CN104196248B - Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method - Google Patents
Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method Download PDFInfo
- Publication number
- CN104196248B CN104196248B CN201410350120.4A CN201410350120A CN104196248B CN 104196248 B CN104196248 B CN 104196248B CN 201410350120 A CN201410350120 A CN 201410350120A CN 104196248 B CN104196248 B CN 104196248B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe column
- hydraulic press
- vibrator
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410350120.4A CN104196248B (en) | 2014-07-22 | 2014-07-22 | Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410350120.4A CN104196248B (en) | 2014-07-22 | 2014-07-22 | Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104196248A CN104196248A (en) | 2014-12-10 |
CN104196248B true CN104196248B (en) | 2016-03-02 |
Family
ID=52081597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410350120.4A Active CN104196248B (en) | 2014-07-22 | 2014-07-22 | Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104196248B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104674845A (en) * | 2015-02-09 | 2015-06-03 | 中国建筑第八工程局有限公司 | Auxiliary construction method for hydraulic vibration reverse inserting column |
CN106499185B (en) * | 2016-11-10 | 2019-01-04 | 广东省工业设备安装有限公司 | A kind of steel pipe height throws no vibrated concrete and pours funnel |
CN108149679A (en) * | 2018-01-18 | 2018-06-12 | 中国建筑西北设计研究院有限公司 | A kind of construction for inserting special reinforcing bar rear in the plain concrete of CFG |
CN113832988A (en) * | 2021-09-24 | 2021-12-24 | 中电建路桥集团有限公司 | Self-correcting recyclable steel casing system for verticality in karst cave area and correcting method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0849235A (en) * | 1994-08-04 | 1996-02-20 | Toyo Techno Kk | Inclination adjusting device in construction method for building up permanent substractural column |
CN1119690A (en) * | 1995-09-27 | 1996-04-03 | 福州市建筑设计院 | Reinforced concrete post containing steel pipe high-strength column for basement building and construction method |
JPH11130399A (en) * | 1997-10-31 | 1999-05-18 | Kayaba Ind Co Ltd | Hydraulic moving device for positioning |
CN101736762A (en) * | 2008-11-20 | 2010-06-16 | 上海市第二建筑有限公司 | Intelligent verticality adjusting method and device of ultra-deep topdown construction method stand column pile |
CN102704479A (en) * | 2012-06-12 | 2012-10-03 | 张永忠 | Hydraulic hammering type concrete cast-in-place pile equipment |
CN203546728U (en) * | 2013-10-28 | 2014-04-16 | 中国建筑第四工程局有限公司 | Improved installation fixing device of top-down steel pipe column |
CN204040499U (en) * | 2014-07-22 | 2014-12-24 | 安徽省建筑科学研究设计院 | Steel pipe column vertical locating device is inserted after contrary sequence method |
-
2014
- 2014-07-22 CN CN201410350120.4A patent/CN104196248B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0849235A (en) * | 1994-08-04 | 1996-02-20 | Toyo Techno Kk | Inclination adjusting device in construction method for building up permanent substractural column |
CN1119690A (en) * | 1995-09-27 | 1996-04-03 | 福州市建筑设计院 | Reinforced concrete post containing steel pipe high-strength column for basement building and construction method |
JPH11130399A (en) * | 1997-10-31 | 1999-05-18 | Kayaba Ind Co Ltd | Hydraulic moving device for positioning |
CN101736762A (en) * | 2008-11-20 | 2010-06-16 | 上海市第二建筑有限公司 | Intelligent verticality adjusting method and device of ultra-deep topdown construction method stand column pile |
CN102704479A (en) * | 2012-06-12 | 2012-10-03 | 张永忠 | Hydraulic hammering type concrete cast-in-place pile equipment |
CN203546728U (en) * | 2013-10-28 | 2014-04-16 | 中国建筑第四工程局有限公司 | Improved installation fixing device of top-down steel pipe column |
CN204040499U (en) * | 2014-07-22 | 2014-12-24 | 安徽省建筑科学研究设计院 | Steel pipe column vertical locating device is inserted after contrary sequence method |
Also Published As
Publication number | Publication date |
---|---|
CN104196248A (en) | 2014-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104196248B (en) | Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method | |
CN103266600B (en) | Construction method of occlusion pile of full reinforcement pile | |
CN105064375B (en) | Construction method of retaining and water stopping structure of foundation pit support | |
CN204040035U (en) | A kind of positioning guiding structure of steel pile casting | |
CN106930277A (en) | A kind of construction of manual-excavation cast-in-place pile method | |
CN106759347A (en) | Steel pipe Larsen steel plate combination fender post constructing structure and its construction method | |
CN204098021U (en) | A kind of deposited reinforced concrete pile reinforcing cage locator | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN204040499U (en) | Steel pipe column vertical locating device is inserted after contrary sequence method | |
CN109555115B (en) | Steel-pipe pile enclosure construction structure | |
CN104652439A (en) | Auxiliary mounting device of pre-embedment grouting pipe in impervious wall slot | |
CN104018505A (en) | Prefabricated steel sleeve guided rock-socketed system and application method thereof | |
CN212052764U (en) | Underground continuous wall core pile positioning and guiding device | |
CN202595747U (en) | Section steel guide frame for piling U-shaped concrete sheet pile | |
CN105155545B (en) | A kind of A/C device is used to carry out the method that conduit is fixing in antiseepage wall chase section casting process | |
CN203222817U (en) | Connecting structure of basement stand column | |
CN203866840U (en) | Device for pouring concrete into pile hole | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN210368947U (en) | Prefabricated reinforced concrete foundation | |
CN103790162B (en) | Synchronous mode steel sheet pile stake holes filling device | |
CN103205983B (en) | Construction method of basement rear support system | |
CN106223334A (en) | The restorative procedure of a kind of broken pile and ruggedized construction thereof | |
CN206722088U (en) | Steel pile foundation bolt positioning device | |
CN202298632U (en) | Steel-structured column capable of ensuring verticality | |
CN105986577B (en) | The secondary intubation plugging device of underwater concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Dai Liangjun Inventor after: Zhao Shiyun Inventor after: Zeng Wei Inventor after: Qian Liping Inventor after: Chen Weidong Inventor after: Cui Linzhao Inventor after: Yu Bojiang Inventor after: Qin Xufei Inventor before: Dai Liangjun Inventor before: Zeng Wei Inventor before: Qian Liping Inventor before: Cui Linzhao Inventor before: Chen Weidong |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: Lake Road in Shushan District of Hefei City, Anhui Province, No. 567 230000 Patentee after: ANHUI INSTITUTE OF BUILDING RESEARCH & DESIGN Address before: 230001 No. 28 South Road, Luyang District, Anhui, Hefei Patentee before: ANHUI INSTITUTE OF BUILDING RESEARCH & DESIGN |
|
CP02 | Change in the address of a patent holder |