CN206529701U - Traversing deviation correcting device during steel truss girder pushing tow - Google Patents

Traversing deviation correcting device during steel truss girder pushing tow Download PDF

Info

Publication number
CN206529701U
CN206529701U CN201720090451.8U CN201720090451U CN206529701U CN 206529701 U CN206529701 U CN 206529701U CN 201720090451 U CN201720090451 U CN 201720090451U CN 206529701 U CN206529701 U CN 206529701U
Authority
CN
China
Prior art keywords
block
steel truss
truss girder
device during
correcting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720090451.8U
Other languages
Chinese (zh)
Inventor
何玉珠
曹久慧
韩海儒
张勇
毛伟
李豪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Original Assignee
CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd, CCCC THIRD HARBOR ENGINEERING Co Ltd NANJING BRANCH filed Critical CHINA COMMUNICATIONS THIRD NAVIGATIONAL BUREAU 2ND ENGINEERING Co Ltd
Priority to CN201720090451.8U priority Critical patent/CN206529701U/en
Application granted granted Critical
Publication of CN206529701U publication Critical patent/CN206529701U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种钢桁梁顶推过程中的横移纠偏装置,包括滑块、固定块以及限位器,所述滑块包括两个长方形的承重体,两个承重块之间设有三块隔板,所述承重体包括上垫块、下垫块以及两侧立块,所述立块外侧设有钢绞线孔,所述上垫块上方连接夹心橡胶板,下垫块下方设有MEG板,MEG板外侧设有限位块,所述限位块的下边缘高度低于MEG板的下平面高度,所述限位器为两个千斤顶,所述两个千斤顶设置在固定块上,两个千斤顶的顶头分别顶住两个下垫块的外侧面,本实用新型设计合理,结构简洁,具有两侧同步、单侧单动、单点单动及点动限位功能,效果好,使用寿命长。

The utility model discloses a lateral movement correction device in the pushing process of a steel truss girder, which comprises a sliding block, a fixing block and a limiter. The sliding block includes two rectangular load-bearing bodies, and a There are three partitions, and the load-bearing body includes an upper block, a lower block and vertical blocks on both sides. Steel strand holes are provided on the outside of the vertical block. A sandwich rubber plate is connected above the upper block, and a A MEG board is provided, and a limiting block is arranged on the outside of the MEG board. The height of the lower edge of the limiting block is lower than the height of the lower plane of the MEG board. The limiting device is two jacks, and the two jacks are arranged on the fixed block. On the top, the tops of the two jacks bear against the outer sides of the two lower pads respectively. The utility model has reasonable design, simple structure, and has the functions of synchronization on both sides, single-side single-action, single-point single-action and jog limit. Well, long life.

Description

钢桁梁顶推过程中的横移纠偏装置The lateral movement correction device in the process of steel truss girder pushing

技术领域technical field

本实用新型属于桥梁施工设备领域。具体涉及钢桁梁顶推过程中的横移纠偏装置。The utility model belongs to the field of bridge construction equipment. In particular, it relates to a lateral movement correction device in the pushing process of steel truss girders.

背景技术Background technique

在桥梁建设过程中,有时采用多点顶推架设法架设钢桁梁由前一墩向后一墩方向顶推架设,利用大型履带吊在拼装平台上拼装钢桁梁,将整个钢桁梁全部拼装完成后,整体向后一墩方向拖拉,直至钢梁就位,由于钢桁梁跨度大,在应力、温差等作用下易产生较大的位移,需要不断的调整位置,现有的装置结构复杂,长期使用后,接触面摩擦系数降低,影响偏斜纠正的效果,施工质量难以控制。In the process of bridge construction, sometimes a multi-point jacking frame is used to try to erect the steel truss girder from the front pier to the rear pier, and the steel truss girder is assembled on the assembly platform by using a large crawler crane. After the assembly is completed, the whole is dragged toward the rear pier until the steel girder is in place. Due to the large span of the steel truss girder, it is easy to produce a large displacement under the action of stress and temperature difference, which requires constant adjustment of the position. The existing device structure Complicated, after long-term use, the friction coefficient of the contact surface decreases, which affects the effect of deflection correction, and the construction quality is difficult to control.

发明内容Contents of the invention

为解决上述问题,本实用新型公开了钢桁梁顶推过程中的横移纠偏装置,设计合理,结构简洁,具有两侧同步、单侧单动、单点单动及点动限位功能,效果好,使用寿命长。In order to solve the above problems, the utility model discloses a lateral movement correction device in the pushing process of the steel truss girder, which has a reasonable design, a simple structure, and has the functions of synchronous on both sides, single-action on one side, single-point single-action and jog limit functions. Good effect and long service life.

为达到上述目的,本实用新型的技术方案如下:In order to achieve the above object, the technical scheme of the utility model is as follows:

钢桁梁顶推过程中的横移纠偏装置,其特征在于:包括滑块、固定块以及限位器,所述滑块包括两个长方形的承重体,两个承重块之间设有三块隔板,所述承重体包括上垫块、下垫块以及两侧立块,所述立块外侧设有钢绞线孔,所述上垫块上方连接夹心橡胶板,下垫块下方设有MEG板,MEG板外侧设有限位块,所述限位块的下边缘高度低于MEG板的下平面高度,所述限位器为两个千斤顶,所述两个千斤顶设置在固定块上,两个千斤顶的顶头分别顶住两个下垫块的外侧面。The lateral movement correction device during the pushing process of the steel truss girder is characterized in that it includes a slider, a fixed block and a stopper. The slider includes two rectangular load-bearing bodies, and three spacers are arranged between the two load-bearing blocks. The load-bearing body includes an upper block, a lower block, and vertical blocks on both sides. Steel strand holes are provided on the outside of the vertical block. A sandwich rubber plate is connected above the upper block, and MEG is provided under the lower block. plate, the outer side of the MEG board is provided with a limit block, the height of the lower edge of the limit block is lower than the height of the lower plane of the MEG plate, the limiter is two jacks, and the two jacks are arranged on the fixed block. The tops of the two jacks bear against the outer sides of the two lower pads respectively.

作为本实用新型的一种改进,所述承重体内部设有加强筋。As an improvement of the utility model, reinforcing ribs are provided inside the load-bearing body.

作为本实用新型的一种改进,所述下垫块宽度大于上垫块宽度。As an improvement of the utility model, the width of the lower pad is greater than that of the upper pad.

作为本实用新型的一种改进,所述限位块为方块。As an improvement of the utility model, the limiting block is a block.

作为本实用新型的一种改进,所述千斤顶的顶头为平面型。As an improvement of the utility model, the plug of the jack is planar.

作为本实用新型的一种改进,所述夹心橡胶板的厚度为30mm。As an improvement of the utility model, the thickness of the sandwich rubber plate is 30mm.

本实用新型的有益效果是:The beneficial effects of the utility model are:

本实用新型所述的钢桁梁顶推过程中的横移纠偏装置,利用MEG滑块以减小摩擦系数,用限位板将滑块在滑道梁上限位,千斤顶设置在临时支架滑道梁上,在顶推过程中对钢桁梁构件纠偏,设计合理,结构简洁,具有两侧同步、单侧单动、单点单动及点动限位功能,纠偏效果好,使用寿命长。The lateral movement correction device in the pushing process of the steel truss girder described in the utility model uses the MEG slider to reduce the friction coefficient, uses the limit plate to position the slider on the upper limit of the slideway beam, and sets the jack on the temporary support slideway On the beam, the deflection correction of the steel truss girder members during the pushing process is reasonable in design and simple in structure. It has the functions of synchronous on both sides, single-side single-action, single-point single-action and jog limit functions. The deviation correction effect is good and the service life is long.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型的俯视图。Fig. 2 is a top view of the utility model.

附图标记列表:List of reference signs:

1、滑块,2、固定块,3、限位器,4、隔板,5、上垫块,6、下垫块,7、立块,8、夹心橡胶板,9、MEG板,10、限位块,11、千斤顶的顶头,12、加强筋,13、滑道梁。1. Slider, 2. Fixed block, 3. Limiter, 4. Partition plate, 5. Upper block, 6. Lower block, 7. Upright block, 8. Sandwich rubber plate, 9. MEG plate, 10 , limit block, 11, the top of the jack, 12, reinforcing ribs, 13, slideway beam.

具体实施方式detailed description

下面结合附图和具体实施方式,进一步阐明本实用新型,应理解下述具体实施方式仅用于说明本实用新型而不用于限制本实用新型的范围。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。The utility model will be further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the utility model and are not intended to limit the scope of the utility model. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to the directions in the drawings, and the words "inner" and "outer ” refer to directions towards or away from the geometric center of a particular part, respectively.

如图所示,本实用新型所述的钢桁梁顶推过程中的横移纠偏装置,包括滑块1、固定块2以及限位器3,所述滑块包括两个长方形的承重体,两个承重块之间设有三块隔板4,所述承重体包括上垫块5、下垫块6以及两侧立块7,立块7外侧设有钢绞线孔,所述上垫块5上方连接30mm厚的夹心橡胶板8,下垫块6下方设有MEG板9,MEG板外侧设有限位块10,所述限位块的下边缘高度低于MEG板的下平面高度,所述下垫块6宽度大于上垫块5宽度,所述限位器3为两个千斤顶,所述两个千斤顶设置在固定块上,两个千斤顶的顶头11分别顶住两个下垫块6的外侧面。As shown in the figure, the lateral movement correction device in the pushing process of the steel truss girder described in the utility model includes a slider 1, a fixed block 2 and a limiter 3, and the slider includes two rectangular load-bearing bodies, Three partitions 4 are arranged between the two load-bearing blocks, and the load-bearing body includes an upper pad 5, a lower pad 6, and two side vertical blocks 7, and steel strand holes are provided on the outside of the vertical block 7, and the upper pad 5, a sandwich rubber plate 8 with a thickness of 30 mm is connected to the top, and a MEG plate 9 is provided under the lower pad 6, and a limit block 10 is provided on the outside of the MEG plate, and the height of the lower edge of the limit block is lower than the height of the lower plane of the MEG plate. The width of the lower cushion block 6 is greater than that of the upper cushion block 5. The stopper 3 is two jacks, and the two jacks are arranged on the fixed block. of the outer side.

本实用新型所述的钢桁梁顶推过程中的横移纠偏装置,滑块1安装在滑道梁13上,滑块1上表面与钢梁节点底板接触,支撑钢梁的全部重量,在上垫块5上方连接夹心橡胶板8,缓冲压力,立块7外侧的钢绞线孔连接钢绞线,滑块下方安装有MGE板9,与滑道梁13接触,由于MGE板9具有刚性强、动摩擦系数小等特点,因此应用于钢梁拼装与滑道支撑产生相对位移的滑块底部,当水平顶施加水平力向前做功,因滑块底部摩擦系数小,水平力克服摩擦力向前移动,达到钢梁位移的功能,滑块长约1.1米宽1.2米,滑块之间设3块隔板4,立块7高约0.88米,钢梁重力通过立块7传至滑块继而传至滑道梁上,滑块1预留穿钢绞线孔,滑块1支撑在钢桁梁的节点处,随着钢桁梁的移动而移动,利用限位块10将滑块在滑道梁13上限位,所述固定块2一头焊接在临时支架滑道梁13上,另一头连接千斤顶,利用横向纠偏千斤顶在顶推过程中对钢桁梁构件纠偏,本实用新型设计合理,结构简洁,具有两侧同步、单侧单动、单点单动及点动限位功能,纠偏效果好,使用寿命长。In the lateral movement correction device in the pushing process of the steel truss girder described in the utility model, the slider 1 is installed on the slideway beam 13, and the upper surface of the slider 1 is in contact with the bottom plate of the steel beam node to support the entire weight of the steel beam. The upper part of the upper block 5 is connected with a sandwich rubber plate 8 to buffer the pressure. The steel strand hole on the outer side of the vertical block 7 is connected with the steel strand. The MGE plate 9 is installed under the slider, which is in contact with the slideway beam 13. Since the MGE plate 9 has a rigid Strong and small dynamic friction coefficient, etc., so it is applied to the bottom of the slider where the steel beam assembly and the slideway support produce relative displacement. When the horizontal force is applied to the horizontal top to do work forward, because the friction coefficient at the bottom of the slider is small, the horizontal force overcomes the friction force to Move forward to achieve the function of steel beam displacement. The slider is about 1.1 meters long and 1.2 meters wide. There are 3 partitions 4 between the sliders. The height of the vertical block 7 is about 0.88 meters. The gravity of the steel beam is transmitted to the slider through the vertical block 7 Then it is transmitted to the slideway beam. The slider 1 reserves a hole for passing through the steel strand. The slider 1 is supported at the node of the steel truss beam and moves with the movement of the steel truss beam. The upper limit of the slideway beam 13, one end of the fixed block 2 is welded on the temporary support slideway beam 13, and the other end is connected to a jack, and the horizontal deviation correction jack is used to correct the deviation of the steel truss beam member during the pushing process. The utility model has a reasonable design, The structure is simple, with two-side synchronization, one-side single-action, single-point single-action and jog limit functions, good deviation correction effect and long service life.

本实用新型所述承重体内部设有加强筋12,增加强度。The inside of the load-bearing body of the utility model is provided with reinforcing ribs 12 to increase the strength.

本实用新型所述限位块10为方块,能够更好的限位。The limiting block 10 of the utility model is a block, which can better limit the position.

本实用新型所述千斤顶的顶头11为平面型,最大接触面积,提高纠偏效果。The jack head 11 of the jack described in the utility model is planar, has the largest contact area, and improves the deviation-correcting effect.

本实用新型所述隔板4为工字钢,连接稳固。The dividing plate 4 described in the utility model is an I-beam, and the connection is firm.

本实用新型方案所公开的技术手段不仅限于上述实施方式所公开的技术手段,还包括由以上技术特征任意组合所组成的技术方案。The technical means disclosed in the solution of the utility model are not limited to the technical means disclosed in the above embodiments, but also include technical solutions composed of any combination of the above technical features.

Claims (6)

1. the traversing deviation correcting device during steel truss girder pushing tow, it is characterised in that:Including sliding block, fixed block and limiter, institute Stating sliding block is included provided with three pieces of dividing plates between two rectangular weight bodies, two bearing blocks, the weight body include upper cushion block, The sandwich rubber slab of connection, underlay above steel strand wires hole, the upper cushion block are provided with the outside of lower cushion block and two edge-on pieces, the vertical block Block lower section, which is provided with the outside of MEG plates, MEG plates, is provided with limited block, and the lower edge of the limited block is highly less than the lower plane height of MEG plates Degree, the limiter is two jack, and described two jack are arranged on fixed block, and the top of two jack is pushed up respectively The firmly lateral surface of two lower cushion blocks.
2. the traversing deviation correcting device during steel truss girder pushing tow according to claim 1, it is characterised in that:The weight body Inside is provided with reinforcement.
3. the traversing deviation correcting device during steel truss girder pushing tow according to claim 1, it is characterised in that:The lower cushion block Width is more than upper cushion block width.
4. the traversing deviation correcting device during steel truss girder pushing tow according to claim 1, it is characterised in that:The limited block For square.
5. the traversing deviation correcting device during steel truss girder pushing tow according to claim 1, it is characterised in that:The jack Top be plane.
6. the traversing deviation correcting device during steel truss girder pushing tow according to claim 1, it is characterised in that:The sandwich rubber The thickness of offset plate is 30mm.
CN201720090451.8U 2017-01-24 2017-01-24 Traversing deviation correcting device during steel truss girder pushing tow Expired - Fee Related CN206529701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720090451.8U CN206529701U (en) 2017-01-24 2017-01-24 Traversing deviation correcting device during steel truss girder pushing tow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720090451.8U CN206529701U (en) 2017-01-24 2017-01-24 Traversing deviation correcting device during steel truss girder pushing tow

Publications (1)

Publication Number Publication Date
CN206529701U true CN206529701U (en) 2017-09-29

Family

ID=59917477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720090451.8U Expired - Fee Related CN206529701U (en) 2017-01-24 2017-01-24 Traversing deviation correcting device during steel truss girder pushing tow

Country Status (1)

Country Link
CN (1) CN206529701U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035259A (en) * 2017-12-11 2018-05-15 山东大学 Unidirectional full cantilever steel truss arched bridge deviation correcting device and its application method
CN110241729A (en) * 2019-05-16 2019-09-17 中铁七局集团有限公司 A kind of broad box girder pushing tow synchronisation control means
CN111188274A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder moving and transporting system of large-span steel-concrete composite bridge and construction method
CN112482243A (en) * 2020-12-08 2021-03-12 山东潍莱高速铁路有限公司 Large cantilever steel truss transverse dragging construction fabricated deviation rectifying device and construction method
CN113123250A (en) * 2021-05-10 2021-07-16 南通帆森能源科技有限公司 Precise assembling and adjusting device for steel truss girder and assembling construction method
CN113322832A (en) * 2021-07-13 2021-08-31 广西北投公路建设投资集团有限公司 Bridge incremental launching construction technology

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035259A (en) * 2017-12-11 2018-05-15 山东大学 Unidirectional full cantilever steel truss arched bridge deviation correcting device and its application method
CN110241729A (en) * 2019-05-16 2019-09-17 中铁七局集团有限公司 A kind of broad box girder pushing tow synchronisation control means
CN111188274A (en) * 2019-12-31 2020-05-22 湖北省路桥集团有限公司 Large-section steel truss girder moving and transporting system of large-span steel-concrete composite bridge and construction method
CN112482243A (en) * 2020-12-08 2021-03-12 山东潍莱高速铁路有限公司 Large cantilever steel truss transverse dragging construction fabricated deviation rectifying device and construction method
CN112482243B (en) * 2020-12-08 2022-10-25 山东潍莱高速铁路有限公司 Large cantilever steel truss transverse dragging construction fabricated deviation rectifying device and construction method
CN113123250A (en) * 2021-05-10 2021-07-16 南通帆森能源科技有限公司 Precise assembling and adjusting device for steel truss girder and assembling construction method
CN113322832A (en) * 2021-07-13 2021-08-31 广西北投公路建设投资集团有限公司 Bridge incremental launching construction technology

Similar Documents

Publication Publication Date Title
CN206529701U (en) Traversing deviation correcting device during steel truss girder pushing tow
CN201183929Y (en) Girder bridge main beam longitudinal spacing structure
CN204266134U (en) Heavy duty longspan steel truss girder walking type pushing device
CN105839516B (en) A kind of bridge lateral anti-fall girder apparatus and its construction method
CN102619174B (en) Large-span continuous steel truss girder arch pushing device
CN210066516U (en) A deviation correction device used for controlling the line shape in the process of pushing the steel truss girder
CN204738229U (en) Two bearing plate cable -stay bridge cable wire tower steel anchor case anchor structures
CN105544863A (en) Super high rise steel structure building outrigger truss delay connection node and construction method
CN201436332U (en) Bolted steel plate shear wall with seams in the middle
CN103273567B (en) A movable steel pedestal with an adjustable jack and its construction method
CN101967862B (en) Middle-bolted slit steel plate shear wall and processing and manufacturing method thereof
CN103835400B (en) A kind of pre-stressed steel plate shear wall
CN107227820A (en) A kind of replaceable steel truss high spin system superimposed sheet composite coupling beams
CN208136711U (en) It is a kind of suitable for steel bridge or the anti-pulling support of steel reinforced concrete composite beam bridge
CN104963410B (en) Beam column of steel structure is slidably connected node
CN105442750A (en) Steel girder and mounting method
CN208309811U (en) A kind of connecting node of the replaceable active beam link of accentric support steel construction
CN204781928U (en) Bracket face contact supporting box roof beam that jacking die carrier was used
CN205116431U (en) Eccentric connection structure who aligns of beam column
CN104878856B (en) The laminated steel plate coupling beam and its construction method being placed in building structure between shear wall
CN202164729U (en) Knee brace structure between beams of different heights
CN202450773U (en) Oblique large formwork for steel reinforced concrete structure
CN203475695U (en) Steel structure supporting beam
CN201406839Y (en) Retractable and limitable sliding carriage
CN207812310U (en) A kind of flexible suspension structure applied on hanging beam after mobile formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929