CN208533968U - It is a kind of for conveying the pipeline of skyscraper rubbish - Google Patents
It is a kind of for conveying the pipeline of skyscraper rubbish Download PDFInfo
- Publication number
- CN208533968U CN208533968U CN201820927373.7U CN201820927373U CN208533968U CN 208533968 U CN208533968 U CN 208533968U CN 201820927373 U CN201820927373 U CN 201820927373U CN 208533968 U CN208533968 U CN 208533968U
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipeline
- wall
- slide post
- conveying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuse Collection And Transfer (AREA)
Abstract
The utility model discloses a kind of for conveying the pipeline of skyscraper rubbish, belongs to technical field of buildings.The pipeline includes the first pipe being vertically arranged and second pipe, third pipeline is equipped between the first pipe and second pipe, the upper end of the third pipeline is connected to the lower end of the first pipe, the lower end of third pipeline is connected to the upper end of the second pipe, the tube wall of the first pipe, second pipe and third pipeline is double-layer structure, is equipped with rubber layer between the inner and outer wall of pipeline;Multiple buffer boards are equipped in the first pipe, one end of the buffer board and the inner wall of the first pipe are hinged, the other end extends downwardly, and it is connected by least two slide posts and the inner wall of first pipe, spring is arranged on the slide post, and one end of spring is fixed on the elongated end of buffer board, the other end is fixed on the inner wall of first pipe.The utility model has the advantages of reducing building waste to the impact force of pipeline, extending pipeline service life.
Description
Technical field
The utility model relates to a kind of for conveying the pipeline of skyscraper rubbish, belong to technical field of buildings.
Background technique
Building waste refers to that construction, unit in charge of construction or individual build all kinds of buildings, structures, pipe network etc., spread
If or remove, generated dregs, spoir, rejected material, mud and other wastes in reparative processes, need to be located accordingly
Reason, can reach ideal Engineering Project Construction in this way.
In the prior art, general building waste processing mode are as follows: tower crane handling, elevator traffic and waste pipe fortune
Defeated, tower crane handling therein is at high cost, there are safety hazard, elevator traffic low efficiency, and high labor cost, waste pipe transport
Practicability is most strong, but the utility model patent of existing refuse conveying pipe road such as Publication No. CN205502507, in the patent
Buffering spring sheet and inner wall of the pipe between directly connected by spring, in building waste transportational process, especially building waste
When more, heavy, spring meeting almost all is compressed, and buffering spring sheet does not have buffer function, to cause rubbish to pipeline
Impact force is big, influences the service life of pipeline.
Utility model content
The utility model aims to solve the problem that buffering effect existing for refuse conveying pipe road in the prior art is bad, influences the pipeline longevity
The technical issues of life, provide it is a kind of new for conveying the pipeline of skyscraper rubbish, by the third pipeline that is obliquely installed with
And buffer board, slide post are equipped with, having reduces building waste to the impact force of pipeline, extends the excellent of pipeline service life
Point.
For achieving the above object, the technical solution of the utility model is as follows:
It is a kind of for conveying the pipeline of skyscraper rubbish, it is characterised in that: including the first pipe being vertically arranged and
Two pipelines are equipped with third pipeline, the upper end of the third pipeline and first pipe between the first pipe and second pipe
The lower end in road is connected to, and the lower end of third pipeline is connected to the upper end of the second pipe, the third pipeline and first pipe it
Between angle be 30~45 °;The tube wall of the first pipe, second pipe and third pipeline is double-layer structure, pipeline it is interior
Rubber layer is equipped between wall and outer wall;
Multiple buffer boards, the inner wall hinge of one end of the buffer board and the first pipe are equipped in the first pipe
It connects, the other end extends downwardly, and is connected by least two slide posts and the inner wall of first pipe, is arranged on the slide post
Spring, and one end of spring is fixed on the elongated end of buffer board, the other end is fixed on the inner wall of first pipe;The slide post packet
It includes the first slide post and diameter is greater than the second slide post of the first slide post, it can between first slide post and the second slide post
It is slidably connected.
In order to which the utility model is better achieved, further, the junction of the first pipe and third pipeline is equipped with
For the baffle of backgauge, one end of the baffle is fixedly connected with the inner wall of first pipe, the inner wall of the other end and third pipeline
It is fixedly connected.
Further, rubber is filled in the gap between the baffle and the first pipe, third pipeline.
Further, the lower end of the second pipe is equipped with dust cover.
Further, length of the length of first slide post less than the second slide post.
The utility model has the beneficial effects that
(1) compared with prior art, the utility model further increases buffering effect by the setting of inclined third pipeline
Fruit, meanwhile, multiple buffer boards are set in first pipe, are connected between buffer board and inner wall of the pipe by least two slide posts
It connects, when the side of buffer board encounters the construction material of whereabouts, the first slide post is slided into the second slide post, until cannot slide
It is dynamic, when the sliding end of the first slide post is overlapped with the end center of circle of the second slide post, the elongated end and first pipe of buffer board
Inner wall still have one end distance, play the role of preferably stopping to the rubbish of whereabouts, buffering, can avoid building waste from pipeline
Upper end falls vertically causes biggish impact force, and caused pipeline service life is short and pipeline lower section building waste is collected and existed
Difficult problem.
(2) in the utility model, by the setting of baffle, corner that further first pipe is connected with second pipe
It is protected, further, by filled rubber in the gap between baffle and pipeline, is played a supporting role, while rubber energy
It is enough to have certain buffer function to impact force, impact of the building waste to pipeline of whereabouts is further decreased on the whole.
(3) pipeline is double-layer structure in the utility model, is equipped with rubber layer between inner and outer wall, rubber layer matter is soft, right
Active force plays dispersion, buffer function.
(4) lower end of second pipe is equipped with dust cover in the utility model, to reduce raising for the building waste to fall generation
Dirt, and can play the role of facilitating collection by the way that dust cover to be connect with building waste collection device.
Detailed description of the invention
Fig. 1 is the schematic cross-sectional view of the utility model;
Fig. 2 is partial enlarged view at the A of Fig. 1.
Wherein, 1- first pipe, 2- second pipe, 3- third pipeline, 4- rubber layer, 5- buffer board, 501- buffer board
Elongated end, the first slide post of 6-, the second slide post of 7-, 8- spring, 9- baffle, 10- dust cover.
Specific embodiment
The utility model is described in further detail below with reference to embodiment, but the embodiments of the present invention is not
It is limited to this.
It is a kind of for conveying the pipeline of skyscraper rubbish, including the first pipe 1 being vertically arranged and second pipe 2,
Third pipeline 3 is equipped between one pipeline 1 and second pipe 2, the upper end of third pipeline 3 is connected to the lower end of first pipe 1, third
The lower end of pipeline 3 is connected to the upper end of second pipe 2, and the angle between third pipeline 3 and first pipe 1 is 30 °;First pipe
1, the tube wall of second pipe 2 and third pipeline 3 is double-layer structure, is equipped with rubber layer 4 between the inner and outer wall of pipeline, is used for
Dissipation of ferees reduces the percussion to pipeline;
Three buffer boards 5 are equipped in the first pipe 1 of the present embodiment, as shown in Figure 1, three buffer boards are staggered, buffering
One end of plate 5 and the inner wall of first pipe 1 are hinged, and the other end extends downwardly, and pass through two slide posts and first pipe 1
Inner wall connection, two slide posts can guarantee the relative stability of buffer board and slide post, are arranged with spring 8, and bullet on slide post
One end of spring 8 is fixed on the elongated end of buffer board 5, and the other end is fixed on the inner wall of first pipe 1;Slide post includes the first sliding
Column 6 and diameter are greater than the second slide post 7 of the first slide post 6, slidable connection between the first slide post 6 and the second slide post 7.
In the present embodiment, the junction of first pipe 1 and third pipeline 3 is equipped with the baffle 9 for backgauge, and the one of baffle 9
End is fixedly connected with the inner wall of first pipe 1, and the other end is fixedly connected with the inner wall of third pipeline 3.
In the present embodiment, rubber is filled in the gap between baffle 9 and first pipe 1, third pipeline 3.
In the present embodiment, the lower end of second pipe 2 is equipped with dust cover 10.
In the present embodiment, the length of the length of the first slide post 6 less than the second slide post 6.
It should be noted that the term " first ", " second " etc. in the utility model are merely for convenience of describing and understand,
Not to the quantity of technical characteristic, using being sequentially defined.
Above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although referring to preferred embodiment pair
The utility model is described in detail, those skilled in the art should understand that, it can be to the technology of the utility model
Scheme is modified or replaced equivalently, and without departing from the objective and range of technical solutions of the utility model, should all be covered
In the scope of the claims of the utility model.
Claims (5)
1. a kind of for conveying the pipeline of skyscraper rubbish, it is characterised in that: including the first pipe (1) being vertically arranged and
Two pipelines (2), between the first pipe (1) and second pipe (2) be equipped with third pipeline (3), the third pipeline (3) it is upper
End is connected to the lower end of the first pipe (1), and the lower end of third pipeline (3) is connected to the upper end of the second pipe (2), institute
Stating the angle between third pipeline (3) and first pipe (1) is 30~45 °;The first pipe (1), second pipe (2) and
The tube wall of three pipelines (3) is double-layer structure, is equipped with rubber layer (4) between the inner and outer wall of pipeline;
Multiple buffer boards (5) are equipped in the first pipe (1), one end and the first pipe (1) of the buffer board (5)
Inner wall is hinged, and the other end extends downwardly, and is connect by least two slide posts with the inner wall of first pipe (1), the sliding
It is arranged on column spring (8), and one end of spring (8) is fixed on the elongated end of buffer board (5), the other end is fixed on first pipe
(1) inner wall;The slide post includes the second slide post (7) that the first slide post (6) and diameter are greater than the first slide post (6),
Slidable connection between first slide post (6) and the second slide post (7).
2. as described in claim 1 for conveying the pipeline of skyscraper rubbish, it is characterised in that: the first pipe (1)
The baffle (9) for backgauge is equipped with the junction of third pipeline (3), and one end of the baffle (9) is interior with first pipe (1)
Wall is fixedly connected, and the other end is fixedly connected with the inner wall of third pipeline (3).
3. as claimed in claim 2 for conveying the pipeline of skyscraper rubbish, it is characterised in that: the baffle (9) and institute
It states in the gap between first pipe (1), third pipeline (3) filled with rubber.
4. as described in claim 1 for conveying the pipeline of skyscraper rubbish, it is characterised in that: the second pipe (2)
Lower end be equipped with dust cover (10).
5. as described in claim 1 for conveying the pipeline of skyscraper rubbish, it is characterised in that: first slide post
(6) length of the length less than the second slide post (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820927373.7U CN208533968U (en) | 2018-06-15 | 2018-06-15 | It is a kind of for conveying the pipeline of skyscraper rubbish |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820927373.7U CN208533968U (en) | 2018-06-15 | 2018-06-15 | It is a kind of for conveying the pipeline of skyscraper rubbish |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208533968U true CN208533968U (en) | 2019-02-22 |
Family
ID=65392257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820927373.7U Expired - Fee Related CN208533968U (en) | 2018-06-15 | 2018-06-15 | It is a kind of for conveying the pipeline of skyscraper rubbish |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208533968U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227654A (en) * | 2020-10-02 | 2021-01-15 | 江苏省建筑工程集团有限公司 | Depend on building rubbish transportation system of building body |
-
2018
- 2018-06-15 CN CN201820927373.7U patent/CN208533968U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112227654A (en) * | 2020-10-02 | 2021-01-15 | 江苏省建筑工程集团有限公司 | Depend on building rubbish transportation system of building body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207277982U (en) | A kind of construction protective fence | |
CN208329503U (en) | A kind of construction garbage chute | |
CN208830666U (en) | A kind of skyscraper vertical garbage transportation system | |
CN208533968U (en) | It is a kind of for conveying the pipeline of skyscraper rubbish | |
CN109629795A (en) | A kind of intelligent construction garbage classification device | |
CN207144396U (en) | Building waste cleaning plant in a kind of high-rise | |
CN206308968U (en) | A kind of skyscraper vertical garbage transport channel | |
CN206667792U (en) | A kind of architectural engineering protective stent | |
CN207032786U (en) | A kind of atomized dust settling energy dissipating garbage chute | |
CN205637487U (en) | High -rise building garbage recycling device | |
CN207169250U (en) | A kind of vortex-flow and defrosting device | |
CN208265371U (en) | A kind of buffering limit dirt device for construction site construction waste vertical transport safety | |
CN105858050A (en) | Buffering device for vertical falling pipeline for building garbage | |
CN103104123A (en) | Steel truss wind-break wall and construction method thereof | |
CN206091206U (en) | Building floor construction rubbish collecting channel | |
CN213683064U (en) | Vertical transport passageway of building rubbish in elevator shaft | |
CN215054926U (en) | Buffer and transport passage are transported perpendicularly to super high-rise building rubbish | |
CN213297220U (en) | Brake mechanism for high-altitude anti-falling protection | |
CN205739061U (en) | Refuse of building vertical blanking pipeline buffer unit | |
CN206346110U (en) | A kind of bridge rhone | |
CN219387025U (en) | Quick clear device of high-rise construction building rubbish | |
CN207245099U (en) | The interim rubbish blanking system of Core Walls Structure | |
CN206289537U (en) | A kind of viaduct bridge frontier defense guardrail | |
CN201702500U (en) | Dust collector applicable to submerged arc welded pipe production line | |
CN201074423Y (en) | Disturbed flow steel smokestack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190222 Termination date: 20200615 |
|
CF01 | Termination of patent right due to non-payment of annual fee |