CN106996103B - Built-in pipe construction method in concrete cut based on detachable machine straightening device - Google Patents

Built-in pipe construction method in concrete cut based on detachable machine straightening device Download PDF

Info

Publication number
CN106996103B
CN106996103B CN201710303774.5A CN201710303774A CN106996103B CN 106996103 B CN106996103 B CN 106996103B CN 201710303774 A CN201710303774 A CN 201710303774A CN 106996103 B CN106996103 B CN 106996103B
Authority
CN
China
Prior art keywords
built
pipe
straightening device
machine straightening
detachable machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710303774.5A
Other languages
Chinese (zh)
Other versions
CN106996103A (en
Inventor
乔丕忠
谢瑞峰
刘庆辉
祁洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201710303774.5A priority Critical patent/CN106996103B/en
Publication of CN106996103A publication Critical patent/CN106996103A/en
Application granted granted Critical
Publication of CN106996103B publication Critical patent/CN106996103B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Built-in pipe construction method in a kind of concrete cut based on detachable machine straightening device, connected by the way that manually more built-in pipes are vertically in detachable machine straightening device simultaneously head and the tail respectively and are welded in batch, then uppermost built-in pipe is fixed on guide groove, and casting concrete cut-pff wall is achieved in guide groove from below to up by concreting conduit.The present invention does not need crane, manually can be completed.Horizontal detachable machine straightening device is simple, can recycle, and can reduce the accumulation inclination that built-in pipe is aligned, generates in welding process, guarantees the integral inclined degree of built-in pipe.It improves efficiency, biggish saved cost;By the consolidation process at pad, so that node upper layer and lower layer built-in pipe becomes an entirety, the rigidity of both direction is increased, reduces the deformation generated in casting process.

Description

Built-in pipe construction method in concrete cut based on detachable machine straightening device
Technical field
It is specifically a kind of based on detachable machine straightening device the present invention relates to the technology in a kind of construction of hydro project Built-in pipe construction method in concrete cut.
Background technique
In hydraulic engineering, for the antiseepage mode that dam concrete cut-pff wall and grout curtain combine, concrete cut It is middle which type of forming hole method to have very big influence to the quality of engineering, progress, cost etc. using.Wall is deep within 30m at present Cut-pff wall in relatively mostly use drilling Cheng Fangfa.But boring method presence cannot save the duration, it cannot be guaranteed that hole quality, and Engineering cost is higher, and pore-creating damages cut-pff wall larger.Built-in pipe construction method expend certain tubing cause it is higher Engineering cost, but pore-forming is convenient and efficient, one-tenth porosity is high, and construction interference is small, saves the duration.Especially in wall deeply more than 30m, wall Pore-forming will bring more convenience in thick lesser cut-pff wall.
The methods of layering integral hoisting employed in few cut-pff wall built-in pipe engineering construction practice needs to utilize Crane increases construction cost, and how to guarantee that embedded steel tube is in vertical, how accurate in lifting, alignment, welding process The problems such as alignment, is dealt with improperly, centainly will cause built-in pipe gradient with the increase of weld length and builds up increase.This It is difficult to find in a accumulation construction.Find that gradient is excessive after casting concrete, it is also necessary to redrilling.So to being constructed into Sheet, duration etc. bring more trouble.If the width of dam crest operation side is smaller or other situations make crane can not be into Enter work surface, just can not construct according to previous method.Secondly, previous construction method not can guarantee between pad upper layer and lower layer Along the rigidity of guiding flute length and wide direction.
Summary of the invention
The present invention is for the prior art when in face of the concrete cut of relatively deep (especially 50 meters or more), it is necessary to use The defect that crane could construct proposes built-in pipe construction method in a kind of concrete cut based on detachable machine straightening device, It can manually be handled without crane.
The present invention is achieved by the following technical solutions:
More built-in pipes are vertically in detachable machine straightening device simultaneously head and the tail weldering in batch by artificial by the present invention respectively Even, then uppermost built-in pipe is fixed on guide groove, and through concreting conduit from below to up in guide groove Casting concrete cut-pff wall is achieved.
The method specifically includes the following steps:
The mobile detachable machine straightening device of step 1) is to construction location and is leveled;
The detachable machine straightening device is the rectangular frame of four-layer structure, is equipped with height-adjustable liter on four stabilizer blades Falling tone section support may be implemented on rectangular frame for construction ground out-of-flatness situation by adjusting each lift adjustment support Four horizontal planes are in true horizontal position.
The rectangular frame is made of hollow rectangle steel pipe.The material of the device can utilize the steel on building site, to All pre-buried pipe constructions all after the completion of, which can be disassembled, make other building structural materials.
The hollow rectangle steel pipe in length and breadth of identical size is equipped in the middle part of each layer of structure on the rectangular frame, from And it constitutes corresponding for fixing the through hole of embedded steel tube position.
After two bottom built-in pipes are manually inserted into the through hole of detachable machine straightening device by step 2) from top to bottom respectively It gradually transfers, every bottom built-in pipe passes through in upper and lower four through holes;
The length of the bottom built-in pipe is usually 6m, and diameter is usually 90-130mm.
The bottom end of two bottom built-in pipes is symmetrically welded consolidation process with angle steel by step 3);
The position of the reinforcement of weld is preferably at the 500mm of built-in pipe bottom end.
The angle steel realizes reinforcing by the way of being symmetrically welded using two, the size of the angle steel is used but is not limited to 80x80x10mm。
Step 4) manually hooks the both ends of the reinforcement of weld angle steel in step 3 using pulley gear, then by rope by Gradually transfer the first section built-in pipe of described two;
The pulley gear includes: rectangle frame bracket and two groups of movable pulleys being slideably positioned on bracket both arms;It should The height of pulley gear is lower than the bottom horizontal plane in detachable machine straightening device.
Step 5) is when between centre the second third horizontal plane that the upper end of first section built-in pipe drops to detachable machine straightening device Stop decentralization, in two through holes that two upper layer built-in pipes are inserted into from top to bottom on most and will transfer again at this time, until upper layer It is welded when connecting with built-in pipe below the lower end of built-in pipe;Further decentralization rope is pre-buried by two layers after the completion of welding Pipe continues decentralization and butt welding contact carries out consolidation process.
The welding is constructed according to the code requirement of corresponding welding procedure.Previous construction method is not to welding The strength checking of node.But the built-in pipe in cut-pff wall biggish for depth, comprehensively consider construction quality, the welding of welding Seam takes the progress consolidation process at welding node in a height, the larger situation of built-in pipe overall length.
Due to being at vertical state behind the fixed hole of two layers of built-in pipe insertion, two layers of steel pipe is just in naturally after welding On one vertical line, solves vertically accumulating in general crane lifting correction construction due to caused by manual operation misalignment and ask Topic.It does not need artificially to be aligned by this device simultaneously, eliminates prover time.
The consolidation process, upper butt welding contact carries out reinforcement of weld respectively preferably in both directions.
Step 6) repeat step 5 until bottom built-in pipe transfer near to or in contact with guide groove bottom (with can be realized weldering It is connected in standard), then top built-in pipe is fixed on guide groove, is finally being oriented to from below to up using concreting conduit Casting concrete cut-pff wall in slot, to complete to construct.
The top built-in pipe, using but be not limited by two 30A i shaped steels and be fixedly welded on guide groove.
Technical effect
Compared with prior art, the present invention does not need crane, manually can be completed;Horizontal detachable machine straightening device of the invention Simply, it can recycle, it is ensured that the gradient in built-in pipe alignment, welding process.It improves efficiency, biggish saving Cost;Both direction is increased so that node upper layer and lower layer built-in pipe becomes an entirety by the consolidation process at pad Rigidity, reduce the deformation that generates in casting process.
Detailed description of the invention
Fig. 1 is that detachable machine straightening device controls verticality part (along flute length direction) elevation;
Fig. 2 is that detachable machine straightening device controls verticality part (along flute length direction) side view;
Fig. 3 is that detachable machine straightening device manually transfers pre-buried pipe holder elevation;
Fig. 4 is that detachable machine straightening device manually transfers built-in pipe bracket side view;
Fig. 5 is that two built-in pipes of bottom are put into schematic diagram;
Fig. 6 is two built-in pipe connections of bottom and decentralization schematic diagram;
In figure: a is connection schematic diagram;B is that built-in pipe is transferred schematic diagram using pulley;
Fig. 7 is the welding schematic diagram of second layer built-in pipe and two built-in pipes of bottom;
Fig. 8 is the consolidation process schematic diagram of two layers of built-in pipe pad;
Fig. 9 is that joint reinforcing handles side view schematic diagram;
Figure 10 is the whole decentralization schematic diagram of bottom and second layer built-in pipe;
Figure 11 is each piping diagram in guide groove;
In figure: 1 first layer horizontal plane, 2 second layer horizontal planes, 3 third layer horizontal planes, 4 the 4th layers of horizontal plane, 5 are adjusted Lifting support, 6 pulley gears, the built-in pipe of 7 welding, 8 pad reinforcing joint sizes, 9 suspension hooks and the first contact for saving built-in pipe, 10 built-in pipes, 11 angle steel, 12 reinforcing bars, 13 guide grooves, 14 concrete are poured conduit, 15 slots.
Specific embodiment
The present embodiment the following steps are included:
The mobile entire tunable arrangement of step 1), positioning make the first of device top by rotating adjustable up-down support 5 To the 4th layer of level, since first layer horizontal plane 1, second layer horizontal plane 2, third layer horizontal plane 3, the 4th layer of horizontal plane 4 are mutual Between to be arranged in parallel, therefore when device first layer horizontal plane 1 is horizontal, other planes are also horizontality.It is leveled by this, Centainly on a vertical line, it is all vertical for ensuring to be inserted into built-in pipe in this way to four through holes of the same position of four horizontal planes , the connection of two layers of built-in pipe must on a vertical line, be brought in the process to greatly reduce using crane lifting Inclination and inclination accumulation, and it is easy to operate, as shown in figures 1-4.
Step 2) manually by four through holes of 10 insertion apparatus of bottom (two) built-in pipe, is then transferred;Such as Fig. 5 institute Show.
Step 3) at the 500mm of built-in pipe bottom end with two angle steel 11 by two steel-pipe welding consolidation process;So that Two tubes form entirety, enhance overall stiffness, as shown in Figure 6;Then two built-in pipes 10 are manually transferred by pulley gear, As shown in fig. 7, two people of entire decentralization process can be completed due to being handled by movable pulley.
Second layer built-in pipe is inserted by step 4), is welded, is transferred, as shown in Figure 8 between intermediate two layers of lateral aperture.
Consolidation process is respectively welded in step 5) in two directions;As shown in Figure 9.Reinforce the steel using 22 millimeters of diameter Muscle.The rigidity of both direction is enhanced.When the rebar sizes in groove width direction may insure placing concrete, built-in pipe inclines Tiltedly maximum to be no more than 20 centimetres, the integral inclined rate of built-in pipe is 20 centimetres deep divided by corresponding concrete cut, far smaller than Slope requirement in hydraulic anti-seepage wall job specfication.
Step 6) bottom and the whole of second layer built-in pipe are transferred, as shown in Figure 10.Aforesaid operations are repeated, top is pre- Pipe laying is fixed on guide groove, pours cut-off wall concrete, as shown in figure 11.
Above-mentioned specific implementation can by those skilled in the art under the premise of without departing substantially from the principle of the invention and objective with difference Mode carry out local directed complete set to it, protection scope of the present invention is subject to claims and not by above-mentioned specific implementation institute Limit, each implementation within its scope is by the constraint of the present invention.

Claims (4)

1. built-in pipe construction method in a kind of concrete cut based on detachable machine straightening device, which is characterized in that pass through people More built-in pipes are vertically to respectively in detachable machine straightening device in batch for work and head and the tail weld and connect, then will be uppermost pre-buried Pipe is fixed on guide groove, and casting concrete cut-pff wall is able to reality in guide groove from below to up by concreting conduit It is existing, this method specifically includes the following steps:
The mobile detachable machine straightening device of step 1) is to construction location and is leveled;
Two bottom built-in pipes are manually inserted into after the through hole of detachable machine straightening device gradually by step 2) from top to bottom respectively Decentralization, every bottom built-in pipe pass through in upper and lower four through holes;
The bottom end of two first section built-in pipes is symmetrically welded consolidation process with angle steel by step 3);
Step 4) manually hooks the both ends of the reinforcement of weld angle steel in step 3 using pulley gear, under then passing through rope gradually Put two bottom built-in pipes;
Step 5) is stopped when between centre the second third horizontal plane that the upper end of bottom built-in pipe drops to detachable machine straightening device It only transfers, in two through holes that two upper layer built-in pipes are inserted into from top to bottom on most and will transfer again at this time, until upper layer is pre- It is welded when connecting with built-in pipe below the lower end of pipe laying;Rope is further transferred after the completion of welding by two layers of built-in pipe Continue decentralization and butt welding contact carries out consolidation process;
Step 6) repeats step 5 until bottom built-in pipe is transferred near to or in contact with guide groove bottom, then that top is pre-buried Pipe is fixed on guide groove, finally uses the concreting conduit casting concrete cut-pff wall in guide groove from below to up, from And complete construction;
The detachable machine straightening device is the rectangular frame of four-layer structure, is equipped with height-adjustable rising-falling tone on four stabilizer blades Support is saved, four on rectangular frame may be implemented by adjusting each lift adjustment support for construction ground out-of-flatness situation Horizontal plane is in true horizontal position;
The pulley gear includes: rectangle frame bracket and two groups of movable pulleys being slideably positioned on bracket both arms;The pulley The height of device is lower than the bottom horizontal plane in detachable machine straightening device.
2. according to the method described in claim 1, it is characterized in that, be all provided in the middle part of each layer of structure on the rectangular frame There is the hollow rectangle steel pipe in length and breadth of identical size, to constitute corresponding for fixing the through hole of embedded steel tube position.
3. according to the method described in claim 1, it is characterized in that, the consolidation process, butt welding contact point in two directions It carry out not reinforcement of weld.
4. according to the method described in claim 1, it is characterized in that, the top built-in pipe passes through two 30A i shaped steels It is fixedly welded on guide groove.
CN201710303774.5A 2017-05-03 2017-05-03 Built-in pipe construction method in concrete cut based on detachable machine straightening device Expired - Fee Related CN106996103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710303774.5A CN106996103B (en) 2017-05-03 2017-05-03 Built-in pipe construction method in concrete cut based on detachable machine straightening device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710303774.5A CN106996103B (en) 2017-05-03 2017-05-03 Built-in pipe construction method in concrete cut based on detachable machine straightening device

Publications (2)

Publication Number Publication Date
CN106996103A CN106996103A (en) 2017-08-01
CN106996103B true CN106996103B (en) 2019-03-15

Family

ID=59434618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710303774.5A Expired - Fee Related CN106996103B (en) 2017-05-03 2017-05-03 Built-in pipe construction method in concrete cut based on detachable machine straightening device

Country Status (1)

Country Link
CN (1) CN106996103B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113529767A (en) * 2021-07-28 2021-10-22 海西州那棱格勒河水利枢纽工程建设管理局 Embedded pipe embedding method for impervious wall construction

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008121335A (en) * 2006-11-14 2008-05-29 Kumagai Gumi Co Ltd Construction method and tensioning system device for tower-shaped pc structure
CN202338697U (en) * 2011-11-23 2012-07-18 内蒙古科技大学 Fixing device for embedded pipe
CN103669359A (en) * 2012-09-24 2014-03-26 葛洲坝集团基础工程有限公司 Pre-buried grout pipe truss device of impervious wall
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104652419A (en) * 2015-01-20 2015-05-27 广东水电二局股份有限公司 Construction method for preserving curtain grouting pipe in underground impervious wall
CN104652439A (en) * 2013-11-19 2015-05-27 中国葛洲坝集团股份有限公司 Auxiliary mounting device of pre-embedment grouting pipe in impervious wall slot
CN204495259U (en) * 2015-04-09 2015-07-22 中国电建集团成都勘测设计研究院有限公司 Concrete cut hole slope measurement apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008121335A (en) * 2006-11-14 2008-05-29 Kumagai Gumi Co Ltd Construction method and tensioning system device for tower-shaped pc structure
CN202338697U (en) * 2011-11-23 2012-07-18 内蒙古科技大学 Fixing device for embedded pipe
CN103669359A (en) * 2012-09-24 2014-03-26 葛洲坝集团基础工程有限公司 Pre-buried grout pipe truss device of impervious wall
CN104652439A (en) * 2013-11-19 2015-05-27 中国葛洲坝集团股份有限公司 Auxiliary mounting device of pre-embedment grouting pipe in impervious wall slot
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104652419A (en) * 2015-01-20 2015-05-27 广东水电二局股份有限公司 Construction method for preserving curtain grouting pipe in underground impervious wall
CN204495259U (en) * 2015-04-09 2015-07-22 中国电建集团成都勘测设计研究院有限公司 Concrete cut hole slope measurement apparatus

Also Published As

Publication number Publication date
CN106996103A (en) 2017-08-01

Similar Documents

Publication Publication Date Title
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN103938616B (en) Diaphram wall reinforcement cage structure and its construction method
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN205976476U (en) Movement joint template is propped up and is established structure and stupefied subassembly of back of body and stencil assembly thereof
CN111945714B (en) Steel sleeve guiding method combined with steel upright column inserting construction method
CN106013091A (en) Steel reinforcement cage positioning device and positioning method used for building construction
CN110206071B (en) Method and device for reinforcing joints of underground continuous wall
CN106996103B (en) Built-in pipe construction method in concrete cut based on detachable machine straightening device
CN104831832B (en) Assembly of shear wall structure and its installation method
JP2015052212A (en) Pier construction method and steel pipe pile construction method
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN104196248B (en) Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method
CN212129218U (en) Basement outer wall single face formwork system
CN115341574B (en) Hoisting construction method for steel reinforcement cage of special-shaped underground diaphragm wall
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN104878775A (en) Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
CN114016546A (en) Hole-pile method station steel pipe column hoisting and fixing device and construction method
JP6138192B2 (en) Steel pipe pile construction method
CN210368947U (en) Prefabricated reinforced concrete foundation
CN210684665U (en) Device for ensuring vertical hoisting of underground continuous wall reinforcement cage
CN103850435A (en) Hoisting framework device capable of replacing support framework and used for frame construction building concrete floor
CN113982017A (en) Method for installing reinforcement cage in pile hole
CN204040499U (en) Steel pipe column vertical locating device is inserted after contrary sequence method
CN111827262A (en) Construction method of fold-line-shaped irregular underground continuous wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant