CN208666413U - Steel pipe bundle transferring device - Google Patents

Steel pipe bundle transferring device Download PDF

Info

Publication number
CN208666413U
CN208666413U CN201821398076.4U CN201821398076U CN208666413U CN 208666413 U CN208666413 U CN 208666413U CN 201821398076 U CN201821398076 U CN 201821398076U CN 208666413 U CN208666413 U CN 208666413U
Authority
CN
China
Prior art keywords
steel pipe
pipe bundle
transfer
area
upper spider
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821398076.4U
Other languages
Chinese (zh)
Inventor
刘继宇
张景元
魏楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jujube Mine Zhongxing Steel Structure Co Ltd
ZTE JIAN-AN ENGINEERING Co Ltd OF ZAOZHUANG MINING GROUP
Original Assignee
Shandong Jujube Mine Zhongxing Steel Structure Co Ltd
ZTE JIAN-AN ENGINEERING Co Ltd OF ZAOZHUANG MINING GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jujube Mine Zhongxing Steel Structure Co Ltd, ZTE JIAN-AN ENGINEERING Co Ltd OF ZAOZHUANG MINING GROUP filed Critical Shandong Jujube Mine Zhongxing Steel Structure Co Ltd
Priority to CN201821398076.4U priority Critical patent/CN208666413U/en
Application granted granted Critical
Publication of CN208666413U publication Critical patent/CN208666413U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Abstract

The utility model discloses a kind of steel pipe bundle transferring devices, overcome drawbacks described above existing for existing catenary suspension type continuous vulcanization steel pipe bundle ball blast spray painting drying integral machine, labor intensity of workers can be reduced by providing one kind, increase safety coefficient, utilization rate of equipment and installations is improved, the steel pipe bundle transferring device of energy consumption is reduced.Steel pipe bundle transferring device is located at the transfer region between steel pipe bundle shot-blasting machine, spray painting drying equipment, cut-off rule is divided into discharging area, transfer operation area, feeding area along longitudinal direction in transfer region, longitudinal track is distributed in discharging area, the feeding area of two sides, material guide device for phloem-xylem transport steel pipe bundle is installed, multiple transfer job platforms are distributed in transfer operation area side by side on track.Worker in transfer operating area can carry out in transfer operation area and carry out packaging operation to the steel pipe bundle of entrance, and without being interfered by any other, operating environment is also relatively safer;It is mounted with after the present apparatus, in the present embodiment, as long as whole at most three operators.

Description

Steel pipe bundle transferring device
Technical field
The invention belongs to building material steel pipe bundle technical field of anticorrosion more particularly to a kind of steel pipe bundle component linear type transfers Apparatus for temporary storage.
Background technique
Steel pipe bundle links together for the rectangle tube side-by-side of several standardization, modularization, forms steel pipe bundle.Steel pipe bundle can be with Steel pipe bundle composite structure component is made, the main support supporting member or lateral resistant member as building.Steel pipe bundle main component After the completion of assembly welding, need to carry out impeller blasting to its surface, to remove the impurity such as steel pipe bundle surface corrosion and welding slag, then Steel pipe bundle paint spraying apparatus is timely entered, spray painting processing is carried out, prevents from returning rust.
Usual way is on current market: steel pipe bundle ball blast, spray painting, drying equipment are made into an assembly line.Transporter Formula is then divided into stretched wire and passes through formula and roller-way conveying-type.By formula, relative to roller bed type mode of movement, steel pipe bundle may be implemented in stretched wire After being completed, it is the general orientation of future development that band node, which is run,.
But stretched wire also has incomplete place by formula ball blast spray painting all-in-one machine.Since steel pipe bundle and gusset plate will Derusting by sandblasting, and high-strength bolt rubbing surface gusset plate is then forbidden to paint, this just needs to pacify among abrasive blast equipment and paint spraying apparatus Special messenger at least two people are arranged, it is even more, quickly gusset plate position is covered.And during this, steel pipe bundle is set from sandblasting It is standby to cause personnel to cover construction abnormally dangerous to not stopping among paint spraying apparatus transportational process, and labor intensity is also especially very much not Stop and then component race.If transport is allowed to suspend and then be covered, abrasive blast equipment and spray painting drying equipment can be in standby shape again State not only increases equipment attrition especially shot-blasting machine, also causes energy consumption and increases.
Therefore, this just needs a kind of transferring device in intermediate region, to complete steel pipe bundle component temporary storage to steel pipe bundle It covers after constructing, then steel pipe bundle component is put back into stretched wire conveying device.
Summary of the invention
In order to overcome drawbacks described above existing for existing catenary suspension type continuous vulcanization steel pipe bundle ball blast spray painting drying integral machine, the present invention provides one Kind can reduce labor intensity of workers, increase safety coefficient, improve utilization rate of equipment and installations, reduce the steel pipe bundle transferring device of energy consumption.This Invention adopts the following technical scheme that.
A kind of steel pipe bundle transferring device, steel pipe bundle transferring device are located between steel pipe bundle shot-blasting machine, spray painting drying equipment Transfer region, cut-off rule is divided into discharging area, transfer operation area, feeding area, discharging area, the feeding area of two sides along longitudinal direction in transfer region Longitudinal track is distributed with, the material guide device for phloem-xylem transport steel pipe bundle, transfer operation area and column distribution are installed on track There are multiple transfer job platforms;Material guide device includes: longitudinal running gear, axial transport device and upper spider, lateral rack two End is in orbit across installation by longitudinal rack, and nail belt transporter is equipped in lateral rack, if having in the middle part of nail belt transporter Dry carrying roller, wherein one or both ends are equipped with motorized roller, are respectively mounted walking rolling along longitudinal rack both ends of tracks travel Wheel, walking roller are connect with respective driving device;Transfer job platform includes: axial transport rack and upper spider, is laterally transported Nail belt transporter is installed in defeated rack, there are several carrying rollers in the middle part of nail belt transporter, wherein one or both ends are equipped with electricity Dynamic roller;Nail belt transporter two sides above transfer job platform, material guide device are mounted on upper spider, distribution on the inside of upper spider There are several idler wheels.
According to the steel pipe bundle transferring device, the circumferential surface of the walking roller has inside groove, and walking roller unilateral side is solid Surely it is connected with sprocket wheel, the intracorporal rectilinear translation all-in-one machine of driving device case is connect by transmission chain with above-mentioned sprocket wheel.
According to the steel pipe bundle transferring device, No. 1-7 seven transverse directions successively delimited in the transfer region along orbital direction For indicating the graticule of transfer job platform position, the graticule is equally spaced.
According to the steel pipe bundle transferring device, the upper spider is fixed on the outside of roller rack, in upper spider upright bar Multiple idler wheels are distributed in side vertical direction, are connected with crossbeam between adjacent upright bar.
Technical solution of the present invention has the following characteristics that
One, guarantees operation safety.When material guide device is reached with No. 1 platform aligned position in transfer operation area, operator Start axial transport device in discharging area and No. 1 transfer job platform simultaneously, make steel pipe bundle to the right axial transport to No. 1 transfer Job platform.After transporting suitable position, operation equipment stops transport.The longitudinal traveling mechanism of discharging area vertically moves, and returns Immediately below to stretched wire conveying track, wait next group of steel pipe bundle to complete derusting by sandblasting operation, then repeat above-mentioned movement, successively to 2,3,4,5,6,7,1,2 ... numbers transfer job platforms transport steel pipe bundle, and constantly circulation carries out.Worker in transfer operating area In transfer operation area, while it can carry out and packaging operation, without being interfered by any other, operation ring are carried out to the steel pipe bundle of entrance Border is also relatively safer.
Two, save labor.It is mounted with after the present apparatus, in the present embodiment, as long as whole at most three operators, blanking One people of area, one people of transfer operation area, one people of feeding area.If the reasonable arrangement sequence of operation, construction technology, minimum only 2 people of need are Achievable operation, and this region danger source is less, and operator is very safe.Personnel due to being responsible for packaging are only responsible for packet Dress, and be the operation in the case where steel pipe bundle is static, personnel's phychology is more calm, not only safety, moreover it is possible to guarantee construction quality.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel pipe bundle transferring device.
Fig. 2 is the part A partial enlargement structural representation in Fig. 1.
Fig. 3 is the structural schematic diagram of driving device.
In attached drawing: 1, steel pipe bundle shot-blasting machine;2, stretched wire;3, paint drying equipment;4, blanking material guide device;5, transfer Job platform;6, feeding material guide device;7, idler wheel;8, upper spider;9, crossbeam;10, nail belt transporter;11, roller is driven; 12, carrying roller;13, lateral rack;14, driving device;15, walking roller;16, longitudinal rack;17, rectilinear translation all-in-one machine;18, Transmission chain.
Specific embodiment
Usual way is on current market: steel pipe bundle ball blast, spray painting, drying equipment are made into an assembly line.Wherein, it hangs Chain by formula relative to roller bed type mode of movement, it can be achieved that after steel pipe bundle is completed, band node is run.Suspended chain conveyer is Important one kind in conveyer is existing complete set of equipments.Transverse direction described herein refers to that the direction parallel with stretched wire, the longitudinal direction are Refer to along the orbital direction perpendicular to stretched wire.
As shown in Figure 1, steel pipe bundle transferring device, steel pipe bundle transferring device is located at steel pipe bundle shot-blasting machine 1, spray painting drying equipment Transfer region between 3.Wherein, cut-off rule is divided into discharging area, transfer operation area, feeding from left to right along longitudinal direction in transfer region Longitudinal track is distributed in area, discharging area, the feeding area of two sides, and the guide dress for phloem-xylem transport steel pipe bundle is equipped on track It sets, transfer operation area is distributed with multiple for stopping transfer job platform 5 that is temporary, and having enough to meet the need steel pipe bundle side by side.
Material guide device includes: longitudinal running gear, axial transport device and upper spider, and lateral 13 both ends of rack pass through longitudinal direction Rack 16 is in orbit across installation.Nail belt transporter is installed, it is normal that nail belt transporter belongs to the prior art in lateral rack 13 The conveying equipment seen, conveyer transmission parts are nail belt.There are several carrying rollers 12 in the middle part of nail belt transporter, wherein one end or two End is equipped with motorized roller.Motorized roller belongs to prior art products, is a kind of motor and retarder to be collectively disposed at barrel Internal novel driving device, it is mainly used in fixed and movable belt conveyor, substitutes traditional motor deceleration Device is driving the separate type driving device except roller.Lateral rack 13, longitudinal rack 16 are all made of common cabinet open frame Structure repeats no more.
Walking roller 15, walking roller 15 and respective driving device are respectively mounted along 16 both ends of longitudinal rack of tracks travel 14 connections.The circumferential surface of the walking roller 15 has inside groove, using the bilateral rail wheel of existing H-type, along track stickiness It is good.15 unilateral side of walking roller is fixedly connected with sprocket wheel, and driving device 14 casees intracorporal rectilinear translation all-in-one machine 17 passes through transmission chain 18 connect with above-mentioned sprocket wheel.Rectilinear translation all-in-one machine can use existing translation door all-in-one machine, be existing complete set of equipments, adopt With worm gear reducer mechanism, not only there is distant control function, also with the magnetic position-limit mechanism for stroke-limit, power model size It can be selected according to actual needs.
Transfer job platform 5 includes: axial transport rack and upper spider, and nail belt transport is equipped in axial transport rack There are several carrying rollers at machine, nail belt transporter middle part, and wherein one or both ends are equipped with motorized roller.Transfer job platform 5 is led Nail belt transporter two sides above material device are mounted on upper spider 8, several idler wheels 7 are distributed on the inside of upper spider 8.On described Rack 8 is installed, and is weldingly fixed on the outside of roller rack, 8 upright bar inboard, upright directional spreding of upper spider has multiple idler wheels 7, adjacent Upright bar between be connected with crossbeam 9 for improving the intensity of upright bar.Upper spider main function is security protection, on each rectangular tube Several equally distributed idler wheels are installed in face, reduce steel pipe bundle during phloem-xylem transport with the friction of upper spider.
The transfer region along track longitudinal direction, successively delimit No. 1-7 seven transverse directions for indicating transfer operation The graticule of 5 position of platform, the graticule are equally spaced.
The present invention will be further described by 1-3 with reference to the accompanying drawing.Steel pipe bundle transferring device with lower component by being constituted: blanking Area, transfer operation area, feeding area.Wherein, it is 38kg/m that discharging area, which includes two parallel, interval 7.5m rail specifications,.It is above-mentioned Track operates above the material guide device of one's respective area, and material guide device includes: longitudinal running gear, axial transport device and upper machine Frame.
Phloem-xylem transport device is made of components such as connection frame, rectilinear translation motor, walking rollers.Axial transport device is Nail belt transporter is evenly arranged several carrying rollers 12 on the rack, nail belt is equipped on carrying roller 12, bears steel pipe bundle component Gravity.The driving roller 11 of end drives remaining carrying roller to rotate by steel nail belt, to reach steel pipe bundle component above It transmits to the right, is transported by side to the other side.
8 main function of upper spider is security protection, prevents steel pipe bundle component from tilting to two sides, and main composition has several each Equally distributed vertical rectangular tube uniformly installs several idler wheels again above each rectangular tube, to reduce steel pipe bundle in longitudinal direction In transportational process with the friction of upper spider.
There are two functions for transfer operation area, not only can carry out packaging operation in this area, can also be with transfer, store function. Transfer operation area includes 5-7 group transfer job platform, and transfer job platform quantity can be arranged according to place and actual needs, Fig. 1 It show seven groups.Former and later two transfer job platforms are only drawn since lines are dense, in figure, remaining dotted line frame indicates.
Longitudinal gap 1m between transfer job platform 5, facilitates worker to walk operation in this section.Every group platform is flat by transporting Platform and upper spider are constituted.Wherein, there is nail belt transporter on shipping platform.Nail belt transporter includes several intermediate carrying rollers, a drive Dynamic roller 11, carrying roller 12 and steel nail belt, for being responsible for the axial transport of steel pipe bundle in transfer operation area.Upper spider composition is the same The upper spider for stating discharging area is identical, and function is also security protection.
Referring to attached drawing 1, steel pipe bundle transferring device is located between steel pipe bundle shot-blasting machine and steel pipe bundle spray painting drying equipment.
Firstly, longitudinal running gear of starting discharging area, moves to discharging area material guide device immediately below track, after waiting Continuous supplied materials.When steel pipe bundle is after shot-blasting machine derusting by sandblasting, it is transported out shot-blasting machine through stretched wire, immediately into discharging area material guide device In upper spider surrounds.At this point, steel pipe bundle, is fallen on the nail belt of discharging area material guide device by the stretched wire crane in worker operation workshop On transporter, while rapid decoupling device;Then the longitudinal traveling mechanism for starting material guide device keeps material guide device whole along one's respective area Parallel orbit longitudinal driving.
When reaching with No. 1 platform aligned position in transfer operation area, material guide device stop motion is controlled.Operator is simultaneously Start the axial transport device in discharging area and No. 1 transfer job platform, i.e. nail belt transporter, makes steel pipe bundle axial transport to the right To No. 1 transfer job platform.After transporting suitable position, operation equipment stops transport.The longitudinal traveling mechanism of discharging area is vertical It to movement, returns to immediately below stretched wire conveying track, next group of steel pipe bundle is waited to complete derusting by sandblasting operation, then repeat above-mentioned dynamic Make, successively transport steel pipe bundle to 2,3,4,5,6,7,1,2 ... numbers transfer job platforms, constantly circulation carries out.It is transferred in meanwhile Worker in industry region can carry out in transfer operation area and carry out packaging operation to the steel pipe bundle of entrance, without by any Other interference, operating environment are also relatively safer.
After entering steel pipe bundle on No. 2 transfer job platforms, steel pipe bundle packaging operation on No. 1 transfer job platform is completed Worker starts to carry out packaging operation to the steel pipe bundle on No. 2 platforms.Meanwhile being responsible for the worker of operation transporting equipment, start feeding Area's material guide device is aligned the upper spider of feeding area material guide device with No. 1 transfer job platform;No. 1 transfer is then started simultaneously Nail belt transporter on job platform and feeding area material guide device makes the steel pipe that packaging operation is completed on No. 1 transfer job platform Beam transports to the right, enters in the upper spider of No. 1 material guide device in feeding area.After slightly stable, starting feeding area is longitudinally walked Mechanism makes immediately below feeding area material guide device whole Transporting to stretched wire transporter track.Then, the stretched wire fortune inside workshop is operated Lifting point on defeated machine alignment steel pipe bundle, is linked up with rapidly, then operate stretched wire transporter and move forwards, enter in paint spraying apparatus into The follow-up works such as row spray painting operation.
Feeding area material guide device again under the driving of longitudinal traveling mechanism, into next operation station such as 2,3,4,5, 6, it 7,1,2 ... numbers, successively carries out in order.It repeats the above process, the transfer job platform of transfer operation area is in sequence not The steel pipe bundle from discharging area is received in disconnecting, is also constantly installed to feeding area bull ladle, can be carried out the steel pipe bundle of spray painting operation.
In the present embodiment, as long as whole at most three operators, one people of discharging area, one people of transfer operation area, feeding area One people.It is minimum that 2 people is only needed to can be completed operation if the reasonable arrangement sequence of operation, construction technology, and this region danger source compared with Few, operator is very safe.Personnel due to being responsible for packaging are only responsible for packaging, and are the operation in the case where steel pipe bundle is static, people Member's phychology is more calm, not only safety, moreover it is possible to guarantee construction quality.

Claims (4)

1. a kind of steel pipe bundle transferring device, it is characterised in that: steel pipe bundle transferring device is located at steel pipe bundle shot-blasting machine (1), spray painting is dried Transfer region between dry equipment (3), cut-off rule is divided into discharging area, transfer operation area, feeding area, two sides along longitudinal direction in transfer region Discharging area, feeding area longitudinal track is distributed with, the material guide device for phloem-xylem transport steel pipe bundle, transfer are installed on track Multiple transfer job platforms (5) are distributed in operation area side by side;
Material guide device includes: longitudinal running gear, axial transport device and upper spider, and lateral rack (13) both ends pass through longitudinal machine Frame (16) in orbit, is equipped with nail belt transporter, has several in the middle part of nail belt transporter across installation on lateral rack (13) Carrying roller (12), wherein one or both ends are equipped with motorized roller, and longitudinal rack (16) both ends along tracks travel are respectively mounted row It walks idler wheel (15), walking roller (15) is connect with respective driving device (14);
Transfer job platform (5) includes: axial transport rack and upper spider, and nail belt transporter is equipped in axial transport rack, There are several carrying rollers in the middle part of nail belt transporter, wherein one or both ends are equipped with motorized roller;Transfer job platform (5) is led Nail belt transporter two sides above material device are mounted on upper spider (8), several idler wheels (7) are distributed on the inside of upper spider (8).
2. steel pipe bundle transferring device according to claim 1, it is characterised in that: the circumferential surface band of the walking roller (15) There is inside groove, walking roller (15) unilateral side is fixedly connected with sprocket wheel, the intracorporal rectilinear translation all-in-one machine (17) of driving device (14) case It is connect by transmission chain (18) with above-mentioned sprocket wheel.
3. steel pipe bundle transferring device according to claim 1, it is characterised in that: the transfer region along orbital direction successively The graticule for being used to indicate transfer job platform (5) position of No. 1-7 seven transverse directions delimited, the graticule is equally spaced.
4. steel pipe bundle transferring device according to claim 1, it is characterised in that: the upper spider (8) is fixed on carrying roller Stent outer, upper spider (8) upright bar inboard, upright directional spreding have multiple idler wheels (7), are connected with crossbeam between adjacent upright bar (9).
CN201821398076.4U 2018-08-29 2018-08-29 Steel pipe bundle transferring device Expired - Fee Related CN208666413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821398076.4U CN208666413U (en) 2018-08-29 2018-08-29 Steel pipe bundle transferring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821398076.4U CN208666413U (en) 2018-08-29 2018-08-29 Steel pipe bundle transferring device

Publications (1)

Publication Number Publication Date
CN208666413U true CN208666413U (en) 2019-03-29

Family

ID=65839832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821398076.4U Expired - Fee Related CN208666413U (en) 2018-08-29 2018-08-29 Steel pipe bundle transferring device

Country Status (1)

Country Link
CN (1) CN208666413U (en)

Similar Documents

Publication Publication Date Title
US8191481B2 (en) Friction drive material handling system including composite beam and method of operating same
US20130199893A1 (en) Conveyor unit and conveyor system for conveying vehicle bodies and plant for machining vehicle bodies
US8127687B2 (en) Material handling system including dual track assembly and method of operating same
US20090277748A1 (en) Modular manufacturing line including a buffer and methods of operation therefor
CN108996274B (en) Connecting structure of ore tank mobile dust removal system and working method
CN209367081U (en) Overhead chain conveyer is used in a kind of portable suspension conveying system and spraying
CN110551965B (en) Double-station cast tube surface zinc spraying machine
CN108033183A (en) A kind of shelf shuttle is with changing a layer machine
CN214637662U (en) Spraying and drying production line
CN106185154A (en) A kind of nuclear power evaporator U-tube automatic warehouse equipment and control method thereof
CN108840031A (en) Overhead chain conveyer is used in a kind of portable suspension conveying system and spraying
US5919023A (en) Compact overhead conveyor
CN109941690B (en) Automatic feeding system of silk car and automatic feeding method applying same
CN208666413U (en) Steel pipe bundle transferring device
US9969561B2 (en) Systems, methods, and apparatus for improved conveyor system drive
US20170203919A1 (en) Drive carriage for a transport device, and transport system
CN207791927U (en) Brake beam underground pipeline
CN201254385Y (en) Roller conveying apparatus for belt conveyor maintenance
CN211109640U (en) Feeding and discharging mechanism for zinc spraying processing of cast pipe
CN211732840U (en) Transportation device
JPS6141627B2 (en)
CN209758351U (en) Unilateral ground rail dummy car
CN106005940A (en) Conveying system and slings and conveying device of conveying system
US4345867A (en) Coke dry quenching plant
JP5470307B2 (en) Conveyor equipment for work lines

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329

Termination date: 20190829

CF01 Termination of patent right due to non-payment of annual fee