CN208763379U - The operation processing device of super high rise structure - Google Patents
The operation processing device of super high rise structure Download PDFInfo
- Publication number
- CN208763379U CN208763379U CN201820904486.5U CN201820904486U CN208763379U CN 208763379 U CN208763379 U CN 208763379U CN 201820904486 U CN201820904486 U CN 201820904486U CN 208763379 U CN208763379 U CN 208763379U
- Authority
- CN
- China
- Prior art keywords
- chassis
- super high
- high rise
- processing device
- operation processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model provides a kind of operation processing device of super high rise structure, comprising: at least two operating platform units and channel design;The operating platform unit and/or the channel design connect the super high rise structure by the first connection structure, and the channel design is along vertically to sequentially passing through the part or all of at least two operating platforms unit.The utility model can greatly reduce the duration, improve efficiency, the quality of effective guarantee platform.
Description
Technical field
The utility model relates to the realm of building construction more particularly to a kind of operation processing devices of super high rise structure.
Background technique
Currently, high-rise steel structure construction field, numerous items outer framework steel structure system is complicated and changeable, and non-traditional steel knot
The smooth vertical and horizontal structure type of structure, monomer members are often anomalistic object, and operating condition is complicated in these component mounting process, constructor
Member's installation exercise is difficult.
In the construction of traditional high-rise steel structure, scaffold building is generallyd use in outer framework Steel Structure Installation ascend a height and operate and put down
Platform, foot need to follow constantly being mounted on high-altitude and setting up scaffold operating platform for frame structure by hand, while construction personnel need to be
A series of operations such as component installation, measurement correction, Member Welding are completed on the operating platform set up.
It will cause that the construction period is longer and quality is difficult to the problems such as ensureing.
Utility model content
The utility model provides a kind of operation processing device of super high rise structure, mentioned above to solve the problems, such as.
It is according to the present utility model in a first aspect, providing a kind of operation processing device of super high rise structure, comprising: at least
Two operating platform units and channel design;The operating platform unit and/or the channel design pass through the first connection structure
Connect the super high rise structure, the channel design is along vertically to sequentially passing through part or all of at least two operating platform
Unit.
Optionally, the super high rise structure is equipped with the second connection structure, and first connection structure and described second connect
Connect structure matching connection.
Optionally, first connection structure includes support ontology and hook portion, and second connection structure includes can
The groove body of the hook portion is accommodated, and set on the limiting section of the groove body opening, the support ontology passes through the limit
Portion is connected at the intracorporal hook portion of the slot, the support ontology and the operating platform unit and/or the channel
Structure connection.
Optionally, the operating platform unit includes the first chassis, and the first guardrail on first chassis
Component;
If the operating platform unit connects the super high rise structure by first connection structure, described first connects
Binding structure is set to first chassis and/or first fence assembly.
Optionally, the operating platform unit further includes the second chassis, and the second shield on second chassis
Column component, second chassis is along to the upside or downside for being set to first chassis, second chassis passes through third vertically
Connection structure is connect with first chassis.
Optionally, the third connection structure is step ladder structure, or: first chassis and second chassis it
Between be additionally provided with step ladder structure.
Optionally, the operating platform unit further includes the turnover panel knot for being connected to first chassis or second chassis
Structure.
Optionally, on the upside of the operating platform unit and/or downside is equipped with guard ring structure, and the guard ring structure is connected to institute
State channel design.
Optionally, the channel design includes that fashioned iron and horizontal direction parallel to each other connect two adjacent fashioned iron
Connect steel construction.
Optionally, it is also connected by diagonal brace between the operating platform unit and the channel design.
The operation processing device of super high rise structure provided by the utility model passes through the operating platform unit and/or institute
It states channel design and the super high rise structure is connected by the first connection structure, the channel design is along vertically to sequentially passing through part
Or whole at least two operating platforms units, it avoids and builds complicated scaffold, so that the platform for operation is easier to
In installation, to greatly reduce the duration, efficiency is improved, meanwhile, compared to the repetitive process for manually building scaffold, this reality
It will not be influenced by the quality of operating personnel with the platform mass of novel operating device, thus the effective guarantee matter of platform
Amount.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property
It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram one of the operation processing device of super high rise structure in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram two of the operation processing device of super high rise structure in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the first connection structure and the second connection structure in an embodiment of the present invention;
Fig. 4 is the diagrammatic cross-section of the first connection structure and the second connection structure in an embodiment of the present invention;
Fig. 5 a to Fig. 5 d is that the process of the operation processing device in an embodiment of the present invention using super high rise structure is shown
It is intended to.
Description of symbols:
1- super high rise structure;
2- channel design;
3- operating platform unit;
The first chassis of 31-;
The second chassis of 32-;
The first fence assembly of 33-;
The second fence assembly of 34-;
35- third connection structure;
36- diagonal brace;
37- reverse turning bed structure;
The first connection structure of 4-;
41- supports ontology;
42- hook portion;
The second connection structure of 5-;
51- groove body;
52- limiting section;
6- guard ring structure.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
The specification and claims of the utility model and term " first ", " second ", " third " in above-mentioned attached drawing
(if present)s such as " the 4 " are to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It answers
The data that the understanding uses in this way are interchangeable under appropriate circumstances, so that the embodiments of the present invention described herein can
Implemented with the sequence other than those of illustrating or describing herein.In addition, term " includes " and " having " and they
Any deformation, it is intended that cover it is non-exclusive include, for example, containing the process, method of a series of steps or units, being
System, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include be not clearly listed or
For the intrinsic other step or units of these process, methods, product or equipment.
The technical solution of the utility model is described in detail with specifically embodiment below.These are specific below
Embodiment can be combined with each other, and the same or similar concept or process may be repeated no more in some embodiments.
Fig. 1 is the structural schematic diagram one of the operation processing device of super high rise structure in an embodiment of the present invention, and Fig. 2 is
The structural schematic diagram two of the operation processing device of super high rise structure in an embodiment of the present invention.
Please refer to Fig. 1 and Fig. 2, the operating device of super high rise structure 1, comprising: at least two operating platform units 3 and channel
Structure 2;The operating platform unit 3 and/or the channel design 2 pass through the first connection structure 4 and connect the super high rise structure
1, the channel design 2 is along vertically to sequentially passing through the part or all of at least two operating platforms unit 3.
Wherein:
Channel design 2 can be regarded as climbing for staff by structure, the form of structure can be multiplicity.
It can connect super high rise structure 1, can also attended operation platform unit 3, and then with operating platform unit 3 formed one it is stable whole
Body.
Operating platform unit 3 can be regarded as arbitrarily standing for staff carries out the structure of operation, structure shape thereon
Formula can be multiplicity, can connect super high rise structure 1, can also connecting pipeline structure 2.
In one of embodiment, the channel design 2 may include fashioned iron and horizontal direction connection parallel to each other
The connection steel construction of two adjacent fashioned iron, fashioned iron therein can be I-steel, be the main body of channel design 2, in Fig. 1 and
In the embodiment of Fig. 2 signal, channel design 2 is along vertically to linear arrangement, in other alternative embodiments, channel design 2
It may be any regular or irregular shape.
In one of embodiment, also connected by diagonal brace 36 between the operating platform unit 3 and the channel design 2
It connects, while ensureing connective stability, can also provide support for operating platform unit 3.
Fig. 3 is the structural schematic diagram of the first connection structure and the second connection structure in an embodiment of the present invention;Fig. 4 is
The diagrammatic cross-section of first connection structure and the second connection structure in an embodiment of the present invention.
Please refer to Fig. 3 and Fig. 4, the super high rise structure 1 is equipped with the second connection structure 5, first connection structure 4 with
The matching of second connection structure 5 connection.Wherein, can be regarded as with the second connection structure 5 being capable of the company of matching for the first connection structure 4
It connects, and plays the connection structure of mutual supporting role.
Referring to FIG. 4, first connection structure 4 includes support ontology 41 and hook portion 42, second connection structure 5
Groove body 51 including the hook portion 42 can be accommodated, and set on the limiting section 52 of 51 opening of groove body, the support
Ontology 41 passes through the limiting section 52 and is connected at the hook portion 42 in the groove body 51, the support ontology 41 with it is described
Operating platform unit 3 and/or the channel design 2 connect.
In one of embodiment, support ontology 41 can be connect by two tie points with channel design 2, or be passed through
Two tie points are connect with operating platform unit 3, specifically, can be attached in tie point using latch structure or helicitic texture,
For example, operating platform unit 3 or channel design 2 are set there are two the first hole, support ontology 41 is set there are two the second hole, latch structure or
Helicitic texture, to can realize that positioning is fixed by two o'clock, stablizes 5 phase of the second connection structure also cross the first hole and the second hole
For the position of channel design 2 or operating platform unit 3.
Wherein, by limiting section 52 to the restriction effect of hook portion 42, the first connection structure 4 will not be relative to the second connection
Lateral position variation, and rotation occur for structure 5.
Referring to FIG. 2, the operating platform unit 3 includes the first chassis 31, and on first chassis 31
First fence assembly 33.
If the operating platform unit 3 connects the super high rise structure 1 by first connection structure 4, described
One connection structure 4 is set to first chassis 31 and/or first fence assembly 33.If the channel design 2 passes through institute
It states the first connection structure 4 and connects the super high rise structure 1, then first connection structure 4 is set to the channel design 2.
The operating platform unit 3 further includes the second chassis 32, and the second guardrail on second chassis 32
Component 34, second chassis 32 is along to the upside or downside for being set to first chassis 31, second chassis 32 is logical vertically
Third connection structure 5 is crossed to connect with first chassis 31.
As it can be seen that the difference of the first chassis 31 and the second chassis 32 can be regarded as: if the operating platform unit 3 is described in
First connection structure 4 connects the super high rise structure 1, then the first chassis 31 is the chassis for being provided with the first connection structure 4, and first
Fence assembly 33 is the fence assembly being set on the first chassis 31;Second chassis is the bottom for being not provided with the first connection structure 4
Frame, the second fence assembly 33 are the fence assembly being set on the second chassis 32.
Referring to FIG. 2, wherein the first intermediate chassis 31, the second chassis 32 can belong to an operating platform unit 3, it is close
The first chassis 31, the second chassis 32 of bottom can belong to another operating platform unit 3, which can be total to
With a channel design 2.
Further, in an operating platform unit 3, the first chassis 31, the second chassis 32 quantity can be one,
Be also possible to multiple, it is adjacent with the second chassis 32 that arrangement mode can be the first chassis 31, be also possible to it is non-conterminous, such as:
The upside of one the first chassis 31 connects second chassis 32, and downside also connects second chassis 32, likewise, one the
The upper side and lower side of two chassis 32 can also be separately connected first chassis 31.
In addition, the upside or downside of the first chassis 31, other the first chassis 31 can also be connected, the upside of the second chassis 32 or
Downside can also connect other the second chassis 32.
For connecting the third connection structure 35 of the first chassis 31 and the second chassis 32, step ladder knot can be directly used
Structure, i.e. third connection structure 35 can be step ladder structure, or: it is removed between first chassis 31 and second chassis 32
Except connecting using third connection structure 35, it is additionally provided with step ladder structure.
In one of embodiment, the operating platform unit 3 further includes being connected to first chassis 31 or described
The reverse turning bed structure 37 of second chassis 32, reverse turning bed structure 37 can be turned to can realize around described by shaft connecting pipeline structure 2
The rotation of axis, in rotation to when maintaining an equal level with the bottom surface of the first chassis 31 or the second chassis 32, position be can be fixed, to expand
It is available for staff to stand the base area operated.
In one of embodiment, 3 upside of operating platform unit and/or downside are equipped with guard ring structure 6, the shield
Coil structures 6 are connected to the channel design 2.Staff can enter guard ring structure 6 along channel design 2, be made accordingly
Industry.
In one of embodiment, also connected by diagonal brace 36 between the operating platform unit 3 and the channel design 2
It connects.Diagonal brace 36 may connect between the first chassis 31 and channel design 2, be also connected to the second chassis 32 and channel design 2 it
Between.It can ensure stable connection and supporting role between the two.
In addition, the operating device may also include the oblique of connection super high rise structure 1 and the packaged type of operating platform unit 3
Ladder (not shown).
The operation processing device of super high rise structure provided in this embodiment, by the operating platform unit and/or described
Channel design connects the super high rise structure by the first connection structure, the channel design along vertically to sequentially pass through part or
All at least two operating platforms units avoid and build complicated scaffold, so that the platform for operation is easier to
Installation, to greatly reduce the duration, improves efficiency, meanwhile, compared to the repetitive process for manually building scaffold, this is practical
The platform mass of novel operating device will not be influenced by the quality of operating personnel, thus the effective guarantee quality of platform.
Fig. 5 a to Fig. 5 d is that the process of the operation processing device in an embodiment of the present invention using super high rise structure is shown
It is intended to.
Fig. 5 a to Fig. 5 d is please referred to, the process used can specifically include:
Step 1: operating device being moved integrally to the corresponding position of super high rise structure, and completes pair of the first connection structure
Position.Specifically, please referring to Fig. 5 a, loop wheel machine (tower crane or giant caterpillar crane) can be used and hang the operating device that assembly is completed
It is filled to the corresponding position for the super high rise structure this section structural column completed, and by the first connection structure 4 involved in above
Hook portion 42 is inserted into the groove body 51 of the second connection structure 5.
Step 2: staff completes being connected and fixed for the first connection structure.Staff can pass through mobile oblique ladder
It reaches in operating device, locks the position of the first connection structure 4 and the second connection structure 5, for example, insertion latch structure or screw thread knot
Structure, and carry out installation exercise.
Step 3: please referring to Fig. 5 b, section structure column lifting is in place on super high rise structure, and bottom position can be by one group of work
Make personnel and carry out installation exercise, staff reaches top by channel design 2 and carries out the operation of component uncoupling.
Step 4: please referring to Fig. 5 c, loop wheel machine (tower crane or giant caterpillar crane) can be used by operating device and hang promotion one
The height of section structure column is prepared to install a section structure column.
Step 5: please referring to 5d, can be regarded as upper section structure column, repeating such steps.Fig. 5 a can specifically be compared
Understand with Fig. 5 d.
Above is referred to this section structural column and upper section structure column, can refer to five-layer structure layer L-1, L in Fig. 5 a to Fig. 5 d,
L+1, L+2, L+3, L+4 understand that double-layer structure layer therein can correspond to a section structure column.
To sum up, the utility model and its optional embodiment can have following positive technical effect:
The reliable construction operation platform of high-rise frame structure construction safety and construction channel are provided, while the utility model can
With whole promotion, the height in an installation section is promoted, within a short period of time so as to avoid present in traditional scaffold system
Set up that the time is long, the bad problem of security and stability reaches and shortens high-level structure installation period, improves installation effectiveness, improves
The purpose of work progress overall security.
Finally, it should be noted that the above various embodiments is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should
Understand: it is still possible to modify the technical solutions described in the foregoing embodiments, or to some or all of
Technical characteristic is equivalently replaced;And these are modified or replaceed, it does not separate the essence of the corresponding technical solution, and this is practical new
The range of each embodiment technical solution of type.
Claims (10)
1. a kind of operation processing device of super high rise structure characterized by comprising at least two operating platform units and channel
Structure;The operating platform unit and/or the channel design are described by the first connection structure connection super high rise structure
Channel design is along vertically to sequentially passing through the part or all of at least two operating platforms unit.
2. the operation processing device of super high rise structure according to claim 1, which is characterized in that on the super high rise structure
Equipped with the second connection structure, first connection structure matches connection with second connection structure.
3. the operation processing device of super high rise structure according to claim 2, which is characterized in that first connection structure
Include the groove body that can accommodate the hook portion including support ontology and hook portion, second connection structure, and is set to institute
The limiting section of groove body opening is stated, the support ontology passes through the limiting section and is connected at the intracorporal hook of the slot
Portion, the support ontology are connect with the operating platform unit and/or the channel design.
4. the operation processing device of super high rise structure according to any one of claims 1 to 3, which is characterized in that the behaviour
Making platform unit includes the first chassis, and the first fence assembly on first chassis;
If the operating platform unit connects the super high rise structure, the first connection knot by first connection structure
Structure is set to first chassis and/or first fence assembly.
5. the operation processing device of super high rise structure according to claim 4, which is characterized in that the operating platform unit
It further include the second chassis, and the second fence assembly on second chassis, second chassis is along vertically to being set to
The upside or downside of first chassis, second chassis are connect by third connection structure with first chassis.
6. the operation processing device of super high rise structure according to claim 5, which is characterized in that the third connection structure
For step ladder structure, or: step ladder structure is additionally provided between first chassis and second chassis.
7. the operation processing device of super high rise structure according to claim 5, which is characterized in that the operating platform unit
It further include the reverse turning bed structure for being connected to first chassis or second chassis.
8. the operation processing device of super high rise structure according to any one of claims 1 to 3, which is characterized in that the behaviour
Make on the upside of platform unit and/or downside is equipped with guard ring structure, the guard ring structure is connected to the channel design.
9. the operation processing device of super high rise structure according to any one of claims 1 to 3, which is characterized in that described logical
Road structure includes the connection steel construction that fashioned iron and horizontal direction parallel to each other connect two adjacent fashioned iron.
10. the operation processing device of super high rise structure according to any one of claims 1 to 3, which is characterized in that the behaviour
Make also to connect by diagonal brace between platform unit and the channel design.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820904486.5U CN208763379U (en) | 2018-06-11 | 2018-06-11 | The operation processing device of super high rise structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820904486.5U CN208763379U (en) | 2018-06-11 | 2018-06-11 | The operation processing device of super high rise structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208763379U true CN208763379U (en) | 2019-04-19 |
Family
ID=66126715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820904486.5U Active CN208763379U (en) | 2018-06-11 | 2018-06-11 | The operation processing device of super high rise structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208763379U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532929A (en) * | 2018-06-11 | 2018-09-14 | 上海市机械施工集团有限公司 | The operating device of super high rise structure |
-
2018
- 2018-06-11 CN CN201820904486.5U patent/CN208763379U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532929A (en) * | 2018-06-11 | 2018-09-14 | 上海市机械施工集团有限公司 | The operating device of super high rise structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107524261A (en) | A kind of construction method of roofing Elements of Space Grid Truss | |
CN105484503B (en) | One kind tilts fusiformis space truss hanging method | |
CN208763379U (en) | The operation processing device of super high rise structure | |
CN201512940U (en) | Door type building scaffold | |
CN204876578U (en) | Building construction system | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN108532929A (en) | The operating device of super high rise structure | |
CN105839907A (en) | Suspension type steel platform scaffold foundation and method for mounting same | |
CN207144427U (en) | A kind of construction Anti-dropping rack | |
CN107059641B (en) | Goods shelf type pier body outer scaffold | |
CN202718125U (en) | Positioning and guiding frame for bailey steel trestle bridge pier foundation construction | |
CN207144527U (en) | The safeguard protection screen system of Steel Structure Installation | |
CN205653063U (en) | Gantry crane of hoist and mount container | |
CN204876575U (en) | Building construction system | |
CN106401157A (en) | Movable operation platform and high-altitude construction method | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN209567730U (en) | A kind of small-sized lattice dead man steel construction | |
CN207749426U (en) | A kind of bridge side guardrail template construction device | |
CN207260943U (en) | A kind of cat ladder | |
CN208150849U (en) | Steel vestibule integral lifting apparatus and steel vestibule installation system | |
CN207812982U (en) | A kind of inner wall of oil tank construction hanging basket | |
CN205617804U (en) | Support work platform | |
CN207374992U (en) | The accumulating stent of concrete plate-type component | |
CN203639825U (en) | Reserved concrete platform operating frame capable of pushing auxiliary-arm type SS stage guardrail | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |