mounting seats 20. 22 is exposed halfway out of the concrete unit 2. The parts of the force transmitting member 3 exposing the concrete unit 2 are to be embedded in the concrete unit of the next stage, and the force transmitting members 3 are used for transmitting the force of the concrete unit in which it is located to other concrete units, Avoid the warpage and deformation of the concrete unit due to pressure during the leveling process.

請參照圖4A至4F,其係為應用本實施例之擋板組件1於混凝土分段澆築工程之過程示意圖。Please refer to FIG. 4A to FIG. 4F , which are schematic diagrams of the process of applying the baffle assembly 1 of the embodiment to the concrete section pouring project.

該金屬板體10之長度與高度係依據工程中所鋪設之混凝土之長、寬、高而定,該金屬板體10之長度係大於或等於對應之混凝土之長度或寬度,而該金屬板體10之高度係大致為該混凝土之高度的二倍以上。The length and height of the metal plate body 10 are determined according to the length, width and height of the concrete laid in the project, and the length of the metal plate body 10 is greater than or equal to the length or width of the corresponding concrete, and the metal plate body The height of 10 is roughly twice the height of the concrete.

如圖4A所示,該等安裝座20係可預先地被裝設於該金屬板體10之第一表面11上,每一安裝座20係以二個螺絲15由該金屬板體之第二表面12的裝卸孔14穿入至每一安裝座20之固定孔21中,以將該等安裝座20與該金屬板體10相結合。其中,該等安裝座20之位置、數量及彼此之間的距離係依據所遇鋪設之混凝土單元的長度與高度而定。其中,該等安裝座20係排列設置在該金屬板體10於一半高度之中心線上,即該等安裝座20之高度位置係對應於所欲鋪設之混凝土單元距離底面之高度的一半的位置。As shown in FIG. 4A, the mounting bases 20 are pre-installed on the first surface 11 of the metal plate body 10. Each mounting base 20 is provided with two screws 15 from the second metal plate body. The loading and unloading holes 14 of the surface 12 are inserted into the fixing holes 21 of each of the mounting seats 20 to join the mounting bases 20 with the metal plate body 10. The position, number and distance between the mounts 20 depend on the length and height of the concrete unit being laid. The mounting bases 20 are arranged on the center line of the half height of the metal plate body 10, that is, the height positions of the mounting seats 20 correspond to a position where the concrete unit to be laid is half of the height of the bottom surface.

如圖4B所示,已劃分好之欲澆築混凝土的小區域係能以已預先裝設有該等安裝座20之一個或多個金屬板體10圍繞出四周封閉的擋牆,為便於說明,圖式中係僅顯示一個擋板組件,然所述四周封閉的擋牆係可由複數個擋板組件或配合周圍建築或其他結構之壁面所共同圍繞形成。As shown in FIG. 4B, the small area to be poured into the concrete can be surrounded by one or more metal plates 10 pre-installed with the mounting seats 20, for the sake of explanation. In the drawings, only one baffle assembly is shown, but the surrounding closed retaining wall may be formed by a plurality of baffle assemblies or a wall surrounding the surrounding building or other structure.

如圖4C所示,藉由該限位裝置30與該凸出部可拆地結合,而可暫時地維持每一金屬板體10直立以保持所圍繞出之四周封閉的擋牆。As shown in FIG. 4C, by the detachable coupling of the limiting device 30 and the protruding portion, each of the metal plate bodies 10 can be temporarily maintained upright to maintain the surrounding wall surrounded by the surrounding walls.

如圖4D所示,將混凝土貫注於擋牆中而形成混凝土單元2,每一金屬板體10之第一表面係擋止該混凝土單元2。As shown in Fig. 4D, concrete is poured into the retaining wall to form a concrete unit 2, and the first surface of each of the metal plates 10 blocks the concrete unit 2.

如圖4所示,該混凝土單元2初凝並成形後,先將鎖固金屬板體10與安裝座20之螺絲15取下,將該一個或多個金屬板體10自該混凝土單元2上分離,並使該等安裝座20留置於該混凝土單元2當中。As shown in FIG. 4, after the concrete unit 2 is initially set and formed, the locking metal plate body 10 and the screw 15 of the mounting seat 20 are first removed, and the one or more metal plate bodies 10 are attached to the concrete unit 2. The separation is carried out and the mounts 20 are left in the concrete unit 2.

如圖4F所示,於每一安裝座20中插置該傳力件3,藉以完成混凝土單元2之澆築工程。As shown in FIG. 4F, the force transmitting member 3 is inserted into each of the mounting seats 20 to complete the pouring work of the concrete unit 2.

接著係進行下一段混凝土單元之澆築,其步驟與上述圖4A至3F大致相同,並以該混凝土單元2具有該等傳力件3之一面作為擋牆的其中一面,即下一段混凝土單元係緊鄰該混凝土單元2,該等傳力件3之一半係被埋設於下一段混凝土單元當中。Then, the pouring of the next section of the concrete unit is carried out, the steps of which are substantially the same as those of the above-mentioned FIGS. 4A to 3F, and the concrete unit 2 has one side of the force transmitting member 3 as one side of the retaining wall, that is, the next section of the concrete unit is in close proximity The concrete unit 2, one half of the force transmitting members 3 is buried in the next section of the concrete unit.

上述本實施例中,該金屬板體10係為鋼板,並一體成型有該凸出部13。然其係不限於此,如圖5所示之金屬板體10’係可包含一第一板單元16及一第二板單元17,該第一板單元16及該第二板單元17係具有L型截面,該第一板單元16與該第二板單元17靠合組裝後係形成該凸出部13。其中,該第一板單元16與該第二板單元17係分別具有對應之螺孔18,以供螺栓19固定而組裝在一起。In the above embodiment, the metal plate body 10 is a steel plate, and the protruding portion 13 is integrally formed. However, the metal plate body 10' shown in FIG. 5 may include a first plate unit 16 and a second plate unit 17, and the first plate unit 16 and the second plate unit 17 have In the L-shaped cross section, the first plate unit 16 is assembled with the second plate unit 17 to form the protruding portion 13. The first plate unit 16 and the second plate unit 17 respectively have corresponding screw holes 18 for the bolts 19 to be fixed and assembled.

綜上所述,本創作實施例之擋板組件係可預先地於金屬板體上裝設好用於插置傳力件的安裝座,不需要抵達施工現場即能施作,還可節省現場需待混凝土單元初凝後才能以鑽孔機逐一鑽孔及插置傳力件等麻煩與時間。並且,該擋板組件之金屬板體不會因吸水而收縮變形,而可避免在混凝土單元未初凝成形時因金屬板體變形而損壞,進而避免影響該擋板組件在混凝土單元初凝成形之形狀表面水平度。此外,該擋板組件之金屬板體係表面光滑而較易與已硬化初凝之混凝土單元分離,且可降施力拆卸擋板組件時造成崩角的機會。In summary, the baffle assembly of the present embodiment can be pre-installed on the metal plate body for mounting the force transmitting member, and can be applied without reaching the construction site, thereby saving the site. It is necessary to wait for the concrete unit to be condensed before drilling and inserting the force transmitting parts one by one with the drilling machine. Moreover, the metal plate body of the baffle assembly does not shrink and deform due to water absorption, and can avoid damage caused by deformation of the metal plate body when the concrete unit is not initially formed, thereby avoiding affecting the initial setting of the baffle assembly in the concrete unit. The shape of the surface level. In addition, the metal plate system of the baffle assembly has a smooth surface and is relatively easy to be separated from the hardened initial concrete unit, and can reduce the chance of disintegration when the baffle assembly is removed.

本創作在上文中已以較佳實施例揭露,然熟習本項技術者應理解的是,該實施例僅用於描繪本創作,而不應解讀為限制本創作之範圍。應注意的是,舉凡與該實施例等效之變化與置換,均應設為涵蓋於本創作之範疇內。因此,本創作之保護範圍當以申請專利範圍所界定者為準。The present invention has been disclosed in the above preferred embodiments, and it should be understood by those skilled in the art that the present invention is only intended to depict the present invention and should not be construed as limiting the scope of the present invention. It should be noted that variations and permutations equivalent to those of the embodiments are intended to be included within the scope of the present invention. Therefore, the scope of protection of this creation is subject to the definition of the scope of patent application.

1‧‧‧擋板組件1‧‧‧Baffle assembly

10‧‧‧金屬板體10‧‧‧Metal plate

11‧‧‧第一表面11‧‧‧ first surface

13‧‧‧凸出部13‧‧‧Protruding

20‧‧‧安裝座20‧‧‧ Mounting

21‧‧‧固定孔21‧‧‧Fixed holes

30‧‧‧限位裝置30‧‧‧Limiting device

31‧‧‧基座31‧‧‧ Pedestal

32‧‧‧支撐桿32‧‧‧Support rod

33‧‧‧限位件33‧‧‧Limited parts

34‧‧‧夾具34‧‧‧Clamp

35‧‧‧縱向調整器35‧‧‧Vertical adjuster

351‧‧‧第一套筒351‧‧‧First sleeve

352‧‧‧調整螺絲352‧‧‧Adjustment screw

353‧‧‧延伸桿353‧‧‧Extension rod

36‧‧‧橫向調整器36‧‧‧Horizontal adjuster

361‧‧‧第二套筒361‧‧‧Second sleeve

362‧‧‧調整螺絲362‧‧‧Adjustment screw

Claims (7)

一種用於混凝土之分段澆築之擋板組件,包含:一金屬板體,其係具有相對且平坦之一第一表面與一第二表面,該第一表面係用於擋止一混凝土單元,該第二表面上係形成有一凸出部;複數個安裝座,係可分離地設置於該第一表面上,各該安裝座係用於插置一傳力件;及一限位裝置,係與該凸出部可拆地結合,以暫時地維持該金屬板體與該混凝土單元的相對位置。 A baffle assembly for segmental pouring of concrete, comprising: a metal plate body having opposite and flat one of a first surface and a second surface, the first surface being used to block a concrete unit, Forming a protrusion on the second surface; a plurality of mounting seats are detachably disposed on the first surface, each of the mounting seats for inserting a force transmitting member; and a limiting device Removably coupled with the projection to temporarily maintain the relative position of the metal plate body and the concrete unit. 如請求項第1項所述之擋板組件,其中該金屬板體係包含一第一板單元及一第二板單元,該第一板單元及該第二板單元係具有L型截面,該第一板單元與該第二板單元靠合組裝後係形成該凸出部。 The baffle assembly of claim 1, wherein the metal plate system comprises a first plate unit and a second plate unit, the first plate unit and the second plate unit having an L-shaped cross section, the first The one plate unit is assembled with the second plate unit to form the protruding portion. 如請求項第2項所述之擋板組件,其中該第一板單元與該第二板單元係分別具有對應之螺孔,以供螺栓固定而組裝在一起。 The baffle assembly of claim 2, wherein the first plate unit and the second plate unit respectively have corresponding screw holes for bolting and assembly. 如請求項第1至3項中任一項所述之擋板組件,其中該限位裝置係包含一基座、一支撐桿、一限位件及一夾具,該支撐桿係設置於該基座,該限位件係可移動地設置於該支撐桿上並抵靠支撐該凸出部,該夾具係用於夾持固定該凸出部與該限位件。 The baffle assembly according to any one of claims 1 to 3, wherein the limiting device comprises a base, a support rod, a limiting member and a clamp, the support rod is disposed on the base The retaining member is movably disposed on the support rod and supports the protruding portion, and the clamp is used for clamping and fixing the protruding portion and the limiting member. 如請求項第4項所述之擋板組件,其中該限位裝置係具有一縱向調整器及一橫向調整器,該縱向調整器係包含一第一套筒、一調整螺絲及一延伸桿,該第一套筒係可移動地套設於該支撐桿上並藉由該調整螺絲鎖固抵頂至該支撐桿,該延伸桿係由該第一套筒側 面橫向延伸,該橫向調整器係包含一第二套筒及一調整螺絲,該第二套筒係可移動地套設於該延伸桿上並藉由該調整螺絲鎖固抵頂該延伸桿,該限位件係設置於該第二套筒上。 The baffle assembly of claim 4, wherein the limiting device has a longitudinal adjuster and a lateral adjuster, the longitudinal adjuster comprising a first sleeve, an adjusting screw and an extension rod, The first sleeve is movably sleeved on the support rod and is locked to the support rod by the adjusting screw, and the extension rod is from the first sleeve side The lateral adjuster includes a second sleeve and an adjusting screw, and the second sleeve is movably sleeved on the extension rod and locked by the adjusting screw against the extension rod. The limiting member is disposed on the second sleeve. 如請求項第5項所述之擋板組件,其中該金屬板體上係具有複數個裝卸孔,各該安裝座上係具有對應各該裝卸孔之固定孔,以藉由螺絲將各該安裝座與該金屬板體結合。 The baffle assembly of claim 5, wherein the metal plate body has a plurality of loading and unloading holes, and each of the mounting bases has a fixing hole corresponding to each of the loading and unloading holes, so as to be installed by screws The seat is combined with the metal plate body. 如請求項第6項所述之擋板組件,其中各該安裝座係具有一三角狀凹槽,該傳力件係為一矩形板。 The baffle assembly of claim 6, wherein each of the mounting bases has a triangular groove, and the force transmitting member is a rectangular plate.
TW104204630U 2015-03-27 2015-03-27 Blocking board component for sectional concreting of concrete TWM506174U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW104204630U TWM506174U (en) 2015-03-27 2015-03-27 Blocking board component for sectional concreting of concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW104204630U TWM506174U (en) 2015-03-27 2015-03-27 Blocking board component for sectional concreting of concrete

Publications (1)

Publication Number Publication Date
TWM506174U true TWM506174U (en) 2015-08-01

Family

ID=54339446

Family Applications (1)

Application Number Title Priority Date Filing Date
TW104204630U TWM506174U (en) 2015-03-27 2015-03-27 Blocking board component for sectional concreting of concrete

Country Status (1)

Country Link
TW (1) TWM506174U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI626359B (en) * 2016-09-13 2018-06-11 白明正 Concrete baffle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI626359B (en) * 2016-09-13 2018-06-11 白明正 Concrete baffle

Similar Documents

Publication Publication Date Title
KR101745242B1 (en) Bariable beam form and construction method thereof
KR100819833B1 (en) Apparatus and method for building slab of a concrete build
KR102179294B1 (en) Transformable formwork apparatus and method for manufacturing concrete precast wall
KR102299680B1 (en) Finishing formwork for gap
KR101679346B1 (en) Form construction structure and method for building concrete slab
CN107246145B (en) Concrete floor slab placement equipment and construction method for preserved pipeline hole
TWM506174U (en) Blocking board component for sectional concreting of concrete
KR101668521B1 (en) A construction method of concrete
JP2015105552A (en) Form support tool and slab construction method using the same
KR20190000957A (en) Concrete mold connector and method for connecting concrete mold using concrete mold
JP6764594B2 (en) Formwork fixture, formwork fixing device, formwork, formwork fixing method and joint construction method
KR101284190B1 (en) Joint apparatus for form
CN208918294U (en) The baffle plate assembly that segmentation for concrete pours
KR101606330B1 (en) apparatus for adjusting horizon of a concrete mold
KR20080087196A (en) The slab and beam form construction table form
JP2007217871A (en) Dry foundation and its construction method
KR100482272B1 (en) A supprot pipe for construction
JP6914028B2 (en) Formwork fixing device, formwork, formwork fixing method and joint construction method
JP7288390B2 (en) Foundation construction method and foundation
CN216587760U (en) Assembled floor joint bar height fixing tool
KR20160120828A (en) A supporter fixing unit for waterprof sill
JP6471056B2 (en) Structural restoration method
CN114033172B (en) Adjustable steel membrane frame cast-in-place concrete inverted ridge construction method
JP2005297497A (en) Manufacturing method for concrete product
JP6949532B2 (en) How to join precast concrete members