CN208843543U - A kind of hanging stage for shaft sinking - Google Patents
A kind of hanging stage for shaft sinking Download PDFInfo
- Publication number
- CN208843543U CN208843543U CN201821501126.7U CN201821501126U CN208843543U CN 208843543 U CN208843543 U CN 208843543U CN 201821501126 U CN201821501126 U CN 201821501126U CN 208843543 U CN208843543 U CN 208843543U
- Authority
- CN
- China
- Prior art keywords
- hanging
- main body
- hanging scaffold
- support rod
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a kind of hanging stages for shaft sinking, the hanging stage main body is the integral structure being combined by cuboid and semicircular body, the shackle of hanging steel rope gib head is separately provided in the surrounding of hanging scaffold main body, the support rod for preventing and treating the shaking of hanging scaffold main body is respectively provided in semicircular body side, support rod one end is connected with hanging scaffold main body, fixed pedestal is provided on the other end, the telescopic joint for playing adjustment effect is also provided on support rod, the counterweight for adjusting hanging scaffold balance is provided in the opposite side lower part of semicircular body, top is provided with the bumper bar of fixed safety belt.The utility model structure simply uses, and efficiently solves current vertical problems present in hanging stage use during sinking shaft, has universal reference and promotional value.
Description
Technical field
The utility model relates to a kind of field of mining equipment, are related to a kind of hanging stage, and in particular to one kind is used for vertical
The hanging stage of sinking shaft.
Background technique
Hanging scaffold is in mine vertical shaft shaft construction, for putting underground pumping equipment, arrangement face lighting and well or more
Contact signal, personnel are upper and lower and transport the construction installation of other effects such as underground construction equipment.At present in mine construction, generally
Hanging scaffold used, hang in shaft building construction enterprises pit shaft are as follows: 2 or 4 hanging stages are arranged around the well head of ground
Stable car, winding wire ropes connected by hanging scaffold in the fixed head sheave of headgear pulley platform and pit shaft, as hanging scaffold in pit shaft
The suspention facility run up and down, hanging scaffold when in use, lifting it is in place it is levelling after, steady rope, to grab suspension rope band greatly tight, keeps hanging
Disk, suspension wire uniform force.With timber wedge by the fixed jail of each layer disk wedging, to prevent and treat hanging scaffold shaking.
Want according to " safety regulations in coal mine " the 73rd article of regulation: the spacing between hanging scaffold and permanent wall should be less than
150mm.This requires hanging scaffolds good stickiness between the borehole wall in use, but two classes used now
One is oblong-shapeds for hanging scaffold, and another kind is round, the first hanging scaffold is difficult to meet when in use to be wanted with the spacing of the borehole wall
It asks, although being able to satisfy the requirement of spacing for second, even if this hanging scaffold, which unloads power device plus revolution, is also easy to happen rotation
Turn, and both hanging scaffolds also all generally existing problem in use, that is, vibration is easy to happen during operation, this
Kind vibration not only influences operating efficiency, can also damage to pipeline, equipment etc., is easy to cause industrial accident.
Therefore, a kind of requirement convenient for operating with, while being able to satisfy in regulation again is studied, the good suspension of stability is hung
Disk for improving production efficiency, ensures that the safety of worker is of great advantage.
Utility model content
In order to overcome above-mentioned shortcoming, utility model aims to solve the stabilizations of hanging scaffold during shaft sinking
Property, safety, while the problem of meet regulation regulation again.
The technical solution of the utility model are as follows: a kind of hanging stage for shaft sinking, the hanging stage main body (1) are
The integral structure being combined by cuboid and semicircular body is separately provided for suspension steel wire in the surrounding of hanging scaffold main body (1)
The shackle (2) of rope hook head is respectively provided with the support rod (3) for preventing and treating hanging scaffold main body (1) shaking, support in semicircular body side
Bar (3) one end is connected with hanging scaffold main body (1), and fixed pedestal (5) are provided on the other end, has been also provided on support rod (3)
To the telescopic joint (4) of adjustment effect, the counterweight (6) for adjusting hanging scaffold balance, top are provided in the opposite side lower part of semicircular body
Bumper bar (7) provided with fixed safety belt.
Further, the telescopic joint (4) uses slip expansion section (4).
Further, the fixed pedestal (5) is made of rectangular or circular anti-corrosive rubber material.
Further, the counterweight (6) will not produce pyrophoric metal building using corrosion-resistant, the collision that are adjustable weight.
The beneficial effects of the utility model are that a kind of suspension for shaft sinking that above-mentioned technical proposal proposes is hung
Disk, be existing hanging stage further investigation on the basis of, the new design obtained, it is structurally reasonable, function is unique, stablize peace
Entirely, the semi-circular structure of setting can effectively solve the requirement adjusted the distance in " safety regulations in coal mine ", while the support rod (3) being arranged
Structure not only acts as the effect of stable hanging scaffold, additionally it is possible to which absorption equipment vibrates and overcome the problems, such as borehole wall deflection.This suspension
Hanging scaffold makes the operation during shaft sinking convenient, and structure is simple, cheap, is easy to promote the use of.
Detailed description of the invention
Fig. 1 is the model structure schematic diagram of the utility model.
In figure: 1. hanging scaffold main bodys;2. shackle;3. support rod;4. telescopic joint;5. fixed pedestal;6. counterweight;7. bumper bar.
Specific embodiment
Below in conjunction with attached drawing, the utility model is further described: as shown in Figure 1, a kind of for the outstanding of shaft sinking
Hanging scaffold is hung, which is the integral structure being combined by cuboid and semicircular body, in hanging scaffold main body (1)
Surrounding is separately provided for the shackle (2) of hanging steel rope gib head, is respectively provided in semicircular body side for preventing and treating hanging scaffold
The support rod (3) that main body (1) is shaken, support rod (3) one end are connected with hanging scaffold main body (1), and fixed pedestal is provided on the other end
(5), it is also provided with the telescopic joint (4) for playing adjustment effect on support rod (3), is provided in the opposite side lower part of semicircular body
The counterweight (6) of hanging scaffold balance is adjusted, top is provided with the bumper bar (7) of fixed safety belt.
On the shackle (2) that the gib head of connecting steel wire ropes is hung over to hanging scaffold main body (1) surrounding when in use, with worker
Seat belt hanger is fixed with bumper bar (7), according to the weight of load-carrying and distribution adjustment counterweight (6) on hanging scaffold, as hanging scaffold master
Body (1) decentralization adjusts the telescopic joint (4) on support rod (3) according to borehole wall surface bumps degree to after working face, allows fixed pedestal
(5) it is bonded completely with the borehole wall, hanging scaffold main body (1) is made to keep balance.
Above-described is only preferred embodiments of the present invention, it is noted that for the ordinary skill of this field
For personnel, without departing from the concept of the present invention, various modifications and improvements can be made, these all belong to
In the protection scope of the utility model.
Claims (4)
1. a kind of hanging stage for shaft sinking, which be combined by cuboid and semicircular body
Integral structure, the shackle (2) of hanging steel rope gib head is separately provided in the surrounding of hanging scaffold main body (1), in semicircular body
Side is respectively provided with the support rod (3) for preventing and treating hanging scaffold main body (1) shaking, support rod (3) one end and hanging scaffold main body (1) phase
Even, fixed pedestal (5) are provided on the other end, the telescopic joint (4) for playing adjustment effect is also provided on support rod (3),
The opposite side lower part of semicircular body is provided with the counterweight (6) for adjusting hanging scaffold balance, and top is provided with the bumper bar of fixed safety belt
(7).
2. a kind of hanging stage for shaft sinking according to claim 1, it is characterised in that: the telescopic joint
(4) slip expansion section (4) are used.
3. a kind of hanging stage for shaft sinking according to claim 1, it is characterised in that: the fixed pedestal
(5) it is made of rectangular or circular anti-corrosive rubber material.
4. a kind of hanging stage for shaft sinking according to claim 1, it is characterised in that: the counterweight (6)
Pyrophoric metal building will not be produced using corrosion-resistant, the collision that are adjustable weight.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821501126.7U CN208843543U (en) | 2018-09-14 | 2018-09-14 | A kind of hanging stage for shaft sinking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821501126.7U CN208843543U (en) | 2018-09-14 | 2018-09-14 | A kind of hanging stage for shaft sinking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208843543U true CN208843543U (en) | 2019-05-10 |
Family
ID=66372902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821501126.7U Expired - Fee Related CN208843543U (en) | 2018-09-14 | 2018-09-14 | A kind of hanging stage for shaft sinking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208843543U (en) |
-
2018
- 2018-09-14 CN CN201821501126.7U patent/CN208843543U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105000482B (en) | Tower crane with walking mechanism | |
CN205387439U (en) | Mast hoisting accessory | |
CN105016218B (en) | The guide rail mechanism being fixed on building | |
CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
CN204980946U (en) | Take running gear's tower crane | |
CN104291222B (en) | The inner hard protection of a kind of high-rise building Core Walls Structure hangs integrated system with row | |
CN203128099U (en) | Slipping type pipeline lifting device | |
CN205773024U (en) | Convenient pipeline promotes auxiliary device | |
CN207346997U (en) | One kind hangs vehicle safety protection device | |
CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
CN208843543U (en) | A kind of hanging stage for shaft sinking | |
CN205873594U (en) | Special construction elevator of cooling tower section of thick bamboo wall | |
CN206308626U (en) | Operating platform for installing hanging basket at top of pier body of pier | |
CN210594945U (en) | Movable hoisting operation frame for bridge floor wet joint construction | |
CN108996377A (en) | A kind of hanging stage for shaft sinking | |
CN204938801U (en) | The tower crane that is connected can be realized with building | |
CN204569238U (en) | Omnipotent bracing or strutting arrangement bottom a kind of tower crane | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
CN204643664U (en) | A kind of building tower crane | |
CN104609316B (en) | Longitudinal simple ground jack of tripartite confrontation | |
CN206667058U (en) | A kind of across cable walking cord clip handling erecting device | |
CN207330121U (en) | A kind of crane hook device for building | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN219753908U (en) | Sliding rack adherence operation platform for dismantling chimney and water tower | |
CN204823905U (en) | Fix guide rail mechanism on building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190510 Termination date: 20190914 |