CN106759496A - Anti-settling inspection shaft changes the outfit technique - Google Patents

Anti-settling inspection shaft changes the outfit technique Download PDF

Info

Publication number
CN106759496A
CN106759496A CN201610854814.0A CN201610854814A CN106759496A CN 106759496 A CN106759496 A CN 106759496A CN 201610854814 A CN201610854814 A CN 201610854814A CN 106759496 A CN106759496 A CN 106759496A
Authority
CN
China
Prior art keywords
settling
concrete
well lid
concrete cover
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610854814.0A
Other languages
Chinese (zh)
Other versions
CN106759496B (en
Inventor
丁奋勇
应振海
叶青敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ye Zhuang Technology & Trade Co Ltd
NANJING ZHUOER WATER-SAVING ENVIRONMENTAL PROTECTION ENGINEERING INDUSTRIAL CO LTD
Shanxi Taishui Municipal Engineering Co Ltd
Original Assignee
Nanjing Ye Zhuang Technology & Trade Co Ltd
NANJING ZHUOER WATER-SAVING ENVIRONMENTAL PROTECTION ENGINEERING INDUSTRIAL CO LTD
Shanxi Taishui Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ye Zhuang Technology & Trade Co Ltd, NANJING ZHUOER WATER-SAVING ENVIRONMENTAL PROTECTION ENGINEERING INDUSTRIAL CO LTD, Shanxi Taishui Municipal Engineering Co Ltd filed Critical Nanjing Ye Zhuang Technology & Trade Co Ltd
Priority to CN201610854814.0A priority Critical patent/CN106759496B/en
Publication of CN106759496A publication Critical patent/CN106759496A/en
Application granted granted Critical
Publication of CN106759496B publication Critical patent/CN106759496B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of anti-settling inspection shaft changes the outfit technique, it is characterized in that comprising the following steps:Step 1) prefabricated anti-settling concrete cover (1), anti-settling concrete cover (1) is reinforced concrete structure;Step 2) road surface cutting:Centered on well room, the length for increasing 200mm per side according to the size of anti-settling concrete cover (1) carries out cutting road surface, removes original well cover frame, and dabbing treatment is carried out to surrounding.Anti-settling inspection shaft of the invention changes the outfit construction technology simply, saves the time, is easy to operation, influences smaller to traffic current, and the old-fashioned well lid for being applicable to vast both urban and rural area changes the outfit.

Description

Anti-settling inspection shaft changes the outfit technique
Technical field
Changed the outfit technique the present invention relates to well lid technical field of construction, especially a kind of anti-settling inspection shaft.
Background technology
The inspection shaft that the solid clay brick for commonly using at present is built by laying bricks or stones, low intensity, water penetration are high, use table after a period of time Skin comes off loose inside, causes well body integral sinking, periphery roadbed subsidence, as road engineering in a big common fault, thus produce Raw potential safety hazard, inspection shaft hurt sb.'s feelings, the damage accident of vehicle happens occasionally.
In addition, cement pressed brick is similar to clay brick, intensity is not reached, and connectivity is poor, and assembling type device for detecting manhole is conducted oneself with dignity Heavier, assembled difficulty is big, it is necessary to installed with loop wheel machine, cumbersome.
The content of the invention
Changed the outfit technique it is an object of the invention to provide a kind of anti-settling inspection shaft, replace original old-fashioned inspection shaft, changed the outfit The anti-settling inspection shaft of Cheng Caiyong corrosion-resistant anti-compressions, high intensity.
The technical scheme is that:
A kind of anti-settling inspection shaft changes the outfit technique, it is characterized in that comprising the following steps:
Step 1) prefabricated anti-settling concrete cover (1), anti-settling concrete cover (1) is reinforced concrete structure;
Step 2) road surface cutting:Centered on well room, increase per side according to the size of anti-settling concrete cover (1) The length of 200mm carries out cutting road surface, removes original well cover frame, and dabbing treatment is carried out to surrounding;
Step 3) Jing Zhou basic units crushing and clearing:According to the feelings such as original pavement of road, basis, inspection shaft and surrounding, well room Condition excavates downwards 45-55CM along blacktop, and the adjustment of pit shaft absolute altitude is carried out with modular brick or concrete brick;And to pit shaft week Tamped with battering ram on the basis on side;
Step 4) pea gravel concreten bed course (11) construction:By basic unit's bottom leveling, compacting after excavation, and surrounding basis Backfilled using two ashes, Yong Shang Quan are levelling, the difference in height on after basis is finished and ground is 300mm, and levelling absolute altitude is higher than pit shaft 50mm;
Step 5) anti-settling concrete cover (1) and well lid (4) installation:After pea gravel concreten bed course (11) tentatively solidification Lift immediately, anti-settling concrete cover (1) is in place, the hole to be provided of rear holding pit shaft in place and anti-settling concrete cover (1) Mouthful (2) with one heart, anti-settling concrete cover (1) side parallel to direction of traffic, and anti-settling concrete cover (1) lower surface with Pea gravel concreten bed course (11) contact is closely knit, and anti-settling concrete cover (1) upper level is less than asphalt concrete pavement 10mm, it is ensured that bituminous concrete laying depth, additionally, the size according to well lid base (3) upper limit ring (5) determines that bolt is fixed The position of mouth, on anti-settling concrete cover (1), gets 4 holes of symmetrical diameter 18mm, then fixed with expansion bolt Spacing ring (5), well head is concentric with walling crib;
Step 6) changeover portion asphalt concrete construction around anti-settling concrete cover:Bituminous concrete is backfilled into mould (12) it is buckled on well lid base (3), after bituminous concrete backfills mould (12) in place, in anti-settling concrete cover (1) surrounding Space with C30 pea gravel concretens fill it is closely knit, bituminous concrete is carried out to well lid base (3) surrounding and is poured, and use equipment Levelling pitch, well lid and road surface (10);
Step 7) compacting pitch, remaining soil outward transport:Pitch to well room surrounding is tamped, and well lid is put after road surface is recovered (4) anti-theft bolt (6), is installed and well lid (4) is compacted, road surface is finally cleaned, remaining soil and construction rubbish outward transport completes to change the outfit.
Anti-settling concrete cover (1) middle part offers reserved opening (2).
This has damping washer (9) between the well lid (4) and well lid base (3)
The spacing ring (5) is arranged on well lid base (3).
Well lid base (3) inner ring is provided with anti-theft bolt seat (7), and anti-theft bolt (6) is through well lid (4) and anti-theft bolt Seat (7) is threadedly coupled with anti-theft nut (8) afterwards.
It is tubbiness that the bituminous concrete backfills mould (12), and top is cone cylinder (13), bituminous concrete backfill mould (12) be respectively provided on two sides with handle (14).
The beneficial effects of the invention are as follows:
Anti-settling inspection shaft of the invention changes the outfit construction technology simply, saves the time, is easy to operation, and traffic current is influenceed Smaller, the old-fashioned well lid for being applicable to vast both urban and rural area changes the outfit.
After changing the outfit, sedimentation will not be produced, effectively prevent disaster from occurring, and with service life more long.
Short construction period, destroys small to pavement of road, and underground pipe network also can be protected effectively, and backfilling process is accurately tight It is close, with original road surface holding level after changing the outfit, the drawbacks of overcome low-lying deformation.
Using particular manufacturing craft, technique is accurate, the no-float between well lid, it is not easy to deformation, the well lid after changing the outfit occur Combined together with road surface, it is elegant in appearance.
Brief description of the drawings
Fig. 1 is the structural representation of anti-settling concrete cover of the invention.
Fig. 2 is the construction technology process schematic that changes the outfit of the invention.
Fig. 3 is the planar structure schematic diagram that bituminous concrete of the invention backfills mould.
Fig. 4 is the overlooking the structure diagram that bituminous concrete of the invention backfills mould.
Fig. 5 is the structural representation of well lid of the invention and base.
In figure:1 is anti-settling concrete cover, 2 is reserved opening, 3 is well lid base, 4 is well lid, 5 is spacing ring, 6 For anti-theft bolt, 7 be anti-theft bolt seat, 8 be anti-theft nut, 9 be damping washer, 10 be road surface, 11 be pea gravel concreten bed course, 12 is bituminous concrete backfill mould, 13 is cone cylinder, 14 is handle.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Such as Fig. 1 to Fig. 5
Work progress is as follows:
1st, prefabricated reinforced concrete anti-settling concrete cover, appearance and size from 1000 × 1000 × 200mm to 2000 × 2000 × 200mm, can be made according to actual conditions, and correcting center is according to the well lid specification reservation well lid size installed. By taking the straw hat formula well lid of model DN650 as an example, armored concrete anti-settling concrete cover is as shown in Figure 1.
2nd, road surface cutting, centered on well room, increases according to the size of armored concrete anti-settling concrete cover per side The length of 200mm carries out cutting road surface, notes the regularity of road surface cutting, removes original well cover frame, and dabbing is carried out to surrounding Treatment.
3rd, the crushing and clearing of Jing Zhou basic units
45- is excavated downwards along blacktop according to situations such as original pavement of road, basis, inspection shaft and surrounding, well room 55CM, the adjustment of pit shaft absolute altitude is carried out with modular brick or concrete brick;And the basis to pit shaft periphery is tamped with battering ram.
4th, pea gravel concreten cushion construction
Basic unit's bottom leveling, compacting after excavation, and surrounding basis are backfilled using two ashes, the levelling (peaces of Yong Shang Quan The loading plate of 200mm thickness is calculated), basis finish after with the difference in height on ground be 300mm, levelling absolute altitude should be higher than that pit shaft 50mm.Note during cushion construction with former base layer binding site must vibration compacting, while set up horizontal checkout bottom whether meet The requirement of the longitudinal and transverse gradient on road surface.
5th, the installation of anti-settling concrete cover and well lid
Lifted immediately after the tentatively solidification of pea gravel concreten bed course, precast concrete cover is in place, it is in place after keep pit shaft with With one heart, deck side edge is closely knit with pea gravel concreten layer contacts parallel to direction of traffic, and cover plate lower surface for cover plate reserved opening, Cover plate upper level is less than asphalt concrete pavement 10mm, it is ensured that bituminous concrete laying depth, additionally, according to spacing ring The position of size and determination bolt fixing port, on anti-settling concrete cover, makes a call to 4 holes of symmetrical diameter 18mm, then use Expansion bolt fixes spacing ring, and bolt need to be tightened fully, be fixed concrete packing ring with M10 cement mortar, well head and well Circle is concentric.
6th, changeover portion asphalt concrete construction around anti-settling concrete cover
Bituminous concrete is backfilled into mould (12) to be buckled on well lid base (3), it is in place that bituminous concrete backfills mould (12) Afterwards, fill closely knit with C30 pea gravel concretens in the space of anti-settling concrete cover (1) surrounding, well lid base surrounding is entered Row bituminous concrete is poured, and with the levelling pitch of equipment, well lid and road surface.
7th, pitch, remaining soil outward transport are tamped
Recover to require according to municipal sector's pitch, according to ground elevation, the pitch to well room surrounding is tamped, and treats road surface Well lid is put after recovery, anti-theft screw is installed and well lid is compacted, finally clean road surface, remaining soil and construction rubbish outward transport are completed Change the outfit.
Anti-settling concrete cover (1) middle part offers reserved opening (2).
This has damping washer (9) between the well lid (4) and well lid base (3)
The spacing ring (5) is arranged on well lid base (3).
Well lid base (3) inner ring is provided with anti-theft bolt seat (7), and anti-theft bolt (6) is through well lid (4) and anti-theft bolt Seat (7) is threadedly coupled with anti-theft nut (8) afterwards.
It is tubbiness that the bituminous concrete backfills mould (12), and top is cone cylinder (13), bituminous concrete backfill mould (12) be respectively provided on two sides with handle (14).
Embodiment described above is only that the preferred embodiment of the present invention is described, not to structure of the invention Think and scope is defined, under the premise of design concept of the present invention is not departed from, ordinary skill technical staff is to this hair in this area The all variations and modifications that bright technical scheme is made, all should fall into protection scope of the present invention, claimed skill of the invention Art content has all been recorded in detail in the claims.

Claims (6)

1. a kind of anti-settling inspection shaft changes the outfit technique, it is characterized in that comprising the following steps:
Step 1) prefabricated anti-settling concrete cover (1), anti-settling concrete cover (1) is reinforced concrete structure;
Step 2) road surface cutting:Centered on well room, increase 200mm's per side according to the size of anti-settling concrete cover (1) Length carries out cutting road surface, removes original well cover frame, and dabbing treatment is carried out to surrounding;
Step 3) Jing Zhou basic units crushing and clearing:The edge according to situations such as original pavement of road, basis, inspection shaft and surrounding, well room Blacktop excavates downwards 45-55CM, and the adjustment of pit shaft absolute altitude is carried out with modular brick or concrete brick;And to pit shaft periphery Tamped with battering ram on basis;
Step 4) pea gravel concreten bed course (11) construction:Basic unit's bottom leveling, compacting after excavation, and surrounding basis are used Two ashes are backfilled, and Yong Shang Quan are levelling, and the difference in height on after basis is finished and ground is 300mm, and levelling absolute altitude is higher than pit shaft 50mm;
Step 5) anti-settling concrete cover (1) and well lid (4) installation:After pea gravel concreten bed course (11) tentatively solidification immediately Lift, anti-settling concrete cover (1) is in place, the reserved opening (2) of rear holding pit shaft in place and anti-settling concrete cover (1) With one heart, anti-settling concrete cover (1) side is parallel to direction of traffic, and anti-settling concrete cover (1) lower surface and microlith Concrete cushion (11) contact is closely knit, and anti-settling concrete cover (1) upper level is less than asphalt concrete pavement 10mm, really Bituminous concrete laying depth is protected, additionally, the size according to well lid base (3) upper limit ring (5) determines the position of bolt fixing port Put, on anti-settling concrete cover (1), get 4 holes of symmetrical diameter 18mm, then spacing ring is fixed with expansion bolt (5), well head is concentric with walling crib;
Step 6) changeover portion asphalt concrete construction around anti-settling concrete cover:Bituminous concrete is backfilled into mould (12) to buckle On well lid base (3), after bituminous concrete backfills mould (12) in place, in the space of anti-settling concrete cover (1) surrounding Fill closely knit with C30 pea gravel concretens, bituminous concrete is carried out to well lid base (3) surrounding and is poured, and with the levelling drip of equipment Blue or green, well lid and road surface (10);
Step 7) compacting pitch, remaining soil outward transport:Pitch to well room surrounding is tamped, and well lid (4) is put after road surface is recovered, Anti-theft bolt (6) is installed and well lid (4) is compacted, road surface is finally cleaned, remaining soil and construction rubbish outward transport complete to change the outfit.
2. anti-settling inspection shaft according to claim 1 changes the outfit technique, it is characterised in that the anti-settling concrete cover (1) middle part offers reserved opening (2).
3. anti-settling inspection shaft according to claim 1 changes the outfit technique, it is characterised in that the well lid (4) and well lid base (3) this has damping washer (9) between.
4. anti-settling inspection shaft according to claim 1 changes the outfit technique, it is characterised in that the spacing ring (5) is arranged on well On cover base (3).
5. anti-settling inspection shaft according to claim 1 changes the outfit technique, it is characterised in that well lid base (3) inner ring sets There is anti-theft bolt seat (7), anti-theft bolt (6) is threadedly coupled with anti-theft nut (8) afterwards through well lid (4) with anti-theft bolt seat (7).
6. anti-settling inspection shaft according to claim 1 changes the outfit technique, it is characterised in that the bituminous concrete backfills mould Tool (12) is tubbiness, top is cone cylinder (13), and bituminous concrete backfill mould (12) is respectively provided on two sides with handle (14).
CN201610854814.0A 2016-09-28 2016-09-28 Anti-settling inspection shaft changes the outfit technique Expired - Fee Related CN106759496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610854814.0A CN106759496B (en) 2016-09-28 2016-09-28 Anti-settling inspection shaft changes the outfit technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610854814.0A CN106759496B (en) 2016-09-28 2016-09-28 Anti-settling inspection shaft changes the outfit technique

Publications (2)

Publication Number Publication Date
CN106759496A true CN106759496A (en) 2017-05-31
CN106759496B CN106759496B (en) 2019-03-22

Family

ID=58972246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610854814.0A Expired - Fee Related CN106759496B (en) 2016-09-28 2016-09-28 Anti-settling inspection shaft changes the outfit technique

Country Status (1)

Country Link
CN (1) CN106759496B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035382A (en) * 2017-12-21 2018-05-15 广州市城市规划勘测设计研究院 Pithead position correcting method
CN108589497A (en) * 2018-07-09 2018-09-28 中交天航环保工程有限公司 A kind of inspection shaft circumferential annular cutter device and cutting method
CN109826234A (en) * 2019-01-09 2019-05-31 深圳市平通工程有限公司 A kind of maintaining process of national highway inspection well cover
CN110158660A (en) * 2019-06-11 2019-08-23 陕西路桥集团有限公司 A kind of tunnel center inspection shaft well lid construction method for being adapted to heavy traffic and rolling
CN111041947A (en) * 2019-12-30 2020-04-21 云南省建设投资控股集团有限公司 Mold for anti-settling well lid construction limiting well ring and construction method thereof
CN112095668A (en) * 2020-09-22 2020-12-18 齐力建设集团有限公司 Municipal road anti-settlement manhole cover and rapid construction method thereof
CN112681386A (en) * 2020-12-08 2021-04-20 吴兴利新水泥制品厂 Cement prefabricated anti-settling well mat
CN114622600A (en) * 2022-01-26 2022-06-14 杭州市路桥集团股份有限公司 Urban road assembled anti-settling well cover maintenance method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20302717U1 (en) * 2003-02-20 2003-04-30 Scheer, Richard, 55432 Damscheid Road inspection concrete cover surround made of lightweight special reinforced concrete
CN102644295A (en) * 2012-04-28 2012-08-22 江苏阳湖建设项目管理有限公司 Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN103114607A (en) * 2013-03-04 2013-05-22 济南城建集团有限公司 Anti-settling manhole cover and construction method thereof
CN105421571A (en) * 2015-12-15 2016-03-23 重庆金灿钢结构有限公司 Sewer well and rainwater well construction process

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20302717U1 (en) * 2003-02-20 2003-04-30 Scheer, Richard, 55432 Damscheid Road inspection concrete cover surround made of lightweight special reinforced concrete
CN102644295A (en) * 2012-04-28 2012-08-22 江苏阳湖建设项目管理有限公司 Construction method for preventing peripheral and local sedimentation of road surface inspection well
CN103114607A (en) * 2013-03-04 2013-05-22 济南城建集团有限公司 Anti-settling manhole cover and construction method thereof
CN105421571A (en) * 2015-12-15 2016-03-23 重庆金灿钢结构有限公司 Sewer well and rainwater well construction process

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035382A (en) * 2017-12-21 2018-05-15 广州市城市规划勘测设计研究院 Pithead position correcting method
CN108589497A (en) * 2018-07-09 2018-09-28 中交天航环保工程有限公司 A kind of inspection shaft circumferential annular cutter device and cutting method
CN109826234A (en) * 2019-01-09 2019-05-31 深圳市平通工程有限公司 A kind of maintaining process of national highway inspection well cover
CN110158660A (en) * 2019-06-11 2019-08-23 陕西路桥集团有限公司 A kind of tunnel center inspection shaft well lid construction method for being adapted to heavy traffic and rolling
CN111041947A (en) * 2019-12-30 2020-04-21 云南省建设投资控股集团有限公司 Mold for anti-settling well lid construction limiting well ring and construction method thereof
CN112095668A (en) * 2020-09-22 2020-12-18 齐力建设集团有限公司 Municipal road anti-settlement manhole cover and rapid construction method thereof
CN112681386A (en) * 2020-12-08 2021-04-20 吴兴利新水泥制品厂 Cement prefabricated anti-settling well mat
CN114622600A (en) * 2022-01-26 2022-06-14 杭州市路桥集团股份有限公司 Urban road assembled anti-settling well cover maintenance method

Also Published As

Publication number Publication date
CN106759496B (en) 2019-03-22

Similar Documents

Publication Publication Date Title
CN106759496A (en) Anti-settling inspection shaft changes the outfit technique
CN110056000B (en) Construction method and structure of counter weight type retaining wall
CN110295628A (en) A kind of pavement construction method with inspection shaft
CN104358196B (en) Highway open to traffic Embankment Subsidence disposes the construction method of structure
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN108035379B (en) Comprehensive pipe gallery and construction method thereof
CN210529400U (en) Solidified building residue soil road structure
CN102493485A (en) Method for building slope protection retaining wall during filling
CN210797316U (en) Box culvert construction structure on soft foundation
CN107642109A (en) A kind of town road heavy well cover walling crib ruggedized construction and its construction method
CN207228166U (en) A kind of town road heavy well cover walling crib ruggedized construction
KR20020022446A (en) Repairing method of earth-fill dam
CN206971279U (en) A kind of municipal administration is mated formation bright dress inspection shaft and engineering attachment structure of mating formation in engineering
CN112982051B (en) Roadbed suitable for karst landform and construction method
CN210797245U (en) Structure is backfilled to bridgehead abutment back of body
CN114457855A (en) Sunken horizontal seepage-proofing and perpendicular seepage-proofing integrated configuration
CN114855522A (en) Replacement and filling method for treating municipal road soft soil foundation
CN209816896U (en) Collapsible loess area utility tunnel foundation structure
CN211057526U (en) Road bed for municipal road engineering
CN210780020U (en) Integrated railway cable trough structure
CN211142675U (en) Roadbed structure of expressway filled with muck type construction waste
CN209924091U (en) Rectangular side ditch structure for reducing roadbed water level and discharging road surface
CN210151776U (en) Structure of balance weight type retaining wall
CN109403356B (en) Side slope supporting structure
CN206448289U (en) It is provided with the large tank basis of connection raceway groove

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: SHANXI TAISHUI MUNICIPAL ENGINEERING CO., LTD. Patent person in charge

Document name: Notice of non patent agent (person)

DD01 Delivery of document by public notice
PB01 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Nanjing Ye Zhuang technology & Trade Co., Ltd.

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322

Termination date: 20200928

CF01 Termination of patent right due to non-payment of annual fee