CN206308968U - A kind of skyscraper vertical garbage transport channel - Google Patents

A kind of skyscraper vertical garbage transport channel Download PDF

Info

Publication number
CN206308968U
CN206308968U CN201621445480.3U CN201621445480U CN206308968U CN 206308968 U CN206308968 U CN 206308968U CN 201621445480 U CN201621445480 U CN 201621445480U CN 206308968 U CN206308968 U CN 206308968U
Authority
CN
China
Prior art keywords
connecting tube
plate
transport channel
inwall
vertical garbage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621445480.3U
Other languages
Chinese (zh)
Inventor
徐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Fu Fu Sen Electrical And Mechanical Equipment Engineering Co Ltd
Original Assignee
Tianjin Fu Fu Sen Electrical And Mechanical Equipment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Fu Fu Sen Electrical And Mechanical Equipment Engineering Co Ltd filed Critical Tianjin Fu Fu Sen Electrical And Mechanical Equipment Engineering Co Ltd
Priority to CN201621445480.3U priority Critical patent/CN206308968U/en
Application granted granted Critical
Publication of CN206308968U publication Critical patent/CN206308968U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a kind of skyscraper vertical garbage transport channel, it is related to Architectural Equipment technical field.The skyscraper vertical garbage transport channel, including building body and Material collecting box for harvesting, are installed with connecting seat at the top of the Material collecting box for harvesting, discharge nozzle is connected with the top of the connecting seat, and card pipe, the top feedthrough connecting tube of the card pipe are communicated with the top of the discharge nozzle.The skyscraper vertical garbage transport channel; by the setting to baffle plate, expansion plate, damping spring, snubber block and buffer board; make to access sufficiently buffering and damping into the garbage energy in connecting tube; building waste is so set safely and effectively to transport the inside of Material collecting box for harvesting; avoid the influence of the impact to connecting tube of building waste; so effectively raise construction quality; construction safety is ensured; also protect whole device simultaneously; the life-span of transport pipeline is extended, infusion of financial resources is reduced.

Description

A kind of skyscraper vertical garbage transport channel
Technical field
The utility model is related to Architectural Equipment technical field, specially a kind of skyscraper vertical garbage transport channel.
Background technology
In Building Construction, construct due to professional subpackage, in addition in design, structure construction and masonry are decorated Change etc. subdivisional work increases, therefore, easily produce a large amount of building wastes to be deposited in each floor, so have a strong impact on every The construction of floor body.
But existing skyscraper vertical garbage transport channel all can be due to the height of high building too during use Height, causes inwall impact of the rubbish to transport channel excessive, has so had a strong impact on skyscraper vertical garbage transport channel, subtracts In the low life-span of skyscraper vertical garbage transport channel, increased construction fund.
Utility model content
(1) technical problem for solving
In view of the shortcomings of the prior art, the utility model provides a kind of skyscraper vertical garbage transport channel, solves Rubbish impacts excessive problem to skyscraper vertical garbage transport channel.
(2) technical scheme
To realize object above, the utility model is achieved by the following technical programs:A kind of skyscraper rubbish hangs down Straight transport channel, including building body and Material collecting box for harvesting, are installed with connecting seat, the top of the connecting seat at the top of the Material collecting box for harvesting Discharge nozzle is connected with, card pipe, the top feedthrough connecting tube of the card pipe, the connecting tube are communicated with the top of the discharge nozzle Top be installed with the deck being adapted with card pipe, the surface of the connecting tube offers fixing groove, and connecting tube table The position of face and correspondence fixing groove is fixedly connected by retainer ring with building body, one end of the close building body of the connecting tube be communicated with into Expects pipe, the feed pipe runs through building body and extends to the inside of building body away from one end of connecting tube.
The inwall both sides of the connecting tube are installed with swash plate, the one end and card of the swash plate away from connection inside pipe wall It is fixedly connected at the top of pipe, the connecting tube is installed with fixed block away from inwall one end of feed pipe, the fixed block is remote Base plate is installed with from the inwall side of connecting tube, the inwall of the base plate is sequentially installed with portable plate and fixation from top to bottom Plate, the both sides of the portable plate are slidably connected with the inwall both sides of base plate, the both sides of the fixed plate with the inwall of base plate It is fixedly connected, the bottom of the portable plate is installed with pole, and the bottom of the pole runs through fixed plate and extends to fixation The lower section of plate, the surface of the pole and between fixed plate and portable plate around being provided with damping spring, the bottom of the pole Portion is installed with briquetting, and expansion plate is installed with the top of the portable plate, and base plate is run through simultaneously in the top of the expansion plate The outside of base plate is extended to, the side of the expansion plate and the external stability positioned at base plate are provided with baffle plate, the bottom of the deck Portion is installed with deduster.
Preferably, the inside of the deduster is installed with fixture block, and wire is installed with the fixture block.
Preferably, it is installed with buffer board at the top of the swash plate.
Preferably, the draw-in groove being adapted with card pipe is offered on the deck.
Preferably, the position of the inwall bottom of the base plate and correspondence briquetting is provided with the snubber block being adapted with briquetting.
Preferably, the quantity of the connecting tube be at least between three, and the adjacent connecting tube of each two by block pipe and Deck fixes clamping.
(3) beneficial effect
The utility model provides a kind of skyscraper vertical garbage transport channel.Possesses following beneficial effect:
(1), the skyscraper vertical garbage transport channel, eases up by baffle plate, expansion plate, damping spring, snubber block The setting of punching, makes to access sufficiently buffering and damping into the garbage energy in connecting tube, building waste is pacified Complete effective transport is to the inside of Material collecting box for harvesting, it is to avoid influence of the impact of building waste to connecting tube, so effective raising Construction quality, has ensured construction safety, while also protecting whole device, extends the life-span of transport pipeline, reduces throwing Enter fund.
(2), the skyscraper vertical garbage transport channel, by the setting to fixing groove and retainer ring, connects each The sole mass of pipe is supported by building body, so makes do not have pressure between each connecting tube, so that connecting tube is in the mistake for using More stablize in journey, it is to avoid the pressure between connecting tube is excessive, causes the damage of connecting tube, has ensured construction safety, while The installation and removal connecting tube of people is also allowed for.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the structural representation of the utility model connecting tube;
Fig. 3 is the structural representation of the utility model base plate;
Fig. 4 is the structure upward view of the utility model deduster.
In figure:1 building body, 2 Material collecting box for harvesting, 3 connecting seats, 4 discharge nozzles, 5 card pipes, 6 connecting tubes, 7 decks, 8 fixing grooves, 9 are fixed Ring, 10 feed pipes, 11 swash plates, 12 fixed blocks, 13 base plates, 14 portable plates, 15 fixed plates, 16 poles, 17 damping springs, 18 pressures Block, 19 expansion plates, 20 baffle plates, 21 dedusters, 22 fixture blocks, 23 wires, 24 buffer boards, 25 draw-in grooves, 26 snubber blocks.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment for being obtained, belongs to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of skyscraper vertical garbage transport channel, Including building body 1 and Material collecting box for harvesting 2, the top of Material collecting box for harvesting 2 is installed with connecting seat 3, and connecting seat 3 has support and fixed discharge nozzle 4 effect, the top of connecting seat 3 is connected with discharge nozzle 4, and the top of discharge nozzle 4 is communicated with card pipe 5, the top feedthrough of card pipe 5 Connecting tube 6, the quantity of connecting tube 6 is at least between three, and the adjacent connecting tube 6 of each two is fixed by card pipe 5 and deck 7 Clamping, every layer of connecting tube 6 and building body 1 it is highly identical, so facilitate using and installing for people, the top of connecting tube 6 is consolidated Dingan County is equipped with the deck 7 being adapted with card pipe 5, and the draw-in groove 25 being adapted with card pipe 5 is offered on deck 7, and draw-in groove 25 has solid Determine the effect of card pipe 5, connecting tube 6 is more stablized, the surface of connecting tube 6 offers fixing groove 8, and the surface of connecting tube 6 and The position of correspondence fixing groove 8 is fixedly connected by retainer ring 9 with building body 1, and connecting tube 6 is communicated with charging near one end of building body 1 Pipe 10, feed pipe 10 runs through building body 1 and extends to the inside of building body 1 away from one end of connecting tube 6.
The inwall both sides of connecting tube 6 are installed with swash plate 11, and swash plate 11 is managed away from one end of the inwall of connecting tube 6 with card 5 top is fixedly connected, and the top for stating swash plate 11 is installed with buffer board 24, and buffer board 24 has the effect of bumper and absorbing shock, Noise can be also reduced simultaneously, the work quality of staff is which enhanced, connecting tube 6 is consolidated away from inwall one end of feed pipe 10 Dingan County is equipped with fixed block 12, and fixed block 12 is installed with base plate 13 away from the inwall side of connecting tube 6, the inwall of base plate 13 from Top to bottm is sequentially installed with portable plate 14 and fixed plate 15, and the both sides of portable plate 14 connect with the Slideslip of inwall two of base plate 13 Connect, the inwall of the both sides of fixed plate 15 with base plate 13 is fixedly connected, and the bottom of portable plate 14 is installed with pole 16, pole 16 bottom is through fixed plate 15 and extends to the lower section of fixed plate 15, the surface of pole 16 and positioned at fixed plate 15 and portable plate Around damping spring 17 is provided between 14, the bottom of pole 16 is installed with briquetting 18, the inwall bottom of base plate 13 and correspondence The position of briquetting 18 is provided with dual the subtracting of the snubber block 26 being adapted with briquetting 18, damping spring 17 and the offer of snubber block 26 Shake, the impact made so as to improve rubbish to drop, so as to protect whole device, the top of portable plate 14 is installed with flexible Plate 19, the top of expansion plate 19 is through base plate 13 and extends to the outside of base plate 13, the side of expansion plate 19 and positioned at base plate 13 External stability baffle plate 20 is installed, the bottom of deck 7 is installed with deduster 21, and the inside of deduster 21 is installed with Fixture block 22, is installed with wire 23 on fixture block 22, deduster 21 prevents dust from being diffused out from feed pipe 10, so as to ensure work The working environment of personnel.
In sum, the skyscraper vertical garbage transport channel, by baffle plate 20, expansion plate 19, damping spring 17, The setting of snubber block 26 and buffer board 24, makes to access sufficiently buffering and damping into the garbage energy in connecting tube 6, so makes Building waste can safely and effectively transport the inside of Material collecting box for harvesting 2, it is to avoid shadow of the impact of building waste to connecting tube 6 Ring, so effectively raise construction quality, ensured construction safety, while also protecting whole device, extend delivery tube In the life-span in road, reduce infusion of financial resources.
Meanwhile, by the setting to fixing groove 8 and retainer ring 9, the sole mass of each connecting tube 6 is passed through building body 1 Support, so makes not have pressure between each connecting tube 6, so that connecting tube 6 is more stablized during use, it is to avoid even Pressure between adapter 6 is excessive, causes the damage of connecting tube 6, has ensured construction safety, at the same also allowed for people installation and Dismounting connecting tube 6.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.And, term " including ", "comprising" or its any other variant be intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element for limiting, it is not excluded that Also there is other identical element in the process including the key element, method, article or equipment ".
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out various changes in the case where principle of the present utility model and spirit is not departed from, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (6)

1. a kind of skyscraper vertical garbage transport channel, including building body (1) and Material collecting box for harvesting (2), it is characterised in that:It is described to gather materials Connecting seat (3) is installed with the top of case (2), discharge nozzle (4), the discharge nozzle are connected with the top of the connecting seat (3) (4) card pipe (5) is communicated with the top of, top feedthrough connecting tube (6) of card pipe (5), the top of the connecting tube (6) is consolidated Equipped with the deck (7) being adapted with card pipe (5), the surface of the connecting tube (6) offers fixing groove (8), and connecting tube for Dingan County (6) surface and the position of correspondence fixing groove (8) is fixedly connected by retainer ring (9) with building body (1), and the connecting tube (6) is leaned on The one end in nearly building body (1) is communicated with feed pipe (10), and the feed pipe (10) runs through building body (1) away from one end of connecting tube (6) And extend to the inside of building body (1);
The inwall both sides of the connecting tube (6) are installed with swash plate (11), and the swash plate (11) is away from connecting tube (6) inwall One end and card pipe (5) at the top of be fixedly connected, the connecting tube (6) is installed with away from inwall one end of feed pipe (10) Fixed block (12), the fixed block (12) is installed with base plate (13), the base plate away from the inwall side of connecting tube (6) (13) inwall is sequentially installed with portable plate (14) and fixed plate (15) from top to bottom, and the both sides of the portable plate (14) are and bottom The inwall both sides of plate (13) are slidably connected, and the inwall of the both sides of the fixed plate (15) with base plate (13) is fixedly connected, described The bottom of portable plate (14) is installed with pole (16), and the bottom of the pole (16) is run through fixed plate (15) and extended to solid The lower section of fixed board (15), the surface of the pole (16) and between fixed plate (15) and portable plate (14) around being provided with damping Spring (17), the bottom of the pole (16) is installed with briquetting (18), is installed with the top of the portable plate (14) Expansion plate (19), the top of the expansion plate (19) runs through base plate (13) and extends to the outside of base plate (13), the expansion plate (19) the side and external stability positioned at base plate (13) is provided with baffle plate (20), the bottom of the deck (7) is installed with Deduster (21).
2. a kind of skyscraper vertical garbage transport channel according to claim 1, it is characterised in that:The deduster (21) inside is installed with fixture block (22), and wire (23) is installed with the fixture block (22).
3. a kind of skyscraper vertical garbage transport channel according to claim 1, it is characterised in that:The swash plate (11) Top be installed with buffer board (24).
4. a kind of skyscraper vertical garbage transport channel according to claim 1, it is characterised in that:The deck (7) On offer and card pipe (5) draw-in groove (25) that is adapted.
5. a kind of skyscraper vertical garbage transport channel according to claim 1, it is characterised in that:The base plate (13) Inwall bottom and correspondence briquetting (18) position the snubber block (26) being adapted with briquetting (18) is installed.
6. a kind of skyscraper vertical garbage transport channel according to claim 1, it is characterised in that:The connecting tube (6) quantity is at least between three, and the adjacent connecting tube of each two (6) fixes clamping by blocking pipe (5) and deck (7).
CN201621445480.3U 2016-12-27 2016-12-27 A kind of skyscraper vertical garbage transport channel Expired - Fee Related CN206308968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621445480.3U CN206308968U (en) 2016-12-27 2016-12-27 A kind of skyscraper vertical garbage transport channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621445480.3U CN206308968U (en) 2016-12-27 2016-12-27 A kind of skyscraper vertical garbage transport channel

Publications (1)

Publication Number Publication Date
CN206308968U true CN206308968U (en) 2017-07-07

Family

ID=59247646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621445480.3U Expired - Fee Related CN206308968U (en) 2016-12-27 2016-12-27 A kind of skyscraper vertical garbage transport channel

Country Status (1)

Country Link
CN (1) CN206308968U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339400A (en) * 2018-11-16 2019-02-15 广东恒新建设有限公司 A kind of skyscraper refuse collection channel
CN110002149A (en) * 2019-03-14 2019-07-12 湖南工程学院 A kind of more environmentally-friendly modern countryside domestic garbage disposer
CN112209000A (en) * 2020-09-14 2021-01-12 上海建工四建集团有限公司 Vertical transportation channel for multi-storey building construction waste and use method thereof
CN114291487A (en) * 2021-12-30 2022-04-08 北京乐孚装饰工程有限公司 Green hotel's assembled cloth grass passageway

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339400A (en) * 2018-11-16 2019-02-15 广东恒新建设有限公司 A kind of skyscraper refuse collection channel
CN110002149A (en) * 2019-03-14 2019-07-12 湖南工程学院 A kind of more environmentally-friendly modern countryside domestic garbage disposer
CN112209000A (en) * 2020-09-14 2021-01-12 上海建工四建集团有限公司 Vertical transportation channel for multi-storey building construction waste and use method thereof
WO2022052457A1 (en) * 2020-09-14 2022-03-17 上海建工四建集团有限公司 Vertical transportation channel for multi-storey building construction waste, and usage method therefor
CN114291487A (en) * 2021-12-30 2022-04-08 北京乐孚装饰工程有限公司 Green hotel's assembled cloth grass passageway

Similar Documents

Publication Publication Date Title
CN206308968U (en) A kind of skyscraper vertical garbage transport channel
CN210264167U (en) Rail guard for building engineering with dust removal function
CN204866801U (en) Dust absorbing device is used in weaving workshop
CN205637545U (en) But height -adjusting's scaffold puts up strutting arrangement
CN209227980U (en) A kind of environmental protecting device under architectural environment
CN204023389U (en) For the environmental protection process equipment of bituminous concrete waste recovery recycling
CN209879969U (en) Sand table is optimized in highway service area overall arrangement
CN110315490A (en) A kind of tool box being arranged in house ornamentation decorative legs hand cradle
CN207746860U (en) A kind of wood plank grinding and polishing dust exhaust apparatus
CN207110424U (en) A kind of safety hanging cradle of anti-falling object from high altitude
CN207480395U (en) A kind of dedusting polishing workbench
CN205577380U (en) Suspension type scaffold
CN205743966U (en) A kind of mining two-way dust suppression damper
CN207144424U (en) A kind of construction scaffold
CN220666882U (en) Protection device for building engineering
CN205894696U (en) A construction elevator passageway platform for connection structure floor
CN206220991U (en) Aperture automatic dust removing apparatus
CN206769335U (en) A kind of high stability scaffold for building
CN112238086B (en) On-spot ash removal device of dregs car dress soil
CN208965575U (en) A kind of Novel road bridge consolidation of pile device
CN211817682U (en) A building rubbish discharging equipment for in construction
CN215718462U (en) Subway construction roof drilling equipment
CN204530682U (en) A kind of mechanical hole perfusion post
CN216108718U (en) Noise reduction type loader
CN204684901U (en) The even dedusting ventilation unit of Mining Environment Conservation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170707

Termination date: 20171227