CN205605114U - Karst karst area prestressed anchorage cable drilling equipment - Google Patents
Karst karst area prestressed anchorage cable drilling equipment Download PDFInfo
- Publication number
- CN205605114U CN205605114U CN201620376151.1U CN201620376151U CN205605114U CN 205605114 U CN205605114 U CN 205605114U CN 201620376151 U CN201620376151 U CN 201620376151U CN 205605114 U CN205605114 U CN 205605114U
- Authority
- CN
- China
- Prior art keywords
- karst
- anchor cable
- steel sleeve
- construction
- prestressed anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 34
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 25
- 239000010959 steel Substances 0.000 claims abstract description 25
- 238000010276 construction Methods 0.000 abstract description 23
- 238000009434 installation Methods 0.000 abstract description 2
- 238000007689 inspection Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 235000019994 cava Nutrition 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000007664 blowing Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Earth Drilling (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种喀斯特岩溶地区预应力锚索钻孔装置,包括机座,在机座顶部两端分别设置有轴承座和套筒固定座,钢套筒固定在套筒固定座上,钻机连接头一端与轴承座内的轴承转动连接,另一端通过法兰与空心钻杆固定连接,空心钻杆穿入钢套筒后与钻头连接。本实用新型可在喀斯特岩溶地区实现快速钻孔,以满足预应力锚索施工的要求,而且钻孔深度可以根据实际需要进行调整,操作简单、安装快捷、使用安全可靠,还能有效提高施工效率,缩短工期,而且能周转使用,节约施工成本,达到降本增效的目的。
The utility model discloses a prestressed anchor cable drilling device in karst karst areas, which comprises a machine base, bearing seats and sleeve fixing seats are respectively arranged at both ends of the top of the machine base, and the steel sleeve is fixed on the sleeve fixing seats. One end of the drill connector is rotationally connected with the bearing in the bearing seat, and the other end is fixedly connected with the hollow drill pipe through the flange, and the hollow drill pipe penetrates the steel sleeve and is connected with the drill bit. The utility model can realize rapid drilling in karst karst areas to meet the requirements of prestressed anchor cable construction, and the drilling depth can be adjusted according to actual needs. The utility model is simple in operation, fast in installation, safe and reliable in use, and can effectively improve construction efficiency. , shorten the construction period, and can be used repeatedly, saving construction costs and achieving the purpose of reducing costs and increasing efficiency.
Description
技术领域 technical field
本实用新型涉及一种喀斯特岩溶地区预应力锚索钻孔装置,属于建筑施工技术领域。 The utility model relates to a prestressed anchor cable drilling device in a karst area, which belongs to the technical field of building construction.
背景技术 Background technique
目前,鉴于喀斯特岩溶地区的溶洞、暗河等地质现象普遍,支护桩施工遇超深度、超大直径的溶洞或暗河时施工非常困难。特别是在预应力锚索施工场地周围地下水丰富且工程工期紧的情况下,加之支护桩施工外围全是居民住宅楼,塌孔缩孔以及渗水量等不利因素的存在,进而土体承受的压力大大加大,导致常规的预应力锚索施工技术不能克服喀斯特地质条件下的施工要求。因此,急需设计一种喀斯特岩溶地区预应力锚索钻孔装置来确保预应力锚索施工满足设计和规范要求。 At present, in view of the common geological phenomena such as karst caves and underground rivers in karst karst areas, the construction of support piles is very difficult when encountering ultra-deep and super-large-diameter karst caves or underground rivers. Especially when the groundwater around the prestressed anchor cable construction site is rich and the construction period is tight, and the surrounding area of the support pile construction is full of residential buildings, there are unfavorable factors such as collapse holes, shrinkage holes, and water seepage, and the soil bears The pressure is greatly increased, resulting in the conventional prestressed anchor cable construction technology unable to overcome the construction requirements under karst geological conditions. Therefore, it is urgent to design a prestressed anchor cable drilling device in karst karst areas to ensure that the prestressed anchor cable construction meets the design and specification requirements.
实用新型内容 Utility model content
本实用新型的目的在于:提供结构简单、钻孔快捷、安全可靠,并可周转使用的喀斯特岩溶地区预应力锚索钻孔装置,以克服现有技术的不足。 The purpose of the utility model is to provide a prestressed anchor cable drilling device in karst karst areas with simple structure, fast drilling, safety and reliability, and can be used repeatedly, so as to overcome the deficiencies of the prior art.
本实用新型的技术方案:一种喀斯特岩溶地区预应力锚索钻孔装置,包括机座,在机座顶部两端分别设置有轴承座和套筒固定座,钢套筒固定在套筒固定座上,钻机连接头一端与轴承座内的轴承转动连接,另一端通过法兰与空心钻杆固定连接,空心钻杆穿入钢套筒后与钻头连接。 The technical scheme of the utility model: a prestressed anchor cable drilling device in karst karst areas, including a machine base, bearing seats and sleeve fixing seats are respectively arranged at both ends of the top of the machine base, and the steel sleeve is fixed on the sleeve fixing seats On the one hand, one end of the drill rig connecting head is connected to the bearing in the bearing housing in rotation, and the other end is fixedly connected to the hollow drill pipe through the flange, and the hollow drill pipe is connected to the drill bit after passing through the steel sleeve.
所述钢套筒或空心钻杆的两端分别设置有内螺纹和外螺纹,便于其余钢套筒或空心钻杆的接长连接。 Both ends of the steel sleeve or the hollow drill rod are respectively provided with internal threads and external threads, which facilitates the extension and connection of the remaining steel sleeves or hollow drill rods.
所述钢套筒的长度小于空心钻杆的长度,便于空心钻杆与钻头连接。 The length of the steel sleeve is shorter than that of the hollow drill rod, which facilitates the connection between the hollow drill rod and the drill bit.
所述钻头最大处直径大于钢套筒的直径5mm~8mm,便于钻机移动钢套筒。 The maximum diameter of the drill bit is 5mm-8mm larger than the diameter of the steel sleeve, which is convenient for the drilling rig to move the steel sleeve.
与现有技术相比,本实用新型的优点在于:本实用新型可在喀斯特岩溶地区实现快速钻孔,以满足预应力锚索施工的要求,而且钻孔深度可以根据实际需要进行调整,操作简单、安装快捷、使用安全可靠,还能有效提高施工效率,缩短工期,而且能周转使用,节约施工成本,达到降本增效的目的。 Compared with the prior art, the utility model has the advantages that: the utility model can realize rapid drilling in karst karst areas to meet the requirements of prestressed anchor cable construction, and the drilling depth can be adjusted according to actual needs, and the operation is simple , Fast installation, safe and reliable use, can also effectively improve construction efficiency, shorten the construction period, and can be used repeatedly, saving construction costs, and achieving the purpose of reducing costs and increasing efficiency.
附图说明 Description of drawings
图1为本实用新型的结构示意图; Fig. 1 is the structural representation of the utility model;
图2为本实用新型中空心钻杆的结构示意图; Fig. 2 is the structural representation of hollow drill rod of the present utility model;
图3为本实用新型中钢套筒的结构示意图。 Fig. 3 is a structural schematic diagram of a steel sleeve in the utility model.
附图标记说明:1-机座,2-轴承座,3-套筒固定座,4-钻机连接头,5-法兰,6-空心钻杆,7-钢套筒,8-钻头。 Explanation of reference numerals: 1-machine base, 2-bearing housing, 3-sleeve fixing seat, 4-drilling rig connector, 5-flange, 6-hollow drill pipe, 7-steel sleeve, 8-drill bit.
具体实施方式 detailed description
为了使本实用新型目的、技术方案和优点更加清楚,下面结合附图和实施例对本实用新型作进一步的详细说明。 In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.
本实用新型的实施例:喀斯特岩溶地区预应力锚索钻孔装置的结构示意图如图1所示,包括机座1,在机座1顶部两端分别设置有轴承座2和套筒固定座3,钢套筒7固定在套筒固定座3上,钻机连接头4一端与轴承座2内的轴承转动连接,另一端通过法兰5与空心钻杆6固定连接,空心钻杆6穿入钢套筒7后与钻头8连接,所述钢套筒7的长度小于空心钻杆6的长度,便于空心钻杆6与钻头8连接,钻头8最大处直径大于钢套筒7的直径5mm~8mm,便于钻机移动钢套筒。参见图2及图3,所述钢套筒7或空心钻杆6的两端分别设置有内螺纹和外螺纹,便于其余钢套筒7或空心钻杆6的接长连接。 Embodiment of the present utility model: the structural diagram of the prestressed anchor cable drilling device in the karst karst area is shown in Figure 1, including a machine base 1, and a bearing seat 2 and a sleeve fixing seat 3 are respectively arranged at both ends of the top of the machine base 1 , the steel sleeve 7 is fixed on the sleeve fixing seat 3, one end of the drill connector 4 is connected to the bearing in the bearing seat 2 for rotation, and the other end is fixedly connected to the hollow drill rod 6 through the flange 5, and the hollow drill rod 6 penetrates into the steel After the sleeve 7 is connected with the drill bit 8, the length of the steel sleeve 7 is less than the length of the hollow drill rod 6, which facilitates the connection between the hollow drill rod 6 and the drill bit 8, and the maximum diameter of the drill bit 8 is 5 mm to 8 mm larger than the diameter of the steel sleeve 7 , to facilitate the drilling rig to move the steel sleeve. Referring to Fig. 2 and Fig. 3, both ends of the steel sleeve 7 or the hollow drill rod 6 are respectively provided with internal threads and external threads, which facilitates the extension and connection of the remaining steel sleeves 7 or hollow drill rods 6 .
在喀斯特岩溶地区采用本实用新型进行预应力锚索施工时,可采用以下步骤实施: When using the utility model to carry out prestressed anchor cable construction in karst karst areas, the following steps can be adopted:
a、锚孔测放,基坑施工边挖边支护,即开挖一层,喷锚一层,支撑施工一层,每层开挖底面位于各层支护结构下500mm,不得一次开挖到底;b、根据锚孔立面图,按设计要求准确放出锚索孔口位置并做出明显的标志;c、将钻机与本实用新型中的钻机连接头4连接;d、为确保锚孔直径,要求实际使用钻头8的直径不得小于设计孔径(150mm)。为确保锚孔深度,要求实际钻孔深度大于设计深度0.5m以上;e、采用一节机构(即一根钢套筒7和一根空心钻杆6)钻孔,空心钻杆6的直径为80mm,钻头8最大处直径为155~158mm,长度2.0m;f、当钻孔≧1.5m时,分别接长钢套筒7和空心钻杆6,再进行下一阶段预应力锚索孔的施工;g、重复上述步骤,直至使预应力锚索孔施工至设计位置;f、钻进过程中对每个孔的地层变化,钻进状态(钻压、钻速)、地下水及一些特殊情况作好现场施工记录;h、锚索施工时必须严格控制钻孔角度,确保孔位、孔斜正确,固机平稳。施工过程中,及时检测孔斜,倾斜度偏差不大于3%,并视钻孔需要,合理采取纠偏措施;i、钻进达到设计深度后,不能立即停钻,要求稳钻1~2min,防止孔底尖灭、达不到设计孔径。钻孔孔壁不得有沉碴及水体粘滞,必须清理干净,在钻孔完成后,使用高压空气(风压0.2~0.4MPa)将孔内岩粉及水体全部清除出孔外,以免降低水泥砂浆与孔壁岩土体的粘结强度,不得采用高压水冲洗。j、锚孔钻造结束后,须经现场监理检验合格后,方可进行下道工序。孔径、孔深检查一般采用设计孔径、钻头和标准钻杆在现场监理旁站的条件下验孔,要求验孔过程中钻头平顺推进,不产生冲击或抖动,钻具验送长度满足设计锚孔深度,退钻要求顺畅,用高压风吹验不存明显飞溅尘碴及水体现象。同时要求复查锚孔孔位、倾角和方位,全部锚孔施工分项工作合格后,即可认为锚孔钻造检验合格。 a. Anchor hole surveying, foundation pit construction is excavated and supported at the same time, that is, one layer is excavated, one layer is sprayed and anchored, and one layer is supported for construction. To the end; b, according to the elevation of the anchor hole, accurately release the position of the anchor cable hole according to the design requirements and make an obvious mark; c, connect the drilling rig with the drilling rig connector 4 in the utility model; d, in order to ensure the anchor hole Diameter, it is required that the diameter of the drill bit 8 actually used shall not be less than the design aperture (150mm). In order to ensure the depth of the anchor hole, the actual drilling depth is required to be greater than the design depth by 0.5m or more; e. A single-section mechanism (that is, a steel sleeve 7 and a hollow drill rod 6) is used to drill holes, and the diameter of the hollow drill rod 6 is 80mm, the maximum diameter of the drill bit 8 is 155-158mm, and the length is 2.0m; f. When the drilling hole is ≧1.5m, connect the long steel sleeve 7 and the hollow drill pipe 6 respectively, and then proceed to the next stage of prestressed anchor cable hole Construction; g. Repeat the above steps until the prestressed anchor cable hole is constructed to the design position; f. During the drilling process, the stratum change of each hole, the drilling status (pressure on the hole, drilling speed), groundwater and some special circumstances Make on-site construction records; h. During anchor cable construction, the drilling angle must be strictly controlled to ensure that the hole position and inclination are correct and the machine is stable. During the construction process, timely detect the inclination of the hole, and the inclination deviation is not more than 3%, and take reasonable corrective measures according to the drilling needs; i. After the drilling reaches the design depth, the drilling cannot be stopped immediately. The bottom of the hole pinches out and cannot reach the designed pore size. There must be no ballast and sticky water on the wall of the drilled hole, and it must be cleaned. After the drilling is completed, use high-pressure air (wind pressure 0.2-0.4MPa) to remove all the rock powder and water in the hole out of the hole, so as not to reduce the cement. The bond strength between the mortar and the rock-soil mass of the hole wall must not be washed with high-pressure water. j. After the anchor hole drilling is completed, the next process can only be carried out after passing the on-site supervision inspection. The hole diameter and hole depth inspection generally adopt the design hole diameter, drill bit and standard drill pipe to inspect the hole under the condition of the on-site supervision station. It is required that the drill bit advances smoothly during the hole inspection process without impact or vibration, and the inspection delivery length of the drilling tool meets the designed anchor hole. Depth, drill back is required to be smooth, and there is no obvious phenomenon of splashing dust and water in the high-pressure wind blowing test. At the same time, it is required to recheck the anchor hole position, inclination and orientation. After all the anchor hole construction sub-items are qualified, the anchor hole drilling inspection can be considered qualified.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620376151.1U CN205605114U (en) | 2016-04-29 | 2016-04-29 | Karst karst area prestressed anchorage cable drilling equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620376151.1U CN205605114U (en) | 2016-04-29 | 2016-04-29 | Karst karst area prestressed anchorage cable drilling equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205605114U true CN205605114U (en) | 2016-09-28 |
Family
ID=56970712
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620376151.1U Expired - Fee Related CN205605114U (en) | 2016-04-29 | 2016-04-29 | Karst karst area prestressed anchorage cable drilling equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205605114U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106812466A (en) * | 2017-01-17 | 2017-06-09 | 武汉工程大学 | Underground mining digging laneway reduction noise method |
| CN110344865A (en) * | 2019-07-18 | 2019-10-18 | 江苏科技大学 | A kind of magnetic principle reinforces anchor pole and its construction method |
| CN113482683A (en) * | 2021-07-14 | 2021-10-08 | 东北大学 | Anchor cable anchoring multistage synergistic stirring lifting guide assembly and working method thereof |
-
2016
- 2016-04-29 CN CN201620376151.1U patent/CN205605114U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106812466A (en) * | 2017-01-17 | 2017-06-09 | 武汉工程大学 | Underground mining digging laneway reduction noise method |
| CN110344865A (en) * | 2019-07-18 | 2019-10-18 | 江苏科技大学 | A kind of magnetic principle reinforces anchor pole and its construction method |
| CN110344865B (en) * | 2019-07-18 | 2020-11-24 | 江苏科技大学 | A kind of magnetic principle reinforcement bolt and its construction method |
| CN113482683A (en) * | 2021-07-14 | 2021-10-08 | 东北大学 | Anchor cable anchoring multistage synergistic stirring lifting guide assembly and working method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102121395B (en) | An integrated method for comprehensive management of low-permeability single coal seam gas | |
| CN106759449B (en) | A rock-socketed single pile foundation for seabed offshore wind turbines and its construction method | |
| CN102953364B (en) | Multilayer blade-typed multipoint displacement metre anchor head used for soft soil layer | |
| CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
| CN109024719B (en) | A method of rectifying the inclination of buildings with pile side disturbance and resistance reduction | |
| CN113338356B (en) | Anti-floating anchor rod construction structure and construction method thereof | |
| CN108166486A (en) | Deep layer buried tube type prefabrication type energy pile pile and its construction technology | |
| CN110645033A (en) | Device and method for deep grouting in sandy cobble stratum shield construction tunnel | |
| CN115852954A (en) | Anti-floating anchor rod structure of existing building and construction method | |
| CN220868198U (en) | An underwater anchor cable construction device | |
| CN108570982A (en) | The quiet brill of one kind taking root in energy stake and its construction method | |
| CN112813989A (en) | Anchor cable supporting structure for foundation pit and construction method | |
| CN110206032A (en) | A New Method of Vibrating Pile Driving | |
| CN2466348Y (en) | Fine diameter rigid external valve one-way segmented grouting device | |
| CN207761667U (en) | A kind of supporting construction for tunnel reconstruction and extension project | |
| CN220079996U (en) | Rotary expansion type anti-floating anchor rod structure | |
| CN103711130B (en) | Portal frame type bamboo joint mortar pile enclosure structure and construction method thereof | |
| CN107143335A (en) | The guide hole construction method of ultra-deep shaft | |
| CN109322624B (en) | Anchoring hole bottom reaming device | |
| CN115030170B (en) | Hole collapse backfill construction method and backfill auxiliary device for bored pile | |
| CN206092024U (en) | Pipe -shed advance support structure in barrel section | |
| CN204139162U (en) | Concrete tubular pile pile splicing structure | |
| CN210341918U (en) | A new type of vibratory pile driving device | |
| CN110005367B (en) | Drilling hole sealing device | |
| CN108444121B (en) | Construction method of heat exchange system of cast-in-place energy pile based on post-drilling deep-buried pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160928 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |