CN208486886U - A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function - Google Patents

A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function Download PDF

Info

Publication number
CN208486886U
CN208486886U CN201820551311.0U CN201820551311U CN208486886U CN 208486886 U CN208486886 U CN 208486886U CN 201820551311 U CN201820551311 U CN 201820551311U CN 208486886 U CN208486886 U CN 208486886U
Authority
CN
China
Prior art keywords
rack
pedestal
railway tunnel
existing railway
fast assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820551311.0U
Other languages
Chinese (zh)
Inventor
刘改英
王延林
江世民
周通
程明杰
朱培富
戴阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201820551311.0U priority Critical patent/CN208486886U/en
Application granted granted Critical
Publication of CN208486886U publication Critical patent/CN208486886U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function, including pedestal, the pedestal is equipped with rail wheel, is detachably provided with rack on the pedestal, and the Its lower side is provided with that anti-transverse direction topples supporting leg and anti-longitudinal direction is toppled rope.The rack is convenient for disassembly and assembly, safety coefficient is high, strong applicability, has been greatly improved existing railway tunnel defect treatment construction working efficiency, has reduced construction safety risk.

Description

A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function
Technical field
The utility model relates to construction railroad constructing tunnel rack technical fields, more particularly to one kind to have fast assembling-disassembling function The existing railway tunnel defect treatment construction rack of energy.
Background technique
In recent years, development is very fast at home for railway tunnel, but horizontal by current geology exploration technique and construction technology The reason of, constructing tunnel quality is unable to absolute guarantee, so domestic all Multiple tunnels occur in various degree after starting operation Defect.It is well known that both wired construction external interference factor is larger, construction risk is higher, the construction efficiency requirement to scene Operation platform higher, that traditional existing railway tunnel in-cavity construction uses, it is cumbersome to set up process, heavier mass, security risk compared with It is high.In order to meet the requirements of existing railway tunnel defect renovation, traditional work rack disadvantages mentioned above is overcome, using new Profile material, configuration associated safety take precautions against component, a kind of existing railway tunnel defect with fast assembling-disassembling function of researching and designing Treatment construction rack.
Utility model content
The purpose of utility model be intended to provide it is a kind of it is convenient for disassembly and assembly, safety coefficient is high, strong applicability, be greatly improved both There is railway tunnel defect treatment construction working efficiency, reduces the railway tunnel defect treatment construction rack of construction safety risk.
In order to reach the purpose, utility model is adopted the following technical scheme that
A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function, it is characterised in that: the bottom of including Seat, the pedestal are equipped with rail wheel, are detachably provided with rack on the pedestal, the Its lower side is provided with anti-transverse direction and inclines It covers supporting leg and anti-longitudinal direction is toppled rope.
As a preference, the pedestal is channel steel structure, the rail wheel is symmetrically fixed at the Its lower side.
As a preference, the anti-transverse direction is toppled, supporting leg is the screw structure across the pedestal, and the anti-transverse direction is inclined The quantity for covering supporting leg is four and is symmetrically distributed in the rail wheel two sides.
As a preference, the anti-longitudinal direction is toppled, rope is the rope for connecting rack and ground or track, described anti-vertical It is four to the quantity for the rope that topples and is symmetrically distributed in the anti-transverse direction and topples supporting leg two sides.
As a preference, further including electrostatic prevention structure, the quantity of the electrostatic prevention structure is two and is separately positioned on On the pedestal and the rack.
As a preference, the rack includes the first rack and the second rack, first rack and described second Frame is arranged along the vertical guide rail direction in the bottom plate two sides.
As a preference, first rack and second rack are equipped with Holder for scissors.
As a preference, first rack and second rack are equipped with ladder, the ladder is aluminium alloy Pipe.
As a preference, the rack includes vertical beam and the rack is divided into the horizontal beam of several work layers, The work layer is equipped with job platform.
As a preference, further including anti-slip body, the anti-slip body is arranged in the rail wheel side.
To sum up, compared with prior art, be the advantages of utility model: rack base is the frame structure of channel steel processing, Have the characteristics that firm, stable;Rope cooperation that anti-transverse direction topples supporting leg and anti-longitudinal direction is toppled, ensure that rack in use Safety;It is two aluminium alloy steel pipes that bridging, which reinforces stabilising arrangement, and centre uses rivet interlacement, has good integrity, can The characteristics of quick-assembling;Job platform is made of steel pipe, mesh sheet, and each work layer has one group, it is possible to increase job area and increasing The stability of strong rack.
Detailed description of the invention
Fig. 1 is the longitudinal section of the utility model embodiment;
Fig. 2 is the cross-sectional view of the utility model embodiment;
Fig. 3 is the structural schematic diagram of the utility model embodiment;
Fig. 4 is the structure enlargement diagram of the utility model example embodiment.
Label in figure is as follows:
1. pedestal, 11. rail wheels, 2. racks, 21. first racks, 22. second racks, 23. job platforms, 3. anti-transverse directions Topple supporting leg, and topple rope for 4. anti-longitudinal directions, 5. electrostatic prevention structures, 6. Holder for scissors, 7. ladders, 8. anti-slip bodies.
Specific embodiment
Middle embodiment is described further utility model with reference to the accompanying drawing.
A kind of existing railway tunnel defect treatment construction rack 2 with fast assembling-disassembling function as shown in Figures 1 to 4, Including pedestal 1, pedestal 1 is equipped with rail wheel 11, is detachably provided with rack 2 on pedestal 1, anti-transverse direction is provided on the downside of pedestal 1 It topples supporting leg 3 and anti-longitudinal direction is toppled rope 4.The cooperation of rope 4 that anti-transverse direction topples supporting leg 3 and anti-longitudinal direction is toppled, it is comprehensive to ensure that The safety of rack 2 in use.Pedestal 1 is channel steel structure, and channel steel structure forms rectangular frame, also sets in rectangular frame It is parallel to the reinforcement steel channel beam of track.Rail wheel 11 is symmetrically fixed at 1 downside of pedestal.2 pedestal 1 of rack is channel steel processing Frame structure, have the characteristics that firm, stable.11 side of rail wheel be equipped with anti-slip body 8, anti-slip body 8 be located at rail wheel 11 and It is rubber material between track, has anti-slip effect good, security performance is high, and feature easy to use.
The anti-transverse direction supporting leg 3 that topples is screw structure across pedestal 1, and the topple quantity of supporting leg 3 of anti-transverse direction is four and right Title is distributed in 11 two sides of rail wheel.Topple the rope that rope 4 is connection rack 2 and ground or track for anti-longitudinal direction, and anti-longitudinal direction is toppled The quantity of rope 4 is four and is symmetrically distributed in anti-transverse direction and topples 3 two sides of supporting leg.The anti-transverse direction supporting leg 3 that topples topples with anti-longitudinal direction Rope 4 is quickly and expediently installed.
It further include electrostatic prevention structure 5, the quantity of electrostatic prevention structure 5 is two and is separately positioned on pedestal 1 and rack 2. Electrostatic prevention structure 5 is copper core material, each one upper and lower, has conductive effect at unified entirety with pedestal 1 and rack 2 respectively It is good, and feature easy to use.
Rack 2 includes the first rack 21 and the second rack 22, and the first rack 21 and the second rack 22 are along vertical guide rail direction It is arranged in bottom plate two sides.First rack 21 and the second rack 22 are equipped with Holder for scissors 6.Holder for scissors 6 is two aluminium alloys Pipe, centre use rivet interlacement, have good integrity, can quick-assembling the characteristics of.It is set on first rack 21 and the second rack 22 There is ladder 7, ladder 7 is aluminium alloy steel pipe, and the skeleton for being rack 2 is also 7 structure of ladder.Rack 2 include vertical beam and Rack 2 is divided into the horizontal beam of several work layers, work layer is equipped with job platform 23.Job platform 23 is by steel pipe, mesh sheet group At each work layer has a group job platform 23, it is possible to increase job area and the stability for enhancing rack 2.
The overlap joint application method of the platform are as follows: manually pedestal 1 is carried to above rail, pedestal 1 is existed by rail wheel 11 Traveling is to job location above rail;Then four of pedestal 1 anti-slip bodies 8 are put down, is fitted closely with rail top face arc;Again The supporting leg 3 that topples of four anti-transverse directions on pedestal 1 is in place, lower tracks electrostatic prevention structure 5 is connected to track;Then start 4 one end of rope is toppled fixed to rack 2 in assembly to tunnel-liner vault construction in anti-longitudinal direction by assembled 2 main structure of rack Upper-side area, the other end are fixed on ground or guide rail, then install electrostatic prevention structure 5;Finally the first and second racks are used Holder for scissors 6 reinforces stabilising arrangement connection in place.It is about 20 minutes that operation platform, which entirely sets up the time,.
Described above is only the explanation to utility model, so that those of ordinary skill in the art's can completely implements we Case, but be not the limitation to utility model, those skilled in the art are can according to need after reading this specification to this Embodiment makes the modification of not creative contribution, these are all without creative modification, but as long as in utility model All by the protection of Patent Law in scope of the claims.

Claims (10)

1. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function, it is characterised in that: including pedestal (1), the pedestal (1) is equipped with rail wheel (11), is detachably provided with rack (2) on the pedestal (1), the pedestal (1) Downside is provided with that anti-transverse direction topples supporting leg (3) and rope (4) are toppled in anti-longitudinal direction.
2. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by: the pedestal (1) is channel steel structure, the rail wheel (11) is symmetrically fixed on the downside of the pedestal (1).
3. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by: the anti-transverse direction is toppled, supporting leg (3) are the screw structure across the pedestal (1), and the anti-transverse direction is toppled branch The quantity of leg (3) is four and is symmetrically distributed in the rail wheel (11) two sides.
4. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by: the anti-longitudinal direction is toppled, rope (4) is the rope for connecting rack (2) and ground or track, and the anti-longitudinal direction is inclined The quantity for covering rope (4) is four and is symmetrically distributed in the anti-transverse direction and topples supporting leg (3) two sides.
5. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by also including electrostatic prevention structure (5), the quantity of the electrostatic prevention structure (5) is two and is separately positioned on described On pedestal (1) and the rack (2).
6. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by: the rack (2) includes the first rack (21) and the second rack (22), first rack (21) and described the Two racks (22) are arranged along vertical rail direction in the pedestal (1) two sides.
7. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 6, It is characterized by: first rack (21) and second rack (22) are equipped with Holder for scissors (6).
8. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 6, It is characterized by: first rack (21) and second rack (22) are equipped with ladder (7), the ladder (7) is aluminium conjunction Golden steel pipe.
9. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by: the rack (2) includes vertical beam and the rack (2) is divided into the horizontal beam of several work layers, it is described Work layer is equipped with job platform (23).
10. a kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function according to claim 1, It is characterized by also including anti-slip body (8), the anti-slip body (8) is arranged in the rail wheel (11) side.
CN201820551311.0U 2018-04-18 2018-04-18 A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function Active CN208486886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820551311.0U CN208486886U (en) 2018-04-18 2018-04-18 A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820551311.0U CN208486886U (en) 2018-04-18 2018-04-18 A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function

Publications (1)

Publication Number Publication Date
CN208486886U true CN208486886U (en) 2019-02-12

Family

ID=65252291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820551311.0U Active CN208486886U (en) 2018-04-18 2018-04-18 A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function

Country Status (1)

Country Link
CN (1) CN208486886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096453A (en) * 2020-09-27 2020-12-18 随州隧治实业有限公司 Construction process for longitudinal cutting and dismantling equipment of tunnel secondary lining defect correcting ring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112096453A (en) * 2020-09-27 2020-12-18 随州隧治实业有限公司 Construction process for longitudinal cutting and dismantling equipment of tunnel secondary lining defect correcting ring

Similar Documents

Publication Publication Date Title
CN109383716B (en) Drilling platform safety device against wind for ocean engineering
CN203923882U (en) One-sided dorsal funciculus steel work cable stayed bridge
CN206529701U (en) Traversing deviation correcting device during steel truss girder pushing tow
CN208486886U (en) A kind of existing railway tunnel defect treatment construction rack with fast assembling-disassembling function
CN206307232U (en) A kind of supporting construction for watercraft engine room
CN202705924U (en) Assembling platform arranged in the middle of bridge span
CN204081970U (en) The windproof gate of a kind of transformer station
CN104631719A (en) Prefabricated reinforced concrete shockproof stair and construction method
CN206436858U (en) A kind of railway contact line strut replacing transition equipment
CN108252218A (en) A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device
CN206784865U (en) A kind of detachable adjustable for height subway tunnel section construction operation platform
CN203111203U (en) Mining vehicle baffling device for mine
CN206917597U (en) A kind of contact net power equipment maintaining step ladder
CN215444056U (en) Long-distance air-propelled station-crossing shield tunneling machine bracket
CN204677214U (en) First Zhi Lianti bis-serves as a contrast the device of free-standing tunnel transporting material
CN207538439U (en) A kind of stable type operating platform
CN205296892U (en) A merogenesis stair and up -downgoing passageway for deep foundation pit construction is current from top to bottom
CN103350706A (en) Mine car masking device
CN211647597U (en) Municipal construction rail guard
CN212250138U (en) Construction operation vehicle in railway tunnel
CN207538080U (en) One kind is laid with for subway station inside wall waterproof, reinforcing steel bar-binding bench vehicle
CN208201606U (en) Monoblock type bicycle occupation bridge structure
CN208472469U (en) A kind of pre-buried steel-rail structure of suspension type monorail traffic
CN202787923U (en) Movable scaffold
CN206359842U (en) Room formula access bridge and combinations thereof formula viaduct