CN208539499U - Portable pre-buried electronic box support frame - Google Patents

Portable pre-buried electronic box support frame Download PDF

Info

Publication number
CN208539499U
CN208539499U CN201821298210.3U CN201821298210U CN208539499U CN 208539499 U CN208539499 U CN 208539499U CN 201821298210 U CN201821298210 U CN 201821298210U CN 208539499 U CN208539499 U CN 208539499U
Authority
CN
China
Prior art keywords
angle bar
bolt
fixing bolt
distribution box
flower basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821298210.3U
Other languages
Chinese (zh)
Inventor
孙小虎
李文波
赵维灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201821298210.3U priority Critical patent/CN208539499U/en
Application granted granted Critical
Publication of CN208539499U publication Critical patent/CN208539499U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casings For Electric Apparatus (AREA)

Abstract

The utility model discloses portable pre-buried electronic box support frames, including concrete wall, distribution box is embedded in the concrete wall, the distribution box is equipped with distribution box cavity, the first angle bar is provided on the upper lower wall of the distribution box cavity, the second angle bar is provided on the two sidewalls of the distribution box cavity, it is arranged on the fixing bolt II being located above and is connected with flower basket bolt I, the outer middle side part of second angle bar is welded with fixing bolt I, it is arranged on the fixing bolt I and is connected with flower basket bolt II, the described one end of flower basket bolt I far from top fixing bolt II, the one end of flower basket bolt II far from fixing bolt I is set on underlying fixing bolt II;The problem of electronic box box deformation occurred during the utility model effective solution distribution box is pre-buried, worker facilitate light and handy when installing, when dismounting is time saving and energy saving to be used in turn rate height, reduces pollution, improves stock utilization, reduce cost.

Description

Portable pre-buried electronic box support frame
Technical field
The utility model relates to electronic box technical field, specially portable pre-buried electronic box support frame.
Background technique
With the continuous development of China's economy, the mainstream of construction industry is increasingly becoming with the skyscraper of shear wall structure, it is high Layer build big and small distribution box not under several hundred, for practitioner is installed as Architectural Equipment, how simple and direct effective guarantor Pre-buried distribution box is indeformable in card shear wall certainly will become a critical issue.
Traditional installation method is to make angle bar frame according to the geometric dimension of distribution box or with steel pipe branch in main body construction Support removes angle bar frame after main body construction, and there are many disadvantages in whole installation process.Angle bar frame is made, it certainly will be additional Increase expense, and since the stationarity of angle bar frame, flexibility are poor, stress is squeezed in concrete placings, causes Demolition Construction difficult, it is right Cabinet needs to redress after beaing.Worker needs to spend the very long working time in installing and dismounting, makes a general survey of whole process, takes When it is laborious, and but cannot be guaranteed installation quality.
Utility model content
The purpose of this utility model is to provide portable pre-buried electronic box support frames, to solve to propose in above-mentioned background technique The problem of.
To achieve the above object, the utility model provides the following technical solutions: portable pre-buried electronic box support frame, including mixed Solidifying cob wall body, is embedded with distribution box in the concrete wall, and the distribution box is equipped with distribution box cavity, in the distribution box It is provided with the first angle bar on the upper lower wall of chamber, is provided with the second angle bar on the two sidewalls of the distribution box cavity, described One angle bar and the second angle bar pass through positioning screw and are fixed on the inner wall of distribution box cavity, two adjacent the first angle bar and The inside of two angle bar is arranged with a junction steel plate, and passes through connection between junction steel plate and the first angle bar, the second angle bar Bolt is fixedly connected, and the outer middle side part of first angle bar is welded with fixing bolt II, on the fixing bolt II being located above It is arranged and is connected with flower basket bolt I, the outer middle side part of second angle bar is welded with fixing bolt I, equal on the fixing bolt I It is arranged and is connected with flower basket bolt II, the fixing bolt I and the front end for being located above fixing bolt II offer jack, insert Kong Zhongjun is interspersed with limit bolt, and the one end far from top fixing bolt II the flower basket bolt I, flower basket bolt II are far from fixed One end of bolt I is set on underlying fixing bolt II, and the front end for being located below fixing bolt II passes through limit Nut locking.
Preferably, it is 5mm that the width of first angle bar, which is 50mm, thickness, and the width of second angle bar is 40mm, thickness are 4mm.
Preferably, the fixing bolt I and fixing bolt II is disposed as M16 bolt, and fixing bolt I and fixing bolt The length of II is at least provided with 50mm.
Preferably, the junction steel plate is disposed as rectangular steel plates, and the thickness of rectangular steel plates is up to 5mm, described One end of junction steel plate offers the inclined-plane parallel with the second angle bar, and the other end of junction steel plate offers and the first angle bar Parallel inclined-plane.
Compared with prior art, the utility model has the beneficial effects that the structure design of the utility model is reasonable, distribution box exists The support frame is put to electronic box inside when processing district blocks, electronic box inner wall has been supported by flower basket bolt, then fills glue with sawdust Band sealing, is waited to be installed;After the completion of concreting, wall mould clears up sawdust and adhesive tape in electronic box in time after removing, and takes out support Frame is Ke Xunhuanliyong, and the effective site operation that improves is horizontal, reaches the target of green construction, civilized construction, and the support frame Easy to process, assembling and disassembling is convenient, can play good supporting role, occurs during effective solution distribution box is pre-buried Electronic box box deformation the problem of, worker facilitates light and handy when installing, when dismounting is time saving and energy saving to be used in turn rate height, reduce pollution, Stock utilization is improved, cost is reduced.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is structure enlargement diagram at A in the utility model Fig. 1;
Fig. 3 is the utility model junction steel plate schematic diagram;
Fig. 4 is the utility model fixing bolt II schematic diagram;
Fig. 5 is the second angle bar of the utility model schematic diagram;
Fig. 6 is the utility model flower basket bolt I schematic diagram.
In figure: concrete wall 1, distribution box cavity 3, the first angle bar 4, the second angle bar 5, junction steel plate 6, connects distribution box 2 Connecting bolt 7, fixing bolt I8, fixing bolt II9, flower basket bolt I10, flower basket bolt II11, limit bolt 12, positioning screw 13, limit screw cap 14.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-6 is please referred to, the utility model provides a kind of technical solution: portable pre-buried electronic box support frame, including coagulation Cob wall body 1, is embedded with distribution box 2 in concrete wall 1, and distribution box 2 is equipped with distribution box cavity 3, distribution box cavity 3 up and down It is provided with the first angle bar 4 on wall, the second angle bar 5, the first angle bar 4 and second are provided on the two sidewalls of distribution box cavity 3 Angle bar 5 is fixed on the inner wall of distribution box cavity 3 by positioning screw 13, and the width of the first angle bar 4 is that 50mm, thickness are equal For 5mm, it is 4mm that the width of the second angle bar 5, which is 40mm, thickness, two adjacent the first angle bar 4 and the second angle bar 5 it is interior Side is arranged with a junction steel plate 6, and solid by connection bolt 7 between junction steel plate 6 and the first angle bar 4, the second angle bar 5 Fixed connection, junction steel plate 6 is disposed as rectangular steel plates, and the thickness of rectangular steel plates is up to 5mm, one end of junction steel plate 6 The inclined-plane parallel with the second angle bar 5 is offered, the other end of junction steel plate 6 offers the inclined-plane parallel with the first angle bar 4, Junction steel plate 6 can play good consolidation effect, so that support effect is more preferable, the outer middle side part of the first angle bar 4 is welded with It is arranged on fixing bolt II9, the fixing bolt II9 being located above and is connected with flower basket bolt I10, the outer middle side part of the second angle bar 5 It is welded with fixing bolt I8, is arranged on fixing bolt I8 and is connected with flower basket bolt II11, fixing bolt I8 and fixing bolt II9 is disposed as M16 bolt, and the length of fixing bolt I8 and fixing bolt II9 are at least provided with 50mm, fixing bolt I8 And be located above the front end of fixing bolt II9 and offer jack, limit bolt 12, limit bolt 12 are interspersed in jack Flower basket bolt I10 and flower basket bolt II11 can be limited, prevent it from running out of, flower basket bolt I10 is far from the fixed spiral shell in top The one end of one end, flower basket bolt II11 far from fixing bolt I8 of bolt II9 is set on underlying fixing bolt II9, And the front end for being located below fixing bolt II9 is locked by limit screw cap 14;
This support frame constitutes three supporting points, the characteristics of connection using flower basket bolt, Ke Yishi using three flower basket bolts The adjustability of existing supporting point bears external force by the first angle bar 4 and the second angle bar 5, uses fixing bolt I8, fixing bolt II9 connection and flower basket bolt are fastened, and are avoided pre-buried electronic box from vibrating in concreting and are made with concrete extrusion to electronic box At deformation and damage, ensure that construction quality;Distribution box is put the support frame when processing district blocks to passing through inside electronic box Flower basket bolt I10 and flower basket bolt II1 has supported 2 inner wall of distribution box, then fills tape seal with sawdust, waits to be installed;It is mixed After the completion of solidifying soil pours, wall mould clears up sawdust and adhesive tape in electronic box in time after removing, and taking out support frame can be recycled, effectively It is horizontal to improve site operation, reaches the target of green construction, civilized construction, and the support frame is easy to process, assembling and disassembling side Just, good supporting role can be played, the electronic box box deformation occurred during effective solution distribution box is pre-buried is asked Topic, worker facilitate light and handy when installing, when dismounting is time saving and energy saving to be used in turn rate height, reduces pollution, improves stock utilization, reduces Cost.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. portable pre-buried electronic box support frame, including concrete wall (1), it is characterised in that: pre- in the concrete wall (1) It is embedded with distribution box (2), the distribution box (2) is equipped with distribution box cavity (3), on the upper lower wall of the distribution box cavity (3) It is provided with the first angle bar (4), is provided with the second angle bar (5) on the two sidewalls of the distribution box cavity (3), first angle bar (4) it is fixed on the inner wall of distribution box cavity (3) by positioning screw (13) with the second angle bar (5), adjacent two first The inside of angle bar (4) and the second angle bar (5) is arranged with a junction steel plate (6), and junction steel plate (6) and the first angle bar (4), It is fixedly connected by connecting bolt (7) between second angle bar (5), the outer middle side part of first angle bar (4) is welded with solid Determine bolt II(9), the fixing bolt II(9 being located above) on be arranged be connected with flower basket bolt I(10), second angle bar (5) Outer middle side part be welded with fixing bolt I(8), the fixing bolt I(8) on be arranged be connected with flower basket bolt II(11), The fixing bolt I(8) and be located above fixing bolt II(9) front end offer jack, intert in jack limited Position bolt (12), the flower basket bolt I(10) far from top fixing bolt II(9) one end, flower basket bolt II(11) far from solid Determine bolt I(8) one end be set in underlying fixing bolt II(9) on, and be located below fixing bolt II(9) before It is locked by limit screw cap (14) at end.
2. portable pre-buried electronic box support frame according to claim 1, it is characterised in that: the width of first angle bar (4) It is 5mm that degree, which is 50mm, thickness, and it is 4mm that the width of second angle bar (5), which is 40mm, thickness,.
3. portable pre-buried electronic box support frame according to claim 1, it is characterised in that: the fixing bolt I(8) and it is solid Determine bolt II(9) be disposed as M16 bolt, and fixing bolt I(8) and fixing bolt II(9) length at least provided with 50mm。
4. portable pre-buried electronic box support frame according to claim 1, it is characterised in that: the junction steel plate (6) is all provided with Rectangular steel plates are set to, and the thickness of rectangular steel plates is up to 5mm, one end of the junction steel plate (6) offers and second The parallel inclined-plane of angle bar (5), the other end of junction steel plate (6) offer the inclined-plane parallel with the first angle bar (4).
CN201821298210.3U 2018-08-13 2018-08-13 Portable pre-buried electronic box support frame Active CN208539499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821298210.3U CN208539499U (en) 2018-08-13 2018-08-13 Portable pre-buried electronic box support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821298210.3U CN208539499U (en) 2018-08-13 2018-08-13 Portable pre-buried electronic box support frame

Publications (1)

Publication Number Publication Date
CN208539499U true CN208539499U (en) 2019-02-22

Family

ID=65378410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821298210.3U Active CN208539499U (en) 2018-08-13 2018-08-13 Portable pre-buried electronic box support frame

Country Status (1)

Country Link
CN (1) CN208539499U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110474271A (en) * 2019-08-21 2019-11-19 云南建投第十一建设有限公司 The construction method of fixing concrete shear wall distribution box body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110474271A (en) * 2019-08-21 2019-11-19 云南建投第十一建设有限公司 The construction method of fixing concrete shear wall distribution box body

Similar Documents

Publication Publication Date Title
CN208168368U (en) A kind of construction wall construction template connector
CN208539499U (en) Portable pre-buried electronic box support frame
CN201144520Y (en) Combined door opening formwork
CN208563977U (en) A kind of easy-to-mount slideable constructional column aluminum alloy pattern plate
CN204040450U (en) A kind of for angle connector in tools type section steel builder's jack
CN207048321U (en) A kind of aluminum dipping form board connecting equipment
CN202831624U (en) Template for deformation joint of shear wall
CN206458091U (en) A kind of constructional form fixing apparatus
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN205046851U (en) Building template
CN210289132U (en) Cross-shaped constructional column combined type aluminum alloy template assembly
CN204676885U (en) A kind of steel concrete column template fast pacifies the system of tearing open
CN208534510U (en) A kind of support device of culvert construction
CN205100552U (en) Enclosure assembling die that bears down on one
CN206000154U (en) A kind of building pours uses template
CN211849566U (en) Roughing mill body reserved bolt hole support-free template
CN208380088U (en) A kind of reinforcing support construction for architectural engineering
CN203022346U (en) Three-section-head type water stop threaded rod
CN204040411U (en) A kind of external wall plastering lands mortar and reclaims bucket
CN202272818U (en) Plaster die for producing quartz crucibles
CN206071047U (en) A kind of beam formwork for building
CN205976473U (en) Aluminum -wood formwork support device
CN205822778U (en) A kind of huge post of stiffness is without screw aluminum alloy formwork system
CN202559728U (en) Building template supporting combination structure
CN204850425U (en) Aluminum alloy template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant