CN208688755U - A kind of replacing panel of high-purity special gas - Google Patents

A kind of replacing panel of high-purity special gas Download PDF

Info

Publication number
CN208688755U
CN208688755U CN201821301172.2U CN201821301172U CN208688755U CN 208688755 U CN208688755 U CN 208688755U CN 201821301172 U CN201821301172 U CN 201821301172U CN 208688755 U CN208688755 U CN 208688755U
Authority
CN
China
Prior art keywords
valve
pressure helium
tube
helium
exhaust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821301172.2U
Other languages
Chinese (zh)
Inventor
曹旭峰
朱颜
王陆平
王仕华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QUANJIAO NANDA PHOTOELECTRIC MATERIAL Co Ltd
Original Assignee
QUANJIAO NANDA PHOTOELECTRIC MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANJIAO NANDA PHOTOELECTRIC MATERIAL Co Ltd filed Critical QUANJIAO NANDA PHOTOELECTRIC MATERIAL Co Ltd
Priority to CN201821301172.2U priority Critical patent/CN208688755U/en
Application granted granted Critical
Publication of CN208688755U publication Critical patent/CN208688755U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of replacing panels of high-purity special gas, it is related to high-purity special gas field, including connecting tube, high pressure helium tracheae, low pressure helium tube, exhaust pipe, exhaust tube, high-pressure helium storage device, exhaust gas processing device, vacuum pump, high pressure helium air valve, pressure reducing valve, low pressure helium valve, exhaust-valve, isolating valve,;The high pressure helium tracheae, low pressure helium tube, exhaust pipe, exhaust tube are arranged in parallel, and connect the connecting tube jointly;The high pressure helium tracheae, low pressure helium tube are all connected with the high-pressure helium storage device, and the high pressure helium tracheae is equipped with high pressure helium air valve, and the low pressure helium tube is equipped with pressure reducing valve and low pressure helium valve;The exhaust pipe connects the exhaust gas processing device, and the exhaust pipe is equipped with exhaust-valve;The exhaust tube connects the vacuum pump;The connecting tube is equipped with the 4th pressure gauge and isolating valve,.Utility model has the advantages that guaranteeing the purity of product and the safety of working environment.

Description

A kind of replacing panel of high-purity special gas
Technical field
The utility model relates to high-purity special gas field more particularly to a kind of replacing panels of high-purity special gas.
Background technique
As high-purity special gas of IC industry key raw material, not only occupy in IC industry important Status, the fields such as photovoltaic, flat-panel screens, compound semiconductor device, petrochemical industry, optical-fibre communications also all There is indispensable role, is widely used in the techniques such as film, doping, etching, diffusion, vapor deposition.With scientific skill The development of art, also higher and higher for the quality requirements of high-purity special gas, the purity requirement generally for gas is greater than 99.9999%, impurity total concentration is not higher than 1ppm (ppm indicates hundred a ten thousandths).
The transport of high-purity special gas is usually to be contained in gas by pipeline by pressure vessels such as steel cylinders In steel cylinder.If connecting pipe displacement is clean or there are leak sources, new impurity can be introduced so that product purity without Method guarantees 99.9999%;And special gas usually has many characteristics, such as that severe toxicity, explosive range are wide, easily reacts with oxygen, these belong to Property allows it to be even more important filling replacement operator when disconnecting and seem, and the implementation carrier of this operation is exactly replacing panel.It is existing Some replacing panels are not easy to exclude leak source, it cannot be guaranteed that the airtightness of whole system.
Utility model content
The technical problem to be solved by the utility model is to provide one kind can guarantee the high-purity of the airtightness of whole system The replacing panel of special gas.
The utility model is to solve a kind of above-mentioned technical problem: displacement of high-purity special gas by the following technical programs Panel, including connecting tube (14), high pressure helium tracheae (15), low pressure helium tube (16), exhaust pipe (17), exhaust tube (18), high pressure Helium storage device (19), exhaust gas processing device (20), vacuum pump (21), high pressure helium air valve (26), pressure reducing valve (27), low pressure helium Air valve (28), exhaust-valve (29), isolating valve, (32);The high pressure helium tracheae (15), low pressure helium tube (16), exhaust pipe (17), Exhaust tube (18) is arranged in parallel, and connects the connecting tube (14) jointly;The high pressure helium tracheae (15), low pressure helium tube (16) are equal The high-pressure helium storage device (19) is connected, the high pressure helium tracheae (15) is equipped with high pressure helium air valve (26), the low pressure Helium tube (16) is equipped with pressure reducing valve (27) and low pressure helium valve (28);The exhaust pipe (17) connects the exhaust gas processing device (20), the exhaust pipe (17) is equipped with exhaust-valve (29);The exhaust tube (18) connects the vacuum pump (21);The connection It manages (14) and is equipped with the 4th pressure gauge (25) and isolating valve, (32).Replacing panel is not only the carrier of replacement operator, can also lead to It crosses the 4th pressure gauge and high pressure survey leakage is carried out to the pipe-line system of connection, exclude leak source to guarantee the airtightness of whole system.
As the technical solution of optimization, from the high-pressure helium storage device (19) to institute on the high pressure helium tracheae (15) It states and is successively arranged first pressure gauge (22) and high pressure helium air valve (26) between connecting tube (14).
As the technical solution of optimization, from the high-pressure helium storage device (19) to institute on the low pressure helium tube (16) It states and is successively arranged pressure reducing valve (27), second pressure gauge (23) and low pressure helium valve (28) between connecting tube (14).
As the technical solution of optimization, on the exhaust tube (18) from the vacuum pump (21) to the connecting tube (14) it Between be successively arranged the first evacuation valve (30), third pressure gauge (24) and the second evacuation valve (31).It can be used for whether measuring valve There are interior leakages.
As the technical solution of optimization, the high-pressure helium storage device (19) uses high-pressure helium steel cylinder or helium packaging Lattice.
As the technical solution of optimization, each pressure gauge is all made of pressure gauge with digital display.
As the technical solution of optimization, each pressure gauge is all connected to automatic control system.
As the technical solution of optimization, each valve is all connected to automatic control system.
As the technical solution of optimization, each valve is all made of pneumatic diaphragm valve.The leak rate of this type valve is low, flux Greatly.
As the technical solution of optimization, tubing, the component of the replacing panel are all made of stainless steel.
Utility model has the advantages that replacing panel is not only the carrier of replacement operator, pressure gauge pair can also be passed through The pipe-line system of connection carries out high pressure survey leakage and low pressure judges whether there is valves leakage, excludes leak source to guarantee whole system Airtightness, do not introduce new impurity in the course of work, guarantee the purity of product and the safety of working environment;Emission-free row It puts;It is small in size, it is easy for installation, it is not take up space;Operator can remotely operate, and far from production line, reduce operation Triviality improves safety coefficient.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the replacing panel of the high-purity special gas of the utility model embodiment.
Specific embodiment
As shown in Figure 1, a kind of replacing panel of high-purity special gas, including high pressure helium tracheae 15, low pressure helium tube 16, row Tracheae 17, exhaust tube 18, high-pressure helium storage device 19, exhaust gas processing device 20, vacuum pump 21, first pressure gauge 22, second Pressure gauge 23, third pressure gauge 24, the 4th pressure gauge 25, high pressure helium air valve 26, pressure reducing valve 27, low pressure helium valve 28, exhaust-valve 29, the first evacuation valve 30, the second evacuation valve 31, isolating valve, 32.
High pressure helium tracheae 15, low pressure helium tube 16, exhaust pipe 17, exhaust tube 18 are arranged in parallel, common to connect connecting tube 14.
High pressure helium tracheae 15, low pressure helium tube 16 are all connected with high-pressure helium storage device 19, high-pressure helium storage device 19 Using high-pressure helium steel cylinder or helium packaging lattice.
From high-pressure helium storage device 19 to being successively arranged first pressure gauge 22 connecting tube 14 on high pressure helium tracheae 15 With high pressure helium air valve 26.
From high-pressure helium storage device 19 to being successively arranged pressure reducing valve 27, second connecting tube 14 on low pressure helium tube 16 Pressure gauge 23 and low pressure helium valve 28.
Exhaust pipe 17 connects exhaust gas processing device 20, and exhaust pipe 17 is equipped with exhaust-valve 29.
Exhaust tube 18 connects vacuum pump 21, from vacuum pump 21 to being successively arranged the first pumping connecting tube 14 on exhaust tube 18 Empty valve 30, third pressure gauge 24 and the second evacuation valve 31.
In connecting tube 14 3 from replacing panel to filling tube between be successively arranged the 4th pressure gauge 25 and isolating valve, 32.
First pressure gauge 22, second pressure gauge 23, third pressure gauge 24, the 4th pressure gauge 25 are all made of with communications protocol Pressure gauge with digital display, each pressure gauge passes through communications protocol and is connected to PLC, DCS automatic control system.
First valve 4, the second valve 5, third valve 13, high pressure helium air valve 26, low pressure helium valve 28, exhaust-valve 29, One evacuation valve 30, the second evacuation valve 31, isolating valve, 32 are all made of pneumatic diaphragm valve, and the leak rate of this type valve is low, flux is big, Each valve passes through communications protocol and is connected to PLC, DCS automatic control system.
The component of replacing panel uses VCR connection, and this connection type benefit is panel convenient disassembly, valve and pressure Replacement is convenient when table has damage, and leak rate is low.
The workflow of the replacing panel of the high-purity special gas of the present embodiment are as follows:
1, high pressure whether there is leakage to measure pipe fitting, access: open high pressure helium air valve 26, isolating valve, 32 is passed through about 60atm helium is to the pipeline pressure maintaining leakage detection newly accessed, it is desirable that positive and negative twice of the helium of new access pipeline examined using hand-held helium inspection instrument, Pressure maintaining 15 minutes.Helium leak test rate is lower than five times of environment leak rates, and the variation of 15 minutes the 4th pressure gauges 25 of pressure maintaining is less than 5psig, It can be considered that helium inspection passes through.
2, low pressure whether there is interior leakage to measure valve: opening the first evacuation valve 30, the second evacuation valve 31, opens vacuum pump 21 registrations for being evacuated to third pressure gauge 24 are Absolute Negative Pressure, are then shut off the first evacuation valve 30, pressure maintaining 5 minutes, if third The registration of pressure gauge 24 is constant, then valves leakage is not present.
3, replacement procedure: the high-pressure helium come out by high-pressure helium storage device 19 is adjusted to 3 using pressure reducing valve 27~ 5atm opens low pressure helium valve 28, after keeping 10~20s to wait until pipeline concora crush, opens the emptying of exhaust-valve 29 to the 4th pressure gauge After 25 display relative pressures, low pressure helium valve 28, exhaust-valve 29 are closed, then opens the first evacuation valve 30, the second evacuation valve 31 pumping Vacuum all shows range minimum to second pressure gauge 23, third pressure gauge 24, and above-mentioned whole process can be considered 1 displacement of completion Program, rerun 20 replacement procedures.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Made any modifications, equivalent replacements, and improvements etc., should be included in the guarantor of the utility model within novel spirit and principle Within the scope of shield.

Claims (10)

1. a kind of replacing panel of high-purity special gas, it is characterised in that: including connecting tube (14), high pressure helium tracheae (15), low Press helium tube (16), exhaust pipe (17), exhaust tube (18), high-pressure helium storage device (19), exhaust gas processing device (20), vacuum Pump (21), high pressure helium air valve (26), pressure reducing valve (27), low pressure helium valve (28), exhaust-valve (29), isolating valve, (32);The height Pressure helium tube (15), low pressure helium tube (16), exhaust pipe (17), exhaust tube (18) are arranged in parallel, and connect the connecting tube jointly (14);The high pressure helium tracheae (15), low pressure helium tube (16) are all connected with the high-pressure helium storage device (19), the high pressure Helium tube (15) is equipped with high pressure helium air valve (26), and the low pressure helium tube (16) is equipped with pressure reducing valve (27) and low pressure helium valve (28);The exhaust pipe (17) connects the exhaust gas processing device (20), and the exhaust pipe (17) is equipped with exhaust-valve (29);Institute It states exhaust tube (18) and connects the vacuum pump (21);The connecting tube (14) is equipped with the 4th pressure gauge (25) and isolating valve, (32)。
2. the replacing panel of high-purity special gas as described in claim 1, it is characterised in that: on the high pressure helium tracheae (15) From the high-pressure helium storage device (19) to being successively arranged first pressure gauge (22) and high pressure helium the connecting tube (14) Air valve (26).
3. the replacing panel of high-purity special gas as described in claim 1, it is characterised in that: on the low pressure helium tube (16) From the high-pressure helium storage device (19) to being successively arranged pressure reducing valve (27), second pressure gauge the connecting tube (14) (23) and low pressure helium valve (28).
4. the replacing panel of high-purity special gas as described in claim 1, it is characterised in that: from institute on the exhaust tube (18) State vacuum pump (21) to be successively arranged between the connecting tube (14) the first evacuation valve (30), third pressure gauge (24) and second take out Empty valve (31).
5. the replacing panel of high-purity special gas as described in claim 1, it is characterised in that: the high-pressure helium storage device (19) high-pressure helium steel cylinder or helium packaging lattice are used.
6. the replacing panel of high-purity special gas as described in any one in claim 1-5, it is characterised in that: each pressure gauge is adopted Use pressure gauge with digital display.
7. the replacing panel of high-purity special gas as described in any one in claim 1-5, it is characterised in that: each pressure gauge connects It is connected to automatic control system.
8. the replacing panel of high-purity special gas as described in any one in claim 1-5, it is characterised in that: each valve is all connected with To automatic control system.
9. the replacing panel of high-purity special gas as described in any one in claim 1-5, it is characterised in that: each valve is all made of Pneumatic diaphragm valve.
10. the replacing panel of high-purity special gas as described in any one in claim 1-5, it is characterised in that: the replacing panel Tubing, component be all made of stainless steel.
CN201821301172.2U 2018-08-13 2018-08-13 A kind of replacing panel of high-purity special gas Active CN208688755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821301172.2U CN208688755U (en) 2018-08-13 2018-08-13 A kind of replacing panel of high-purity special gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821301172.2U CN208688755U (en) 2018-08-13 2018-08-13 A kind of replacing panel of high-purity special gas

Publications (1)

Publication Number Publication Date
CN208688755U true CN208688755U (en) 2019-04-02

Family

ID=65884968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821301172.2U Active CN208688755U (en) 2018-08-13 2018-08-13 A kind of replacing panel of high-purity special gas

Country Status (1)

Country Link
CN (1) CN208688755U (en)

Similar Documents

Publication Publication Date Title
CN110410662B (en) Steel cylinder treatment system and method for ultra-high purity gas
CN204816244U (en) Weigh device of many bottles of standard gas mixtures of cofabrication on line
CN109838686A (en) A kind of steel cylinder processing system and its application method and application
CN208688755U (en) A kind of replacing panel of high-purity special gas
CN208687354U (en) A kind of subpackage apparatus of high-purity special gas
CN102635784A (en) Quick replacing processing device for gas cylinder of silane filling system
CN104006930A (en) Leak detection test bed
CN101696765A (en) Boron trifluoride conveying device
CN214369312U (en) Deep purging box for special gas ultrahigh flow conveying equipment
CN111351907A (en) High-purity gas analysis system and use method
CN201282131Y (en) Microelectron air source cabinet purging system
CN115336421B (en) Helium mass spectrometer leak detection device for single-component thruster
CN203037423U (en) Air tightness detection device for positive-pressure containers
CN102155611A (en) Method and system for purifying gas storage steel cylinder
WO2019144791A1 (en) Piston bottle
CN219200772U (en) Leak detection device for full-bottle high-pressure steel bottle
CN220289548U (en) Silane on-line sampling system
CN210219313U (en) Steel bottle processing system
CN102494849A (en) Air tightness detecting device and implementation method for same
CN210266695U (en) Steel cylinder processing system of ultra-pure gas
CN219689844U (en) Vacuum pipeline of thin film equipment
CN220082809U (en) Liquid electronic special gas filling and returning device
CN212298565U (en) Gas adding system capable of avoiding pollution
CN208348955U (en) One kind easily liquefaction and low-vapor pressure distributes heating device
JP2000257797A (en) Valve for liquefied petroleum gas cylinder with pressure reducing function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant