CN208563310U - Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting - Google Patents

Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting Download PDF

Info

Publication number
CN208563310U
CN208563310U CN201821119549.2U CN201821119549U CN208563310U CN 208563310 U CN208563310 U CN 208563310U CN 201821119549 U CN201821119549 U CN 201821119549U CN 208563310 U CN208563310 U CN 208563310U
Authority
CN
China
Prior art keywords
positioning
steel
pile casting
river
bar cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821119549.2U
Other languages
Chinese (zh)
Inventor
赵中连
魏军辉
郭丙瑞
杨洪伟
韩伟
吴震
刘欢
侯伟
张欢
靳元方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201821119549.2U priority Critical patent/CN208563310U/en
Application granted granted Critical
Publication of CN208563310U publication Critical patent/CN208563310U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of integrated dedicated positioning devices for river pile foundation steel bar cage and steel pile casting, including locating platform, it is provided in the middle part of the locating platform through thereon, the positioning tube of following table, at least three positioning pluging rods are uniformly arranged in locating platform, locating platform lateral wall is extended in one end sliding of each positioning pluging rod and other end sliding extends in the positioning tube.The utility model aims at the positioning in construction of river pile foundation steel bar cage and permanent steel pile casting and designs, and steel reinforcement cage and permanent steel pile casting are hung using positioning pluging rod.It the advantage is that the positioning accuracy that not only ensure that steel reinforcement cage and the decentralization of permanent steel pile casting, but also improve construction efficiency, save the decentralization positioning operation time of steel reinforcement cage and permanent steel pile casting, while also providing safe operation platform for worker operation.

Description

Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting
Technical field
The utility model relates to the pile foundation constructions of Large Diameter Super-long Bored Piles in river, are especially for river The integrated dedicated positioning device of pile foundation steel bar cage and steel pile casting.
Background technique
In Large Diameter Super-long Bored Piles pile foundation construction, generally in 2m or more, designing pile length exists main bridge Pile Diameter 83-100m;Access bridge Pile Diameter is generally 1.8m, designing pile length 47-64m;15m below pile foundation top surface has additional directly in main stem Diameter is the permanent steel pile casting of 2.2m, wall thickness 20mm, and the every section 12m of steel reinforcement cage used in pile foundation is at the construction field (site) in steel bar meter field It is made, the weight of every section steel reinforcement cage is about 3t, and single pile foundation steel bar cage maximum weight is 21t, each permanent steel pile casting weight Up to 15t.
In pile foundation construction, traditional steel reinforcement cage lowering operation is generally fixed using rod, such fixing means built on the sand, work People's construction is very dangerous, and causes main reinforcement sleeve to be not easy to dock using rod fixed steel bars cage;Meanwhile permanent steel pile casting suspention There are still difficulty for decentralization positioning greatly, construction insecurity factor.
Summary of the invention
The utility model aim is to provide a kind of dedicated positioning of the integration for river pile foundation steel bar cage and steel pile casting Device.
To achieve the above object, the utility model takes following technical proposals:
Integrated dedicated positioning device described in the utility model for river pile foundation steel bar cage and steel pile casting, including positioning Platform is provided with through thereon in the middle part of the locating platform, the positioning tube of following table, has been uniformly arranged at least three in locating platform Locating platform lateral wall is extended in one end sliding of a positioning pluging rod, each positioning pluging rod and other end sliding extends to institute It states in positioning tube.
Each positioning pluging rod is horizontally disposed each along the radial direction of the positioning tube, in the locating platform side wall On be uniformly arranged multiple lifting lugs.
The both ends of each positioning pluging rod are respectively arranged with locking pin.
Its axial direction is provided with graduated scale on the positioning tube inner wall.
The positioning pluging rod is vertical plate structure.
The utility model aims at the positioning in construction of river pile foundation steel bar cage and permanent steel pile casting and designs, and utilizes positioning Inserted link hangs steel reinforcement cage and permanent steel pile casting.It the advantage is that the positioning accurate that both ensure that steel reinforcement cage and the decentralization of permanent steel pile casting Degree, and construction efficiency is improved, the decentralization positioning operation time of steel reinforcement cage and permanent steel pile casting is saved, while also grasping for worker Provide safe operation platform.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the sectional view along A-A of Fig. 1.
Specific embodiment
It elaborates with reference to the accompanying drawing to the embodiment of the present invention, the present embodiment before being with technical solution of the present invention It puts and is implemented, the detailed implementation method and specific operation process are given, but protection scope of the present invention is not limited to down State embodiment.
As shown in Figure 1, 2, the dedicated positioning of the integration described in the utility model for river pile foundation steel bar cage and steel pile casting Device, the locating platform 1 including square structure are provided in the middle part of locating platform through thereon, the positioning tube 2 of following table, The radius R1 of positioning tube 2 is greater than the radius R2 of permanent steel pile casting 3 and the radius R3 of steel reinforcement cage 4, along its axial direction on 2 inner wall of positioning tube It is provided with graduated scale 5, is uniformly arranged on 1 side wall of locating platform there are four lifting lug 6.
The uniformly distributed positioning pluging rod 7 there are six along the setting of 2 radial direction of positioning tube in locating platform 1, positioning pluging rod 7 are vertical plate 1 lateral wall of locating platform is extended in one end sliding of structure, six positioning pluging rods 7 and other end sliding extends in positioning tube 2, The both ends of each positioning pluging rod 7 are respectively arranged with locking pin 8.1,8.2;The effect of locking pin 8.1 be in order to prevent steel reinforcement cage 4 and It falls off on the self-positioning inserted link 7 of permanent steel pile casting 3, the effect of locking pin 8.2 is for the ease of positioning pluging rod 7 into and out behaviour Make.
To further increase positioning accuracy, its axial direction is provided with graduated scale 9 on 2 inner wall of positioning tube.
In use, after drilling machine mentions brill, it is smooth to the progress of stake holes aperture periphery place, cross shield is gone out according to the setting-out of stake holes center Stake slings locating platform 1 by lifting appliance, and adjustment 2 central point of positioning tube is overlapped with the central point of pile foundation.
Permanent steel pile casting 3 and steel reinforcement cage 4 are suspended on positioning pluging rod 7 by hangs muscle, and permanent steel pile casting 3 is hung using two Point, steel reinforcement cage 4 use four suspension centres.
When the hangs muscle of permanent steel pile casting 3, the hangs muscle of steel reinforcement cage 4 are each located on the identical quarter of 2 inner wall high scale ruler 9 of positioning tube When on degree, illustrate that permanent steel pile casting 3 and 4 central point of steel reinforcement cage are overlapped with 4 central point of pile foundation steel bar cage, thus adjusts permanent steel The deviation that casing 3 and steel reinforcement cage 4 are transferred, improves the precision of decentralization.
Permanent steel pile casting 3 and steel reinforcement cage 4 are suspended in the positioning tube 2 at stake holes aperture simultaneously by positioning pluging rod 7, Form the positioning integrated with steel reinforcement cage 4 of permanent steel pile casting 3.
The utility model transferred by pull positioning pluging rod 7 with fixed steel bars cage 4 and permanent steel pile casting 3, it is easy to operate, Reduce when permanent steel pile casting 3 is transferred with interfering with each other in 4 decentralization process of steel reinforcement cage, reduces docking, the decentralization of steel reinforcement cage 4 Time, while reducing the quantity of construction personnel, it greatly improves work efficiency, ensure that construction quality.

Claims (5)

1. a kind of integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting, it is characterised in that: including positioning Platform is provided with through thereon in the middle part of the locating platform, the positioning tube of following table, has been uniformly arranged at least three in locating platform Locating platform lateral wall is extended in one end sliding of a positioning pluging rod, each positioning pluging rod and other end sliding extends to institute It states in positioning tube.
2. being used for the integrated dedicated positioning device of river pile foundation steel bar cage and steel pile casting, feature according to claim 1 Be: each positioning pluging rod is horizontally disposed each along the radial direction of the positioning tube, on the locating platform side wall It has been uniformly arranged multiple lifting lugs.
3. the integrated dedicated positioning device according to claim 1 or claim 2 for river pile foundation steel bar cage and steel pile casting, special Sign is: the both ends of each positioning pluging rod are respectively arranged with locking pin.
4. the integrated dedicated positioning device according to claim 1 or claim 2 for river pile foundation steel bar cage and steel pile casting, special Sign is: its axial direction being provided with graduated scale on the positioning tube inner wall.
5. the integrated dedicated positioning device according to claim 1 or claim 2 for river pile foundation steel bar cage and steel pile casting, special Sign is: the positioning pluging rod is vertical plate structure.
CN201821119549.2U 2018-07-16 2018-07-16 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting Expired - Fee Related CN208563310U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821119549.2U CN208563310U (en) 2018-07-16 2018-07-16 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821119549.2U CN208563310U (en) 2018-07-16 2018-07-16 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting

Publications (1)

Publication Number Publication Date
CN208563310U true CN208563310U (en) 2019-03-01

Family

ID=65493333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821119549.2U Expired - Fee Related CN208563310U (en) 2018-07-16 2018-07-16 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting

Country Status (1)

Country Link
CN (1) CN208563310U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661048A (en) * 2018-07-16 2018-10-16 中交公局第三工程有限公司 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661048A (en) * 2018-07-16 2018-10-16 中交公局第三工程有限公司 Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting

Similar Documents

Publication Publication Date Title
CN201649072U (en) Pile foundation reinforcement cage hoisting device
CN107178079B (en) Tool platform suitable for positioning cast-in-place pile reinforcement cage and guide pipe
CN203625890U (en) Large-diameter cast-in-situ bored pile reinforcement cage positioning device
CN109372015B (en) Movable connecting device for steel pipe column and reinforcement cage in reverse construction method
CN208563310U (en) Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting
CN107858923B (en) Method for positioning pile foundation reinforcement cage hole
CN103556626B (en) Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage
CN106193776A (en) Chimney and the combinative structure of water tower and construction method thereof
CN210341893U (en) Steel reinforcement cage linkage of major diameter overlength bored concrete pile
CN210151723U (en) Pile foundation steel reinforcement cage elevation positioner
CN104499706A (en) Elevator well template platform and construction method thereof
CN108661048A (en) Integrated dedicated positioning device for river pile foundation steel bar cage and steel pile casting
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN207714327U (en) A kind of lattice column locator
CN205400087U (en) Group tears formula steel reinforcement cage mounting platform open
CN213267538U (en) Leading hole platform for U-shaped sandstone riverbed steel trestle on shoal
CN108179749A (en) A kind of lattice column locator and its localization method
CN203625891U (en) Hanging structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN211773584U (en) Quick-separating concrete pouring pile head
CN206330577U (en) A kind of mobile integrated concrete measuring table
CN206800401U (en) Cast-in-place pile casing positions and operating platform integrated apparatus
CN212294631U (en) Hoisting and positioning fixture for large-diameter steel reinforcement cage
CN209504423U (en) A kind of mold of lamppost fixing seat prefabricated component
CN205976695U (en) Integrated configuration of chimney and water tower
CN204370796U (en) Hoistway formwork platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant