CN206330577U - A kind of mobile integrated concrete measuring table - Google Patents

A kind of mobile integrated concrete measuring table Download PDF

Info

Publication number
CN206330577U
CN206330577U CN201621415390.XU CN201621415390U CN206330577U CN 206330577 U CN206330577 U CN 206330577U CN 201621415390 U CN201621415390 U CN 201621415390U CN 206330577 U CN206330577 U CN 206330577U
Authority
CN
China
Prior art keywords
concrete component
measuring table
concrete
mobile integrated
protection mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621415390.XU
Other languages
Chinese (zh)
Inventor
姚保民
张耀臣
刘学良
王顺泽
尚健祥
耿忠祥
周崇刚
邵克军
李松
毛焰珠
徐卫鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 24 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 24 Construction Co Ltd filed Critical China Nuclear Industry 24 Construction Co Ltd
Priority to CN201621415390.XU priority Critical patent/CN206330577U/en
Application granted granted Critical
Publication of CN206330577U publication Critical patent/CN206330577U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of mobile integrated concrete measuring table; including concrete component; some secondary hoisting mechanisms and some mounting cylinders are installed on the concrete component; mounting cylinder is arranged on inside the region of hoisting mechanism formation; protection mechanism is provided with above concrete component; the bottom of protection mechanism is inserted between the cube structure for forming inner hollow in mounting cylinder between rear protection mechanism, protection mechanism and is fixed to one another, and climbing mechanism is provided with the side wall of concrete component.The measuring table is stabilised platform by using concrete component, and corresponding structure increases stability on stage+module, so as to increase measurement accuracy and security during construction survey, and being capable of fast assembling-disassembling, the middle stand-by period is shortened, efficiency of construction is improved, realizes and reuses, instrument antenna height increase simultaneously, which is reduced, turns station quantity, improves in-site measurement work quality.

Description

A kind of mobile integrated concrete measuring table
Technical field
The utility model belongs to building engineering construction field, and in particular to a kind of mobile integrated concrete measurement is flat Platform.
Background technology
Building construction measurement is the important procedure of field operation, is the important leverage of Contraction in Site quality.
The problem of current building construction measurement is present:1., construction site condition is complicated and changeable, need to often increase measurement work temporarily Make platform, now conventional scaffold formula measurement workbench mobility is too poor, is not convenient to use;2., scaffold formula measurement work is put down Platform must frequently be taken and tear open, expend time length, take and tear high cost open;3., scaffold formula measurement workbench less stable, influence measurement Work quality;4., scaffold formula measurement workbench security performance is general, easily causes survey crew injured.
Utility model content
It is flat as measurement using scaffold is built when technical problem to be solved in the utility model is existing construction survey Platform causes poor stability, consuming time length, takes and tear high cost open, and moving integrally property is too poor, and personnel trample unstable so that measurement is accurate Property is low, thus provides a kind of mobile integrated concrete measuring table, the measuring table is by using concrete component Stabilised platform, and corresponding structure increases stability on stage+module, so that measurement when increasing construction survey is accurate True property and security, and can fast assembling-disassembling, shorten the middle stand-by period, improve efficiency of construction.
The utility model is achieved through the following technical solutions:
It is provided with a kind of mobile integrated concrete measuring table, including concrete component, the concrete component Some secondary hoisting mechanisms and some mounting cylinders, mounting cylinder are arranged on inside the region of hoisting mechanism formation, on concrete component Side is provided with protection mechanism, and the bottom of protection mechanism is inserted into cube for forming inner hollow in mounting cylinder between rear protection mechanism It is fixed to one another between body structure, protection mechanism, climbing mechanism is installed in the side wall of concrete component.Construction survey is referred to The measurement work that Construction stage is carried out, construction survey is the bridge between design and construction, through whole work progress In, it is the important component of construction.The foundation of construction survey including construction control network, the setting-out of building, acceptance survey and Deformation observation of construction period etc..In building construction measurement, its construction site condition is complicated and changeable, need to often increase measurement temporarily Workbench, now through frequently with plank is laid after building scaffold as measurement workbench, its mobility is too poor, is not easy to make With, and scaffold formula measurement workbench must frequently take and tear open, expend time length, take and tear high cost open, its less stable, influence Work quality is measured, while security is also low, is easily collapsed under extreme natural environment, survey crew is easily caused injured. The measuring table of this programme design, using concrete component as main platform, it is in regular tetragonal body structure, and mixed Steel reinforcement cage is provided with as support frame in solidifying soil component, and embrittlement is difficult after increasing its stability, concrete coagulation.Survey crew Stand at the top of concrete component, installation protection is carried out by protection mechanism, security is improved, and due to concrete structure Part own wt weight, can form self-insurance under severe natural climate, thus measurement accuracy when increasing construction survey and Security, and can fast assembling-disassembling, shorten the middle stand-by period, improve efficiency of construction.Need to use work at the scene During platform, by way of lifting directly by the utility model lifting in place, hoisting mechanism is set in inverted U-shaped structure by it Reinforcing bar, and the two ends of the reinforcing bar of U-shape structure are inserted respectively into realization fixation in concrete component;The quantity of hoisting mechanism is four It is individual, and four corners divided equally at the top of concrete component, so being capable of held stationary in lifting.
Protection mechanism is plate-like, and leg is provided with its bottom surface, and the bottom of leg is inserted into corresponding mounting cylinder And contacted with the inwall of mounting cylinder, flexibly connection is formed, it is so very convenient in dismounting;Adjacent protection mechanism in protection mechanism Between be provided with connecting rod, and the two ends of connecting rod are connected with corresponding protection mechanism respectively, to realize pass between protection mechanism Connection property, so as to increase stability, when occurring unexpected, survey crew's security in measurement is higher.
Concrete component bottom is provided with several support feets, and the bottom surface of support feet is arranged under concrete component bottom Side, support feet increases component stability using default steel construction;The quantity of support feet is five, and in quincuncial arrangement, i.e., one Internally, four additional support feet is set individual support feet around it, and being arranged on four support feets positioned at middle support feet forms Regional center at, and support feet formation region be arranged on protection mechanism formation region in, so support when center of gravity It is firm.
Climbing mechanism is cat ladder, is provided with position-limit mechanism on the side wall of concrete component, cat ladder is connected with position-limit mechanism; Position-limit mechanism is some horizontally disposed angle steel, and angle steel with the same side wall of concrete component along vertical cloth Put, cat ladder and wherein one or more Bolted angle connection.Due to concrete component according to it is different measurement height Multiple Type is set, Cause its height different, some meetings cause survey crew free-hand not climb more than two meters, therefore set climbing mechanism to be easy to Above and below survey crew, cat ladder is made of metal, and it welds with the position-limit mechanism that angle steel is made or is flexibly connected, and such as directly hangs Above, angle steel is just buried simultaneously when concrete component makes, and so forms overall steadiness, only need to be according to scene when using Environmental selection is welded or hung up.
The utility model compared with prior art, has the following advantages and advantages:The measuring table by using Concrete component is stabilised platform, and corresponding structure increases stability on stage+module, is surveyed so as to increase construction Measurement accuracy and security during amount, and can fast assembling-disassembling, shorten the middle stand-by period, improve construction effect Rate, realizes and reuses, while instrument antenna height increase, which is reduced, turns station quantity, improves in-site measurement work quality.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the utility model embodiment, constitutes the one of the application Part, does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is side view of the present utility model;
Fig. 2 is Fig. 1 top view;
Fig. 3 is Fig. 1 upward view;
Fig. 4 is that the utility model installs the side view after protection mechanism;
Fig. 5 is enlarged diagram at Fig. 4 A.
Mark and corresponding parts title in accompanying drawing:
1- hoisting mechanisms, 2- mounting cylinders, 3- concrete components, 4- climbing mechanisms, 5- position-limit mechanisms, 6- protection mechanisms, 7- Support feet, 8- connecting rods, 9- limit shafts, 10- stopper slots, 11- bearing pins.
Embodiment
For the purpose of this utility model, technical scheme and advantage is more clearly understood, with reference to embodiment and accompanying drawing, The utility model is described in further detail, and exemplary embodiment of the present utility model and its explanation are only used for explaining this Utility model, is not intended as limiting of the present utility model.
Embodiment:
As shown in Figures 1 to 5, a kind of mobile integrated concrete measuring table, using steel reinforcement cage as support frame, this Sample postpones the concrete component 3 for toppling over concrete formation in regular tetragonal body structure by formwork cloth, while in order to mitigate weight, But structural stability is not influenceed, four of concrete component 3 vertical seamed edges are recessed on groove, concrete component 3 in advance Four hoisting mechanisms 1 and eight mounting cylinders 2 are installed, each hoisting mechanism 1 is disposed therein between two mounting cylinders, such as Fig. 2 institutes Show, hoisting mechanism 1 is preferably in the reinforcing bar hanger of inverted U-shaped structure, and the two ends of U-shape structure are inserted respectively into concrete component 3 Realize and fix, four hoisting mechanisms 1 are divided equally in four corners at the top of concrete component 3, are more consolidated when so lifting, Suspension ring can be used.Mounting cylinder 2 uses metal cylinder, and mounting cylinder 2 is arranged on inside the region of the formation of hoisting mechanism 1, and mounting cylinder 2 is big Part is arranged in concrete component 3 and forms fixation, and top is stretched out from the top of concrete component 3, in the top of concrete component 3 Four block protection mechanisms 6 are provided with, protection mechanism 6 is plate-like, its bottom surface is provided with two legs, the bottom difference of every leg Insert and contacted with the inwall of mounting cylinder 2 from the top of a mounting cylinder, realize the fixation of protection mechanism 6, four block protection mechanisms 6 Between formed inner hollow cube structure, survey crew station protection mechanism 6 formation region in, phase in protection mechanism 6 It is provided between adjacent protection mechanism 6 on connecting rod 8, one of protection mechanism 6 and is provided with bearing pin 11, bearing pin 11 passes through the connection Bar 8, and connecting rod 8 can be rotated around bearing pin 11, and limit shaft 9, the bottom of connecting rod 8 are provided with another block protection mechanism 6 Portion is recessed stopper slot 10, in order that obtaining clamping effect more preferably, prevents that gravity from causing to come off, and stopper slot 10 is also wanted and connecting rod 8 symmetrical wall runs through, while the cross section of limit shaft 9 is less than the size of stopper slot 10, as connecting rod 8 is around 11 turns of bearing pin When dynamic, stopper slot 10 realizes the engaging or disengaging with limit shaft 9, this makes it possible to will be formed between protection mechanism 6 fixation or Depart from, the resistance to overturning of lifting protection mechanism 6 loses in survey crew and it can be supported when center of gravity is toppled over, protection people The safety of member, and dismounting is also convenient for, and four block protection mechanisms 6 substantially can be connected as into monolithic, improve stability.
Five support feets 7 are provided with the bottom of concrete component 3, the bottom surface of support feet 7 is arranged on the bottom of concrete component 3 Lower section, support feet 7 is arranged in the region of the formation of protection mechanism 6 in quincuncial arrangement, and the region of the formation of support feet 7.Branch Spike 7 can use pre-buried steel component, increase platform stabilization.
Climbing mechanism 4 is installed in the side wall of concrete component 3, climbing mechanism 4 is cat ladder, in the side of concrete component 3 Position-limit mechanism 5 is provided with wall, cat ladder is connected with position-limit mechanism 5.Position-limit mechanism 5 is some horizontally disposed angle steel, and angle Steel arranges with the same side wall of concrete component 3 along vertical, cat ladder and wherein one or more Bolted angle connection, cat ladder When being fixed using welding manner and angle steel, directly the vertical bar of cat ladder and angle steel are welded, during using flexible connection, such as hung Dress mode, then can weld hook in the vertical bar of cat ladder, hook angle steel, realized and fixed using Action of Gravity Field, hook Quantity is so more consolidated at least provided with two.Carried out when above and below survey crew along cat ladder, by corresponding protection mechanism 6 from Removed in mounting cylinder 2, survey crew can free in and out, do not influence turnover, while also more safety and conveniently, dismounting It is easy.
The utility model solve current job site carry out construction survey work measurement workbench mobility used it is poor, The problems such as use cost is high, stability is poor.The mobile integrated concrete measurement can be used for the construction survey of building plant area, make In, used after being reinforced by tower crane by the platform transfer to setting position and using steel wire rope etc..By by measuring instrument frame It is located on platform and combines plant area's control point acquisition survey station coordinate and set station.The utility model, which solves measurement bay, frequently to be taken and tears open, regards Caused by line obstacle the problems such as the wasting of resources, inefficiency.Instrument antenna height increase, which is reduced, turns station quantity, improves scene Work quality is measured, while security and operability are higher, when the mode of integral hoisting reduces traditional scaffold building Complicated procedures, without wasting the middle stand-by period, at the construction field (site), are equipped with lifting machine, then the movement of this programme substantially Performance is enough realized.
Above-described embodiment, is entered to the purpose of this utility model, technical scheme and beneficial effect One step is described in detail, be should be understood that and be the foregoing is only embodiment of the present utility model, is not used to limit Fixed protection domain of the present utility model, all any modifications within spirit of the present utility model and principle, made, is equally replaced Change, improve, should be included within protection domain of the present utility model.

Claims (10)

1. a kind of mobile integrated concrete measuring table, it is characterised in that including concrete component(3), the concrete Component(3)On some secondary hoisting mechanisms are installed(1)With some mounting cylinders(2), mounting cylinder(2)It is arranged on hoisting mechanism(1) Inside the region of formation, concrete component(3)Top is provided with protection mechanism(6), protection mechanism(6)Bottom be inserted into installation Cylinder(2)In after protection mechanism(6)Between formed inner hollow cube structure, protection mechanism(6)Between be fixed to one another, mixed Solidifying soil component(3)Side wall climbing mechanism is installed(4).
2. a kind of mobile integrated concrete measuring table according to claim 1, it is characterised in that the concrete Component(3)In regular tetragonal body structure, in concrete component(3)In be provided with support frame.
3. a kind of mobile integrated concrete measuring table according to claim 2, it is characterised in that the hoisting machine Structure(1)Concrete component is inserted respectively into the two ends of inverted U-shaped structure, and U-shape structure(3)Middle realize is fixed.
4. a kind of mobile integrated concrete measuring table according to claim 3, it is characterised in that the hoisting machine Structure(1)Quantity be four, and divide equally in concrete component(3)Four corners at top.
5. a kind of mobile integrated concrete measuring table according to claim 1, it is characterised in that the protection machine Structure(6)Plate-like, its bottom surface is provided with leg, and the bottom of leg is inserted into corresponding mounting cylinder(2)In and and mounting cylinder (2)Inwall contact.
6. a kind of mobile integrated concrete measuring table according to claim 5, it is characterised in that the protection machine Structure(6)In adjacent protection mechanism(6)Between be provided with connecting rod(8), and connecting rod(8)Two ends respectively with corresponding protection machine Structure(6)Connection.
7. a kind of mobile integrated concrete measuring table according to claim 1, it is characterised in that the concrete Component(3)Bottom is provided with several support feets(7), support feet(7)Bottom surface be arranged on concrete component(3)Bottom part down.
8. a kind of mobile integrated concrete measuring table according to claim 7, it is characterised in that the support feet (7)Quantity be five, and in quincuncial arrangement, and support feet(7)The region of formation is arranged on protection mechanism(6)Formed In region.
9. a kind of mobile integrated concrete measuring table as claimed in any of claims 1 to 8, its feature exists In the climbing mechanism(4)For cat ladder, in concrete component(3)Side wall on be provided with position-limit mechanism(5), cat ladder with it is spacing Mechanism(5)Connection.
10. a kind of mobile integrated concrete measuring table according to claim 9, it is characterised in that described spacing Mechanism(5)For some horizontally disposed angle steel, and angle steel is and concrete component(3)The same side wall along vertical cloth Put, cat ladder and wherein one or more Bolted angle connection.
CN201621415390.XU 2016-12-22 2016-12-22 A kind of mobile integrated concrete measuring table Active CN206330577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621415390.XU CN206330577U (en) 2016-12-22 2016-12-22 A kind of mobile integrated concrete measuring table

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621415390.XU CN206330577U (en) 2016-12-22 2016-12-22 A kind of mobile integrated concrete measuring table

Publications (1)

Publication Number Publication Date
CN206330577U true CN206330577U (en) 2017-07-14

Family

ID=59290737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621415390.XU Active CN206330577U (en) 2016-12-22 2016-12-22 A kind of mobile integrated concrete measuring table

Country Status (1)

Country Link
CN (1) CN206330577U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108004933A (en) * 2017-12-25 2018-05-08 中铁大桥局集团第五工程有限公司 A kind of bridge construction survey platform that can be recycled and application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108004933A (en) * 2017-12-25 2018-05-08 中铁大桥局集团第五工程有限公司 A kind of bridge construction survey platform that can be recycled and application method
CN108004933B (en) * 2017-12-25 2024-02-27 中铁大桥局集团第五工程有限公司 Recyclable bridge construction measurement platform and using method

Similar Documents

Publication Publication Date Title
CN101781879B (en) Construction method of single-pylon cable-stayed bridge without dorsal cables
CN106006404A (en) Super high-rise external hanging movable arm tower crane climbing supporting device
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN102767176A (en) Hoisting positioning construction method of pile foundation steel reinforcement cage
CN102828469A (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN204040035U (en) A kind of positioning guiding structure of steel pile casting
CN105317052B (en) Tower crane foundation bolt fixing method
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN109653515A (en) Across the steel worm-gearing truss hanging method of 120m
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN207362866U (en) A kind of bolt collar fixed structure
CN105804110A (en) Construction method of foundation bolts of railway contact net and mounting bracket
CN206330577U (en) A kind of mobile integrated concrete measuring table
CN203834928U (en) Automatic climbing formwork
CN205742249U (en) A kind of prestressed concrete back cover cushion cap template
CN109898871A (en) Inclined in two-way steel column mounting and positioning device and localization method
CN207050740U (en) A kind of scalable building wall form verticality measurement device
CN209588891U (en) A kind of measuring scale based on quick precise measurement high iron catenary
CN104499706A (en) Elevator well template platform and construction method thereof
CN103276722A (en) Low-clearance pile frame and application method for same
CN109883284A (en) A kind of measuring scale based on quick precise measurement high iron catenary
CN109056781A (en) Tower crane in a kind of tower crane waterborne and water
CN205591587U (en) Steel structure box type board room
CN106123873B (en) Upright projection positioning measuring device positions cultellation construction method
CN113048961A (en) Measuring tool for independent foundation positioning and using method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant