CN208666413U - Steel pipe bundle transferring device - Google Patents
Steel pipe bundle transferring device Download PDFInfo
- Publication number
- CN208666413U CN208666413U CN201821398076.4U CN201821398076U CN208666413U CN 208666413 U CN208666413 U CN 208666413U CN 201821398076 U CN201821398076 U CN 201821398076U CN 208666413 U CN208666413 U CN 208666413U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe bundle
- transfer
- area
- upper spider
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Specific Conveyance Elements (AREA)
Abstract
The utility model discloses a kind of steel pipe bundle transferring devices, overcome drawbacks described above existing for existing catenary suspension type continuous vulcanization steel pipe bundle ball blast spray painting drying integral machine, labor intensity of workers can be reduced by providing one kind, increase safety coefficient, utilization rate of equipment and installations is improved, the steel pipe bundle transferring device of energy consumption is reduced.Steel pipe bundle transferring device is located at the transfer region between steel pipe bundle shot-blasting machine, spray painting drying equipment, cut-off rule is divided into discharging area, transfer operation area, feeding area along longitudinal direction in transfer region, longitudinal track is distributed in discharging area, the feeding area of two sides, material guide device for phloem-xylem transport steel pipe bundle is installed, multiple transfer job platforms are distributed in transfer operation area side by side on track.Worker in transfer operating area can carry out in transfer operation area and carry out packaging operation to the steel pipe bundle of entrance, and without being interfered by any other, operating environment is also relatively safer;It is mounted with after the present apparatus, in the present embodiment, as long as whole at most three operators.
Description
Technical field
The invention belongs to building material steel pipe bundle technical field of anticorrosion more particularly to a kind of steel pipe bundle component linear type transfers
Apparatus for temporary storage.
Background technique
Steel pipe bundle links together for the rectangle tube side-by-side of several standardization, modularization, forms steel pipe bundle.Steel pipe bundle can be with
Steel pipe bundle composite structure component is made, the main support supporting member or lateral resistant member as building.Steel pipe bundle main component
After the completion of assembly welding, need to carry out impeller blasting to its surface, to remove the impurity such as steel pipe bundle surface corrosion and welding slag, then
Steel pipe bundle paint spraying apparatus is timely entered, spray painting processing is carried out, prevents from returning rust.
Usual way is on current market: steel pipe bundle ball blast, spray painting, drying equipment are made into an assembly line.Transporter
Formula is then divided into stretched wire and passes through formula and roller-way conveying-type.By formula, relative to roller bed type mode of movement, steel pipe bundle may be implemented in stretched wire
After being completed, it is the general orientation of future development that band node, which is run,.
But stretched wire also has incomplete place by formula ball blast spray painting all-in-one machine.Since steel pipe bundle and gusset plate will
Derusting by sandblasting, and high-strength bolt rubbing surface gusset plate is then forbidden to paint, this just needs to pacify among abrasive blast equipment and paint spraying apparatus
Special messenger at least two people are arranged, it is even more, quickly gusset plate position is covered.And during this, steel pipe bundle is set from sandblasting
It is standby to cause personnel to cover construction abnormally dangerous to not stopping among paint spraying apparatus transportational process, and labor intensity is also especially very much not
Stop and then component race.If transport is allowed to suspend and then be covered, abrasive blast equipment and spray painting drying equipment can be in standby shape again
State not only increases equipment attrition especially shot-blasting machine, also causes energy consumption and increases.
Therefore, this just needs a kind of transferring device in intermediate region, to complete steel pipe bundle component temporary storage to steel pipe bundle
It covers after constructing, then steel pipe bundle component is put back into stretched wire conveying device.
Summary of the invention
In order to overcome drawbacks described above existing for existing catenary suspension type continuous vulcanization steel pipe bundle ball blast spray painting drying integral machine, the present invention provides one
Kind can reduce labor intensity of workers, increase safety coefficient, improve utilization rate of equipment and installations, reduce the steel pipe bundle transferring device of energy consumption.This
Invention adopts the following technical scheme that.
A kind of steel pipe bundle transferring device, steel pipe bundle transferring device are located between steel pipe bundle shot-blasting machine, spray painting drying equipment
Transfer region, cut-off rule is divided into discharging area, transfer operation area, feeding area, discharging area, the feeding area of two sides along longitudinal direction in transfer region
Longitudinal track is distributed with, the material guide device for phloem-xylem transport steel pipe bundle, transfer operation area and column distribution are installed on track
There are multiple transfer job platforms;Material guide device includes: longitudinal running gear, axial transport device and upper spider, lateral rack two
End is in orbit across installation by longitudinal rack, and nail belt transporter is equipped in lateral rack, if having in the middle part of nail belt transporter
Dry carrying roller, wherein one or both ends are equipped with motorized roller, are respectively mounted walking rolling along longitudinal rack both ends of tracks travel
Wheel, walking roller are connect with respective driving device;Transfer job platform includes: axial transport rack and upper spider, is laterally transported
Nail belt transporter is installed in defeated rack, there are several carrying rollers in the middle part of nail belt transporter, wherein one or both ends are equipped with electricity
Dynamic roller;Nail belt transporter two sides above transfer job platform, material guide device are mounted on upper spider, distribution on the inside of upper spider
There are several idler wheels.
According to the steel pipe bundle transferring device, the circumferential surface of the walking roller has inside groove, and walking roller unilateral side is solid
Surely it is connected with sprocket wheel, the intracorporal rectilinear translation all-in-one machine of driving device case is connect by transmission chain with above-mentioned sprocket wheel.
According to the steel pipe bundle transferring device, No. 1-7 seven transverse directions successively delimited in the transfer region along orbital direction
For indicating the graticule of transfer job platform position, the graticule is equally spaced.
According to the steel pipe bundle transferring device, the upper spider is fixed on the outside of roller rack, in upper spider upright bar
Multiple idler wheels are distributed in side vertical direction, are connected with crossbeam between adjacent upright bar.
Technical solution of the present invention has the following characteristics that
One, guarantees operation safety.When material guide device is reached with No. 1 platform aligned position in transfer operation area, operator
Start axial transport device in discharging area and No. 1 transfer job platform simultaneously, make steel pipe bundle to the right axial transport to No. 1 transfer
Job platform.After transporting suitable position, operation equipment stops transport.The longitudinal traveling mechanism of discharging area vertically moves, and returns
Immediately below to stretched wire conveying track, wait next group of steel pipe bundle to complete derusting by sandblasting operation, then repeat above-mentioned movement, successively to
2,3,4,5,6,7,1,2 ... numbers transfer job platforms transport steel pipe bundle, and constantly circulation carries out.Worker in transfer operating area
In transfer operation area, while it can carry out and packaging operation, without being interfered by any other, operation ring are carried out to the steel pipe bundle of entrance
Border is also relatively safer.
Two, save labor.It is mounted with after the present apparatus, in the present embodiment, as long as whole at most three operators, blanking
One people of area, one people of transfer operation area, one people of feeding area.If the reasonable arrangement sequence of operation, construction technology, minimum only 2 people of need are
Achievable operation, and this region danger source is less, and operator is very safe.Personnel due to being responsible for packaging are only responsible for packet
Dress, and be the operation in the case where steel pipe bundle is static, personnel's phychology is more calm, not only safety, moreover it is possible to guarantee construction quality.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel pipe bundle transferring device.
Fig. 2 is the part A partial enlargement structural representation in Fig. 1.
Fig. 3 is the structural schematic diagram of driving device.
In attached drawing: 1, steel pipe bundle shot-blasting machine;2, stretched wire;3, paint drying equipment;4, blanking material guide device;5, transfer
Job platform;6, feeding material guide device;7, idler wheel;8, upper spider;9, crossbeam;10, nail belt transporter;11, roller is driven;
12, carrying roller;13, lateral rack;14, driving device;15, walking roller;16, longitudinal rack;17, rectilinear translation all-in-one machine;18,
Transmission chain.
Specific embodiment
Usual way is on current market: steel pipe bundle ball blast, spray painting, drying equipment are made into an assembly line.Wherein, it hangs
Chain by formula relative to roller bed type mode of movement, it can be achieved that after steel pipe bundle is completed, band node is run.Suspended chain conveyer is
Important one kind in conveyer is existing complete set of equipments.Transverse direction described herein refers to that the direction parallel with stretched wire, the longitudinal direction are
Refer to along the orbital direction perpendicular to stretched wire.
As shown in Figure 1, steel pipe bundle transferring device, steel pipe bundle transferring device is located at steel pipe bundle shot-blasting machine 1, spray painting drying equipment
Transfer region between 3.Wherein, cut-off rule is divided into discharging area, transfer operation area, feeding from left to right along longitudinal direction in transfer region
Longitudinal track is distributed in area, discharging area, the feeding area of two sides, and the guide dress for phloem-xylem transport steel pipe bundle is equipped on track
It sets, transfer operation area is distributed with multiple for stopping transfer job platform 5 that is temporary, and having enough to meet the need steel pipe bundle side by side.
Material guide device includes: longitudinal running gear, axial transport device and upper spider, and lateral 13 both ends of rack pass through longitudinal direction
Rack 16 is in orbit across installation.Nail belt transporter is installed, it is normal that nail belt transporter belongs to the prior art in lateral rack 13
The conveying equipment seen, conveyer transmission parts are nail belt.There are several carrying rollers 12 in the middle part of nail belt transporter, wherein one end or two
End is equipped with motorized roller.Motorized roller belongs to prior art products, is a kind of motor and retarder to be collectively disposed at barrel
Internal novel driving device, it is mainly used in fixed and movable belt conveyor, substitutes traditional motor deceleration
Device is driving the separate type driving device except roller.Lateral rack 13, longitudinal rack 16 are all made of common cabinet open frame
Structure repeats no more.
Walking roller 15, walking roller 15 and respective driving device are respectively mounted along 16 both ends of longitudinal rack of tracks travel
14 connections.The circumferential surface of the walking roller 15 has inside groove, using the bilateral rail wheel of existing H-type, along track stickiness
It is good.15 unilateral side of walking roller is fixedly connected with sprocket wheel, and driving device 14 casees intracorporal rectilinear translation all-in-one machine 17 passes through transmission chain
18 connect with above-mentioned sprocket wheel.Rectilinear translation all-in-one machine can use existing translation door all-in-one machine, be existing complete set of equipments, adopt
With worm gear reducer mechanism, not only there is distant control function, also with the magnetic position-limit mechanism for stroke-limit, power model size
It can be selected according to actual needs.
Transfer job platform 5 includes: axial transport rack and upper spider, and nail belt transport is equipped in axial transport rack
There are several carrying rollers at machine, nail belt transporter middle part, and wherein one or both ends are equipped with motorized roller.Transfer job platform 5 is led
Nail belt transporter two sides above material device are mounted on upper spider 8, several idler wheels 7 are distributed on the inside of upper spider 8.On described
Rack 8 is installed, and is weldingly fixed on the outside of roller rack, 8 upright bar inboard, upright directional spreding of upper spider has multiple idler wheels 7, adjacent
Upright bar between be connected with crossbeam 9 for improving the intensity of upright bar.Upper spider main function is security protection, on each rectangular tube
Several equally distributed idler wheels are installed in face, reduce steel pipe bundle during phloem-xylem transport with the friction of upper spider.
The transfer region along track longitudinal direction, successively delimit No. 1-7 seven transverse directions for indicating transfer operation
The graticule of 5 position of platform, the graticule are equally spaced.
The present invention will be further described by 1-3 with reference to the accompanying drawing.Steel pipe bundle transferring device with lower component by being constituted: blanking
Area, transfer operation area, feeding area.Wherein, it is 38kg/m that discharging area, which includes two parallel, interval 7.5m rail specifications,.It is above-mentioned
Track operates above the material guide device of one's respective area, and material guide device includes: longitudinal running gear, axial transport device and upper machine
Frame.
Phloem-xylem transport device is made of components such as connection frame, rectilinear translation motor, walking rollers.Axial transport device is
Nail belt transporter is evenly arranged several carrying rollers 12 on the rack, nail belt is equipped on carrying roller 12, bears steel pipe bundle component
Gravity.The driving roller 11 of end drives remaining carrying roller to rotate by steel nail belt, to reach steel pipe bundle component above
It transmits to the right, is transported by side to the other side.
8 main function of upper spider is security protection, prevents steel pipe bundle component from tilting to two sides, and main composition has several each
Equally distributed vertical rectangular tube uniformly installs several idler wheels again above each rectangular tube, to reduce steel pipe bundle in longitudinal direction
In transportational process with the friction of upper spider.
There are two functions for transfer operation area, not only can carry out packaging operation in this area, can also be with transfer, store function.
Transfer operation area includes 5-7 group transfer job platform, and transfer job platform quantity can be arranged according to place and actual needs, Fig. 1
It show seven groups.Former and later two transfer job platforms are only drawn since lines are dense, in figure, remaining dotted line frame indicates.
Longitudinal gap 1m between transfer job platform 5, facilitates worker to walk operation in this section.Every group platform is flat by transporting
Platform and upper spider are constituted.Wherein, there is nail belt transporter on shipping platform.Nail belt transporter includes several intermediate carrying rollers, a drive
Dynamic roller 11, carrying roller 12 and steel nail belt, for being responsible for the axial transport of steel pipe bundle in transfer operation area.Upper spider composition is the same
The upper spider for stating discharging area is identical, and function is also security protection.
Referring to attached drawing 1, steel pipe bundle transferring device is located between steel pipe bundle shot-blasting machine and steel pipe bundle spray painting drying equipment.
Firstly, longitudinal running gear of starting discharging area, moves to discharging area material guide device immediately below track, after waiting
Continuous supplied materials.When steel pipe bundle is after shot-blasting machine derusting by sandblasting, it is transported out shot-blasting machine through stretched wire, immediately into discharging area material guide device
In upper spider surrounds.At this point, steel pipe bundle, is fallen on the nail belt of discharging area material guide device by the stretched wire crane in worker operation workshop
On transporter, while rapid decoupling device;Then the longitudinal traveling mechanism for starting material guide device keeps material guide device whole along one's respective area
Parallel orbit longitudinal driving.
When reaching with No. 1 platform aligned position in transfer operation area, material guide device stop motion is controlled.Operator is simultaneously
Start the axial transport device in discharging area and No. 1 transfer job platform, i.e. nail belt transporter, makes steel pipe bundle axial transport to the right
To No. 1 transfer job platform.After transporting suitable position, operation equipment stops transport.The longitudinal traveling mechanism of discharging area is vertical
It to movement, returns to immediately below stretched wire conveying track, next group of steel pipe bundle is waited to complete derusting by sandblasting operation, then repeat above-mentioned dynamic
Make, successively transport steel pipe bundle to 2,3,4,5,6,7,1,2 ... numbers transfer job platforms, constantly circulation carries out.It is transferred in meanwhile
Worker in industry region can carry out in transfer operation area and carry out packaging operation to the steel pipe bundle of entrance, without by any
Other interference, operating environment are also relatively safer.
After entering steel pipe bundle on No. 2 transfer job platforms, steel pipe bundle packaging operation on No. 1 transfer job platform is completed
Worker starts to carry out packaging operation to the steel pipe bundle on No. 2 platforms.Meanwhile being responsible for the worker of operation transporting equipment, start feeding
Area's material guide device is aligned the upper spider of feeding area material guide device with No. 1 transfer job platform;No. 1 transfer is then started simultaneously
Nail belt transporter on job platform and feeding area material guide device makes the steel pipe that packaging operation is completed on No. 1 transfer job platform
Beam transports to the right, enters in the upper spider of No. 1 material guide device in feeding area.After slightly stable, starting feeding area is longitudinally walked
Mechanism makes immediately below feeding area material guide device whole Transporting to stretched wire transporter track.Then, the stretched wire fortune inside workshop is operated
Lifting point on defeated machine alignment steel pipe bundle, is linked up with rapidly, then operate stretched wire transporter and move forwards, enter in paint spraying apparatus into
The follow-up works such as row spray painting operation.
Feeding area material guide device again under the driving of longitudinal traveling mechanism, into next operation station such as 2,3,4,5,
6, it 7,1,2 ... numbers, successively carries out in order.It repeats the above process, the transfer job platform of transfer operation area is in sequence not
The steel pipe bundle from discharging area is received in disconnecting, is also constantly installed to feeding area bull ladle, can be carried out the steel pipe bundle of spray painting operation.
In the present embodiment, as long as whole at most three operators, one people of discharging area, one people of transfer operation area, feeding area
One people.It is minimum that 2 people is only needed to can be completed operation if the reasonable arrangement sequence of operation, construction technology, and this region danger source compared with
Few, operator is very safe.Personnel due to being responsible for packaging are only responsible for packaging, and are the operation in the case where steel pipe bundle is static, people
Member's phychology is more calm, not only safety, moreover it is possible to guarantee construction quality.
Claims (4)
1. a kind of steel pipe bundle transferring device, it is characterised in that: steel pipe bundle transferring device is located at steel pipe bundle shot-blasting machine (1), spray painting is dried
Transfer region between dry equipment (3), cut-off rule is divided into discharging area, transfer operation area, feeding area, two sides along longitudinal direction in transfer region
Discharging area, feeding area longitudinal track is distributed with, the material guide device for phloem-xylem transport steel pipe bundle, transfer are installed on track
Multiple transfer job platforms (5) are distributed in operation area side by side;
Material guide device includes: longitudinal running gear, axial transport device and upper spider, and lateral rack (13) both ends pass through longitudinal machine
Frame (16) in orbit, is equipped with nail belt transporter, has several in the middle part of nail belt transporter across installation on lateral rack (13)
Carrying roller (12), wherein one or both ends are equipped with motorized roller, and longitudinal rack (16) both ends along tracks travel are respectively mounted row
It walks idler wheel (15), walking roller (15) is connect with respective driving device (14);
Transfer job platform (5) includes: axial transport rack and upper spider, and nail belt transporter is equipped in axial transport rack,
There are several carrying rollers in the middle part of nail belt transporter, wherein one or both ends are equipped with motorized roller;Transfer job platform (5) is led
Nail belt transporter two sides above material device are mounted on upper spider (8), several idler wheels (7) are distributed on the inside of upper spider (8).
2. steel pipe bundle transferring device according to claim 1, it is characterised in that: the circumferential surface band of the walking roller (15)
There is inside groove, walking roller (15) unilateral side is fixedly connected with sprocket wheel, the intracorporal rectilinear translation all-in-one machine (17) of driving device (14) case
It is connect by transmission chain (18) with above-mentioned sprocket wheel.
3. steel pipe bundle transferring device according to claim 1, it is characterised in that: the transfer region along orbital direction successively
The graticule for being used to indicate transfer job platform (5) position of No. 1-7 seven transverse directions delimited, the graticule is equally spaced.
4. steel pipe bundle transferring device according to claim 1, it is characterised in that: the upper spider (8) is fixed on carrying roller
Stent outer, upper spider (8) upright bar inboard, upright directional spreding have multiple idler wheels (7), are connected with crossbeam between adjacent upright bar
(9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821398076.4U CN208666413U (en) | 2018-08-29 | 2018-08-29 | Steel pipe bundle transferring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821398076.4U CN208666413U (en) | 2018-08-29 | 2018-08-29 | Steel pipe bundle transferring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208666413U true CN208666413U (en) | 2019-03-29 |
Family
ID=65839832
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821398076.4U Expired - Fee Related CN208666413U (en) | 2018-08-29 | 2018-08-29 | Steel pipe bundle transferring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208666413U (en) |
-
2018
- 2018-08-29 CN CN201821398076.4U patent/CN208666413U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8191481B2 (en) | Friction drive material handling system including composite beam and method of operating same | |
US20130199893A1 (en) | Conveyor unit and conveyor system for conveying vehicle bodies and plant for machining vehicle bodies | |
US8127687B2 (en) | Material handling system including dual track assembly and method of operating same | |
US20090277748A1 (en) | Modular manufacturing line including a buffer and methods of operation therefor | |
CN108996274B (en) | Connecting structure of ore tank mobile dust removal system and working method | |
CN209367081U (en) | Overhead chain conveyer is used in a kind of portable suspension conveying system and spraying | |
CN110551965B (en) | Double-station cast tube surface zinc spraying machine | |
CN108033183A (en) | A kind of shelf shuttle is with changing a layer machine | |
CN214637662U (en) | Spraying and drying production line | |
CN106185154A (en) | A kind of nuclear power evaporator U-tube automatic warehouse equipment and control method thereof | |
CN108840031A (en) | Overhead chain conveyer is used in a kind of portable suspension conveying system and spraying | |
US5919023A (en) | Compact overhead conveyor | |
CN109941690B (en) | Automatic feeding system of silk car and automatic feeding method applying same | |
CN208666413U (en) | Steel pipe bundle transferring device | |
US9969561B2 (en) | Systems, methods, and apparatus for improved conveyor system drive | |
US20170203919A1 (en) | Drive carriage for a transport device, and transport system | |
CN207791927U (en) | Brake beam underground pipeline | |
CN201254385Y (en) | Roller conveying apparatus for belt conveyor maintenance | |
CN211109640U (en) | Feeding and discharging mechanism for zinc spraying processing of cast pipe | |
CN211732840U (en) | Transportation device | |
JPS6141627B2 (en) | ||
CN209758351U (en) | Unilateral ground rail dummy car | |
CN106005940A (en) | Conveying system and slings and conveying device of conveying system | |
US4345867A (en) | Coke dry quenching plant | |
JP5470307B2 (en) | Conveyor equipment for work lines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 Termination date: 20190829 |
|
CF01 | Termination of patent right due to non-payment of annual fee |