CN208514750U - Secondary structure pipeline burying building block drilling equipment - Google Patents
Secondary structure pipeline burying building block drilling equipment Download PDFInfo
- Publication number
- CN208514750U CN208514750U CN201820980706.2U CN201820980706U CN208514750U CN 208514750 U CN208514750 U CN 208514750U CN 201820980706 U CN201820980706 U CN 201820980706U CN 208514750 U CN208514750 U CN 208514750U
- Authority
- CN
- China
- Prior art keywords
- sliding sleeve
- column
- pedestal
- building block
- sizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of secondary structure pipeline burying building block drilling equipments, including sizing pedestal, column and water drilling, sliding sleeve is housed in column outer sheath, water drilling is fixed on the side of sliding sleeve, the left or right side of sizing pedestal is provided with pedestal and traveling wheel is installed, the lower edge height of traveling wheel is higher than sizing base end face height.The utility model can realize control water drilling lifting carriage operation by the guiding relationship between sliding sleeve and column.Water drilling elevating translational is controlled using composite bushing and sliding sleeve guiding slide construction.Simple to operate, Quick labor-saving can significantly improve working efficiency, improve the precise degrees of drilling, improve construction quality.
Description
Technical field:
The utility model belongs to building engineering construction structure masonry project technical field, and in particular to a kind of secondary structure pipe
Line secretly buries building block drilling equipment.
Background technique:
After traditional secondary piping construction needs masonry construction, fluting carries out pipeline burying operation on blockwork,
Because fluting vibration causes to destroy wall integrity in later period fluting operation process, after pipeline is embedded, since pipeline surface is smooth,
It is not easy to combine with closed material, causes bad sealing close, the defects of leakiness;In later period plastering construction, even if pasting alkaline-resisting
Glass fiber reticular cloth, but there are still very big rendering layer crackings, hollowing hidden danger at pipeline embedding place.
Therefore BIM technology is combined in the masonry project construction stage now, it accurately determines pipeline position, work is secretly buried to pipeline
Industry, it is more demanding to borehole perpendicularity because being multiple building block bonds when pipeline burying operation;But existing building block water drilling bores
When the operation of hole, the bad grasp of verticality be easy to cause perpendicularity deviation after Completion of Drilling Hole larger, and bore operation low efficiency.
Utility model content:
In order to overcome the shortcomings of in above-mentioned existing building block water drilling boring procedure, the utility model provides a kind of structure letter
It is single, it is easy for operation, service life is long, greatly improve a kind of building block drilling dress of building block drilling efficiency and borehole perpendicularity
It sets.
Solution adopted by the utility model to solve its technical problems is that: a kind of secondary structure pipeline burying building block drilling dress
It sets, including sizing pedestal, column and water drilling, sliding sleeve is housed in column outer sheath, water drilling is fixed on the side of sliding sleeve, at sizing bottom
The left or right side of seat is provided with pedestal and is equipped with traveling wheel, and the lower edge height of traveling wheel is higher than sizing base end face height.
The front side or rear side of the sizing pedestal is provided with pedestal and traveling wheel is installed, the lower edge height of traveling wheel is high
In sizing base end face height.
On the outside of the column and sliding sleeve inner sleeve is equipped with compound sleeve, while column lower part being provided with support block machine, institute
The lower end for stating compound sleeve is located on the upside of support block machine;Locking pin is set between compound sleeve and column, is set between compound sleeve and sliding sleeve
Set convex-concave guide rail.
Tension spring is connected between the column and sliding sleeve or between compound sleeve and sliding sleeve.
The utility model has the advantages that the utility model can rapidly and accurately determine bore position by the sizing pedestal of rectangle, and it is
Water drilling provides stable constraint and positioning.The utility model can realize control by the guiding relationship between sliding sleeve and column
The operation of water drilling lifting carriage.The utility model guarantees the stationarity of water drilling motion profile by the way of compound sleeve, and
Control and constraint to water drilling operative orientation are realized by adjusting compound sleeve angle.By the way that row can be passed through after tilting the device
Wheel translation is walked, simple to operate, Quick labor-saving can significantly improve working efficiency, improve the precise degrees of drilling, and raising is applied
Working medium amount.
It is drilled by the utility model to masonry and carries out operation, ensure that the verticality quality of pore-forming;Improve building block brill
The efficiency of hole ancestors' meritorious achievements reduces the investment of human resources, reduces labor intensity.
Detailed description of the invention
Fig. 1 is one of structural schematic diagram of the utility model.
Fig. 2 is the second structural representation of the utility model.
Fig. 3 is the A of Fig. 1 to schematic diagram.
Figure label 1 is sizing pedestal, and 2 be column, and 3 be sliding sleeve, and 4 be water drilling, and 5 be pedestal, and 6 be traveling wheel, and 7 be compound
Set, 8 be guide rail, and 9 be support block machine, and 10 be locking pin.
Specific embodiment
Embodiment 1: the first secondary structure pipeline burying building block drilling equipment is as shown in figures 1 and 3, and main includes sizing
The components such as pedestal 1, column 2 and water drilling 4.Each side of the sizing pedestal 1 of rectangle is convenient for judgement, Yi Jirong parallel with room metope
Easily cooperate with surface drilling mark line, achievees the purpose that rapidly and accurately determining bore position, be conducive to provide stabilization for water drilling 4
Constraint and positioning.Wherein, column (1600mm high, diameter 25mm stainless-steel pipe) and sizing pedestal 1 form, pedestal 1 of being formed
It is to be made of 2 500mm long diameter 25mm stainless-steel pipes and 3 300mm long diameter 25mm stainless-steel pipes, column 2 welds
In the sizing unilateral middle position of pedestal 1.
As shown in Figure 1: connector of the water drilling 4 between sliding sleeve 3 be by bolt together with 16 reinforcement welding of 50mm long φ,
Connector is and sliding sleeve 3(diameter 32mm stainless-steel pipe) weld together, there are three handle spiral shells for water drilling the machine upper, left and right
It is tightened by the screw rod of connector fixed whole with sliding sleeve (diameter 32mm stainless-steel pipe) formation using screw hole at the top of water drilling in hole
Body.
Sliding sleeve 3 is housed in 2 outer sheath of column, water drilling 4 is fixed on the side of sliding sleeve 3, can by sliding sleeve 3 and column 2 it
Between guiding relationship, realize control 4 lifting carriage of water drilling operation.
The left or right side of sizing pedestal 1 is provided with pedestal 5 again and traveling wheel 6 is installed, the lower edge height of traveling wheel 6
Higher than sizing 1 floor height of pedestal.The front side or rear side of sizing pedestal 1 can also be provided with pedestal 5 simultaneously and row is installed
Wheel 6 is walked, the lower edge height of traveling wheel 6 is higher than sizing 1 floor height of pedestal.
This system in actual application, must first combine BIM technology before masonry project construction starts, accurate to determine
Pipeline position marks out pipeline position on masonry typesetting figure, and according to typesetting figure and material list, determines that concealed piping is corresponding
Building block, and the bore position at the mark of building block upper surface carry out bore operation using the present apparatus.It through this embodiment being capable of building block
The low problem of drilling efficiency;The labor intensity for alleviating bore operation improves the construction efficiency of bore operation.Solves building block
The problem of borehole perpendicularity bad grasp: water drilling is connected by connector, sliding sleeve and column, by the application to the present apparatus, is mentioned
High building block bore operation is at hole perpendicularity.
2: second secondary structure pipeline burying building block drilling equipment of embodiment, referring to fig. 2, on that basis of example 1, again
Compound sleeve 7 is housed in 2 outside of column and 3 inner sleeve of sliding sleeve, while 2 lower part of column being provided with support block machine 9, the compound sleeve
7 lower end is located at 9 upside of support block machine;Locking pin 10 is set between compound sleeve 7 and column 2, is set between compound sleeve 7 and sliding sleeve 3
Set convex-concave guide rail.Such as guide rail 8 is set on 7 surface of compound sleeve, then sliding slot is arranged in sliding sleeve inner wall again.Using compound sleeve 7
Mode realize to guarantee the stationarity of 4 motion profile of water drilling, and by adjusting 7 angle of compound sleeve to 4 side of work of water drilling
To control and constraint.
Embodiment 3: on the basis of embodiment 1 or 2, and between the column 2 and sliding sleeve 3 or compound sleeve 7 and sliding sleeve 3 it
Between be connected with tension spring.It is acted on by tension spring, is able to maintain 4 automatic reduction of water drilling, further improves convenient construction degree.
Claims (4)
1. a kind of secondary structure pipeline burying building block drilling equipment, including sizing pedestal, column and water drilling, it is characterized in that: vertical
Column outer sheath is equipped with sliding sleeve, and water drilling is fixed on the side of sliding sleeve, and the left or right side of sizing pedestal is provided with pedestal and installs
There is traveling wheel, the lower edge height of traveling wheel is higher than sizing base end face height.
2. secondary structure pipeline burying building block drilling equipment according to claim 1, it is characterized in that: in the sizing pedestal
Front side or rear side be provided with pedestal and traveling wheel be installed, the lower edge height of traveling wheel is higher than sizing base end face height.
3. secondary structure pipeline burying building block drilling equipment according to claim 1, it is characterized in that: on the outside of the column
Compound sleeve is housed with sliding sleeve inner sleeve, while column lower part being provided with support block machine, the lower end of the compound sleeve is located at support
On the upside of block machine;Locking pin is set between compound sleeve and column, convex-concave guide rail is set between compound sleeve and sliding sleeve.
4. secondary structure pipeline burying building block drilling equipment according to claim 1, it is characterized in that: in the column and cunning
Tension spring is connected between set or between compound sleeve and sliding sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820980706.2U CN208514750U (en) | 2018-06-25 | 2018-06-25 | Secondary structure pipeline burying building block drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820980706.2U CN208514750U (en) | 2018-06-25 | 2018-06-25 | Secondary structure pipeline burying building block drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208514750U true CN208514750U (en) | 2019-02-19 |
Family
ID=65336842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820980706.2U Expired - Fee Related CN208514750U (en) | 2018-06-25 | 2018-06-25 | Secondary structure pipeline burying building block drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208514750U (en) |
-
2018
- 2018-06-25 CN CN201820980706.2U patent/CN208514750U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205976476U (en) | Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof | |
CN105762728A (en) | Method for pre-burying of strong and weak electricity box and electrical tubing | |
CN208514750U (en) | Secondary structure pipeline burying building block drilling equipment | |
CN205557938U (en) | Aerated concrete externally -hanging wallboard's spiral anchor node that slides | |
CN218912845U (en) | Portable drilling and cutting integrated device | |
CN105291180B (en) | Two-way porous jewel hole machine | |
CN213361303U (en) | Pipeline buries puts support convenient to piping erection municipal works are used | |
CN109332743A (en) | Independent feeding multi-hole drill | |
CN207123231U (en) | A kind of positioning rule of embedded sleeve barrel and reserving hole channel after being used for prefabricated part hanging | |
CN205605114U (en) | Karst karst area prestressed anchorage cable drilling equipment | |
CN205857693U (en) | A kind of canalization template being applied to movement joint both sides shear wall synchronous construction | |
CN204126079U (en) | A kind of bolt welds T-shaped steel wallboard post | |
CN108839264A (en) | Secondary structure pipeline burying building block drilling equipment | |
CN204430367U (en) | Simple laser based on Magnetic gauge stand is auxiliary to heart drilling equipment | |
CN205503041U (en) | Guider is right in drilling | |
CN212718427U (en) | Line pipe connection fixer | |
CN210172932U (en) | Auxiliary jig for assembling branch pipe and main pipe of pipeline | |
CN205370596U (en) | Steelframe refining methods line traffic control ware | |
CN209110216U (en) | Independent feeding multi-hole drill | |
CN208358161U (en) | Rectangular air duct welds side wall Anti-deformation support structure | |
CN203157154U (en) | Hole expander for plastic pipe fitting | |
CN106337653B (en) | Perforation drills through device and method in a kind of vertical drilling | |
CN106996103B (en) | Built-in pipe construction method in concrete cut based on detachable machine straightening device | |
CN205914795U (en) | A electric hand drill auxiliary device for vertical hole processing | |
CN218265936U (en) | Leading little pipe location leading truck device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 450000 Shangxian Street, Longzihu Wisdom Island, Zhengdong New District, Zhengzhou City, Henan Province Patentee after: Zhengzhou Yijian Group Co.,Ltd. Address before: 450000, No. 91, Bauhinia Road, Zhengzhou City, Henan Province Patentee before: ZHENGZHOU NO.1 CONSTRUCTION ENGINEERING GROUP Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190219 Termination date: 20210625 |
|
CF01 | Termination of patent right due to non-payment of annual fee |