CN208792077U
CN208792077U CN201820757779.5U CN201820757779U CN208792077U CN 208792077 U CN208792077 U CN 208792077U CN 201820757779 U CN201820757779 U CN 201820757779U CN 208792077 U CN208792077 U CN 208792077U
Authority
CN
China
Prior art keywords
coarse sand
tunnel
water drenching
bed course
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820757779.5U
Other languages
Chinese (zh)
Inventor
李凤
张鹏强
傅耀
张丰田
张利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201820757779.5U priority Critical patent/CN208792077U/en
Application granted granted Critical
Publication of CN208792077U publication Critical patent/CN208792077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the road surfaces in mine top plate water drenching tunnel to harden field, disclose a kind of hard surface in top plate water drenching tunnel, coarse sand bed course is set above the road bed, concrete precast block is set above the coarse sand bed course, gap is set between adjacent concrete prefabricated section, coarse sand or rubble are filled in the gap, gutter is arranged in coarse sand bed course side.The utility model laterally can penetrate into gutter to lower part coarse sand bed course by the coarse sand or rubble gap penetration that fill between concrete precast block in time after the water drenching of back drops onto road surface again, and tunnel road surface is avoided muddy, ponding problem occur.

Description

A kind of hard surface in top plate water drenching tunnel
Technical field
The utility model relates to the road surfaces in mine top plate water drenching tunnel to harden field, relate more specifically to a kind of top plate water drenching The hard surface in tunnel.
Background technique
Underground mine can inevitably encounter top plate water drenching phenomenon for the main roadway of personnel and vehicle pass-through, once drainage system It is unsmooth, easily there is surface gathered water, miriness or cracking destruction problem, not only influences the passage environment of personnel and vehicle, and Shorten the service life on road surface.Currently, the hardening of mine top plate water drenching tunnel road surface generally uses the side of one-piece casting concrete Method, but difficulty of construction is big, concrete curing condition is poor in water drenching tunnel section for this method, and the construction quality on road surface is extremely difficult to design It is required that.And easily occur the problems such as pavement cracking is destroyed with ponding, miriness in loaded vehicle roller compaction process, give personnel in the pit and Che Passage bring difficulty.
Utility model content
For surface gathered water, miriness and the cracking destruction for solving the problems, such as mine top plate water drenching tunnel in the prior art, this is practical It is novel that a kind of hard surface in top plate water drenching tunnel is provided.
The utility model adopts the following technical solution:
Coarse sand bed course, the coarse sand bed course is arranged in a kind of hard surface in top plate water drenching tunnel, the road bed top Concrete precast block is arranged in top, and gap is arranged between adjacent concrete prefabricated section, and coarse sand or rubble are filled in the gap, described Gutter is arranged in coarse sand bed course side.
The utility model can be in time by filling after the water drenching of back drops onto road surface between concrete precast block Coarse sand or rubble gap penetration to lower part coarse sand bed course laterally penetrate into gutter again, avoid tunnel road surface from muddy, ponding occur Problem.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the sectional schematic diagram after the hardening of the utility model tunnel road surface.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Referring to attached drawing, the utility model discloses a kind of hard surface in top plate water drenching tunnel, above the road bed Coarse sand bed course 4 is set, concrete precast block 1 is set above the coarse sand bed course 4, gap is set between adjacent concrete prefabricated section 1 2, the gap 2 is interior to fill coarse sand or rubble.
The concrete precast block 1 being laid on coarse sand bed course 4 is mutually indepedent, can be single when rolling during vehicle pass-through to it It is solely pressurized, avoids pavement cracking caused by being rolled by loaded vehicle and destroy problem.
Gutter 3 is arranged in 4 side of coarse sand bed course, and the water drenching of back can pass through concrete precast block 1 in time Between the coarse sand that fills or rubble gap penetrate into bottom cushion and laterally penetrate into gutter 3, play and exclude tunnel bottom in time The effect of plate ponding.
The utility model construct below top plate water drenching roadway floor designed elevation 400mm depth basis and leveling, then 100mm thickness coarse sand bed course 4 is laid with using clean coarse sand, then is laid with 500mm × 500mm × 300mm(long on coarse sand bed course 4 × it is wide × high) cuboid concrete precast block 1.
When the concrete precast block 1 of the utility model is laid with, the gap of 30-50mm need to be reserved between concrete precast block 2(is adjusted according to water yield), the gap 2 between prefabricated section is filled using clean coarse sand or rubble after the completion of being laid with, is formed The infiltration drainage system on road surface.
The concrete precast block 1 of the road surfacing of the utility model is independent from each other, it is ensured that it is in loaded vehicle roller compaction process Middle independent compression, avoids pavement cracking caused by being rolled by loaded vehicle and destroys problem.
The utility model can be in time by filling after the water drenching when back drops onto road surface between concrete precast block The coarse sand or rubble gap penetration filled out laterally penetrate into gutter to lower part coarse sand bed course again, and tunnel road surface is avoided muddy, product occur Water problems.The utility model has construction is simple, safe and reliable advantage;It can solve the leaching of mine top plate by the utility model Ponding, miriness and the cracking destruction problem on water tunnel road surface, greatly improve the passage condition of personnel and vehicle, while effectively prolonging The service life and construction technology on long road surface are simple, and materials extensively, can voluntarily choose coarse sand according to back water drenching amount size Or ballast grain sizes, designed, designed cushion thickness, concrete prefabricated block size and the pore size being laid between prefabricated section have very Big application prospect.

Claims (1)

1. a kind of hard surface in top plate water drenching tunnel, which is characterized in that coarse sand bed course (4) are arranged above road bed, institute It states and concrete precast block (1) is set above coarse sand bed course (4), gap, the gap are set between adjacent concrete precast block (1) (2) gutter (3) are arranged in filling coarse sand or rubble in, coarse sand bed course (4) side.
CN201820757779.5U 2018-05-21 2018-05-21 A kind of hard surface in top plate water drenching tunnel Active CN208792077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820757779.5U CN208792077U (en) 2018-05-21 2018-05-21 A kind of hard surface in top plate water drenching tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820757779.5U CN208792077U (en) 2018-05-21 2018-05-21 A kind of hard surface in top plate water drenching tunnel

Publications (1)

Publication Number Publication Date
CN208792077U true CN208792077U (en) 2019-04-26

Family

ID=66200210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820757779.5U Active CN208792077U (en) 2018-05-21 2018-05-21 A kind of hard surface in top plate water drenching tunnel

Country Status (1)

Country Link
CN (1) CN208792077U (en)

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN207987964U (en) A kind of reinforcing inspection shaft
CN103061328B (en) Post-grouting gravel pile with sand wall wing plates and construction method
CN108547641B (en) Substrate reinforcing system of heavy-duty railway tunnel in water-rich weak stratum and construction method thereof
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN109797769B (en) Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN107905811B (en) Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure
CN110409244B (en) Composite bearing prefabricated road slab and prefabricated pavement construction method
CN106759496A (en) Anti-settling inspection shaft changes the outfit technique
WO2019007176A1 (en) Foam light soil railway subgrade structure and construction method
CN103835203A (en) Deep soft foundation back-jacking light road embankment structure and construction method thereof
CN104452510B (en) Immediate construction method of rural road
CN105714635A (en) Concrete drainage road surface and construction and repairing method thereof
CN107740588B (en) A kind of hoisting transportation method of narrow location construction material in city
CN108086083B (en) Road cushion
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN103225247A (en) Road cushion precast concrete and its laying construction method
CN208792077U (en) A kind of hard surface in top plate water drenching tunnel
CN204489562U (en) A kind of supporting construction depositing steel box-girder
CN103276645A (en) Precast pile, beam and slab renovation technology for diseases of existing line tunnel base
CN107794932B (en) Pier structure is backfilled to foam lightweight concrete
CN102337715A (en) Granite concrete pavior brick and its manufacturing method
JP6553464B2 (en) Construction method of concrete pavement structure
CN205474894U (en) French drain drainage structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant