CN208898457U - Top of building erecting by overhang - Google Patents

Top of building erecting by overhang Download PDF

Info

Publication number
CN208898457U
CN208898457U CN201821730897.3U CN201821730897U CN208898457U CN 208898457 U CN208898457 U CN 208898457U CN 201821730897 U CN201821730897 U CN 201821730897U CN 208898457 U CN208898457 U CN 208898457U
Authority
CN
China
Prior art keywords
plate
building
pipe fitting
sliding part
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821730897.3U
Other languages
Chinese (zh)
Inventor
江模华
华凤娟
荣月红
朱燕明
高培军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengshang Energy Conservation Technology Co Ltd
Original Assignee
Wuxi Heng Heng Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Heng Heng Decoration Engineering Co Ltd filed Critical Wuxi Heng Heng Decoration Engineering Co Ltd
Priority to CN201821730897.3U priority Critical patent/CN208898457U/en
Application granted granted Critical
Publication of CN208898457U publication Critical patent/CN208898457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of top of building erectings by overhang, I-shaped guide rail is installed on the parapet top surface of top of building, guide rail includes the vertical plate of top plate and bottom plate and connection top and bottom plate, the sliding part being slidably matched is set on top plate, an inner circle pipe fitting is fixedly mounted on sliding part, an outer circle pipe fitting is arranged on the periphery of interior round tube part, right angle rack is fixedly installed on outer round tube part, hanging point is arranged in the end of right angle rack, for installing lifting rope and platform sling.The utility model is slid on I-shaped guide rail by sliding part, and positioning bolt is recycled to be locked, and can according to need the position of adjustment hanging point, and each position of outside vertical surface of building is covered convenient for cleaning operation range, improves working efficiency, and practicability is good.Sliding part is coupled using left component and right component, is mounted on the top plate of I-shaped guide rail, and sound construction is reliable, and installation and removal are convenient.

Description

Top of building erecting by overhang
Technical field
The utility model relates to build aerial lift device field, especially a kind of top of building erecting by overhang.
Background technique
As the speed of urban modernization is constantly accelerated, the skyscraper in city is continuously emerged.In order to increase aesthetics With the better daylighting effect of acquisition, many facades use glass curtain wall or composite curtain wall, after a period of time can not What is avoided brings cleaning and maintenance issues.For the periodical safety cleaning of external wall and repair and maintenance, increasingly by people Attention.The cleaning measure of facade at present mainly uses two methods of window cleaning equipment and big rope platform sling, and window cleaning equipment is due to making Valence is higher, and other than super high-rise building, the acceptance of acquisition is not high.Big rope platform sling needs building to have the extension that can be knotted Point, for the building of not set dedicated big rope platform sling hanging point, hanging point be it is artificial randomly selected, safety and reliability is not Foot, for being provided with the building of dedicated big rope platform sling hanging point, hanging point can not usually be moved, and practicability is not high.
Utility model content
The applicant is for immovable platform sling hanging point position, practicability present in above-mentioned existing structure cleaning measure The disadvantages of not high with reliability, provides a kind of structurally reasonable top of building erecting by overhang, can adjust extension as needed The position of point and hanging point are at a distance from metope, and work efficiency is high, and solid and reliable, practicability is good.
Technical solution used by the utility model is as follows:
A kind of top of building erecting by overhang installs I-shaped guide rail, guide rail on the parapet top surface of top of building Vertical plate including top plate and bottom plate and connection top and bottom plate, is arranged the sliding part being slidably matched on top plate, solid on sliding part Dingan County fills an inner circle pipe fitting, and an outer circle pipe fitting is arranged on the periphery of interior round tube part, is fixedly installed on outer round tube part straight Hanging point is arranged in the end of angle support, right angle rack, for installing lifting rope and platform sling.
As a further improvement of the above technical scheme:
Sliding part is coupled by left component and right component, and left component and right component are centered around the periphery of top plate jointly.
Left component includes turning over the right baffle-plate to be formed under the bearing plate and bearing plate above top plate, and right baffle-plate is located at vertical plate Side, right component includes that the right shell body and right shell body positioned at the vertical plate other side turn over the liner plate to be formed, and bearing plate and liner plate are logical It crosses and is bolted.
It is mounted on the idler wheel of horizontal direction in left baffle and right baffle lower surface, the idler wheel of the left and right sides is along vertical plate Two sides roll, and limit to sliding part.
Extend positioning tab on the side of bearing plate and right baffle-plate, open up location hole on positioning tab, on the top of guide rail Compartment offers one group of several connecting hole on plate, and positioning bolt passes through the location hole of bearing plate, connecting hole and right baffle-plate It is connect after location hole with nut.
In the lower surface of bearing plate, rubber pad, rubber pad and top plate contact are set.
It is provided with through-hole of a pair of of line by die on outer circle pipe fitting, several pairs of lines are provided on inner circle pipe fitting and pass through die Adjustment hole, adjust bolt-through through-hole and one pair of them adjustment hole and be fixedly connected with nut.
A plate is fixed in outer round tube part upper end, is fixedly welded right angle rack on plate.
Right angle rack is connected on the periphery of outer circle pipe fitting by a hang plate.
It is embedded into U-shaped part in advance in parapet wall, U-shaped part secures a base plate to the top surface of parapet by fastener On.
The beneficial effects of the utility model are as follows:
The utility model is slid on I-shaped guide rail by sliding part, recycles positioning bolt to be locked, Ke Yigen According to the position for needing to adjust hanging point, each position of outside vertical surface of building is covered convenient for cleaning operation range, improves work effect Rate, practicability are good.Sliding part is coupled using left component and right component, is mounted on the top plate of I-shaped guide rail, structure Solid and reliable, installation and removal are convenient.It is limited by two idler wheels, plays guiding role, convenient for sliding part I-shaped It is steadily slid on guide rail.By being rotatably assorted between inner circle pipe fitting and outer circle pipe fitting, during installation, the bracket on outer circle pipe fitting The inside above building, when in use, bracket is gone on the outside of building, and a variety of usage modes are packed up and stretched in realization.By Removable connection structure is used in sliding part and I-shaped guide rail, when not using this equipment, can be removed on I-shaped guide rail Component, do not influence the overall beautiful of top of building parapet.
Detailed description of the invention
Fig. 1 is the schematic diagram of the utility model.
Fig. 2 is the broken away view of the utility model.
Fig. 3 is the Local map of the utility model.
Fig. 4 is the sectional view of sliding part.
In figure: 1, guide rail;2, sliding part;3, left component;3a, bearing plate;3b, right baffle-plate;4, right component;4a, right shell body; 4b, liner plate;5, idler wheel;6, lug;7, positioning bolt;8, inner circle pipe fitting;9, outer circle pipe fitting;10, bolt is adjusted;11, plate; 12, bracket;13, hanging point;14, parapet;15, U-shaped part.
Specific embodiment
With reference to the accompanying drawing, illustrate specific embodiment of the present utility model.
As shown in Figures 1 to 4, parapet of the top of building erecting by overhang described in the utility model in top of building By installation of embedded parts one I-shaped guide rail 1 on 14, guide rail 1 includes the vertical plate of top plate and bottom plate and connection top and bottom plate, in advance Embedded part is the merging intracorporal U-shaped part 15 of wall, and the bottom plate of guide rail 1 is fixed on the top surface of parapet 14 by fastener.It is pushing up The sliding part 2 being slidably matched is set on plate, and sliding part 2 is coupled by left component 3 and right component 4, left component 3 and right component 4 It is centered around the periphery of top plate jointly.Left component 3 includes turning over the left side to be formed under the bearing plate 3a and bearing plate 3a above top plate Baffle 3b, right baffle-plate 3b are located at the side of vertical plate, and right component 4 includes on the right shell body 4a and right shell body 4a of the vertical plate other side The liner plate 4b to be formed is turned over, bearing plate 3a and liner plate 4b is bolted by multiple, and bolt runs through connection liner plate 4b and right gear up and down Plate 4a.It is mounted on the idler wheel 5 of horizontal direction in right baffle-plate 3b and the lower surface right shell body 4a, the idler wheel 5 of the left and right sides is along vertical Two sides of plate roll, and limit to sliding part 2.In the lower surface of bearing plate 3a, rubber pad, rubber pad and top plate are set Contact slides the abrasion being subject to for reducing sliding part 2.Extend positioning tab 6 on the side of bearing plate 3a and right baffle-plate 3b, Location hole is opened up on positioning tab 6, the location interval formula that location hole is corresponded on the top plate of guide rail 1 offers one group of several company Hole is connect, positioning bolt 7 connect with nut after the location hole by the location hole of bearing plate 3a, connecting hole and right baffle-plate 3b, realizes The selectivity of sliding part 2 positions.
Referring to Figures 1 and 2, an inner circle pipe fitting 8 is fixedly mounted on the upper face of bearing plate 3a, in interior round tube part 8 It is arranged an outer circle pipe fitting 9 on periphery, through-hole of a pair of of line by die is provided on outer circle pipe fitting 9, is provided on inner circle pipe fitting 8 Several pairs of lines adjust bolt 10 through through-hole and one pair of them adjustment hole and fix company with nut by the adjustment hole of die It connects.It takes out when adjusting bolt 10, the angle of adjustment outer circle pipe fitting 9 can be rotated, when installation and adjustment bolt 10, outer circle pipe can be made The position of part 9 is fixed, and is limited it and is rotated and loosen.A plate 11 is fixed in outer 9 upper end of round tube part, is fixed on plate 11 Right angle rack 12 is welded, right angle rack 12 is connected on the periphery of outer circle pipe fitting 9 by a hang plate.The end of right angle rack 12 Hanging point 13 is arranged in portion, for installing lifting rope and platform sling.
The utility model passes through the I-shaped guide rail 1 of installation of embedded parts when implementing on the parapet 14 of top of building, Left component 3 and right component 4 are installed on guide rail 1, a combination thereof is made to be connected into sliding part 2.Outside the inner circle pipe fitting 8 on bearing plate 3a It is arranged outer circle pipe fitting 9 week, bracket 12 is provided on outer circle pipe fitting 9.During installation, outer circle pipe fitting 9 is located on the inside of building, in reality Border in use, adjustable outer circle pipe fitting 9 and bracket 12 deflection angle, and by adjust bolt 10 lock.Then adjustment is slided Position of the moving part 2 on guide rail 1, mobile sliding part 2 arrive suitable position, are locked by positioning bolt 7.Hanging point on bracket 12 Lifting rope and platform sling are installed in 13 positions, and worker takes platform sling and cleans to building wall.When needing to adjust cleaning positions, remove Positioning bolt 7, mobile sliding part 2 arrives the next position, then is locked.
Above description is the explanation to the utility model, is not the restriction to utility model, without prejudice to the utility model In the case where spirit, the utility model can make any type of modification.

Claims (10)

1. a kind of top of building erecting by overhang, it is characterised in that: the erector on parapet (14) top surface of top of building Font guide rail (1), guide rail (1) include the vertical plate of top plate and bottom plate and connection top and bottom plate, and setting is slidably matched on top plate An inner circle pipe fitting (8) is fixedly mounted on sliding part (2), is arranged one on the periphery of interior round tube part (8) for sliding part (2) Right angle rack (12) are fixedly installed on outer round tube part (9) in outer circle pipe fitting (9), and hanging point is arranged in the end of right angle rack (12) (13), for installing lifting rope and platform sling.
2. top of building erecting by overhang described in accordance with the claim 1, it is characterised in that: sliding part (2) by left component (3) and Right component (4) couples, and left component (3) and right component (4) are centered around the periphery of top plate jointly.
3. top of building erecting by overhang according to claim 2, it is characterised in that: left component (3) includes being located at top plate It is turned over the right baffle-plate to be formed (3b) under the bearing plate (3a) and bearing plate (3a) of top, right baffle-plate (3b) is located at the side of vertical plate, right Component (4) includes that the right shell body (4a) and right shell body (4a) positioned at the vertical plate other side turn over the liner plate to be formed (4b), bearing plate (3a) is bolted with liner plate (4b).
4. top of building erecting by overhang described in accordance with the claim 3, it is characterised in that: in right baffle-plate (3b) and right shell body The lower surface (4a) is mounted on the idler wheel (5) of horizontal direction, and the idler wheel (5) of the left and right sides is rolled along two sides of vertical plate, Sliding part (2) is limited.
5. top of building erecting by overhang described in accordance with the claim 3, it is characterised in that: in bearing plate (3a) and right baffle-plate Extend on the side of (3b) positioning tab (6), positioning tab opens up location hole on (6), and compartment is opened on the top plate of guide rail (1) Equipped with one group of several connecting hole, positioning bolt (7) is determined by the location hole of bearing plate (3a), connecting hole and right baffle-plate (3b) Position Kong Houyu nut connection.
6. top of building erecting by overhang described in accordance with the claim 3, it is characterised in that: set in the lower surface of bearing plate (3a) Set rubber pad, rubber pad and top plate contact.
7. top of building erecting by overhang described in accordance with the claim 1, it is characterised in that: outer circle pipe fitting is provided with a pair on (9) Line is provided with adjustment hole of several pairs of lines by die on inner circle pipe fitting (8), is adjusted bolt (10) and passed through by the through-hole of die Reach through hole and one pair of them adjustment hole are simultaneously fixedly connected with nut.
8. top of building erecting by overhang described in accordance with the claim 1, it is characterised in that: fixed in outer round tube part (9) upper end One plate (11) is fixedly welded right angle rack (12) on plate (11).
9. top of building erecting by overhang described in accordance with the claim 1, it is characterised in that: right angle rack (12) is inclined by one Inclined plate is connected on the periphery of outer circle pipe fitting (9).
10. top of building erecting by overhang described in accordance with the claim 1, it is characterised in that: pre- in parapet (14) wall It is embedded into U-shaped part (15), U-shaped part (15) is secured a base plate to by fastener on the top surface of parapet (14).
CN201821730897.3U 2018-10-25 2018-10-25 Top of building erecting by overhang Active CN208898457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821730897.3U CN208898457U (en) 2018-10-25 2018-10-25 Top of building erecting by overhang

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821730897.3U CN208898457U (en) 2018-10-25 2018-10-25 Top of building erecting by overhang

Publications (1)

Publication Number Publication Date
CN208898457U true CN208898457U (en) 2019-05-24

Family

ID=66576786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821730897.3U Active CN208898457U (en) 2018-10-25 2018-10-25 Top of building erecting by overhang

Country Status (1)

Country Link
CN (1) CN208898457U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109231088A (en) * 2018-10-25 2019-01-18 无锡恒尚装饰工程有限公司 Top of building erecting by overhang

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109231088A (en) * 2018-10-25 2019-01-18 无锡恒尚装饰工程有限公司 Top of building erecting by overhang

Similar Documents

Publication Publication Date Title
CN108545628B (en) A kind of mobile hanging device of Super High and its hanging method
CN202144438U (en) Telescopic hanging basket
CN208642145U (en) A kind of efficient watering dust collecting device of architectural engineering
CN204001893U (en) Traction steel rope of cable lift-sliding parking storehouse under simple and easy back boom
CN202324576U (en) Rail-mounted platform system used for installing cornice and ceiling aluminium sheet curtain wall
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN208898457U (en) Top of building erecting by overhang
CN107165401A (en) Cantilever Beams bottom wall construction method
CN106044651A (en) Aerial operation basket
CN205493732U (en) High altitude curtain cleaning robot
CN202731262U (en) Installation and maintenance safe platform for air conditioner external unit
CN109231088A (en) Top of building erecting by overhang
CN113235906A (en) Integrally-lifted peripheral protection hanging frame and lifting method
CN204602519U (en) Paint roller more changing device under horizontal galvanizing unit
CN218406396U (en) Movable hanging basket for construction of building structure outer vertical face
CN201730624U (en) Construction work vehicle for subway region tunnel
CN201952195U (en) Telescopic wall supporting wheel
CN212771963U (en) Movable suspension operation platform
CN213391263U (en) Device for conveying glass plates
CN204872473U (en) Carton lift transmission device
CN205529054U (en) Zinc -plated automatic acid dip pickle is managed in side
CN205894632U (en) Spiral arm over -and -under type mobile scaffold
CN110820649A (en) Highway tunnel cleaning system
CN213508061U (en) Construction equipment for bridge engineering
CN217708658U (en) Curtain wall installation can climb roofing system of hanging

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 214117 No.8, Tonghu Road, Ehu Town, Xishan District, Wuxi City, Jiangsu Province

Patentee after: Jiangsu Hengshang Energy Saving Technology Co.,Ltd.

Address before: 214117 No.8, Tonghu Road, Ehu Town, Xishan District, Wuxi City, Jiangsu Province

Patentee before: WUXI HENGSHANG DECORATION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder